MONTHYEARML20017A1782020-01-17017 January 2020 Relief Request #1 for Four RHR Valves (E1150F006A/B/C/D) Project stage: Request ML20023A0252020-01-30030 January 2020 Summary of January 22, 2020, Teleconference Meeting with DTE Electric Company, Fermi 2 on Pre-Application Teleconference on Two Relief Requests Regarding RHR Valves and HPCI and RCIC Valves Project stage: Meeting 2020-01-17
[Table View] |
Similar Documents at Fermi |
---|
Category:E-Mail
MONTHYEARML23340A1322023-12-0606 December 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Audit Clarifications - EPID L-2023-LLA-0092 ML24011A2072023-11-17017 November 2023 Approval to Conduct NRC Appendix C Inspection Procedure 93100 at Fermi-2 ML23277A1332023-10-0303 October 2023 NRR E-mail Capture - ECCS Strainer Risk Informed Licensing Amendment - Audit Questions ML23276A0052023-10-0202 October 2023 NRR E-mail Capture - (External_Sender) Fermi EDG Crankcase Trip LAR RAI Response ML23250A2732023-09-0707 September 2023 NRR E-mail Capture - Fermi 2 - Request for Additional Information for License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, Surveillance Requirement 3.8.1.12 ML23244A0022023-08-30030 August 2023 NRR E-mail Capture - Fermi 2 - Acceptance of Relief Request RR-A25 for Extended License Period ML23241B0162023-08-24024 August 2023 Exigent License Amendment Request for Additional Information RAI-12 (EPID L-2023-LLA-0112) (Email) ML23235A1822023-08-23023 August 2023 Exigent LAR Request for Additional Information NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-00552023-08-16016 August 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 NRC-23-0028, NRR E-mail Capture - (External Sender) Fermi Relief Request RR-A25 (NRC-23-0028)2023-08-0707 August 2023 NRR E-mail Capture - (External_Sender) Fermi Relief Request RR-A25 (NRC-23-0028) ML23199A2472023-07-14014 July 2023 Acceptance Review License Amendment Pertaining to ECCS Strainer Performance Evaluation ML23163A1742023-06-12012 June 2023 NRR E-mail Capture - Fermi 2 - Acceptance of Requested Licensing Action Regarding Amendment to Revise SR 3.8.1.2 in TS 3.8.1, AC Sources - Operating NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi ML23146A0622023-05-25025 May 2023 Acceptance of Requested Licensing Action Regarding Amendment to Correct Non-Conservative TS 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage ML23131A1912023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Fermi 2 LAR (EDG Crankcase Trip) - 6-Month Review ML23115A1452023-04-25025 April 2023 NRR E-mail Capture - Fermi 2 - Request for Additional Information for Changes to TS 3.8.1, AC Sources - Operating ML23076A0222023-03-14014 March 2023 Email SUNSI Action Related to Fermi Unit 1 Safety Hazards Summary Report (ML23066A135) ML23010A0962023-01-10010 January 2023 NRR E-mail Capture - Fermi 2 - Acceptance Review of the Requested Licensing Action Re License Amendment Request to Revise TS 3.8.1 ML22241A0622022-08-29029 August 2022 NRR E-mail Capture - Fermi 2: Acceptance Review of LAR Regarding Adoption of TSTF-582 ML22027A3612022-01-26026 January 2022 U1: CY2022 Inspection Plan, Docket No. 05000016, License No. DPR-9 ML21350A0482021-11-18018 November 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21266A4342021-09-20020 September 2021 Acceptance of DTE Request for Exemption from 10 CFR 72.44(d)(3) for Fermi 2 ML21214A1492021-08-0202 August 2021 License Amendment Request: Request for Additional Information ML21209A0132021-07-27027 July 2021 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 - Follow-Up to July 12, 2021 Email ML21194A0282021-07-12012 July 2021 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 - Continuance on Fall 2020 Emails ML21126A0532021-05-0404 May 2021 NRR E-mail Capture - Fermi 2 - Request for Additional Information for Revised Relief Request RR A-39 ML21116A2572021-04-21021 April 2021 NRR E-mail Capture - Fermi 2 - Acceptance Review Licensing Amendment Request to Revise Technical Specifications ML21089A3962021-03-30030 March 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21084A1322021-03-19019 March 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21026A1372021-01-25025 January 2021 NRR E-mail Capture - Acceptance Review: Fermi 2 Revised Relief Request RR-A39 ML20329A3802020-11-23023 November 2020 NRR E-mail Capture - Fermi 2 (COVID-19) Part 73 Exemption Request ML20275A2962020-09-30030 September 2020 NRR E-mail Capture - (External_Sender) Action - Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi 2 Nuclear Power Plant ML20289A1032020-09-29029 September 2020 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 ML20289A1052020-09-24024 September 2020 NRR E-mail Capture - Status Update on 2.206 Petition Regarding Fermi Unit 2 ML20261H9282020-08-14014 August 2020 NRR E-mail Capture - (External_Sender) Action - Request for Comments on the Proposed Issuance of Amendments to Technical Specifications for Fermi 2 Nuclear Power Plant ML20239A9682020-08-12012 August 2020 NRR E-mail Capture - Fermi 2 LAR: RAI for Revision to Technical Specifications to Change the Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML20195A2762020-07-0909 July 2020 NRR E-mail Capture - Your Request for Extension of Part 26 Exemption Date - Documentation of Our Discussion on July 8, 2020 ML20181A4102020-06-29029 June 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Licensing Amendment Request to Adopt TSTF-563 ML20239A7962020-06-26026 June 2020 NRR E-mail Capture - Screening Result of 2.206 Petition Regarding Fermi Unit 2 ML20149K4242020-05-19019 May 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Relief Request RR-A42 ML20073E4222020-03-12012 March 2020 NRR E-mail Capture - Fermi 2: Relief Request VRR-004, Minor Clarifications to Ensure Consistency with the Specific