From: Surinder Arora Sent: Tuesday, January 10, 2023 7:43 AM To: Eric Frank Cc: Roxanne Vonhabsburg

Subject:

Fermi 2 - Acceptance Review of the Requested Licensing Action Re: License Amendment Request to Revise TS 3.8.1 (EPID L-2022-LLA-0188)

By letter dated December 16, 2022 (Agencywide Documents Access and Management System (ADAMS) at Accession No. ML22350A504), DTE Energy Company (DTE) submitted the license amendment to revise Fermi 2 Technical Specification (TS) Section 3.8.1, AC Sources -

Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal the NRC staff has estimated that this licensing request will take approximately 520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is December 16, 2023. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

SURINDER ARORA, P.E.

Plant Licensing Branch III (LPL3)

DIVISION OF OPERATING REACTOR LICENSING (DORL)

Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission

Phone: 301 415-1421 Email: Surinder.Arora@nrc.gov

Hearing Identifier: NRR_DRMA Email Number: 1900

Mail Envelope Properties (BY3PR09MB8225487261B11C6B328B873694FF9)

Subject:

Fermi 2 - Acceptance Review of the Requested Licensing Action Re License Amendment Request to Revise TS 3.8.1 (EPID L-2022-LLA-0188)

Sent Date: 1/10/2023 7:43:04 AM Received Date: 1/10/2023 7:43:00 AM From: Surinder Arora

Created By: Surinder.Arora@nrc.gov

Recipients:

"Roxanne Vonhabsburg" <roxanne.vonhabsburg@dteenergy.com>

Tracking Status: None "Eric Frank" <eric.frank@dteenergy.com>

Tracking Status: None

Post Office: BY3PR09MB8225.namprd09.prod.outlook.com

Files Size Date & Time MESSAGE 2940 1/10/2023 7:43:00 AM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: