CNL-15-063, Supplement Safety Evaluation Report - Open Item 33 - Completion of Dcns 53421 and 54636
Letter Sequence Request | |
---|---|
TAC:MD6311, Clarify Application of Setpoint Methodology for LSSS Functions, Control Room Habitability, Steam Generator Tube Integrity (Approved, Closed) TAC:MD8314, Clarify Application of Setpoint Methodology for LSSS Functions, Control Room Habitability, Steam Generator Tube Integrity (Open) | |
Initiation Results Other: CNL-14-154, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12, CNL-15-137, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13, ML080860026, ML080860040, ML081700293, ML082410088, ML083460177, ML090480486, ML101260469, ML102170077, ML102290258, ML103010299, ML11213A130, ML11362A056, ML12234A688, ML13023A315, ML13213A194 | |
MONTHYEARML0732401242007-11-26026 November 2007
[Table View]Summary of Meeting with Tennessee Valley Authority on Use of Eagle 21 at Watts Bar Unit 2 Project stage: Meeting ML0734400222007-12-0505 December 2007 Westinghouse Eagle - 21 Process Protection System Project stage: Request ML0801705432008-01-0303 January 2008 Summary of December 12, 2007, Meeting with Tennessee Valley Authority on Reconstruction of the Licensing Basis for Watts Bar Unit 2 Project stage: Meeting ML0735209712008-01-0303 January 2008 Summary of Meeting with Tennessee Valley Authority on Reconstitution of the Licensing Basis for Watts Bar, Unit 2 Project stage: Meeting ML0803701852008-02-0101 February 2008 Request to Use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Code Case N-520-2, Alternative Rules for Renewal of Active or Expired N-Type Certificates for Plants Not in Active Construction. Project stage: Other ML0812105062008-05-0707 May 2008 Request for Additional Information Regarding Eagle-21 Process Protection System (Tac No. MD6311) Project stage: RAI ML0810101162008-05-0808 May 2008 Review Topics for Safety Evaluation, Attachment 1 Project stage: Approval ML0808600402008-05-0808 May 2008 Enclosure 1- Watts Bar Nuclear Plant, Unit 2 - Assessment of Remaining Operating License Application Review Scope Project stage: Other ML0808600262008-05-0808 May 2008 Assessment of Remaining Operating License Application Review Scope Project stage: Other ML0814300282008-05-14014 May 2008 Transmittal of Annual Radiological Environmental Operating Report of 2007 Project stage: Request ML0813008092008-05-22022 May 2008 Request for Additional Information, Renewal of Active or Expired N-Type Certificates for Plants Project stage: RAI ML0814901102008-05-28028 May 2008 Status of Generic Communications for Review (Tac No. MD8314) Project stage: Other ML0814901182008-05-28028 May 2008 NRC Review: Generic Communications Status for TVA Watts Bar Unit 2 Project stage: Other ML0817002932008-06-16016 June 2008 Response to Additional Information Request on Regulatory Framework for the Completion of Construction and Licensing, Revision 1 Project stage: Other ML0818504592008-07-0202 July 2008 Response to Request for Additional Information Project stage: Response to RAI ML0818504602008-07-0202 July 2008 Final Supplemental Environmental Impact Statement - Request for Additional Information Project stage: Supplement ML0821402382008-07-29029 July 2008 Generic Communications Status, Revision 1 Project stage: Other ML0824100882008-08-25025 August 2008 Westinghouse Eagle-21 Process Protection System Project stage: Other ML0827500192008-09-26026 September 2008 Regulatory Framework for the Completion of Construction and Licensing Activities for Unit 2 - Corrective Action and Special Programs, and Unresolved Safety Issues Project stage: Other ML0825603732008-10-0202 October 2008 Request for Relief Regarding Alternative Rules for Renewal of Active or Expired N-Type Certificates Project stage: Other ML0834601772008-12-0909 December 2008 Unit 2 - Licensing Basis Preservation and Construction Refurbishment Program for Structures, Systems and Components (Sscs) Project stage: Other ML0904804862009-02-23023 February 2009 TVA December 11, 2008 - Public MtgR1 Project stage: Other ML0904804362009-02-23023 February 2009 Summary of December 11, 2008, Meeting with Tennessee Valley Authority on Status of Construction and Licensing Activities Project stage: Meeting ML0904804662009-02-23023 February 2009 NRR - Public Meeting WBN2 Status 12-11-08 Project stage: Meeting ML0904804712009-02-23023 February 2009 Region II - December 2008 Public Meeting with Notes Project stage: Meeting ML1001204872009-11-12012 November 2009 Application for Special Nuclear Material License in Accordance with 10 CFR 