Final Safety Analysis Report (Fsar), Amendment 104
ML11178A155
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 06/03/2011
From: Stinson D
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
Download: ML11178A155 (28)


Text

Attachment 1 to be withheld from Public Disclosure Under 10 CFR 2.390. When separated from this Enclosure, this letter is decontrolled.

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 June 3, 2011 10 CFR 50.4(b)(6) 10 CFR 50.34(b) 10 CFR 2.390(d)(1)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 Docket No. 50-391

Subject:

WATTS BAR NUCLEAR PLANT (WBN) - UNIT 2 - FINAL SAFETY ANALYSIS REPORT (FSAR), AMENDMENT 104

References:

1. TVA letter to NRC dated March 15, 2011, "Watts Bar Nuclear Plant (WBN)

- Unit 2 - Final Safety Analysis Report Amendment 103"

2. TVA letter to NRC dated April 6, 2011, "Watts Bar Nuclear Plant (WBN)

Unit 2 - Safety Evaluation Report Supplement 22 (SSER22) - Response to NRC Required Action Items"

3. TVA letter to NRC dated May 20, 2011, "Watts Bar Nuclear Plant (WBN)

Unit 2 - Response to Final Safety Analysis Report (FSAR), Chapter 11 and Final Supplemental Environmental Impact Statement (FSEIS)

Request for Additional Information" This letter transmits WBN Unit 2 FSAR Amendment 104 (Al 04), which reflects changes made since the issuance of Amendment 103 on March 15, 2011 (Reference 1).

In Reference 2 (Enclosure 1, Item 36), TVA committed to update Table 3.2-2 "to note that TVA Class G and H piping within the SGB System exists downstream of the safety-related containment isolation valves." TVA later discovered that the same information intended to be placed into Table 3.2-2 was already provided in Table 3.2-2a. Therefore, this change to Table 3.2-2 is no longer needed and thus this letter closes the commitment in Reference 2.

Al 04 also includes changes to FSAR Chapter 11 previously proposed via Reference 3. contains a summary listing of FSAR sections and corresponding Unit 2 change package numbers associated with the A104 FSAR changes. Most of these changes were the result of resolutions to NRC Requests for Additional Information.

t')R (

U.S. Nuclear Regulatory Commission Page 2 June 3, 2011 FSAR A104 is contained on the enclosed Optical Storage Media (OSM #1) (Attachment 1). The FSAR contains security-related information identified by the designation "Security-Related Information - Withhold Under 10 CFR 2.390." TVA hereby requests this information be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390. A redacted version of the FSAR is contained on OSM #2 (Attachment 2), which is suitable for public disclosure. contains a listing of the FSAR pages that have been redacted. Enclosure 3 lists the files and file sizes on the security-related OSM (OSM #1), and Enclosure 4 lists the files and file sizes on the publicly available OSM (OSM #2).

There are no new commitments made in this letter. This letter does not close any "Generic Communications." If you have any questions, please contact Bill Crouch at (423) 365-2004.

I declare under the penalty of perjury that the foregoing is true and correct. Executed on the 3 rd day of June, 2011.

Respectfully, David Stinson Watts Bar Unit 2 Vice President

Enclosures:

1. WBN Unit 2 FSAR A104, "Summary Listing ofAl04 FSAR Changes"
2. WBN Unit 2 FSAR A104, "Summary of Redacted Pages"
3. WBN Unit 2 FSAR A104, "List of files and file sizes on the security-related OSM (OSM #1)"
4. WBN Unit 2 FSAR A104, "List of files and file sizes on the publicly available OSM (OSM #2)"

Attachments:

1. OSM #1: WBN Unit 2 FSAR Amendment 104 - Security-Related Information - Withhold Under 10 CFR 2.390
2. OSM #2: WBN Unit 2 FSAR Amendment 104 - Publicly Available Version cc: See Page 3

U.S. Nuclear Regulatory Commission Page 3 June 3, 2011 cc (Enclosures):

U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381

ENCLOSURE1 WBN Unit 2 FSAR A104 "Summary Listing of A104 FSAR Changes" Item Change No. Change Area Change Description Package Number

1. Table In Table 3.2-7, page 16 of 16, change N-520-2 to N-520-3. 2-104-01 3.2-7
1. Added the words "(References 1, 2 and 3)" to the end of the first sentence of the last paragraph on FSAR page 6.2.6-2.
2. Deleted the phrase "as specified in 10 CFR 50, Appendix J" from the end of the second sentence of Exemption 2 on FSAR Page 6.2.6-3.
3. Deleted the phrase,"as specified in 10 CFR 50, Appendix J" from the end of the second sentence of Exemption 3 on FSAR Page 6.2.6-3.
4. Deleted the phrase "as specified in 10 CFR 50, Appendix J" from the end of the second sentence of Exemption 5 on FSAR Page 6.2.6-4.
2. Section 5. Deleted the word "None" and added the following three 2-104-02 6.2.6 references to the bottom of page 6.2.6-6 numbered as 1 through 3:
  • Title 10, Code of Federal Regulations, Part 50, Appendix J, Option B, "Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors - Performance-Based Requirement."

" Regulatory Guide 1.163, "Performance-Based Containment Leak-Test Program," September 1995.

NEI 94-01, Revision 0, "Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J."

1. Changed the design basis blowdown energy identified in assumption (1) of FSAR Section 6.2.1.1.1 from 315.1 x 106 to 317.3 X 106.
2. Changed the design basis blowdown mass identified in assumption (1) of FSAR Section 6.2.1.1.1 from 499.6 x 103 to 502.7 X 103.

Sections

3. 6.2.1 3. Changed the maximum calculated containment pressure and 2-104-03 6.8.3 the time it occurs identified in FSAR Section 6.2.1.3.3 (FSAR page 6.2.1-8) from 10.23 psig at 7172.8 seconds to 12.47 psig at 4346 seconds.
4. Revised the values and footnotes provided on FSAR Table 6.2.1-3 for the Energy Balances. Also, revised the time for the Approximate End of Reflood column on FSAR Table 6.2.1-3 from 238.369 seconds to 241.3 seconds.

E1-1

ENCLOSURE1 WBN Unit 2 FSAR A104 "Summary Listing of A104 FSAR Changes" Item Change Not Change Area Change Description Package Number

5. Revised the values and footnotes provided on FSAR Table 6.2.1-4 for the Energy Balances. Also, revised the column title and the time for the Approximate Ice Meltout Time column from 4077.94 seconds to 3009.3 seconds. Additionally, revised the time for the Approximate Time of Peak Pressure column from 7172.82 seconds to 4346 seconds.
6. Replaced the values included on FSAR Table 6.2.1-16 with the values.
7. Replaced the values included on FSAR Table 6.2.1-17 with the values.
8. Replaced FSAR Table 6.2.1-18 with new values.
9. Replaced the values included on FSAR Table 6.2.1-19 with

.Sections new values.

6.2.1 2-104-03 (cont.) 6.2.1 10. Revised the times for Accumulator Flow Starts, End of

)6.8.3 Blowdown, Accumulators Empty, and End of Reflood on FSAR Table 6.2.1-25.

11. Replaced the values included on FSAR Table 6.2.1-26a with new values.
12. Replaced the values included on FSAR Table 6.2.1-26b with new values.
13. Replaced FSAR Figures 6.2.1-1, 6.2.1-2a, 6.2.1-2b, 6.2.1-3, 6.2.1-4 and 6.2.1-4a with new figures.
14. Changed the peak containment pressure and time of peak pressure from 10.23 psig at approximately 7172.8 seconds to 12.47 psig at approximately 4346 seconds in the first paragraph of FSAR Section 6.8.3.

E1-2

ENCLOSURE 1 WBN Unit 2 FSAR A104 "Summary Listing of A104 FSAR Changes" Item Change Description Change Package Item Change Area Number 1 FSAR Section 10.3.5.3 (2) Cold Shutdown/Wet Layup, added to end of paragraph to read; "orcompletely cover the steam generatortubes with a greaterthan 25 ppm hydrazine layup solution."

2 FSAR Section 10.4.6.1 Design Bases - Power Conversion, Sections added to after the last paragraph a new paragraph to read:

4. 10.4.6.1 "The functions of the condensate startup (Red Iron) filters are 2-104-04 used during startup and as requiredfor removal of hematite and other corrosion products from the condensate system.

These startup filters (12 filters total) are essential to achieve rapidcleanup of the condensate system. Range of flow per filter is 650 gpm to 750 gpm. Maximum design pressurefor the Condensate Startup Filters is 300 psig."

1. For Section 1.2.2.7, changed "six" to "eight" and replaced "two spares" with "two pairs of spares" in the last paragraph of the Page 1.2-6 (A103).
2. In Table 3.2-3, sheet 3 of 4, for the 125 VDC Vital Battery Charges changed "6" to "9," for Chgrs, replaced "Spare" with "V," for Chgr, replaced "6-S and 7-S" with "6-S, 7-S, 8-S, and 9-S," for the Transfer switches, replaced "6DC-8" Sections with "68DC1-S & 68DC2-S," replaced "7DC-S" with 1.2.2.7 "79DC1-S & 79DC2-S," replaced "6AC-S" with "68AC1-S 3.10.4.1 & 68AC2-S," and replaced "7AC-S" with 79AC1-S &

8.3 79AC2-S."