Language in the ASME Code ML20029F0232020-01-29029 January 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Relief Requests (Proposed Alternatives), VRR-010 and VRR-011 for the Fourth 10-year IST Program ML20017A1782020-01-17017 January 2020 Relief Request #1 for Four RHR Valves (E1150F006A/B/C/D) ML20015A3012020-01-14014 January 2020 E-mail Fermi 1: CY2020 Master Inspection Plan ML20008D5752020-01-0808 January 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 - LAR to Revise Technical Specification for Secondary Containment Surveillance Requirements ML20008D1582020-01-0707 January 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 - LAR to Revise Technical Specification for Secondary Containment Surveillance Requirements ML19346F1192019-12-12012 December 2019 NRR E-mail Capture - Acceptance Review: Fermi 2 - LAR to Revise Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML19346F1432019-12-12012 December 2019 NRR E-mail Capture - Fermi 2 - LAR Revise TS Regarding Steam Dome Pressure - Revised Estimate in the Hours to Complete the Amendment ML19304A2142019-10-30030 October 2019 NRR E-mail Capture - Acceptance Review: Fermi 2 Proposed Alternative VRR-004, Rev. 1, Relief to Confirm Obturator Position at Seat Leakage Testing Frequency 2023-09-07
[Table view] |
Text
From: Margaret M Offerle To: Venkataraman, Booma
Subject:
[External_Sender] Fermi Relief Request Date: Friday, January 17, 2020 10:26:20 AM Relief Request #1 for four RHR valves (E1150F006A/B/C/D)
Background:
The fourth 10-year IST interval begins on February 17, 2020. The ASME 2012 OM Code to be used for the fourth interval includes Mandatory Appendix III, which requires preservice testing for MOVs. Four Residual Heat Removal (RHR) MOVs were not required to be tested according to Mandatory Appendix III during the third (i.e., current) 10-year IST interval. Per the new requirements, testing of these four RHR MOVs was scheduled to be performed prior to February 17, 2020 without the need for any relief.
Subsequent review of the test plans just prior to performance identified an operational risk to the work which could result in a loss of a safety function and result in rapid plant shutdown.
Due to this risk, the testing should be performed during plant shutdown conditions only. The next scheduled plant shutdown for Fermi 2 is refueling outage 20 (RF20). RF20 is not scheduled to begin until spring 2020, which would be after the fourth 10-year IST interval start date of February 17, 2020. Fermi 2 will be in non-compliance with the ASME 2012 OM code (and associated 10 CFR 50.55a) on February 17, 2020 unless relief from Mandatory Appendix III is granted.
Proposed Relief Request Summary:
Fermi 2 would seek relief from ASME OM Code 2012 Edition Mandatory Appendix III, Section III-3200. The relief would be requested under 10 CFR 50.55a(z)(2) as compliance with the specified requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The basis for relief would be the testing that has been previously performed on the valves, including: thrust testing, motor control center-based (MCC-based) testing, and quarterly stroke time testing. These tests provide reasonable assurance that the safety functions of the valves can be met. The requested duration of the relief would only be a few months, specifically from February 17, 2020 until testing can be performed in spring 2020 during RF20.
Relief Request #2 for one HPCI (E4150F007) and one RCIC (E5150F012) valve
Background:
The fourth 10-year IST interval begins on February 17, 2020. The ASME 2012 OM Code to be used for the fourth interval includes Mandatory Appendix III, which requires preservice testing for MOVs. An MOV for High Pressure Coolant Injection (HPCI) and an MOV for Reactor Core Isolation Cooling (RCIC) (i.e., two MOVs total) were not required to be tested according to Mandatory Appendix III during the third (i.e., current) 10-year IST interval.
Rather than testing these two MOVs per the new requirements, reclassification of the valves was planned as part of the interval update. The MOVs would no longer be relied upon to perform a pressure isolation valves (PIVs) safety function; existing check valves would be
relied upon instead as the PIVs.
Subsequent review of the plans identified that reclassification could not be completed until the check valves had seat leakage testing and the seat leakage testing should be performed during plant shutdown conditions only. The next scheduled plant shutdown for Fermi 2 is refueling outage 20 (RF20). RF20 is not scheduled to begin until spring 2020, which would be after the fourth 10-year IST interval start date of February 17, 2020. Without the reclassification, the MOVs remain subject to the new code requirements for which they have not been tested.
Fermi 2 will be in non-compliance with the ASME 2012 OM code (and associated 10 CFR 50.55a) on February 17, 2020 unless relief from Mandatory Appendix III is granted.
Proposed Relief Request Summary:
Fermi 2 would seek relief from ASME OM Code 2012 Edition Mandatory Appendix III, Section III-3200. The relief would be requested under 10 CFR 50.55a(z)(2) as compliance with the specified requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The basis for relief would be that there is reasonable assurance that the MOVs can continue to perform their PIV safety function even without performance of the new Appendix III testing. This basis will include credit for the presence of the check valves, even though check valve seat leakage testing has not yet been performed. The requested duration of the relief would only be a few months, specifically from February 17, 2020 until seat leakage testing of the check valves can be performed in Spring 2020 during RF20 and then valve reclassification can be completed.