Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17229A4711997-08-31031 August 1997 Monthly Operating Repts for August 1997 for St Lucie. W/970908 Ltr ML17229A4451997-07-31031 July 1997 Monthly Operating Repts for July 1997 for St Lucie.W/970808 Ltr ML17229A3991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for St Lucie.W/970710 Ltr ML17229A3791997-05-31031 May 1997 Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2.W/970612 Ltr ML17229A3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2.W/970513 Ltr ML17229A3041997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for St. Lucie, Units 1 & 2.W/970410 Ltr ML17229A2651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2.W/970313 Ltr ML17229A2351997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for St Lucie Units 1 & 2.W/970214 Ltr ML17229A2001996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 2.W/970113 Ltr ML17229A1711996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2.W/961216 Ltr ML17229A1361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2 ML17229A0691996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2.W/961011 Ltr ML17229A1391996-09-30030 September 1996 Revised Monthly Operating Rept for Sept 1996 for St.Lucie Unit 2 ML17229A0361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 2.W/960911 Ltr ML17229A0051996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2.W/960812 Ltr ML17228B5701996-06-30030 June 1996 Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2.W/960715 Ltr ML17228B5261996-05-31031 May 1996 Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr ML17228B4941996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 2.W/960510 Ltr ML17228B4651996-03-31031 March 1996 Monthly Operating Repts for March 1996 for SLP.W/960412 Ltr ML17228B4201996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2.W/960312 Ltr ML17228B4021996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for St Lucie.W/960214 Ltr ML17228B3831995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 2.W/960116 Ltr ML17228B3621995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for St Lucie. W/951212 Ltr ML17228B3261995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for St Lucie.W/951112 Ltr ML17228B2911995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17229A9021998-11-0404 November 1998 LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8871998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length ML17229A8781998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length ML17229A8771998-10-14014 October 1998 LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr ML17229A8761998-10-14014 October 1998 LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8511998-09-0202 September 1998 LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17229A8481998-08-0707 August 1998 Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. ML17229A9461998-08-0707 August 1998 Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A8201998-07-29029 July 1998 LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7411998-05-28028 May 1998 LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr 1999-09-30
[Table view] |
Text
acczx.zaAreo 0 raramrow omrow. Arroz SvsrzM REGULAT . INFORMATION DISTRIBUTION lSTEM (RIDS)
'C~
DOCKET ¹ FACIL:50-,335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335
%~0-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BREEN,J.J. Florida Power & Light Co.
SAGERPD.A. Florida Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for Aug 1992 for St Lucie units 1 &
- 2. 'ZUFZD ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ! ENCL / SIZE: 3 TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 NORRIS P J 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NR~R DLP LPEB10 1 1 NRR/DOEA/OEAB 1 1 ~ILE 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-S7 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24
4 II
')
P.O. Box 12$ , Ft. Pierce, FL 34954-0128 September 10, 1992
%Pal L-92-255 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335,and 50-389 Monthl 0 eratin Re ort Attached are the August 1992 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.
Should there be any questions on this information, please contact us ~
Very truly yours, D. A. ger Vice esident St. u ie Plant DAS.JJB kw cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments
.DAS/PSL $ 776-92 l', (.. < 9209170256 92083 j
)
-., i'->> PDR'DOCK 05000335 R PDR an Fpl Group companV
%.r,
~ 'M:18.i
' "~
AVERME DAILY UNIT POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Hat) 8/ 1/92 8/ 2/92 844 8/ 3/92 839 8/ 4/92 84.
