ML16340C901

From kanterella
Jump to navigation Jump to search
Forwards Diablo Canyon Nuclear Power Plant Independent Design Verification Program,Semimonthly Rept for Sept 1982
ML16340C901
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 09/24/1982
From: Cooper W
TELEDYNE ENGINEERING SERVICES
To: Harold Denton, Engelken R, Maneatis G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V), Office of Nuclear Reactor Regulation, PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16340C902 List:
References
5511-142, NUDOCS 8211010106
Download: ML16340C901 (2)


Text

A LEDYNE ENGINEERING SERVICES 130 S ECON 0 AVEN UE WALTHAM.MASSACHUSETTS 02254

)617) 690-3350 TWX 1710) 324 7506 September 24, 1982 5511-142 Mr . G. A. Maneatis, Senior Vice-President Facilities Development Pacific Gas and Electric Co.

77 Beale Street San Francisco, California 94106 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. R. H. Engelken, Regional Administrator Region V U. S. Nuclear Regulatory Com)ission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Re: Docket No. 50-275 Diablo Canyon Unit 1 License No. DPR-76

Subject:

DCNPP Independent Design Verification Program, Semimonthly Status Report for September 1982 Gentlemen:

Enclosed is our semimonthly status report as Program Manager for the DCNPP Independent Design Verification Program.

Very Truly Yours, TELEDYNE ENGINEERING SERVICES William E. Cooper Project Manager WEC/cjr Enclosure cc: H. E. Schierling (NRC)(2)

R. R. Fray (PGImE)

R. L. Cloud (RLCA)

R. F. Reedy (RFR)

F. Sestak (SWEC)

H. B. Brown, Esq.

D. F. Fleischaker, Esq.

J. Reyno lds, Esq.

B. Norton, Esq.

A. C. Gehr, Esq.

8211010106 821006 PDR ADOCK 05000275 EPGIP)ccRS AND METALLURGISTS C PDR

,I ~

  • s w

I'