Monthly Operating Repts for Jul 1991 for St.Lucie Units 1 & 2.W/910813 Ltr
ML17223B244
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/31/1991
From: Breen J, Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-224, NUDOCS 9108190202
Download: ML17223B244 (15)


Text

ACCELERATED DIS UTION DEMONS TION SYSTEM I

~2 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9108190202 DOC.DATE: 91/07/31 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BREEN,J.J. Florida Power & Light Co.

SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Jul 1991 for St.Lucie Units 1 2.W/910813 ltr. &

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) g ENCL g SIZE: l NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DLPQ MPEB10 1 1 S NRR/DOEA/OEAB 1 1 EG~PIL'E 01 1 1 RGN2 1 1 EXTERNAL EG&G BRYCE E J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 R

D D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

P.O. Box 128, Ft. Pierce, FL 34954-0128 JUG 1 5 19S1 L-91-224 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the July 1991 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Very truly yours, D. A. ger Vice r sident St. L ie Plant DAS:JJB:kw cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC

.Senior Resident Inspector, USNRC, St. Lucie Plant Attachments DAS/PSL 8497-91

.(

Qo; g~

9108f90202 91073k PDR ADOCK 05000335 R PDR an FPL Group company

AVERAGE DAILY UNIT POSER LEVEL DOCKET NO. 50-335 COMPLETED BY J.J'. Breen TELEPHONE 407 465-3550 MONTH i7ULY 1991 DAY AVERAGE DAILY POSER LEVEL (MRe-Net) 7/ 1/91 392 7/ 2/91 35 7/ 3/91 497 7/ 4/91 851 7/ 5/91 855 7/ 6/91 849 7/ 7/91 844 7/ 8/91 841

.7/, 9/91 800 7/10/91 599 7/11/91 742 7/12/91 846 7/13/91 845 7/14/91 841 7/15/91 844 7/16/91'/17/91 841 832 7/18/91 792 7/1 9/91 690 7/20/91 841 7/21/91 837 7/22/91 823 7/23/91 715 7/24/91 596 7/25/91 732 7/26/91 845 7/27/91 838 7/28/91 796 7/29/91 668-7/30/91 753 7/31/91 864

~ ~

OPERATING DATA REPORT DOCVET NO 50 335 DATE Age 1 3 1991 COMPLETED BY Jo J. BREEN TELEPHONE 407/468/4248 OPERATING STATUS 1, UNX I NAME: T, LUCIE UNIT 1

2. REPQR'I'ING PERIOD
3. LICENSED THERMAL 4

5.

NAMEPLATE RATING (GROSS MME)'50 JULY t 1991 POWER (MMT) ~

DESIGN ELECTRICAL RATING (NET MME) +

2700 830 6

7.

MAXIMUM DEPENDABLE CAPACITY (GROSS MAXIMUM DEPENDABLE CAPACXTY (NET MHE)o MME)'72 839 8 IF CHANGES OCCUR IN CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORTS GXVE REASONS'OHER LEVEL TO HHICH RESTRICTED~ IF ANY (NET MME) 10 REASONS FOR RESTRICTIONS t IF ANYf MONTHLY -YTD- CUMUI ATXUE lie HOURS XN REPORT PERIOD S 744 . 5087 128063iO 12+ NUMBER OF HOURS REACTOR HAS CRITICAL 713i4 5889+8 97968 '

13+ REACTOR RESERVE SHUTDOWN HOURS 8+8 0~0 205i3 14+ HOURS GENERATOR ON-LINC 78Xi4 4987+9 97092e3 UNXT RESERVE SHUTOOHN HOURS 8.e 8' 39iO 15'6'7'8 GROSS THERMAL ENERGY GENERATED (MMH) 1786735 13047241 250289295 GROSS ELECTRICAL'NERGY GKNKRATED (MHH> 586638 4334350 82542990 NET ELECTRICAL ENERGY GENERATED (MMH) 553534 4106093 77998835 UNXT SERVXCE FAGTOlt 94i3 98+1 75o8

'9'8'io UNIT AVAILABILITY'ACT~ 94+3 98' 75+8 CAPACITY FACTOR- (USXHC MOC NET) 88+7 96 ' 75o4 89ob 97 ' 74 '

22 CAPACITY F AGTQR: (USTNR DKR NKT )

'31 UNIT FORCED OlkYACK RATE 24+ SHUTDOWNS SCHKDUt.ED OVER NEXT h MONTHS

~507 ill 4o2 10/1 8/91 i REFUELINQ 63 DAYS 25'F SHllT DOHH AT END OF REPORT PERIODS ESTXMATED DATE OF STARTUP!

