NRR E-mail Capture - Acceptance Review: Fermi 2 Proposed Alternative VRR-004, Rev. 1, Relief to Confirm Obturator Position at Seat Leakage Testing Frequency
ML19304A214
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/30/2019
From: Booma Venkataraman
NRC/NRR/DORL/LPL3
To: Offerle M
DTE Electric Company
References
L-2019-LLR-0098
Download: ML19304A214 (3)


Text

1 NRR-DRMAPEm Resource From:

Venkataraman, Booma Sent:

Wednesday, October 30, 2019 5:04 PM To:

Margaret M Offerle Cc:

Jason R Haas; Salgado, Nancy

Subject:

ACCEPTANCE REVIEW: Fermi 2 Proposed Alternative VRR-004, Rev. 1, Relief to confirm obturator position at seat leakage testing frequency (EPID: L-2019-LLR-0098)

Expires:

Sunday, December 29, 2019 12:00 AM

Peg, By letter dated October 8,2019 (Agencywide Documents Access and Management System Accession No. ML19281C656), DTE Electric Company (DTE, the licensee), in accordance with 10 CFR 50.55a(z)(1),

submitted a proposed alternative relief request, VRR-004, Rev. 1 for relief from the ASME OM Code requirements in Subsections ISTC-3700 and III-3310 and 10 CFR 50.55a(b)(3)(xi) for certain valves as listed in Attachment 1 to Enclosure 1 of the October 8, 2019 letter for Fermi 2. The proposed alternative is to perform the required verification of obturator position using seat leakage testing at the seat leakage testing frequency interval. The basis of the relief request is that the proposed alternative will provide an acceptable level of quality and safety.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the above request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your submittal and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that the relief request will take approximately 240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> to complete. The NRC staff expects to complete the review of the licensing action by October 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

2 If you have any questions, please contact me at (301) 415-2934.

Sincerely, Booma Booma Venkataraman Project Manager, NRR/DORL/LPL3 Office of Nuclear Reactor Regulation Booma.Venkataraman@nrc.gov 301.415.2934

Hearing Identifier:

NRR_DRMA Email Number:

294 Mail Envelope Properties (MN2PR09MB40008DA09CE72746624EDBAD86600)

Subject:

ACCEPTANCE REVIEW: Fermi 2 Proposed Alternative VRR-004, Rev. 1, Relief to confirm obturator position at seat leakage testing frequency (EPID: L-2019-LLR-0098)

Sent Date:

10/30/2019 5:03:30 PM Received Date:

10/30/2019 5:03:00 PM From:

Venkataraman, Booma Created By:

Booma.Venkataraman@nrc.gov Recipients:

"Jason R Haas" <jason.haas@dteenergy.com>

Tracking Status: None "Salgado, Nancy" <Nancy.Salgado@nrc.gov>

Tracking Status: None "Margaret M Offerle" <margaret.offerle@dteenergy.com>

Tracking Status: None Post Office:

MN2PR09MB4000.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3419 10/30/2019 5:03:00 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

12/29/2019 Recipients Received: