ML16340C901
ML16340C901 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 09/24/1982 |
From: | Cooper W TELEDYNE ENGINEERING SERVICES |
To: | Harold Denton, Engelken R, Maneatis G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V), Office of Nuclear Reactor Regulation, PACIFIC GAS & ELECTRIC CO. |
Shared Package | |
ML16340C902 | List: |
References | |
5511-142, NUDOCS 8211010106 | |
Download: ML16340C901 (2) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212B1681999-09-13013 September 1999
[Table view]Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) DCL-99-033, Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl1999-03-12012 March 1999 Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld1999-01-26026 January 1999 Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled DCL-98-163, Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld1998-11-24024 November 1998 Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. ML20236T2931998-07-24024 July 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities for 5 Yrs.Order Being Issued Due to Falsification of Info on Application to Obtain Unescorted Access to PG&E Plant ML20236T3431998-07-22022 July 1998 Forwards Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.Apparent Violations Identified & Being Considered for Escalated Enforcement Action ML20236J2251998-07-0101 July 1998 Ltr Contract,Task Order 232 Entitled, Review of Callaway, Comanche,Diablo Canyon & Wolf Creek Applications for Conversion to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 IR 05000275/19980051998-04-17017 April 1998 Forwards Insp Repts 50-275/98-05 & 50-323/98-05 on 980202-06 & 23-27 & 0302-18.No Violations Noted.Insp Focused on Resolution of Previous NRC Insp Findings & Included Review of Issues Identified During Architect/Engineering Insp Rept ML20203G0371998-02-25025 February 1998 Forwards Revised Copy of NRC Form 398, Personal Qualification Statement - Licensee, (10/97) Encl 1,which Has Been Revised to Reflect Current Operator Licensing Policy DCL-98-014, Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld1998-02-10010 February 1998 Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld ML20199H6691998-02-0202 February 1998 Ack Receipt of ,Transmitting Rev 18,change 11, to Plant Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Role of Video Capture Audible Alarm Sys Needs to Be Addressed in Security Plan,Per 980123 Telcon DCL-97-187, Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld1997-11-19019 November 1997 Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld IR 05000275/19970181997-10-31031 October 1997 Forwards Insp Repts 50-275/97-18 & 50-323/97-18 on 971006- 10.Insp Verified That Liquid & Gaseous Radioactive Waste Effluent Mgt Program Was Properly Implemented.No Violations Noted DCL-97-156, Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld1997-09-16016 September 1997 Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML16343A4801997-02-25025 February 1997 Forwards non-proprietary WCAP-14796 & Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. Proprietary Rept Withheld,Per 10CFR2.90 ML20134H6271997-02-10010 February 1997 Fifth Partial Response to FOIA Request for Documents.Records in App I Encl & Available in Pdr.App J Records Withheld in Part (Ref FOIA Exemption 5) & App K Records Completely Withheld (Ref FOIA Exemption 5) ML20134K3421997-02-0606 February 1997 Conveys Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRR at Plant,Units 1 & 2, on 960909-12.W/o Encl ML16342D5291997-01-31031 January 1997 Transmits WCAPs Supporting NRCs Review of License Amend Request 96-10,rev of TSs to Support Extended Fuel Cycles to 24 months.WCAP-11082,rev 5,WCAP-11594,rev 2 & WCAP-14646,rev 1 Withheld ML16342D5331997-01-24024 January 1997 Requests Proprietary Version of WCAP-14646,rev 1, Instrumentation Calibration & Drift Evaluation for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1997 Be Withheld from Public Disclosure Per 10CFR2.790 ML16342D5311997-01-24024 January 1997 Requests That WCAP-11594,rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation Be Withheld from Public Disclosure,Per 10CFR2.790 ML16342D5321997-01-24024 January 1997 Requests WCAP-11082,rev 