ML20215D898

From kanterella
Jump to navigation Jump to search
FOIA Request for Records Re NRC Evaluation of Damage,Repair & Design of Facility Breakwater Sys
ML20215D898
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/05/1986
From: Bishop T
O'BRIEN-KREITZBERG & ASSOCIATES, INC.
To: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
References
FOIA-86-679 L-153-3201, NUDOCS 8610140353
Download: ML20215D898 (1)


Text

_ _ _ .

O'O R I E N -K R EITZ B E R G & AO S O CI AT E S , INC.

Ilayside Plaza + 188 The Embarcadero San Francisco, CA 94105 + 415-777-0188 L-153/3201 September 5, 1986 FREEDOM OF INFORMATION ACT REQUEST rec r Office of Administration v sion of Rules and Records b'b9f United States Nuclear Regulatory Commission Washington, D.C. 20555

- d*[ h

Dear Mr. Felton:

Pursuant to the Freedom of Information Act, please forward single cooles of any and all correspondence, notes, memoranda, telephone j conversation notes, and other written material concerning NRC evaluation of the damage, repair, and design adequacy of the Diablo Canyon Breakwater system.

The damage occurred in January, 1981. The NRC Project Manager at that time was Mr. Bart Buckley. Other NRC of ficials known to have been involved are Mr. Myron Fliegel and Mr. Robert Tedesco. The NRC is known to have contracted with the Army Corps of Engineers (Coastal Engineering Research Center - Bob Sorensen) in evaluating the damage to the breakwaters.

Thank you for your prompt response to this request.

Very truly yours, O'Brien-Kreitzberg & Associates, Inc.

D i.%! dp Thomas W. Bishop Vice President >

r(

$s ,

2 7

S2

/

B610140353 PDR 860705~

FOIA BISHOP 86-679 PDR San Jose, C A . Los Angeles. CA Merchants ille. NJ

____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _