Summary of December 11, 2008, Meeting with Tennessee Valley Authority on Status of Construction and Licensing Activities
ML090480436
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/23/2009
From: Milano P
Watts Bar Special Projects Branch
To:
Tennessee Valley Authority
Milano P, NRR/DORL , 415-1457
Shared Package
ML090480388 List:
References
TAC MD6311
Download: ML090480436 (3)


Text

February 23, 2009 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2

SUBJECT:

SUMMARY

OF DECEMBER 11, 2008, MEETING WITH TENNESSEE VALLEY AUTHORITY ON STATUS OF CONSTRUCTION AND LICENSING ACTIVITIES (TAC NO. MD6311)

On December 11, 2008, a Category 3 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Tennessee Valley Authority (TVA, the licensee) at Roane State Community College in Harriman, Tennessee. The purpose of the meeting was to (a) discuss the status of the construction and licensing of Watts Bar Nuclear Power Plant Unit 2 (WBN-2), (b) update the public about the NRCs licensing and inspection processes being applied to the WBN-2 project, and (c) provide information on how the NRC will monitor and the public can participate in those processes. A list of attendees is provided as .

As delineated in its handout slides (Enclosures 2 and 3), the NRC staff presented information regarding the licensing and inspection processes to be implemented by the NRC. In this regard, the staff from the Office of Nuclear Reactor Regulation (NRR) provided the current status of its review of the operating license application and explained the focus of the review, the scope of remaining technical reviews, and the extension of the latest construction completion date in the construction permit. The NRR staff also discussed future noticing in the Federal Register of an additional opportunity for hearing related to the review of the operating license application and how the public can become involved in the process. The staff from the NRCs Region II Office provided a discussion of its construction inspection organization, a description of the inspection program being implemented at WBN-2, and the process for assessment of program results.

The licensee presented information about the WBN-2 construction completion project in its handout slides (Enclosure 4). In addition to information about the status of the WBN-2 Integrated Schedule, TVA discussed the details about the engineering, procurement, construction and refurbishment activities along with the status of its quality assurance and safety conscious work environment programs.

About 15 members of the public were in attendance. Feedback forms were made available during the meeting. However, Public Meeting Feedback forms were not received. Please direct any inquiries to me at 301-415-1457, or patrick.milano@nrc.gov.

/RA/

Patrick D. Milano, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosures:

1. List of Attendees 2-3. NRC Slides
4. TVA Slides cc w/encls: Distribution via Listserv

ML090480436 OFFICE LPWB/PM LPWB/LA LPWB/PM LPWB/BC NAME VSreenivas BClayton PMilano LRaghavan DATE 02/19/09 02/19/09 02/23/09 02/23/09 List of Attendees Meeting to Discuss Construction and Licensing Watts Bar Nuclear Power Plant, Unit 2 December 11, 2008 Nuclear Regulatory Commission (NRC)

Participants:

Name Position/Title Organization Joseph Giitter Division Director Division of Operating Reactor Licensing (DORL)

Office of Nuclear Reactor Regulation (NRR)

L. Raghavan Branch Chief Watts Bar Special Project Branch (WBPB), DORL Parick Milano Sr. Project Manager WBPB/DORL V. Sreenivas Project Manager WBPB/DORL Anthony Gody Deputy Director Division of Construction Projects (DCP),

Region II (R-II)

Robert Haag Branch Chief Construction Branch 3, DCP/R-II Tommy Nazario Resident Inspector DCP/R-II Watts Bar Unit 2 Other NRC Attendees:

Kenneth Clark R-II Brannen Adkins R-II Jeffrey Sowa R-II Patrick Heher R-II Theodore Fanelli R-II Alejandro Alen R-II Joseph Ledford R-II Abhijit Sengupta R-II Tennessee Valley Authority (TVA)

Participants:

Masoud Bajestani Vice President, WBN Unit 2 E. Freeman Manager, Engineering, WBN Unit 2 J. Schlessel Manager, Construction, WBN Unit 2 B. Briody Manager, Maintenance, WBN Unit 2 R. Baron Manager, Quality Assurance, WBN Unit 2 Gordon Arent Manager, Licensing, WBN Unit 2 Other TVA Attendees:

Scott Vance Terry Johnson Tim Rader Enclosure 1

List of Meeting Attendees (continued)

Public:

John Heath Deputy Mayor, City of Dayton Gary Goff Chair, Harriman Utility Board Kendall Bear Rockwood Electric Utility Ed Marcun Knoxville News Sentinel Anne Paine The Tennessean Scott Brown Tom Brown Kelvin Campbell Ann Harris Perry Heath Pete Johnson Mark McDermott Shirley Miller Charles Miller Lyn Miller Walter Perry John Platfoot Debbie Vance