ML17228B221

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for June 1995 for St Lucie Units 1 & 2.W/950711 Ltr
ML17228B221
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/30/1995
From: Rogers J, Sager F
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-203, NUDOCS 9507190341
Download: ML17228B221 (12)


Text

PRIORITY 1 (ACCELERATED RZDS PROCESSING)

~~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSXON NBR: 9507190341 DOC. DATE: 95/06/30 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 p 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION ROGERS,J.A. Florida Power & Light Co. R SAGER,F.A. Florida Power & Light Co.

RECIP.NAME RECXPXENT AFFILIATION

SUBJECT:

Monthly operating repts for June 1995 for St Lucie Units 1 2.W/950711 ltr. &

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

J ENCL L SIZE:

NOTES RECXPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 NORRIS,J 1 1 INTERNAL: CR 10 10 AEOD/SPD/RRAB 1 1 ILE CEN 01 1 1 NRR/DISP/PIPB 1 1 NRR DOPS/OECB 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

NOTE,TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DS (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

P.

4

P.O. Box 128, Ft; Pierce, FL 34954-0129 L-95-203 10 CFR 50.36 July 11, 1995 U. S ~ Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, attached are the June, 1995, Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us.

Very truly yours, D. A. ger Vice r sident St. uc'e Plant DAS/PTQ cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Attachments

/u '4 0Q~8 950719034i 950630 PDR R

ADOCK 05000335 P(pg PDR an FPL Group company

0 j \

V

DOCKET NO.: 50-335 UNIT: St. Lucie I1 DATE: July 10, 1995 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 468-4157 REPORT MONTH Unit 1 operated at essentially 100 percent power for the entire month. However, on June 11 the unit downpowered to approximately 40: to remove a battery cell. The unit returned to full power by the next day.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-335 UNIT: St. Lucie 81 DATE July 6, 1995 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 468-4157 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 6/01/95 840 6/02/95 839 6/03/95 838 6/04/95 838 6/05/95 844 6/06/95 851 6/07/95 854 6/08/95 852 6/09/95 847 6/10/95 837 6/11/95 685 6/12/95 782 6/13/95 843 6/14/95 841 6/15/95 839 6/16/95 837 6/17/95 836 6/18/95 836 6/19/95 835 6/20/95 838 6/21/95 839 6/22/95 838 6/23/95 838 6/24/95 836 6/25/95 839 6/26/95 839 6/27/95 834 6/28/95 831 6/29/95 827 6/30/95 827

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 7/ 6/95 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: JUNE 1995
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. HAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASOHS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 4343 162383.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4123.6 127447.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 205.3
14. HOURS GENERATOR OH-LINE 720.0 4116.2 126073.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1929847 11056159 326789900
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 631260 3656390 107806400
18. NET ELECTRICAL ENERGY GENERATED (MWH) 598998 3468634 101905537
19. UNIT SERVICE FACTOR 100.0 94.8 77.6
20. UNIT AVAILABILITYFACTOR 100.0 94.8 77.7
21. CAPACITY FACTOR (USING MDC NET) 99.2 95.2 77.0
22. CAPACITY FACTOR (USING DER NET) 100.2 96.2 76.4
23. UNIT FORCED OUTAGE RATE 0.0 0.0 3.8
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MOHTHS :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

~

UNIT SHVI'DOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT 1 DATE: July 7, 1995 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 468-4157 IN!PORT MDNTH No. Date TYpe'uration (Hours)

Reasons Method of Shutting Reactor'icenseeEvent Report System Code4 Code'ause Component & Corrective Action to Down ¹ Prevent Recurrence Unit 1 operated at full power for the entire month.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry 8 - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain) 09l sar FPL

DOCKET NO.: 50-389 UNIT: St. Lucie N2 DATE: July 10, 1995 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 468-4157 REPORT MONTH Unit 2 operated at essentially 100 percent power for the month.

The unit downpowered to 65'. on June 15 for a cleaning of all waterboxes with the unit returning to full power on June 17.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-389 UNIT: St. Lucie 52 DATE: July 6, 1995 COMPLETED BY: J.A ROGERS TELEPHONE: (407) 468-4157 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 6/01/95 817 6/02/95 816 6/03/95 814 6/04/95 813 6/05/95 821 6/06/95 833 6/07/95 835 6/08/95 833 6/09/95 821 6/10/95 766 6/11/95 733 6/12/95 827 6/13/95 832 6/14/95 828 6/15/95 788 6/16/95 567 6/17/95 777 6/18/95 831 6/19/95 831 6/20/95 832 6/21/95 834 6/22/95 834 6/23/95 832 6/24/95 832 6/25/95 833 6/26/95 834 6/27/95 831 6/28/95 824 6/29/95 823 6/30/95 820

~ OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 7/ 6/95 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS 1 ~ UNIT HAHE: ST. LUCIE UNIT 2

2. REPORTING PERIOD: JUNE 1995
3. LICENSED THERMAL POWER (MWT): 2700
4. HAHEPLATE RATING (GROSS MWE): 850 5 ~ DESIGN ELECTRICAL RATING (NET M'WE): 830
6. HAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPEHDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACIlY RATINGS (ITEMS NUHBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (HET HWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 4343 104280.0 12 'UMBER OF HOURS REACTOR WAS CRITICAL 720.0 4268.4 88536.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LiNE 720.0 4257.1 87124.1
15. UHIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (HWH) 1909188 11377419 226574960
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 616790 3727180 75180890
18. NET ELECTRICAL ENERGY GENERATED (MWH) 583558 3528177 71034057
19. UNIT SERVICE FACTOR 100.0 98.0 83.5
20. UNIT AVAILABILITYFACTOR 100.0 98.0 83.5
21. CAPACITY FACTOR (USING MDC NET) 96.6 96.8 82.1
22. CAPACITY FACTOR (USING DER NET) 97.7 97.9 82.5
23. UNIT FORCED OUTAGE RATE 0.0 2.0 6.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

October 1, 1995 - Refueling and Maintenance Ou'tage

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DAlE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT. 2 DATE: July 7, 1995 COMPLETED BY: J.A.ROGERS'407)

TELEPHONE: 468-4157 REPORT MONTH No. Date Type Duration (Hours)

Reasons Method of Shutting Reactor'icenseeEvent Report System Code4 Code'ause Component 2 Corrective Action to Down Prevent Recurrence 6/15/95 0.0 N/A HF HTEXCH Unit 2 reduced power for waterbox cleaning.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) I - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Liccnsec Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain)