ML23163A174

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Fermi 2 - Acceptance of Requested Licensing Action Regarding Amendment to Revise SR 3.8.1.2 in TS 3.8.1, AC Sources - Operating
ML23163A174
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/12/2023
From: Shilpa Arora
NRC/NRR/DORL/LPL3
To: Frank E
DTE Electric Company
References
L-2023-LLA-0069
Download: ML23163A174 (3)


Text

From: Surinder Arora Sent: Monday, June 12, 2023 12:53 PM To: Eric Frank Cc: V Sreenivas

Subject:

Fermi 2 - Acceptance of Requested Licensing Action Regarding Amendment to Revise SR 3.8.1.2 in TS 3.8.1, AC Sources - Operating" (EPID L-2023-LLA-0069)

Mr. Frank:

By letter dated May 5, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23131A191), DTE Electric Company submitted a license amendment request for Fermi 2. The purpose of this e-mail is to provide the results of the U.S.

Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br /> to complete. The NRC staff expects to complete this review in one year from the date of this acceptance email; i.e., by June 12, 2024.

If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Surinder Arora, Project Manager LPL3 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Email: Surinder.Arora@nrc.gov Phone: (301) 415-1421

Docket No.

50-341

cc: Listserv

Hearing Identifier: NRR_DRMA Email Number: 2120

Mail Envelope Properties (BY3PR09MB82257575D240C781C10E81D39454A)

Subject:

Fermi 2 - Acceptance of Requested Licensing Action Regarding Amendment to Revise SR 3.8.1.2 in TS 3.8.1, AC Sources - Operating (EPID L-2023-LLA-0069)

Sent Date: 6/12/2023 12:53:24 PM Received Date: 6/12/2023 12:53:00 PM From: Surinder Arora

Created By: Surinder.Arora@nrc.gov

Recipients:

"V Sreenivas" <V.Sreenivas@nrc.gov>

Tracking Status: None "Eric Frank" <eric.frank@dteenergy.com>

Tracking Status: None

Post Office: BY3PR09MB8225.namprd09.prod.outlook.com

Files Size Date & Time MESSAGE 3510 6/12/2023 12:53:00 PM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: