Text

PRIORI%'Y' y(ACCELERATED RIDS PROCESSING)g REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION'BR:9407180266 DOC.DATE: 94/06/30 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION WHITE,C.D. Florida Power & Light Co.

SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for June 1994 for Staint Lucie.

ltr.

W/940713 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) f ENCL 2 SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 10 10 AEOD/DS P/TPAB 1 . 1 OEAB 1 1 NRR/DRI L/RPEB 1 1 EG FILE 01 1 1 RGN2 1 1 EXTERNAL EG&G BRYCE P J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P! -37 (EXT. 504-2083 ) TO ELIM!iPATE YOUR NAME FROM DISTRIBUTIONLISTS I'OR DOCUMEiVTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

e

/

Florida Power 5 Light Company, P.O. Box128, Fort Pierce, FL 34S54-0128 July 13, 1994 L-94-180 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Attached are the June, 1994, Operatic Status and Sumnary of Operating Experience Reports for St. Lucre Units 1 and 2.

Should there be any questions on this information, please contact us.

Very truly yours, D. A. ger Vice r sident St. Lu e Plant DAS/CDW/kw cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Attachments DAS/PSL gll60-94 9407180266 940630 PDR ADOCK 0500033S )zgg$

R PDR I

J an FPL Group company

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50 335 UNIT St. Lucie gl, DATE 7/12/94 COMPLETED BY: Chris D. White TELEPHONE: (407) 468-4248 MONTH June 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 06/01/94 776 06/02/94 777 06/03/94 833 06/04/94 830 06/05/94 817 06/06/94 492 06/07/94 -29 06/08/94 -29 06/09/94 -33 06/10/94 -33 06/11/94 155 06/12/94 531 06/13/94 578 06/14/94 602 06/15/94 766 06/16/94 825 06/17/94 830 06/18/94 833 06/19/94 831 06/20/94 831 06/21/94 826 06/22/94 824 06/23/94 825 06/24/94 824 06/25/94 802 06/26/94 813 06/27/94 852 06/28/94 855 06/29/94 853 06/30/94 855

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 7/12/94 COMPLETED BY C. D. WHITE TELEPHONE 407/468/4248 OPERATING STATUS

1. UNIT NAME: ST. LUCZE UNIT 1
2. REPORTING PERIOD: JUNE 1994
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. ZF CHANGES OCCUR ZN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, ZF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 4343 153623.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 669. 1 4185. 5 119715.6 13'. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 205.3
14. HOURS GENERATOR ON"LINE 601.6 4060.3 118415.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 39.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 1535264 10728692 306493993
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 498900 3511940 101125230 18 'ET ELECTRICAL ENERGY GENERATED (MWH) 468307 3320168 95578530
19. UNIT SERVICE FACTOR 83.6 93.5 77.1
20. UNIT AVAILABILITYFACTOR 83.6 93.5 77.1
21. CAPACITY FACTOR (USING MDC NET) 77.5 91. 1 76.5
22. CAPACITY FACTOR (USING DER NET) 78.4 92.1 75.8
23. UNIT FORCED OUTAGE RATE 16.4 6.5 4.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 1 CYCLE 13 REFUELING OUTAGE SCHEDULED TO BEGIN OCTOBER 1, 1994.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: 07/12/94 COMPLETED BY: C. D. WHITE TELEPHONE: (407) 468-4248 REPORT MONTH I 4 No. Date Type Duration (Hours)

Reasons Method of Shutting Licensee Event Report System Code4 Code'ause Component & Corrective Action to Down ¹ Prevent Recurrence Reactor 118.4 LER 94-05 EB TRANS F Unit 1 tripped automatically during inclement weather due to contact between metal facia and the 1A transformer causing a generator differential current lockout.

940611 0.0 B N/A VESSEL During power ascension, Unit 1 held at 30% power to perform a Nuclear Power-Delta T Power calibration.

10 940611 0.0 B N/A HF PUMPXX Unit 1 was held at 60% power to repair problems with the turbine cooling water pump.

F Forced Reason Method Exhibit G - Instructions for S Scheduled h - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scnun Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training 8c Liccnsc Examination 5 - Load Reduction F - hdministtative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain)

UNIT SHUTDOWNS AI'K) POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT 1 DATE: 07/12/94 COMPLETED BY: C. D. WHITE TELEPHONE: (407) 468-4248 REPORT MONTH JUNE 1 4 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Report Codes Codes Action to Down ¹ Prevent Recurrence Reactor 940612 0.0 B N/A HF HTEXCH Unit 1 reduced power for waterbox cleaning.