70, Domestic Licensing of Special Nuclear Material Project stage: Request ML1001916842010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97, Section 3 - Design of Structures, Components, Equipment, and Systems, Page 3.8.5-1 Through Page 3.11-9 Project stage: Request ML1001914212010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97 Project stage: Request ML1012002042010-04-20020 April 2010 Preservice Inspection Program Plan and Additional Information Project stage: Other ML1012604692010-04-29029 April 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 2, and Status of Generic Communications for Unit 2 - Revision 2 Project stage: Other ML1016805612010-06-17017 June 2010 Preservice Inspection Program Plan and Additional Information Project stage: Other ML1019402362010-06-18018 June 2010 Instrumentation and Controls Staff Information Requests Project stage: Request ML1017602222010-06-25025 June 2010 Request to Use ASME Boiler and Pressure Vessel Code, Code Case N-520-3, Alternative Rules for Renewal of Active or Expired N-Type Certificates for Plants Not in Active Construction, Section III, Division 1 Project stage: Other ML1021700772010-07-30030 July 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 3, and Status of Generic Communications for Unit 2 - Revision 3 Project stage: Other ML1022902582010-07-31031 July 2010 Final Safety Analysis Report - Response to Preliminary Requests for Additional Information and Requests for Additional Information Project stage: Other ML1025001712010-09-0101 September 2010 OL - TVA Letter to NRC - WBN U2 FSAR A100 Project stage: Request ML1027005272010-09-29029 September 2010 Request for Relief Regarding Alternative Rules for Renewal of Active or Expired N-Type Certification Project stage: Other ML1030102992010-10-28028 October 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 4, and Status of Generic Communications for Unit 2 - Revision 4 Project stage: Other ML1031207112010-10-29029 October 2010 Instrumentation and Controls Staff Information Requests Project stage: Request ML1031207122010-10-29029 October 2010 Edcr 52321 Draft Scope and Intent, Unit Difference and Technical Evaluation, Enclosure 2, Attachment 1 Project stage: Request ML1031403142010-11-0101 November 2010 OL - TVA Letter to NRC_10-29-10_WBN U2 FSAR 101 Project stage: Request ML1032001462010-11-0909 November 2010 Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information Project stage: Response to RAI ML1032106442010-11-17017 November 2010 Revision of Commitment for Implementation of the Maintenance Rule Project stage: Request ML1035405602010-12-17017 December 2010 Safety Evaluation Report Supplement 22 (SSER22) - Response to Requests for Additional Information Project stage: Supplement ML1102104862011-01-21021 January 2011 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 5 and Status of Generic Communications for Unit 2 - Revision 5 Project stage: Other ML1106202192011-02-25025 February 2011 Instrumentation and Controls Staff Information Requests Project stage: Request ML1110500092011-04-0808 April 2011 OL - FW: Updated OI List Project stage: Request ML11136A0532011-04-18018 April 2011 OL - TVA Letter to NRC_04-15-11_I&C RAI Response Project stage: Request ML11129A2052011-05-0606 May 2011 Instrumentation and Controls Staff Information Requests Project stage: Request ML11178A1552011-06-0303 June 2011 Final Safety Analysis Report (Fsar), Amendment 104 Project stage: Request 2010-10-28 |
ML15097A421 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 04/07/2015 |
From: | James Shea Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
CNL-15-063, DCN 53421, DCN 54636 SSER, App HH, Open Item 33 | |
Download: ML15097A421 (2) | |
Similar Documents at Watts Bar | |
---|---|
Category:Letter type:CNL
MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024
[Table view]Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-12-22022 December 2022 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-22-101, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-012022-11-28028 November 2022 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-070, Status Regarding the Improved Flood Mitigation System Project2022-06-30030 June 2022 Status Regarding the Improved Flood Mitigation System Project CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-043, Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board.2022-05-0202 May 2022 Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board. CNL-22-046, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan.2022-04-28028 April 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan. 2024-01-09 Category:Safety Evaluation Report MONTHYEARML23122A2322023-06-0707 June 2023