5, Westinghouse Setpoint Methodology for Protection Sys,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1996 Be Withheld from Public Disclosure Per 10CFR2.790 ML20136C3521997-01-11011 January 1997 Discusses Japan Oil Spill & Np Intake & Possibilities of Such Event Occurring at SONGS or Dcnpp ML20133F8961997-01-0909 January 1997 Responds to NRC Ltr of 961206 Received on 961210 Which Requested Further Info Re Utils Violations of Conditions of Its Nuclear Licenses Designated to Promote & Protect Competition in Bulk Power Market in Northern & Central CA ML20133F8721997-01-0909 January 1997 Acks & Responds to NRC Ltr of 961206 Received by Undersigned on 961210 Requesting Further Info to Document Tancs Assertion,Per Filing on 960429 That Util Has Violated Terms & Conditions of Nuclear Power Project Licenses ML16342D5521996-12-18018 December 1996 Requests That Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methology, Be Withheld (Ref 10CFR2.790(b)(4)) ML20129J4001996-10-18018 October 1996 Forwards Order Approving Corporate Restructuring by Establishment of Holding Company & Safety Evaluation NSD-NRC-96-4846, Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl1996-10-16016 October 1996 Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl ML20129G6121996-09-24024 September 1996 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App C,E,F & G.Documents Available in Pdr.App E,F & G Documents Partially Withheld Ref FOIA Exemptions 4 & 6.App D Record Listed as Copyright DCL-96-170, Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld1996-08-14014 August 1996 Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld DCL-96-141, Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld1996-07-31031 July 1996 Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld ML20116B8411996-07-22022 July 1996 Forwards Revisions to SR 95-03,SR 95-04 & SR 95-05 Re EDG 1-2 Valid Failures ML20117E6171996-05-24024 May 1996 Forwards Public Version of Rev 11 to EPIP EP R-7, Off-Site Transportation Accidents DCL-96-102, Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld1996-05-0606 May 1996 Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld DCL-96-096, Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 151996-04-16016 April 1996 Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 15 DCL-96-054, Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld1996-02-28028 February 1996 Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld 1999-09-13 Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC MONTHYEARML20245D9851989-06-22022 June 1989
[Table view]Forwards 21 Insp Rept Executive Summaries,Per NRC Contract NRC-03-87-029,Task Order 037.Individual Quality Evaluations of Insp Repts Also Prepared ML20247P9411989-05-17017 May 1989 FOIA Request for Final Open Item Transmittal Ltrs Per NRC Insp Procedure 94300B for Listed Plants ML20150D4301988-01-0707 January 1988 FOIA Request for Records Re 1975 NRC Seismic Design Audit of Facility ML20235A1251987-12-16016 December 1987 Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs ML20234D7951987-12-14014 December 1987 FOIA Request for Documents Re Encls to to Util Transmitting Suppl to Safety Evaluation & Environ Assessment ML20235Y1711987-07-0606 July 1987 FOIA Request for Documents Re Investigation Into Plant Seismic Design Error ML20235R9191987-07-0202 July 1987 FOIA Request for Statement of Work on Plant Project Verification & Contracts Awarded to BNL by NRC Through DOE for FY79 - FY85.Scope of Work Only,Not Financial Info, Requested ML20234B6211987-05-12012 May 1987 Requests That Listed Plants Be Added to Encl 870508 FOIA Request Re 94300 Region Input on Plant Readiness ML20237J3401987-04-13013 April 1987 FOIA Request for Transcript of 830106 Meeting W/Individual Re Alleged Deficiencies in Plant Component Cooling Water Sys ML20205M4951987-02-20020 February 1987 FOIA Request That All Operational Readiness Ltrs for Diablo Canyon Be Placed in PDR ML20207T1001987-02-13013 February 1987 FOIA Request for Two Categories of Documents Re Diablo Canyon Nuclear Power Plant,Consisting of Transcripts of Closed Commission Briefings on 830422,840131 & 0702 & Secretary 831104 Limited Distribution Memo ML20211D7441987-02-12012 February 1987 Notifies of 830517 Meeting in San Francisco,Ca to Discuss Development of Piping Stress Intensification Factor ML20211D7031987-02-12012 February 1987 Notifies of 830209 Meeting in San Francisco,Ca to Discuss Shake Table Tests of Electrical Equipment ML20211D6631987-02-12012 February 1987 Notifies of 830204 Meeting W/Util,Idvp,Nrc & BNL in San Francisco,Ca to Discuss Status of Containment Annulus Steelwork & Status of Auxiliary Bldg ML20210M9071987-01-26026 January 1987 FOIA Request for Transcript of Commissioner 831017 Briefing Re Diablo Canyon Idvp ML20207T2211987-01-16016 January 1987 FOIA Request for Commissioner 811116 Briefing Transcript Re Diablo Canyon Seismic Design Error & NRC pre-congressional Testimony & Commissioner 811119 Briefing Transcript of NRC pre-congressional Testimony ML20207R6541987-01-0909 January 1987 FOIA Request for All Petitions Referred to Licensing Board by 740319 Memorandum & Order CLI-74-10 & All Licensing Board Orders,Director'S Decisions or Further Commission Orders Responding to Such Petitions ML20215L6371986-12-11011 December 1986 Appeals Denial of FOIA Request for Documents from Chron & Reading Files of H Schierling from Sept 1981 to Present Re Plant ML20215N4931986-10-14014 October 1986 FOIA Request for All NRC Daily Highlight Memos for Plant from 810601-861001 ML20215D8981986-09-0505 September 1986 FOIA Request for Records Re NRC Evaluation of Damage,Repair & Design of Facility Breakwater Sys ML20212N6991986-07-28028 July 1986 FOIA Request for Tw Bishop 811028 Memo to Jl Crews,Nrc Insp Guidance for 1966-1981,D Kirsch 771220 Memo to G Spencer & Listed Insp Repts ML20211Q9331986-06-24024 June 1986 FOIA Request for SALP Input for Cycles Jul 1979 - Dec 1980, Jul 1981 - Dec 1982 & Jan 1983 - June 1984 & Inputs from NRR & SALP Inputs Prepared Prior to Jul 1979 - Dec 1980 Cycle or for Dec 1980 - Jul 1981 ML20202D0531986-06-0202 June 1986 FOIA Request for Records of ACRS Jan 1973 - Dec 1985 Meetings Re Geology,Seismology & Seismic Design of Diablo Canyon ML20212K9331986-05-22022 May 1986 FOIA Request for Documents Re Meetings W/Usgs Between Jan 1973 - Dec 1985 Re Geology & Seismology ML20215M9941986-05-21021 May 1986 FOIA Request for Documents Re Eg Case 771201 Memo to Tj Mctiernan Concerning Chronology of Events Associated W/ Facility Fault Assessments ML20210K5541986-03-11011 March 1986 FOIA Request for Records from Caseload Forecast Review Panel Re Diablo Canyon from Jan 1979 - Dec 1981 ML20210P4871986-03-0404 March 1986 FOIA Request for Records from D Eisenhut Chronological & Reading Files Re Diablo Canyon Units 1 & 2 During Sept 1981 - Dec 1983 ML20209E1221986-03-0404 March 1986 FOIA Request for Documents Re Plant from Files of H Schierling from Jan 1984 to Present ML20206H6161986-03-0404 March 1986 FOIA Request for All Records from H Schierling Chronological Files & Reading Files for Sept 1981 - Dec 1983 Re Facilities ML20198E3211986-03-0404 March 1986 FOIA Request for Documents Re Facility from Chronological & Reading Files of HR Denton from 840101 to Present ML20210P7931986-03-0404 March 1986 FOIA Request for facility-related Documents from 840101 to Present from Files of D Eisenhut ML20210A6801986-03-0404 March 1986 FOIA Request for Documents from H Schierling Files from 810901-831231 Re Diablo Canyon Nuclear Power Plant,Units 1 & 2 ML20199G6651986-03-0404 March 1986 FOIA Request for Documents from Chronological & Reading Files of J Knight During 810901-831231 Re Plant ML20210Q0131985-10-10010 October 1985 FOIA Request for Previously Withheld Portions of 820121,27 & 0205 Commission Meeting Transcripts Re Diablo Canyon Plant ML20134L5011985-06-19019 June 1985 FOIA Request for Operator Exam Results Summary Sheets for Listed Nuclear Plants ML20133C5961985-05-23023 May 1985 FOIA Request for Section 55.25 Exam Summary Sheets Prepared by Operator Licensing Branch for Operator Candidates & Monthly & Quarterly Repts on Senior Operator Performance on Exams ML20215A2341984-08-14014 August 1984 Informs That H Schierling Gave Orders to Destroy Restricted Documents DKM-7-84 on 840802 ML20210E7331984-04-19019 April 1984 Submits Results of 840403-05 Insp of Rectangular Tube Steel W/Perimeter Less than 14 Inches Used for Safety Class I Sys, in Response to P Morrill 840402 Request.Data Re Tube Steel Measurements Encl ML20090A8731984-04-0404 April 1984 FOIA Request for V Gilinsky 830908 & 28 Ltrs to ACRS Re Tau Effect at Diablo Canyon to Be Placed in PDR ML20215G6471984-03-20020 March 1984 Forwards Rept PAR(DCNP)-NDE-3, Followup of Alleged Deficiencies in QA Program at Diablo Canyon Nuclear Plant, Per 840320 Telcon ML20112J3491984-02-0202 February 1984 Forwards Review Detailing Results of 831219 & 20 Audits Performed on Environ Qualification Program Documentation at Facility.Adequate Technical Basis for Claimed Qualification Indicated ML20153G9361984-01-31031 January 1984 Forwards Comments Addressed to Chairman Palladino ML20215H9331983-12-0505 December 1983 Provides Info Re Insp Status of 1982 Mods to Idvp & Data Re Raceway Bolts,Per D Kirsh 831130 Request ML20236U1011983-12-0505 December 1983 Forwards Attachment 1 Tabulating Info by Category W/ Exception of Concrete Expansion Re Insp Status Rept & Attachment 2 Illustrating Info Stored in Data File for Project.Related Documentation Also Encl ML20210E8021983-12-0202 December 1983 Discusses Welding Procedures & Practices Re Use of Unqualified Welders & Welding Procedures That Affect Safety. Response Requested.Supporting Documentation Encl ML20210E6161983-11-23023 November 1983 Forwards Rept PAR(DCNP)-NDE-2 & Project Quality Plan Re Technical Assistance in Support of NDE Work at Plant.Table of Field Welds Chosen for Radiograph & Reader Sheet Review Also Encl ML20080K3981983-09-20020 September 1983 Forwards Rev 0 to Diablo Canyon Unit 1 Idvp Verification of Corrective Action,Turbine Bldg, Interim Technical Rept 56 ML20211E4361983-08-25025 August 1983 Forwards Revs 0 to Interim Technical Repts,Including ITR-57, Review of Diablo Canyon Plant Activities Fuel Handling Bldg, ITR-58, Verification of Diablo Canyon Plant Activities Intake Structure & ITR-60.W/o Encls ML20211E5151983-08-24024 August 1983 Forwards 830819 Rev Package & 839822 Errata Package 5 to Suppl Facility Idvp Final Rept ML20080E1961983-08-19019 August 1983 Provides Summary Info & Eighth Text Submittal of Idvp Final Rept 1989-06-22 Category:INCOMING CORRESPONDENCE MONTHYEARML18107A7011999-06-25025 June 1999
[Table view]Requests Rev of NRC Records to Reflect Change of PG&E Address DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) DCL-99-033, Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl1999-03-12012 March 1999 Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld1999-01-26026 January 1999 Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot DCL-98-163, Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld1998-11-24024 November 1998 Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 DCL-98-014, Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld1998-02-10010 February 1998 Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld DCL-97-187, Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld1997-11-19019 November 1997 Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld DCL-97-156, Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld1997-09-16016 September 1997 Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments ML16343A4801997-02-25025 February 1997 Forwards non-proprietary WCAP-14796 & Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. Proprietary Rept Withheld,Per 10CFR2.90 ML16342D5291997-01-31031 January 1997 Transmits WCAPs Supporting NRCs Review of License Amend Request 96-10,rev of TSs to Support Extended Fuel Cycles to 24 months.WCAP-11082,rev 5,WCAP-11594,rev 2 & WCAP-14646,rev 1 Withheld ML16342D5321997-01-24024 January 1997 Requests WCAP-11082,rev 5, Westinghouse Setpoint Methodology for Protection Sys,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1996 Be Withheld from Public Disclosure Per 10CFR2.790 ML16342D5331997-01-24024 January 1997 Requests Proprietary Version of WCAP-14646,rev 1, Instrumentation Calibration & Drift Evaluation for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1997 Be Withheld from Public Disclosure Per 10CFR2.790 ML16342D5311997-01-24024 January 1997 Requests That WCAP-11594,rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation Be