ML17223A429

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1989 for St Lucie,Units 1 & 2.W/891211 Ltr
ML17223A429
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/30/1989
From: Bonett D, Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-445, NUDOCS 8912190405
Download: ML17223A429 (15)


Text

y 't:p~RATED D> BUTION DEMONSTR ON SYSTEM

.REGULATOE NFORMATION DISTRIBUTION STEM (RIDS)

I ACCESSIGN NBR:8912190405 DOC'DATE: 89/12/11 NOTARIZED: NO DOCKET FACIL:50-"335:;St. Lucie Plant, Unit 1, Florida Power 6 Light Co. 05000335 50-;389 St. Lucie Plant, Unit 2, Florida 'Power a Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BONETT,'D.M. Florida Power 6 Light Co.

SAGER,D.A. Florida Power 6 Light Co.~

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Nov 198 for St Lucie,Units 1 6 2.W/891211 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES COPIES ID 'CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA NORRIS,J 3

1 1'ECIPIENT 3

1 PD2-2 PD 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB , 1 1 IRM TECH ADV 2 2 NRR/DLPQ/LPEB10 1 . 1 NRR/DOEA/OEAB11 1 1 NRR D EP PRPB11 1 1 NUDOCS-ABSTRACT 1 1 R FILE t 1 1 RGN2 1 1 EXTERNAL: EG&G SIMPSONgF 1 1 LPDR 1 1 NRC PDR 1 NSIC 1 1 h

TOTAL NUMBER. OF,. COPIES. REQUIRED: LTTR 29 ENCL 29

n 0 <<g 3

1

0 P.O. Box14000, Juno Beach, FL 33408.0420

,DECEMBER 1 1 $ 989 L-89-445 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the November 1989 Operating Status Reports and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Very truly yours, D. A. er Vice P sident t l t DAS/DMB Attachments cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC an FPL Group company 8912290405 89il30 PDR ADQCK 05000335 R PNU

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 UNIT St. Lucie 1 DATE COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 MONTH November 1989 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) il/ 1/89 11/ 2/89 841 860 il/ 3/89 11/ 4/89 858 859 11/ 5/89 859 ll/

il/ 6/89 7/89 857 856 11/ 8/89 828 1 1/ 9/89 765 ll/10/89 852 11/11/89 851 li/12/89 851 il/13/89 851 li/14/89 852 1l/15/89 839 11/16/89 818 11/17/89 744 li/18/89 853 11/19/89 853 li/20/89 851 11/21/89 8 8 li/22/89 848 11/23/89 826 11/24/89 686 11/25/89 839 ll/26/89 852 il/27/89 846 11/28/89 841 11/29/89 836 ll/30/89 842

QPERATXNG DATA REPORT DOCI<ET NO 50 33b DATE 12/ /89 COMPLETED BY D. M BONI=TT TELEPI-IQNE 4<)7/694/4432 QPFRATXNG STATUS io UNXT NAME) ST> LUCXE UNXT 1 2 Rl"=PORTXNG PERXOD'OVI=MBER 1989 3, LXCENSED THERMAL POWER (MWT): 2708 NAMI=PLATE RATXNG <GROSS MWE)+ 850

5. DESXGN ELECTRXCAL RATXNG <NET MWE)+ 838
6. MAXXMUM DI=PENDAll'LE CAI"ACXTY (GROSS MWE) I 872 7i MAXXMUM DEPENDABLE CAPACXTY (NET MWE)l 839 8, Xl-" CHANGES OCCUR XN CAPACXTY RATINGS <XTEMS NUMBER 3 THI'OUGH 7)

SXNCE LAST REPQRTr GXVE REASONS:

POWER LEVEL TQ WHXCI-I RESTRICTED ~ XF ANY ( NET MWE) ie, REASONS FOI'ESTRXCTXONS~ XF ANY:

MONTHLY -YTD- CUMULATXVE ii 12,

~ HOURS XN REPORT PERXQDe NUMBER OF HOURS REACTOR WAS CRXTXCAL 720 720.0 8016 7546iO 113472iO 86644i6 13 I'EACTOI'ESERVE SHUTDOWN HOURS OiO 0+0 285 i 3 I-IOURS GENERATOR ON-LXNE 720' 7536+2 85915+5 15 UNXT RESERVE SHUTDOWN HOURS 0+0 8+0 39+3 16m GROSS THERMAL ENERGY GENERATED (MWH) 1907837 20841741 221062928 17'ROSS ELECTRXCAL ENERGY GENERATED (MWH) 632070 6688065 72806660 18, NET ELECTRXCAL ENERGY GENERATED (MWH) 599580 6344022 68795552 19, UNXT SERVICE FACTOR 100 i 0 94+0 75t7

20. UNXT AVAXLABXLXTYFACTOR 1<)0+ 0 94iO 75@7
21. CAPACXTY FACTOR (USXNG MDC NET) 99+3 94i3 75+2
22. CAPACXTY FACTOR (USXNG DER NET) 180+3 95' 74+1 23'NXT FORCED OUTAGE RATE 0+0 0+2 3t5 24, SHUTDOWNS SCI-IEDULED OVER NEXT 6 MONTI-IS 2/18/90 i REFUEI XNG 25+ XF SHUT DOWN AT END OF REPORT PERXOD~ ESTXMATED DATE OF STARTUPi

UNlT SHUTDOWNS AND POWER REDUCTlONS DOCKETNO. 50-335 UNIT NAME DATE COMPLETED BY D. H. Bonett REPORT MONTH November 1 8 Method of Shutting Licensee Cause & Corrective Down Event System Component Action to No. Date Type'uration (Hours) Reason~ Reactor Report¹ Code4 Codes Prevent Recurrence 06 891123 0.0 HC HTEXCH Unit 1 reduced power for the lA2 Condenser Waterbox Cleaning. Full power operation was resumed.