UNIT SHUTDOWNS AND POWER REDUCTIONS OOQRBI'O. ~56 55 UNIT NAME ST LUCIE UNIT I DATE Age I3 $ 91 COMPLETED BY J. J. BREEN TBLBPHQNB 644ll 465- 55 ~

RBP QRI'ONTH ~IIILT No. Date Type Duration (Hours)

Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent Code'ause & Corrective Action to Down -¹ Prevent Recurrence 15 910701 18.52 B 91%5 CH INSTRU Unit 1 automatically tripped on low steam geneiator level due to the loss of a steam generator feedwater regulatory controller.

15 910702 15643 A N/A RB CONROD Unit 1 experienced Control Rod position indicator problems.

15 910702 8.63 N/A CC VALVEX Unit 1 experienced turbine control valve problems while commencing up in power 16 910703 0.0 N/A ZZ ZZZZZZ Unit 1 was held at 20 fo power for shift turnover.

F Forced Reason Method ~bit G - Instructions for S Schcdukd A - Eipupmcnt faihtre (explain) 1- Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG-0161)

D - Regulatory ccstriction 4 - Continued E - Operator Training & 11ccnse Exsnunation S - ted Reduction F - Adminbtrative 9 - Other (Explain) Exhbit 1 - Same Source G - Opctational Error (Expalin)

H - Other (Exphun)

UNIT SHUTDOWNS AI'6) POWER REDUCTIONS 000RNT NQ. ~0-3 5 UNIT NAME ST LUCIE UNIT 1 DATE 4UG i 3 i891 COMPLETED BY J. J. BREEN I'NLNPHQNR ~0465- 5 0 RNP NR T MNNTH ~YI 9 No. Date Type'uration (Hours)

Reason* Method of Shutting Reactor'icenseeEvent Report System Code'omponent Code'ause & Corrective Action to Down ¹ Prevent Recurrence 17 910703 0.0 B N/A ZZZZZZ Unit 1 was held at 409o power for Nuclear Instrumentation Calibration.

18 910709 0.0 B N/A HF XXXXXX Unit 1 downpowered for waterbox cleaning.

19 910718 0.0 B N/A HF XXXXXX Unit 1 downpowered for waterbox cleaning.

20 910723 0.0 B N/A HF XXXXXX Unit 1 downpowered for waterbox cleaning.

Reasoa Method Extubit G - Iastmctioas for A - Equipment failure (cxphun) 1 - Manual Preparsnon of Data Enny B - Maintenance or Teat 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Coatiaued E - Operator Trammg ge License Exaaunatioa 5 - Loal Reduction F - Administrative 9 - Other (Exphdn) Exhibit 1 - Sane Source G - Opaational Error (Expalin)

H - Other (Explain)

UNIT SHUTDOWNS &6) POWER REDUCTIONS DDCEET NO. ~5U3 5 UNIT NAME E~LUCIB DATE AUG 1 3 199l COMPLETED BY J. J. BREEN TELEPHONE L60666L 550 RBPORT MDNIH ~IULY 19 No. Date Type Duration (Hours)

Reason'ethod of Shutting-Reactor'icensee Event Report System Code'omponent Code'ause & Corrective Action to Down ¹ Prevent Recurrence 21 910729 0.0 B N/A HF XXXXXX Unit 1 downpowered for waterbox cleaning.

F Forced Reason Method Exhil>it G - Instructions for S Schedukd h - EPpiipmcnt failure (exphin) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling D - Regulatory rriction E - Operator Training gs License Examina6on 4-~

3 - hutomatic Scram 5 - Load Reduction (LER) File (NUREG4)161)

F - hdnunistrative 9 - Other (Exphdn) Exhil>it 1 - Same Source G - Operational Error (Expalin)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO ~ 50-335 COMPLETED BY

~63 %9 I J.J. Breen TELEPHONE 407 465-3550 REPORT MONTH JULY 1991 On July 1, 1991, while the Unit was at full power the reactor automatically tripped on low steam generator level due to the loss of a steam generator feedwater regulatory controller. While commencing reactor startup on July 2, 1991, the Unit had difficulty with CEA f30 position indicator; after some troubleshooting CEA g30 was withdrawn and the Unit increased in power. The Unit then reduced in power when it experienced turbine control valve problems. On July 3, 1991, Unit 1 began to commence up in power and was held at 20% for shift turnover, the Unit was then held at 40% power for Nuclear Instrumentation Calibration. On July 4, 1991, Unit 1 was operating at full power.

The Unit downpowered periodically the rest of the month for waterbox cleaning.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

AVERAGE DAILY UNIT PORER LEVEL DOCKET NO.

COMPLETED BY TELEPHONE

~B 50-389 J.J.

407 K~

Breen 465-3550 MONTH JULY 1991 DAY AVERAGE DAILY POSER LEVEL tMWe-Net) 7/ 1/91 857 7/ 2/91 860 7/ 3/91 860 7/ 4/91 862 7/ 5/91 863 7/ 6/91 861 7/ 7/91 861 7/ 8/91 859

..7/ 9/91 861 7/1 0/91 860 7/11/91 861 7/12/91 859 7/13/91 859 7/14/91 858 7/15/91 861 7/16/91 860 7/17/91 857 7/18/91 857 7/19/91 857 7/20/91 857 7/21/91 856 7/22/91 808 7/23/91 852 7/20/91 S59 7/25/91 863 7/26/91 868 7/27/91 858 7/28/91 856 7/29/91 859 7/30/91 863 7/31/91 865

v OPERATING DATA REPORT DOCYET NO 50 809 DATE 498 1 3 3991 COMPLETED B Ji Jo BREE.'l TELEPHONE 407/468."".248 OPERATING STATUS UNIT NAME ) ST. LUCIE UNIT 2 Z. REPORTING PERIOD: JULY ~ 1991

'3- LICENSED THERMAL POWER (MWT) o ~700 NAMEPLATE RATING ( GROSS MWE > i 850

5. DESIGN ELECTRXCAL RATING (NET MWE) e 830
o. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882 7i MAXIMUM DEPENDABLE CAPACXTY (NET MWE) o 839
8. IF I'HANGES OCCUR XN CAPACITY RATXNGS (XTEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORTS GXVE REASONS'.

POWER LEVEL TO WHICH RESTRXCTED ~ IF ANY (NET MWE) 10'EASONS FOR RESTRICTIONS~ XF ANY'ONTHLY

-YTD- CUMULATIVE lii HOURS XN REPORT PERIOD!

12'UMBER OF HOURS REACTOR WAS CRXTXCAL 744 744+8 5087 5887i8 69960.0 59947.3 13'EACTOR RESERVE SHUTOOWH HOURS 8' 0+8 OoO 14 . HOURS GENERATOR ON-LINK 744.e 5887oO 58931o3 15+ UNXT RESERVE SHUTDOWN HOURS 8+8 Oi8 OiO 16+ GROSS THERMAL ENERGY CENKRATED (MWH) 2888766 13551938 154341019 17m GROSS ELECTRICAL ENERGY GKNKRATED (MWH7 673898 4562448 51459360 18+ NET ELECTRICAL ENERGY GENERATED (MWH> 639838 4338546 48664649 19i UNXT SERVICE FACTOR 188.8 188+8 84.2 20 i UNXT AVAIt.ASXLliAE'ACTOR ice.e 188o8 84+2 Zio CAPACXTY FACTOR'tl8INC MOO NET) ieZ.4 181+5 84o4 22+ CAPACITY FACTQR'CUBIC DER NET) 183oS 182o6 84i5 23+ UNXT FORCED'UTAGE RhTE, 8+8 8' 5.4 24'HUTDOWNS SCHEQULK9 OVER NEXT 6 MONTHS t 25'F SHUT DOWt4 AT ENQ OF REPORT PERIODS ESTXMATEO DATE OF STARTUPt

UNIT SHVIDOWNS AI'6) POWER REDUCTIONS DDCHBT ND. ~ILIR UNIT NAME ST LUCIE UNIT 2 DATE AUG 1 3 3991 COMPLETED BY J J BREEN TBLBPHQNB ~46L I3 RBPDRT MONTH ~IU T No. Date ype Duration (Hours)

Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent Code'ause & Corrective Action to Down ¹ Prevent Recurrence Unit 2 was at full power for the month of July.

1 F Forced Reason Method Exhihit G - nstructions for S Schcdtdcd A - Equipment faihuu (cxphin) 1 - Manual Preparation of Data Entry B - Maintcnancc or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) Fslc (NUREG-0161)

D - Regtdatory cstriction 4 - Continued E - Operator Training 4 License Examhumon 5 - Load Reduction F - Administrative 9 - Other (Exphdn) Mul>it 1 - Same Source G - Operational Error (Expalin)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-389 COMPLETED BY J.J.

It'll Breen TELEPHONE 407 465-3550 REPORT MONTH JULY 1991 Unit 2 remained at full power for month of July.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.