MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17229A4711997-08-31031 August 1997 Monthly Operating Repts for August 1997 for St Lucie. W/970908 Ltr ML17229A4451997-07-31031 July 1997 Monthly Operating Repts for July 1997 for St Lucie.W/970808 Ltr ML17229A3991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for St Lucie.W/970710 Ltr ML17229A3791997-05-31031 May 1997 Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2.W/970612 Ltr ML17229A3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2.W/970513 Ltr ML17229A3041997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for St. Lucie, Units 1 & 2.W/970410 Ltr ML17229A2651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2.W/970313 Ltr ML17229A2351997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for St Lucie Units 1 & 2.W/970214 Ltr ML17229A2001996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 2.W/970113 Ltr ML17229A1711996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2.W/961216 Ltr ML17229A1361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2 ML17229A0691996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2.W/961011 Ltr ML17229A1391996-09-30030 September 1996 Revised Monthly Operating Rept for Sept 1996 for St.Lucie Unit 2 ML17229A0361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 2.W/960911 Ltr ML17229A0051996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2.W/960812 Ltr ML17228B5701996-06-30030 June 1996 Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2.W/960715 Ltr ML17228B5261996-05-31031 May 1996 Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr ML17228B4941996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 2.W/960510 Ltr ML17228B4651996-03-31031 March 1996 Monthly Operating Repts for March 1996 for SLP.W/960412 Ltr ML17228B4201996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2.W/960312 Ltr ML17228B4021996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for St Lucie.W/960214 Ltr ML17228B3831995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 2.W/960116 Ltr ML17228B3621995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for St Lucie. W/951212 Ltr ML17228B3261995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for St Lucie.W/951112 Ltr ML17228B2911995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17229A9021998-11-0404 November 1998 LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8871998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length ML17229A8781998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length ML17229A8771998-10-14014 October 1998 LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr ML17229A8761998-10-14014 October 1998 LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8511998-09-0202 September 1998 LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17229A8481998-08-0707 August 1998 Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. ML17229A9461998-08-0707 August 1998 Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A8201998-07-29029 July 1998 LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7411998-05-28028 May 1998 LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr 1999-09-30
[Table view] |
Text
ACCELERATED D TRIBUTION DEMONS TION SYSTEM i~ ~O REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9008210157 DOC.DATE: 9V~Q-3.NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Flor'ida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION HOLT,J.W. Florida Power & Light Co.
SAGER,D.A. Florida Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION Monthly o tr.repts for Jul 1990 for St Lucie Units
SUBJECT:
1 & 2.W 00813 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
I NOTES' RECIPIENT COPIES tRECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 IRM TECH ADV 2 2 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB11 1 1 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 3 3 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACI'HE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29
P.O. Box14000, Juno Beach, FL 33408-0420 AU6 13 1990 L-90-295 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the July 1990 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.
Very truly yours, Vice President St. Lucie Plant DAS/JWH Attachments cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC PDR R 'DC 90082i0i57 90073i ADQCK 05000335 an FPL GNUP company ljl
54+
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-335 UNIT St. Lucie 1 DATE 8 13 90 COMPLETED BY J. W. Holt TELEPHONE 407 465-3550 MONTH JULY 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/90 859 07/02/90 430 07/03/90 07/04/90 07/05/90 07/06/90 07/07/90 07/08/90 07/09/90 07/10/90 07/11/90 07/12/90 07/13/90 07/14/90 07/15/90 07/16/90 07/17/90 07/18/90 07/19/90 07/20/90 07/21/90 07/22/90, 07/23/90 07/24/90 07/25/90 07/26/90 07/27/90 07/28/90 07/29/90 07/30/90 07/31/90
OPERATXNG DATA REPORT DOCKET NQ 50 - 335 DATE 8/15/90 COMPLETED BY J. Ho HOLT TELEPHONE 407/465/3550 OPERATING STATUS ii UNIT NAME/ STi LUCXE UNIT 1 2, REPORTING PERXODt JULYr 1990 3i LICENSED THERMAL POHER (MAT)t 2700 4o NAMEPLATE RATING (GROSS MHE) t 850 5, DESIGN ELECTRICAL RATING (NET MHE) l 830 6i MAXIMUM DEPENDABLE CAPACITY (GROSS MHE) t 8/2
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MME) t 839 8, IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT ~ GIVE REASONS t PONER LEVEL TO WHICH RESTRICTED~ IF ANY (NET MME) 10> REASONS FOR RESTRICTIONS~ IF ANY'ONTHLY
-YTD- CUMULATXVE 11, HOURS IN REPORT PERIOD l 744 5087 119303 i 0 12 NUMBER OF HOURS REACTOR WAS CRXTXCAL 386 89464 i 2 13, REACTOR RESERVE SHUTDOWN HOURS OiO 0iO 265.3 14, HOURS GENERATOR ON-LINE 37 3
~ 2010>2 88647ii 15'NIT RESERVE SHUTDQHN HOURS OiO OiO 39.3 16'ROSS THERMAL ENFRGY GENERATFD (MHH) 98336 5091067 228048767 17'ROSS ELECTRICAL ENERGY GENERATED (MHH) 32900 1699618 75142680 181 NET ELECTRICAL ENERGY GENERATED (MHH) Z5579 1585899 70984674 19> UNIT SERVICE FACTOR 5oe 39>5 74' 20 UNIT AVAIl ABILITY FACTOR 5ie 39i5 74.3 Zii CAPACITY FACTOR (USXNG MDC NET) 4ii 3712 73>9 ZZi CAPACITY FACTOR (USING DER NET) 37 i 6 72i8 23'NIT FORCED OUTAGE RATE 94' 30i5 4i3 24< SHUTDQVNS SCHEDULED OVER NEXT 6 MONTHS 25 XF SHUT DOHN AT END OF REPORT PERXQD ESTIMATED DATE OF STARTUPl 08/06/90
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNlT NAME ST. LUCRE g1 DATE 8/13/90 COMPLETFD By J. N. HOLT RFPORT MONTH JULY 1990 TELEPHONE Method of Shutting Ucensee Cause 8 Corrective Down Event System Component Actionto Date Type'uration (Hours) Reason~ Reactor Reports Code4 Codes PreventRecurrence 09 900702 2.5 N/A CA PUMPXX Unit 1 reduced power for RCP seal leakage.
10 900702 706. N/A CA PUMPXX Unit 1 taken off line to repair a leaking RCP seal.
F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram EntryScheetsLicensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NURES4161)
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)
G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Explain) 091587
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT St. Lucie 1 DATE 8 13 90 COMPLETED BY J. W. Holt TELEPHONE 407 465-3550 REPORT MONTH JULY 1990
'On June 2, 1990 Unit 1 had a power reduction and was taken off line due to a Reactor Coolant Pump (RCP) seal leak. The unit was off line the remainder of the month for RCP seal repair.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-389 UNIT St. Lucie 2 DATE 8 13 90 COMPLETED BY Z. W. Holt TELEPHONE 407 465-3550 MONTH iJULY 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/90 855 07/02/90 856 07/03/90 856 07/04/90 854 07/05/90 852 07/06/90 851 07/07/90 853 07/08/90 852 07/09/90 847 07/10/90 844 07/11/90 843 07/12/90 846 07/13/90 852 07/14/90 857 07/15/90 859 07/16/90 858 07/17/90 855 07/18/90 854 07/19/90 851 07/20/90 849 07/21/90 851 07/22/90 852 07/23/90 852 07/24/90 846 07/25/90 839 07/26/90 806 07/27/90 657 07/28/90 845 07/29/90 846 07/30/90 846 07/31/90 848
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO 50-389 UNIT Bt. Lucie 2 DATE 8 13 90 COMPLETED BY Z W Holt TELEPHONE 407 465-3550 REPORT MONTH TRULY 1990 On July 26, 1990 Unit, 2 reduced power for condenser waterbox cleaning. After cleaning was complete, Unit 2 was returned to full power.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME ST. LUCIE ¹2 DATE COMPLETED BY REPORT MONTH JULY 199 0 TELEPHONE Method of Shutting Ucensee Cause &Corrective Duration Down Event System Component Action to No. Date Type (Hours) Reason2 Reactor Reports Code4 Codes Prevent Recurrence 07 900726 23.0 N/A HF TURBIN Unit 2 reduced power for condenser waterbox cleaning.
F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram EntryScheetsLicensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUREG%161)
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Explain)
f' li A
II l
OPERATING DATA REPORT DOCVET NO 50 389 DATE 8/15/96 COMPLETED BY J H HOLT TELEPHONE 407/465/3550 OPERATING STATUS ii UNXT NAMEl STo LUCXE UNIT 2 Zi REPQRTXNG PERIODS JULY'9'90 3o LICENSED THERMAL POHER (MHT) t 2700 NAMEPLATE RATING (GROSS MVE): 85e 5s DESIGN ELECTRICAL RATING (NET MHE) l 838 hi MAXIMUM DEPENDABl E CAPACITY (GROSS MHE) t 882 7i MAXXMUM DEPENDABLE CAPACITY (NET MHE) t 839 8 IF CHANGES OCCUR IN CAPACITY RATINGS (XTEMB NUMBER 3 THROUGH 7)
SINCE LAST REPORT GIVE REASONS'o POHER LEVEL TO WHICH RESTRICTED< XF ANY (NET MHE) 10'EASONS FOR RESTRICTIONS~ IF ANY'ONTHLY
-YTD- CUMULATIVE 11 HOURS IN REPORT PERIOD t 744 5087 61260iO 12'UMSER OF HOURS REACTOR HAS CRXTICAL 744iO 4847i5 530ihi4 13, REACTOR RESERVE SHUTDOHN HOURS 0.0 OoO oie 14'OURS GENERATOR ON-LINE 744 i 0 4808iZ 52162'
- 15. UNIT RESERVE SHUTDOHN HOURS eiO ego OiO lh, GROSS THERMAL ENERGY GENERATED (MNH) 1993694 12777265 136574661 17'ROSS ELECTRICAL ENERGY GENERATED (MWH) 661178 4253640 45504950 18'ET ELECTRICAI ENERGY GENERATED (MHH) 627114 4028568 43041682
- 19. UNIT SERVICE FACTOR 100<0 94i5 85i2 20, UNIT AVAILABILITYFACTOR 100iO 94i5 85 i 2 Zii CAPACITY FACTOR (UBXNG MDC NET) 100' 94i4 85 7 22'APACITY FACTOR (UBXNG DER NET) iel ih 95.4 85ih 23'NIT FORCED OUTAGE RATE Oie 5i5 513 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 9/15/9ei 64 DAYS~ REFUELING 25 IF SHUT DOHN AT END OF REPORT PERIOD ~ ESTIMATED DATE OF STARTUP l