MONTHYEARML23340A1322023-12-0606 December 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Audit Clarifications - EPID L-2023-LLA-0092 ML24011A2072023-11-17017 November 2023 Approval to Conduct NRC Appendix C Inspection Procedure 93100 at Fermi-2 ML23277A1332023-10-0303 October 2023 NRR E-mail Capture - ECCS Strainer Risk Informed Licensing Amendment - Audit Questions ML23276A0052023-10-0202 October 2023 NRR E-mail Capture - (External_Sender) Fermi EDG Crankcase Trip LAR RAI Response ML23250A2732023-09-0707 September 2023 NRR E-mail Capture - Fermi 2 - Request for Additional Information for License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, Surveillance Requirement 3.8.1.12 ML23244A0022023-08-30030 August 2023 NRR E-mail Capture - Fermi 2 - Acceptance of Relief Request RR-A25 for Extended License Period ML23241B0162023-08-24024 August 2023 Exigent License Amendment Request for Additional Information RAI-12 (EPID L-2023-LLA-0112) (Email) ML23235A1822023-08-23023 August 2023 Exigent LAR Request for Additional Information NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-00552023-08-16016 August 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 NRC-23-0028, NRR E-mail Capture - (External Sender) Fermi Relief Request RR-A25 (NRC-23-0028)2023-08-0707 August 2023 NRR E-mail Capture - (External_Sender) Fermi Relief Request RR-A25 (NRC-23-0028) ML23199A2472023-07-14014 July 2023 Acceptance Review License Amendment Pertaining to ECCS Strainer Performance Evaluation ML23163A1742023-06-12012 June 2023 NRR E-mail Capture - Fermi 2 - Acceptance of Requested Licensing Action Regarding Amendment to Revise SR 3.8.1.2 in TS 3.8.1, AC Sources - Operating NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi ML23146A0622023-05-25025 May 2023 Acceptance of Requested Licensing Action Regarding Amendment to Correct Non-Conservative TS 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage ML23131A1912023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Fermi 2 LAR (EDG Crankcase Trip) - 6-Month Review ML23115A1452023-04-25025 April 2023 NRR E-mail Capture - Fermi 2 - Request for Additional Information for Changes to TS 3.8.1, AC Sources - Operating ML23076A0222023-03-14014 March 2023 Email SUNSI Action Related to Fermi Unit 1 Safety Hazards Summary Report (ML23066A135) ML23010A0962023-01-10010 January 2023 NRR E-mail Capture - Fermi 2 - Acceptance Review of the Requested Licensing Action Re License Amendment Request to Revise TS 3.8.1 ML22241A0622022-08-29029 August 2022 NRR E-mail Capture - Fermi 2: Acceptance Review of LAR Regarding Adoption of TSTF-582 ML22027A3612022-01-26026 January 2022 U1: CY2022 Inspection Plan, Docket No. 05000016, License No. DPR-9 ML21350A0482021-11-18018 November 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21266A4342021-09-20020 September 2021 Acceptance of DTE Request for Exemption from 10 CFR 72.44(d)(3) for Fermi 2 ML21214A1492021-08-0202 August 2021 License Amendment Request: Request for Additional Information ML21209A0132021-07-27027 July 2021 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 - Follow-Up to July 12, 2021 Email ML21194A0282021-07-12012 July 2021 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 - Continuance on Fall 2020 Emails ML21126A0532021-05-0404 May 2021 NRR E-mail Capture - Fermi 2 - Request for Additional Information for Revised Relief Request RR A-39 ML21116A2572021-04-21021 April 2021 NRR E-mail Capture - Fermi 2 - Acceptance Review Licensing Amendment Request to Revise Technical Specifications ML21089A3962021-03-30030 March 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21084A1322021-03-19019 March 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21026A1372021-01-25025 January 2021 NRR E-mail Capture - Acceptance Review: Fermi 2 Revised Relief Request RR-A39 ML20329A3802020-11-23023 November 2020 NRR E-mail Capture - Fermi 2 (COVID-19) Part 73 Exemption Request ML20275A2962020-09-30030 September 2020 NRR E-mail Capture - (External_Sender) Action - Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi 2 Nuclear Power Plant ML20289A1032020-09-29029 September 2020 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 ML20289A1052020-09-24024 September 2020 NRR E-mail Capture - Status Update on 2.206 Petition Regarding Fermi Unit 2 ML20261H9282020-08-14014 August 2020 NRR E-mail Capture - (External_Sender) Action - Request for Comments on the Proposed Issuance of Amendments to Technical Specifications for Fermi 2 Nuclear Power Plant ML20239A9682020-08-12012 August 2020 NRR E-mail Capture - Fermi 2 LAR: RAI for Revision to Technical Specifications to Change the Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML20195A2762020-07-0909 July 2020 NRR E-mail Capture - Your Request for Extension of Part 26 Exemption Date - Documentation of Our Discussion on July 8, 2020 ML20181A4102020-06-29029 June 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Licensing Amendment Request to Adopt TSTF-563 ML20239A7962020-06-26026 June 2020 NRR E-mail Capture - Screening Result of 2.206 Petition Regarding Fermi Unit 2 ML20149K4242020-05-19019 May 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Relief Request RR-A42 ML20073E4222020-03-12012 March 2020 NRR E-mail Capture - Fermi 2: Relief Request VRR-004, Minor Clarifications to Ensure Consistency with the Specific Language in the ASME Code ML20029F0232020-01-29029 January 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Relief Requests (Proposed Alternatives), VRR-010 and VRR-011 for the Fourth 10-year IST Program ML20017A1782020-01-17017 January 2020 Relief Request #1 for Four RHR Valves (E1150F006A/B/C/D) ML20015A3012020-01-14014 January 2020 E-mail Fermi 1: CY2020 Master Inspection Plan ML20008D5752020-01-0808 January 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 - LAR to Revise Technical Specification for Secondary Containment Surveillance Requirements ML20008D1582020-01-0707 January 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 - LAR to Revise Technical Specification for Secondary Containment Surveillance Requirements ML19346F1192019-12-12012 December 2019 NRR E-mail Capture - Acceptance Review: Fermi 2 - LAR to Revise Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML19346F1432019-12-12012 December 2019 NRR E-mail Capture - Fermi 2 - LAR Revise TS Regarding Steam Dome Pressure - Revised Estimate in the Hours to Complete the Amendment ML19304A2142019-10-30030 October 2019 NRR E-mail Capture - Acceptance Review: Fermi 2 Proposed Alternative VRR-004, Rev. 1, Relief to Confirm Obturator Position at Seat Leakage Testing Frequency 2023-09-07
[Table view] |
Text
From: Venkataraman, Booma Sent: Thursday, March 12, 2020 11:21 AM To: Margaret M Offerle Cc: Arora, Surinder; Tseng, Ian
Subject:
Fermi 2: Relief Request VRR-004, Minor Clarifications to ensure consistency with the specific language in the ASME Code Expires: Monday, May 11, 2020 12:00 AM
- Peg, On February 27, 2020, a conference call was held between NRC staff and DTE Electric Company (DTE) regarding the Relief Request, VRR-004 related to the Inservice Testing (IST) Program, fourth 10-year interval. This was not a request for additional information.
By letter dated October 8, 2019, DTE requested the NRC for approval of a proposed alternative, pursuant to 10 CFR 50.55a(z)(1), to the requirements of the ASME OM Code Subsections ISTC-3700, III-3310, and 10 CFR 50.55a(b)(3)(xi), for a set of valves included in the Fermi 2 IST Program fourth 10-year interval.
The NRC staff had the following clarifying question:
The submittal states that for the listed active motor operated valves in Attachment 1, position indication testing requirements are identified in Mandatory Appendix III as described in ISTC-3700. The staff notes that ISTC-3700, and its reference to Mandatory Appendix III applies to position verification testing for valves with remote position indicators, and not position indication testing. Position indication testing, or testing valve obturator movement as determined by observing an appropriate indicator, such as indicating lights, is addressed in ISTC-3530.