F Forced Reason Method Exhibit G - Instiuctions for S Scheduled A - Equipment failure (explain) 1 - Manual preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licenscc Event Rcport C - Refueling 3 - Automatic Scrain (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training dc License Examination 5 - Load Reduction F - Adininistrative 9 - Other (Explain) Exhibit 1 - Seine Source G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO0 50-335 UNIT0 St. Lucie g1 DATE: 7/12/94 COMPLETED BY Chris D. White TELEPHONE: (407) 468-4248 REPORT MONTH June 1994 Unit 1 was operating at or above 804 power until June 6, 1994, when the reactor automatically tripped during inclement weather due to contact between metal facia and the 1A transformer causing it short out. Unit 1 remained off-line until June 11, 1994. On June to 11, power was increased and held at 30% power to perform Nuclear Delta T calculations. Once the Nuclear Delta T calculations were performed, the Unit continued to increase in power, but was held at 60% power to repair problems with the Turbine Cooling Water Pump.

On June 12, 1994, Unit 1 increased to about 70% power, where held for waterbox cleaning until June 14, 1994. Unit 1 again it increased in power on June 15) 1994'nd operated at or above 804 through the end of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO0 50-389 UNIT St. Lucie g2 DATE 7/12/94 COMPLETED BY: Chris D. White TELEPHONE (407) 468-4248 MONTH one 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 06/01/94 820 06/02/94 821 06/03/94 820 06/04/94 819 06/05/94 775 06/06/94 764 06/07/94 765 06/08/94 792 06/09/94 804 06/10/94 784 06/11/94 753 06/12/94 740 06/13/94 741 06/14/94 772 06/15/94 784 06/16/94 739 06/17/94 408 06/18/94 401 06/19/94 412 06/20/94 475 06/21/94 534 06/22/94 582 06/23/94 604 06/24/94 715'41 06/25/94 06/26/94 845 06/27/94 847 06/28/94 851 06/29/94 848 06/30/94 850

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 7/12/94 COMPLETED BY C. D. WHITE TELEPHONE 407/468/4248 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 2
2. REPORTING PERIOD: JUNE 1994
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10 REASONS FOR RESTRICTIONS g I F ANY MONTHLY - YTD- CUMULATIVE
11. HOURS IN REPORT PERIOD: 720 4343 95520.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 2712.4 79876. 1 13; REACTOR RESERVE SHUTDOWN HOURS '0. 0 0.0 0.0
14. HOURS GENERATOR ON-LINE 720.0 2602.7 78498.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1729694 6621120 203582045
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 553520 2134660 67644210
18. NET ELECTRICAL ENERGY GENERATED (MWH) 520937 1996588 63897759
19. UNIT SERVICE FACTOR 100. 0 59.9 82.2
20. UNIT AVAILABILITYFACTOR 100.0 59.9 82.2
21. CAPACITY FACTOR (USING MDC NET) 86.2 54.8 80.7
22. CAPACITY FACTOR (USING DER NET) 87.2 55.4 81.1
23. UNIT FORCED OUTAGE RATE 0.0 4.4 7 3
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERZOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT 2 DATE: 07/12/94 COMPLETED BY: C. D. WHITE TELEPHONE: (407) 468-4248 REPORT MONTH 1 4 No. Date Duration Reason~ Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Report Codes Codes Action to Down Prevent Recurrence Reactor 940616 0.0 B N/A HF HTEXCH Unit 2 reduced power for waterbox cleaning.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipmcnt failure (explain) I - Manual preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Shccts Liccnsce Event Rcport C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training dc License Examination 5 - Load Reduction F - Adininistrative 9 - Other (Explain) Exhil>it 1 - Same Source G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO 50 389 UNIT St. Lucie g2 DATE 7/12/94 COMPLETED BY: Chris D. White TELEPHONE (407) 468 4248 REPORT MONTH June 1994 Unit 2 operated at or above 804 power from the beginning of the month until June 17, 1994, when it decreased in power for waterbox cleaning until June 23, 1994. On June 24, 1994, the Unit increased in power and operated at or above 804 power through the end of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.