Withheld from Public Disclosure,Per 10CFR2.790 ML20136C3521997-01-11011 January 1997 Discusses Japan Oil Spill & Np Intake & Possibilities of Such Event Occurring at SONGS or Dcnpp ML20133F8961997-01-0909 January 1997 Responds to NRC Ltr of 961206 Received on 961210 Which Requested Further Info Re Utils Violations of Conditions of Its Nuclear Licenses Designated to Promote & Protect Competition in Bulk Power Market in Northern & Central CA ML20133F8721997-01-0909 January 1997 Acks & Responds to NRC Ltr of 961206 Received by Undersigned on 961210 Requesting Further Info to Document Tancs Assertion,Per Filing on 960429 That Util Has Violated Terms & Conditions of Nuclear Power Project Licenses ML16342D5521996-12-18018 December 1996 Requests That Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methology, Be Withheld (Ref 10CFR2.790(b)(4)) NSD-NRC-96-4846, Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl1996-10-16016 October 1996 Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl DCL-96-170, Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld1996-08-14014 August 1996 Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld DCL-96-141, Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld1996-07-31031 July 1996 Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld ML20116B8411996-07-22022 July 1996 Forwards Revisions to SR 95-03,SR 95-04 & SR 95-05 Re EDG 1-2 Valid Failures ML20117E6171996-05-24024 May 1996 Forwards Public Version of Rev 11 to EPIP EP R-7, Off-Site Transportation Accidents DCL-96-102, Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld1996-05-0606 May 1996 Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld DCL-96-096, Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 151996-04-16016 April 1996 Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 15 DCL-96-054, Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld1996-02-28028 February 1996 Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld ML20100L4631996-02-23023 February 1996 Forwards Response to NRC Enforcement Action 95-279 Re Violations Noted in Insp Repts 50-275/95-17 & 50-323/95-17 on 951021-1208.Corrective Actions:Directive Was Issued to Plan 2R7 W/Six Day Work Schedule DCL-96-036, Forwards Public Version of Rev 18 to EPIP EP EF-1, Activation & Operation of Technical Support Ctr1996-02-20020 February 1996 Forwards Public Version of Rev 18 to EPIP EP EF-1, Activation & Operation of Technical Support Ctr ML20097E9341996-01-25025 January 1996 Forwards Public Version of EPIP Update for Diablo Canyon Power Plant,Units 1 & 2 DCL-95-272, Supports Comments Submitted by NEI Re Licensee Qualification for Performing Safety Analyses,With Listed Exception.Nrc Should Allow Traning Requirement to Be Met by on-job Training1995-12-11011 December 1995 Supports Comments Submitted by NEI Re Licensee Qualification for Performing Safety Analyses,With Listed Exception.Nrc Should Allow Traning Requirement to Be Met by on-job Training DCL-95-264, Forwards Change 6 to Rev 18 to Physical Security Plan.Encl Withheld (Ref 10CFR73.55(d)(5))1995-12-0606 December 1995 Forwards Change 6 to Rev 18 to Physical Security Plan.Encl Withheld (Ref 10CFR73.55(d)(5)) ML20094M6001995-11-21021 November 1995 Forwards Final Rept of Investigation & Analysis of Event 29257 Re Substandard Fastner Processed & Sold by Cardinal Industrial Products,Lp,So That Customers Can Evaluate Situation in Light of 10CFR21.21(a)(1)(ii) & (b)(1) DCL-95-204, Forwards Proposed Changes to Physical Security Plan.Encl Withheld1995-09-19019 September 1995 Forwards Proposed Changes to Physical Security Plan.Encl Withheld DCL-95-199, Requests Exemption to 10CFR73.55 & Provides Draft Changes to Plant Physical Security Plan1995-09-14014 September 1995 Requests Exemption to 10CFR73.55 & Provides Draft Changes to Plant Physical Security Plan ML20087A0471995-07-28028 July 1995 Forwards Security Safeguards Info in Form of Change to Proposed Draft Plant Security Program.Encl Withheld DCL-95-153, Forwards Public Files Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 14 to 1.1,Rev 8 to 1.2,Rev 11 to 2.1,Rev 5 to 3.1,Rev 12 to 3.2,Rev 6 to 3.5,Rev 14 to 4.3.W/950807 Release Memo1995-07-27027 July 1995 Forwards Public Files Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 14 to 1.1,Rev 8 to 1.2,Rev 11 to 2.1,Rev 5 to 3.1,Rev 12 to 3.2,Rev 6 to 3.5,Rev 14 to 4.3.W/950807 Release Memo DCL-95-134, Forwards Rev 4 of Diablo Canyon Security Force Training & Qualification Plan.Encl Withheld Per 10CFR2.790(d)1995-07-0505 July 1995 Forwards Rev 4 of Diablo Canyon Security Force Training & Qualification Plan.Encl Withheld Per 10CFR2.790(d) ML20086H5461995-06-29029 June 1995 Forwards Final Exercise Rept for 931020,full Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response plans,site-specific to Plant.No Deficiencies Noted DCL-95-046, Submits Summary Description of Proposed Vehicle Control Measures Per 10CFR73.55.Encl Withheld1995-02-28028 February 1995 Submits Summary Description of Proposed Vehicle Control Measures Per 10CFR73.55.Encl Withheld DCL-95-039, Forwards Public Version of Revised Epips,Including EPIP Table of Contents,Rev 18 to EP G-2,rev 3 to EP OR-3,rev 17 to EP EF-1 & Rev 3 to EP EF-9.W/950306 Release Memo1995-02-23023 February 1995 Forwards Public Version of Revised Epips,Including EPIP Table of Contents,Rev 18 to EP G-2,rev 3 to EP OR-3,rev 17 to EP EF-1 & Rev 3 to EP EF-9.W/950306 Release Memo ML18101A5671995-02-17017 February 1995 Informs of Improper Presentation of Jet Expansion Model in Bechtel Technical rept,BN-TOP-2,Rev 2 Design for Pipe Break Effects Issued May 1974.NRC May Need to Consider Evaluating Consequences of Potential Misapplication of Expansion Model ML18101A5681995-02-17017 February 1995 Requests NRC to Clarify Whether Plant Should Declare ESF Portion of Ssps Inoperable & Enter TS 3.0.3 LCO Under Circumstances as Ref in in 95-10.Subj in Re Postulated Slb W/Potential to Render One Train of Ssps Inoperable ML18101A5741995-02-17017 February 1995 Requests Clarification of Whether Plant Should Declare ESF Portion of Ssps Inoperable & Enter TS 3.0.3 Limiting Conditions for Operation Under Circumstances Described in Info Notice 95-10 DCL-95-033, Forwards Public Version of Rev 3,Change 14 to Corporate Emergency Response Plan (Cerp) & Cerp Implementing Procedures1995-02-13013 February 1995 Forwards Public Version of Rev 3,Change 14 to Corporate Emergency Response Plan (Cerp) & Cerp Implementing Procedures DCL-95-013, Forwards Public Version of Revised Epips,Including Rev 11A to EP RB-11,rev 7A to EP RB-15:F,rev 4A to EP RB-15:G,rev 15A to EP EF-2 & Rev 14D to EP G-4.W/950208 Release Memo1995-01-24024 January 1995 Forwards Public Version of Revised Epips,Including Rev 11A to EP RB-11,rev 7A to EP RB-15:F,rev 4A to EP RB-15:G,rev 15A to EP EF-2 & Rev 14D to EP G-4.W/950208 Release Memo DCL-94-258, Forwards Public Version of Revised Epips,Including Rev 11A to EP RB-8,Rev 4B to EP RB-10,Rev 5 to EP RB-12,on-spot Change to Rev 9 to EP RB-15:C,Rev 16A to EP EF-1 & Rev 3B to EP EF-3B1994-11-21021 November 1994 Forwards Public Version of Revised Epips,Including Rev 11A to EP RB-8,Rev 4B to EP RB-10,Rev 5 to EP RB-12,on-spot Change to Rev 9 to EP RB-15:C,Rev 16A to EP EF-1 & Rev 3B to EP EF-3B 1999-06-25 |
Text
A LEDYNE ENGINEERING SERVICES 130 S ECON 0 AVEN UE WALTHAM.MASSACHUSETTS 02254
)617) 690-3350 TWX 1710) 324 7506 September 24, 1982 5511-142 Mr . G. A. Maneatis, Senior Vice-President Facilities Development Pacific Gas and Electric Co.
77 Beale Street San Francisco, California 94106 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. R. H. Engelken, Regional Administrator Region V U. S. Nuclear Regulatory Com)ission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Re: Docket No. 50-275 Diablo Canyon Unit 1 License No. DPR-76
Subject:
DCNPP Independent Design Verification Program, Semimonthly Status Report for September 1982 Gentlemen:
Enclosed is our semimonthly status report as Program Manager for the DCNPP Independent Design Verification Program.
Very Truly Yours, TELEDYNE ENGINEERING SERVICES William E. Cooper Project Manager WEC/cjr Enclosure cc: H. E. Schierling (NRC)(2)
R. R. Fray (PGImE)
R. L. Cloud (RLCA)
R. F. Reedy (RFR)
F. Sestak (SWEC)
H. B. Brown, Esq.
D. F. Fleischaker, Esq.
J. Reyno lds, Esq.
B. Norton, Esq.
A. C. Gehr, Esq.
8211010106 821006 PDR ADOCK 05000275 EPGIP)ccRS AND METALLURGISTS C PDR
,I ~
- s w
I'