[Table view]Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-15-063, Supplement Safety Evaluation Report - Open Item 33 - Completion of Dcns 53421 and 546362015-04-0707 April 2015 Supplement Safety Evaluation Report - Open Item 33 - Completion of Dcns 53421 and 54636 ML14365A0482014-11-12012 November 2014 E-mail Re. Watts Bar Nuclear Plant, Unit 2 - RAIs - Degraded Voltage Relay Issue ML13213A1942013-07-25025 July 2013 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 10 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 10 ML13205A1362013-06-30030 June 2013 NUREG-0847 Supp 26 Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2 ML12011A0242011-11-30030 November 2011 NUREG-0847, Supp. 25, Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2 ML11277A1482011-09-30030 September 2011 NUREG-0847 Supp 24 Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2. ML11206A4992011-06-30030 June 2011 NUREG-0847 Supp 23, Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2. ML11161A1282011-06-0707 June 2011 Safety Evaluation Report Supplement 22 (Sser 22) - Second Response to NRC Required Action Items ML0905707412009-02-28028 February 2009 NUREG-0847, Supp. 21, Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2 ML0816200432008-06-30030 June 2008 Issuance of Amendment Regarding Reactor Trip System and Engineered Safety Features Actuation System Completion Times, Bypass Test Times, and Surveillance Test Intervals ML0331100912003-10-23023 October 2003 Submittal of Revision 3 to Ice Condenser Utility Group Topical Report No. ICUG-001: Application of the Active Ice Mass Management Concept to the Ice Condenser Ice Mass Technical Specification ML0312600102003-05-0606 May 2003 Draft Safety Evaluation, Ice Condenser Utility Group Topical Report No. ICUG-001, Revision O 2023-06-07 |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-15-063 April 7, 2015 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 Construction Permit No. CPPR-92 NRC Docket No. 50-391
Subject:
Watts Bar Nuclear Plant Unit 2- Supplement Safety Evaluation Report- Open Item 33 - Completion of DCNs 53421 and 54636
References:
- 1. NUREG-0847, Supplement 22, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2, Docket No. 50-391, Tennessee Valley Authority," dated February 2011 [ADAMS Accession No. ML110390197]
- 2. Letter from TVA to NRC, "Watts Bar Nuclear Plant (WBN) Unit 2-Final Safety Analysis Report (FSAR) - Response to Preliminary Requests for Additional Information and Requests For Additional Information," dated July 31 , 2010 [ADAMS Accession No. ML102290258]
- 3. Letter from TVA to NRC, "Watts Bar Nuclear Plant (WBN) Unit 2-Safety Evaluation Report Supplement 22 (SSER22) - Response to NRC Required Action Items," dated April 6, 2011 [ADAMS Accession No. ML110980637]
The purpose of this letter is to inform the Nuclear Regulatory Commission that field work associated with SSER 22 Appendix HH, Open Item 33 (Reference 1) is complete.
U.S. Nuclear Regulatory Commission Page 2 April 7, 2015 The Watts Bar Nuclear Plant Unit 2 response provided in Attachment 9 of Reference 2 listed unverified assumptions pertaining to the 125 Volt DC Vital Battery System Analysis. Cable-related field work associated with the Reciprocating Charging Pump and Turbine Driven Auxiliary Feedwater Pump (AFWP) needed to be completed to resolve the unverified assumptions. The modifications were made by the following design change notices (DCN) .
- DCN 53421 for the removal/abandonment of Reciprocating Charging Pump 2-MTR-62-1 01 , supplied from 480V SHDN BD 2B 1-B, Com pt. 38.
- DCN 54636 for the cable modifications for Unit 2 AFWP Turbine Trip and Throttle Valve and Turbine Controls.
These changes are now complete and a commitment completion package (Tracking No. 112145148, IP&S No. 493) has been prepared and is available on site for NRC closure review.
Tennessee Valley Authority actions associated with Open Item 33 contained in Reference 3 are complete.
There are no new regulatory commitments associated with this submittal. If you have any questions, please contact Gordon Arent at (423) 365-2004.
1 declare under penalty of perjury that the foregoing is true and correct. Executed on the 7th day of April 2015.
Respectfully, 1!/11r1'; she~
J. W . Shea
{}w Vice President, Nuclear Licensing cc:
NRC Regional Administrator- Region II NRC Senior Resident Inspector- Watts Bar Nuclear Plant, Unit 2 NRC Project Manager- Watts Bar Nuclear Plant, Unit 2