8/ 5/92 842 8/ 6/9Z 840 8/ 7/92 833 8/ 8/92 833 8/ 9/92 836 8/10/92 837 8/11/92 842 8/12/92 847 8/13/92 846 8/14/92 8/15/92 849'45 8/16/92 844 8/17/92 840 8/18/92 840 8/19/92 838 j9'R'46 8/28/92 8/21/92 8/22/92 8/23/92 8/24/92 838 838 832 765 535 8/25/92 491 8/26/92 523 8/27/9Z. 653 8/28/92 847 8/29/92 850 8'/38/92. 847 8/34 844
OPERATING DAT* REPORT DOC~:ET NO OArE 50 SEP
'i0351992 COMPLETED BY ,J. V. BREEN TELEPHONE 407Z468i4248 OPERATING STATUS
- 1. UNIT NAMF: STo LUCXE UNIT 1 Zi REPORTING PERIOD+ AUGUST 1992 3i LICENSED THERMAL POWER,(MWT)'700 NAMEPLATE RATING (GROSS MWE)' 850 5, DESIGN ELECTRICAL RATING (NET MWE): 830 6, MAXIMUM DEPENDABI E CAPACITY (GROSS MWE), 87 7i MAXIMUM DEPENDABLE 'CAPACITY (NET MWE)o 839' XF CHANGES OCCUR XN CAPACITY RATXNGS (XTEMS NUMBER 3. THROUGH 7)
SINCE LAST REPORT~ GIVE REASONS'i POWER LEVEL TO WHICH RESTRICTED~ XF ANY (NET MWE) ice REASONS FOR RESTRICTIONS~ IF ANY'ONTHLY
-YTD- CUMULATXVE if'OURS XN REPORT PERIODS 744 5855 137591i0
- l, NUMBER. OF HOURS
'l3 REACTOR REACTOR WAS CRXTICAL 744iO 5855oO 105964.6 RESERVE SHUTDOWN, HOURS- 0+0 OoO 205.3 14o HOURS GENERATOR ON-LINE 744oO 5855iO 105050.9 15, UNXT RESERVE SHUTDOWN HOURS 0 i0 0 i0 39 '
ihi GROSS THERMAL ENERGY GENERATED (MWH) 19218O0 15608042 27:l335294 17'ROSS ELECTRICAL ENERGY, GENERATED (MWH). '629680 52150ie 89547830 18'ET ELECTRICAL ENERGY GENERATED (MWH) 596288 4953976 84637672 19'NIT SERVXCF FACTOR 100+0 100>0 76 '
20 o UNIT AVAILABXK.XTYFACTOR. 100+0 100iO 76.4 21m CAPACITY FACTOR. (USING MDC NET) 95i5 100+8 75 i 9 22'APACITY FACTOR'USXNQ DER NET) 96ih 101 ' 75 s 1 23'NXT FORCED OUTAGE, RATE OiO OiO 3~9 24> SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25 'F SHUT DOWN AT END OF REPORT'ERXODr ESTIMATED DATE OF STARTUPi
0 I~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-335 UNIT NANE ETTLE NIT I DATE 'EP iD 1K COMPLETED BY J J BREEN TELEPHONE I440468424 REPORT MONTH AU UST 1 2 No. Date Type Duration Reasons Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Report Code'" Code Action to Down ¹ Prevent Recurrence Reactor 920822 0.0 H N/A HF XXXXXX Unit 1 was reduced in power due to condenser high back pressure.
920823 0.0 H N/A ZZ ZZZZZZ Unit 1 was reduced to approximately 70% power due to a hurricane warning (Hurricane Andrew).
920824 0.0 B N/A HF XXXXXX Unit 1 was reduced in power for waterbox cleaning.
F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipmcnt failure (explain) I - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Liccnsec Event Report C - Refur ling 3 - Automatic Scram (LER) Fde (NUREG<t6>>
D - Regulatory restriction 4 - Continued E - Operator Training ds License Examination 5 - Load Reduction F - Adnunistrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Expa! in)
H - Other (Explain) 0915s7 FPL
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO COMPLETED BY TELEPHONE
~IK 50-335 Z.Z. Breen 407 468-4248 REPORT MONTH AUGUST 1992 Unit 1 was at 100% power until August 22, 1992; the unit was then reduced in power due to condenser high back pressure. Unit 1 was further reduced to approximately 704 power on August 23, 1992, due to a hurricane warning (Hurricane Andrew). From August 1992, until August 27, 1992, the unit was reduced in power for24, waterbox cleaning. On August 28, 1992, the unit was returned to 1004 power and remained there for the rest of the month.
Zn accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
AVERAQE DAILY UNIT POWER LEVEL 199 DAY AVERAQE DAILY POSER LEVEL (Mve-Net) 8/ 1/92 858 8/ 2/92 857 8/ 3/92 857 8/ 4/92 857 8/ 5/92 aen 8/ 6/92 860 8/ 7/92 854 8/ 8/92 854 8/ 9/92 743 8/10/92 8/ii/92 505
-34 8/12/92 -30 8/13/92 8/14/92 92 8/15/92 184 8/16/92 518 8/17/92 751 8/18/92 855 8/19/92 858 8/20/92 859 8/21/92 860 8/22/92 aeo 8/23/92 857 8/24/92 791 8/25/92 706 8/26/92 853 8/27/92 853
'/28/92 853 8/29/92 859 8/30/92 858 8/31/9'2 856
. 852
OPERATING Or TA REPORT DOCV<ET NO 5() '" 389 O*TE SB'0 199l COMPLETED BY Ji J ~ BREEN TELEPHONE 407/468/4248 OPERATING STATUS ii UNIT NAME+ ST+ LUCXE
'UGUST i UNIT 2 2 i REPORTING PERIOD 992
- 3. LICENSED THERMAL POWER (HWT)i 2700 4s NAMEPLATE RATING (GROSS HWE) t 850 5o DESIGN ELECTRXCAL RATING (NET MWE): 830 6i HAXXHUH DEPENDABLE CAPACITY (GROSS HWE) o 882 7 HAXXHUH DFPENDABLE CAPACXTY (NET MWE): 839 8, XF CHANGES OCCUR XN CAPACXTY RATINGS <ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT~ GXVE REASONS:.