3 F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- ManualScram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Reguhtory Restriction 4 - Continued (NUREG4161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)

P H

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT St. Lucie 1 DATE COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 REPORT MONTH November 1989 Unit 1 reduced power for the 1A2 Condenser,Waterbox Cleaning. Full power operation was resumed.

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-389 UNIT St. Lucie 2 DATE COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 MONTH November 1989 DAY AVERAGE DAILY POWER LEVEL (MWe-Net il/ 2/89 li/ 1/89 855 85&

11/ 3/89 854 li/ 4/89 1/ 5/89 85 BJ 854 li/

1 il/ 6/89 7/89 853 854 li/ 8/89 11/ 9/89 853 851 11/10/89 847 11/11/89 846 li/12/89 845 11/13/89 846 li/14/89 847 il/15/89 846 11/16/89 846 il/17/89 846 li/18/89 il/19/89 11/20/89 844 il/21/89 801 1 1/22/8'9 63l 11/23/89 743 11/24/89 il/25/$9 I 1/26/89 846 il/27/89 653 11/28/89 743 11/29/89 848 li/30/89 852

QF'ERATXNG ()ATA REF'ORT DOC>:ET NQ 50 389 DATE 12/ /89 COMPLETED BY D M BQNETT TE:LEPI-IQNE 487/694/4432 QPFfiATING STATUS UNIT NAMEi ST, LUCIE UNXT 2 2 REPORTING PERIOD: NOVEMBER 1989 3+ LICENSED THERMAL F'OkiER < MMT ) + 2708

'39 4+ NAMEPLATE RATING (GROSS MME)i 850 5+ [)ESXGN ELECTRICAL RATTNG (NET MME) + 838 6i MAXIMUM DLPEND*BLE CAI-'ACITY ( GROSS MHE ) l '882 7i MAXIMUM,DEPENDAE:LE CAF'ACITY (NET MME) 8 II"- CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THI 'OUGH 7)

SINCE LAST REF'QRT r GIVE REASONS o POHER LFVEL TQ WHICH RESTRICTED XF ANY (NET MME)

10. REASON, FQR RESTRICTXONSr IF ANY'ONTHLY

- YTD- CUMULATIVE 11 i I.IQURS IN REPORT F'ERXQD 720 8016 55369 '

NUMBE:R OF HOURS REACTOR WAS CRITICAL

'Z, 728ie 5882i9 47424+9 13r REACTOR RESERVE SHUTDOHN HOURS 8+8 8 i8 eie

14. I.IOURS GENERATOR ON-LXNE 728' 5789+1 46610.7 15 r UNIT RESI. RVE SHUTDOHN HOURS 8 i8 8+8 eie 16, Gf"OSS THERMAL ENE:RGY GENERATE.'D (MHH) 1898843 15329168 121812830 17'ROSS FLECTRICAL ENERGY GENERATED (MWH) 6z7988 589145e 40588290 18'ET ELECTRICAL ENERGY GENERATED <MMH) 594970 48e86ez 38383495 UNIT SERVICE FACTOR ieeie 72 t 2 84 i 2 20, UNIT *VAILhBXLXTYFACTOR ieeie 72 t 2 84iz 21r CAF'ACITY FACTOR (USING MDC NET) 98+5 71+5 84+3
22. CAF'ACITY FACTQR <USING DER NET) 99 i 6 72t3 84 i 3
23. UNIT FORCED OUTAGE RATE 8+8 2+3 5+4 24'HUTDOWNS SCI-IEDULED OVER NE:XT 6 MONTI.IS 25, XF SHUT DOWN AT END OF RFPQRT F'ERIQD r ESTIMATED DATE Ql= STARTUF':

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME St. u DATE COMPLETED BY 0. N. Bon e tt REPORT MONTH November, 1989 TELEPHONE 407 694-4432 Method of Shutting Licensee Cause &Corrective Down Event System Component Actionto Date Type'uration (Hours) Reason~ Reactor Report¹ Code4 Codes Prevent Recurrence 891121 S 0.0 HC HTEXCH Unit 2 reduced power for the 2Al Condenser Waterbox Cleaning. Full power operation was resumed.

891127 S 0.0 HC HTEXCH The unit reduced power for the 2Bl Condenser Waterbox Cleaning. Full power operation was resumed.

F Forced Reason Method Exhibit G-Instructions-S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- ManualScram Entry Scheets Licensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUREG-0161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit 1-'Same Source H - Other(Explain)

4l 4'I i!

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT St. Lucie 2 DATE COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 REPORT MONTH November 1989 Unit 2 reduced power for the 2Al and 2B1 Condenser Waterbox Cleanings. Full power operation was resumed.

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

0 Ci J

L

'1