To prevent confusion, please clarify which OM Code requirements are applicable to your relief request.
Further to the conference call, DTE provided additional clarity in the e-mail below. This e-mail is being put on the docket in public ADAMS as a record of this interchange.
Thanks, Booma Booma Venkataraman Project Manager, NRR/DORL/LPL3 Office of Nuclear Reactor Regulation Booma.Venkataraman@nrc.gov 301.415.2934 From: Margaret M Offerle <margaret.offerle@dteenergy.com>
Sent: Monday, March 09, 2020 5:12 PM To: Venkataraman, Booma <Booma.Venkataraman@nrc.gov>
Subject:
[External_Sender] Fermi VRR-004
- Booma, DTE review of the relief request VRR-004, submitted by DTE letter NRC-19-0067 dated October 8, 2019, has identified the need for some minor clarifications. These minor clarifications are to ensure consistency with the specific language used in the ASME OM Code.
Page 3 of the enclosure to NRC-19-0067 currently includes the following text:
For active motor operated valves in Attachment 1, position indication testing requirements are identified in Mandatory Appendix III as described in ISTC-3700. Per
Subsections III-3300 and III-3310, position indication testing is performed with inservice testing, which itself is performed at a variable frequency.
A minor clarification to this text on page 3 is provided as follows:
For active motor operated valves in Attachment 1, position verification requirements are identified in Mandatory Appendix III as described in ISTC-3700. Per Subsections III-3300 and III-3310, verification of remote position indication is performed with inservice testing, which itself is performed at a variable frequency.
Page 4 of the enclosure to NRC-19-0067 currently includes the following text:
Note that this relief request is not proposing to alter the frequency of position indication testing itself, as required by Subsection ISTC-3700 (or Subsection III-3300(e) for active motor operated valves). Therefore, position indication testing of the valves in Attachment 1 will continue to be performed at a frequency of two years in accordance with ISTC-3700 (or at the frequency in accordance with Subsection III-3310 for active motor operated valves).
A minor clarification of this text on page 4 is provided as follows:
Note that this relief request is not proposing to alter the frequency of position indication testing that does not include obturator verification (i.e., comparison of local observation to indicating lights), as required by Subsection ISTC-3700 (or Subsection III-3300(e) for active motor operated valves). Therefore, this type of position indication testing of the valves in Attachment 1 will continue to be performed at a frequency of two years in accordance with ISTC-3700 (or at the frequency in accordance with Subsection III-3310 for active motor operated valves).
Footnotes 1 and 11 to the table in the attachment to NRC-19-0067 currently state:
- 1. The standard method for performing position indication test will be performed every two years in accordance with the ISTC-3700 frequency requirements.
- 11. Position indication of these active motor operated valves will follow more restrictive ISTC-3700 frequency requirement (2 year) instead of Mandatory Appendix III due to in-progress valve re-classification.
A minor clarification to the table footnotes 1 and 11 is provided as follows:
- 1. The standard method for performing position indication testing (i.e. comparison of local observation to indicating lights) will be performed every two years in accordance with the ISTC-3700 frequency requirements.
- 11. Obturator verification of these active motor operated valves will follow more restrictive ISTC-3700 frequency requirement (2 year) instead of Mandatory Appendix III due to in-progress valve re-classification.
Please let us know if you have any questions regarding these minor clarifications. Thank you.
Peg
Hearing Identifier: NRR_DRMA Email Number: 476 Mail Envelope Properties (MN2PR09MB400039836D05EC0F339AA7F686FD0)
Subject:
Fermi 2: Relief Request VRR-004, Minor Clarifications to ensure consistency with the specific language in the ASME Code Sent Date: 3/12/2020 11:20:30 AM Received Date: 3/12/2020 11:20:00 AM From: Venkataraman, Booma Created By: Booma.Venkataraman@nrc.gov Recipients:
"Arora, Surinder" <Surinder.Arora@nrc.gov>
Tracking Status: None "Tseng, Ian" <Ian.Tseng@nrc.gov>