POWER LEVEL TO WHXCH RESTRICTED~ IF ANY (NET. MWE) iOo REASONS FOR RESTRICTIONS@ XF ANY+
HONTHLY - YTD- CUMULATIVE 11 i HOURS XN REPORT PERIOD t 744 79488.0 i2i NUHBER OF HOURS REACTOR WAS CRXTXCAL 72i i6 5855'229i4 67849+6 13'EACTOR RESERVE SHUTDOWN HOURS 0' Oi0 0.0 i4o HOURS GENERATOR ON-LXNE 682o9 4iiO+6 66714o9
'15'NIT RESERVE SHUTDOWN HOURS 0+0 OiO 0 <)
16+ GROSS'HERMAL ENERGY GENERATED (MWH) i705305 i055i200 i74663806 17m GROSS ELECTRICAL ENERGY GENERATED <HWH) 5657 <) 3529490 58255318 i8, NET ELECTRICAL ENERGY GENERATED. <MWH) 533i49'1+8 3327850 55090697 UNXT SERVXCE FACTOR- 70o2 83.9 20 o UNIT AVAILABXt';XTVFACTOR" 9io8 70 ' 83~9 2i+ CAPACITY FACTOR= (USING'DC NET) 85+4 67o7 83 i 9 22+ CAPACITY FACTOR (USXNC. DER NET) 86+3 68i5 84.i 23'NIT FORCED OUTAGE RATE 8+2 3i4 .... 5.C 24+ SHUTDOWNS SCHEDULED'VER NEXT 6 MONTHS XF SHUT DOWN AT END OF REPORT'ERIOD ~ ESTIMATED DATE OF STARTUP '
0 I ~
UNIT SHU'I DOWNS AND POWER REDUCTIONS DOCKET NO. 50-389 UNIT NAME TL IE 2 DATE SEP jo 199Z COMPLETED BY J BREEN 22!LHPHDHH LPD448H24 REPORT MONTH AUGUST 1 2 No.
Date Type'uration Reason~ Method of Licensee
'vent Report Cod Code'ause Component & Corrective (Hours)
Reactor'ystem Shutting Down ¹ e4 Action to Prevent Recurrence 19 920809 0.0 N/A HF PUMPXX Unit 2 was manually downpowered to repair the traveling screen for the 2B2 Circulating Water Pump (CWP).
19 920810 61.1 H HH PUMPXX The unit was manually tripped due to a fire in the "C" condensate pump lead box.
20 920813 0.0 N/A HH ZZZZZZ Unit 2 was held at approximately 30% power due to a chemistry hold.
21 920815 0.0 N/A HF XXXXXX Unit 2 was held at approximately 83% power due to a 2A2 waterbox tube leak.
22 920823 0.0 N/A ZZ ZZZZZZ Unit 2 was reduced to approximately 70% power due to a hurricane warning (Hurricane Andrew).
F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipmcnt failure (explain) ~ I - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licenscc Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)
D - Regulatory restriction 4 - Continued E - Operator Training dr, License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Bdubit I - Same Source G - Operational Error (Expalin)
H - Other (Explain)
~"
UNIT SHUTDOWNS AND, POWER REDUCTIONS DOCKET NO. 50-389 TL IE NIT2 DATE 0 1992 COMPLETED BY J. J. BREEN TELEPHONE 4 4 8-4248 REPORT MONTH AU UST I 2 Date Type Duration Reason~ Method of System Component Cause & Corrective No. (Hours) Shutting Event Report Code Code Action to Reactor'icensee Down Prevent Recurrence 23 920824 0.0 B N/A HA VALVEX The unit was reduced in power for turbine valve testing..
920824 0.0 H N/A zz ZZZZZZ The unit was held at approximately 78% due to electrical transmission system grid instability.
F Forced Reason Method Exhibit G - Instructions for S Schcdulcd A - Equipntent failure (explain) I - Manual Preparation of Data Entry B - Maintcnancc or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREGW161)
D - Regulatory restriction 4 - Continued E - Operator Training &, License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit I - Sante Source G - Operational Error (Expalin)
H - Other (Explain)
ll 1"a V
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-389 COMPLETED BY
~III.I J.J. Breen IIII TELEPHONE 407 468-4248 REPORT MONTH AUGUST 1992 Unit 2 was at 1004 power until August 9, 1992, when the unit was downpowered due to failure of the 2B2 Circulating Water Pump traveling screen. On August 10, 1992, the unit was manually tripped due to a fire in the "C" condensate pump lead box. On August 13, 1992, the unit was returned to power and then held at approximately 304 power for a Chemistry Hold. On August 15, 1992, the unit was held at approximately 834 power due to a 2A2 waterbox tube leak. On August 23, 1992, the unit was reduced in power to approximately 704 due to a hurricane warning (Hurricane Andrew).
On August. 24, 1992, the unit was reduced slightly in power for turbine valve testing; the unit was then held at approximately 784 power due to electrical transmission system grid instability. The unit was at 100% power by the end of the day and remained there for the rest of the month.
Xn accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
k tl
~ y I
$ I ~ I e
~ ~