5. Tables 3. For Section 3.10.4.1, in the 125VDC Class 1E System 2-104-05 3.2-3 listing, inserted a new line item entitled, "Spare Transfer 3.10-1 Switches" with contract No. "00072332"; and for Battery 8.3-10 Chargers, replaced existing contract No. "74C8-85251" with "00072332."
4. For Table 3.10-1, inserted line item for "Spare Transfer Switches, A-772, 00072332, AMETEK SCI, IEEE 344-1975, Test, Multifrequency, Random Biaxial, Wyle Lab."
5. For Section 8.3.2.1.1, replaced "six" with "eight" and "two spare chargers" with "two pairs of spare chargers," in the second paragraph.

E1-3

ENCLOSURE1 WBN Unit 2 FSAR A104 "Summary Listing of A104 FSAR Changes" Item Change No. Change Area Change Description Package Number

6. For Section 8.3.2.1.1 (page 8.3 A103), replaced the phrase, "a spare (backup) charger for use upon loss of the normal charger" with "two spare (backup) chargers for use upon loss of the normal charger. Each pair of spare chargers are mechanically interlocked such that only one charger in each pair can be utilized at one time," in the first paragraph at top of page.
7. Replaced the phrase, "One spare charger is," with "Two spare chargers are," in the second paragraph on Page 8.3-55 (Al 03).
8. Inserted "pairs of' in the second paragraph on Page 8.3-58 (Al 03).
9. Replaced "one" with "two" in the second paragraph on Page 8.3-58 (A103).

Sections 10. Replaced "VI, and VII" with "6-S, 7-S, 8-S, and 9-S" in the 1.2.2.7 fourth paragraph on Page 8.3-58 (A103).

3.10.4.1 8..3 11. Replaced "300" with "200" and "2.0" with "1.0" in the fifth

5. paragraph on Page 8.3-58 (A103). 2-104-05 (cont.) Tables 12. Inserted a new item 7 that reads as follows: "(7) high voltage 3.2-3 3.10-1 cutout function that will trip the output breaker in the event there is an overvoltage condition," into the next to last 8.3-10 paragraph on Page 8.3-58 (A103).
13. In the last paragraph on Page 8.3-61 (A103), replaced "six" with "eight", "two spare" with "two pairs of spare," and "A manually operated switch transfers," with "Manually operated switches transfer."
14. Replaced on Page 8.3-65 (A103) that reads: "The tests for vital battery boards 1,11,111, and IV and charger 1,11,111, and IV were performed in conformance with IEEE Standard 344-1971, Guide for Seismic Qualification of Class 1 E Equipment.

[Charger V is Seismic Category I(L)]" with "The tests for Vital Battery Boards 1,11,111, IV were performed in conformance to IEEE Standard 344-1971, Guide for Seismic Qualification of Class 1E Equipment. Chargers 1,11,111, and IV (including spare chargers 6-S, 7-S, 8-S, and 9-S) were tested to IEEE Standard 344-1975. [Although charger V is Seismic Category I(L), it has been procured and tested in compliance with IEEE Standard 344-1975 to reduce the spare parts inventory]."

E1-4

ENCLOSURE1 WBN Unit 2 FSAR A104 "Summary Listing of A104 FSAR Changes" Item Nte Change Area Change Change Description Package No. Number

15. For Table 8.3-10, for 125V Spare Bat Chgr 6, added "&8****.,

for 125V Spare Bat Chgr 7, added "&9****..

Sections 1.2.2.7 16. For Table 8.3-10, replaced "Charger DC (6-S)" with "Chargers 3.10.4.1 DC (6-S & 8-S)."

8.3

5. 17. For Table 8.3-10, replaced "Charger DC (7-S)" with "Chargers 2-104-05 (cont.) Tables DC (7-S & 9-S)."

3.2-3 3.10-1 18. For Table 8.3-10, inserted new note as follows: """..These 8.3-10 switch panels contain a second manually interlocked transfer switch to select the charger being utilized. Corrected alignment both AC and DC transfer switch panels is required for proper operation of the utilized charger."

1. On FSAR Table 6.2.4-2, Page 6 of 6, changed the "Penetrating Line Name" for Penetration Number X-1 14 from "Ice Condenser (to Glycol Cool FL Pumps)" to "Ice Condenser (from Glycol Floor Cooling Coils)."
2. On FSAR Table 6.2.4-2, Page 6 of 6, changed the "Penetrating Line Name" for Penetration Number X-1 15 from "Ice Condenser (to Glycol Cool FL Pumps)" to "Ice Condenser (to Glycol Floor Cooling Coils)."
3. On FSAR Table 6.2.6-4, Page 7 of 7 (A103), changed the Tables status of penetration X-47B from "Same as X-47A" to "Glycol
6. 6.2.4-2 cooling return from air handling units in ice condenser required 2-104-06 6.2.6-4 to ensure ice condition is maintained."
4. On FSAR Table 6.2.6-4, Page 7 of 7 (Al 03), changed the status of penetration X-1 14 from "Glycol return from air handling units required to ensure ice condition is maintained."

to "Glycol return line from floor cooling coils required to ensure ice condition is maintained."

5. On FSAR Table 6.2.6-4, Page 7 of 7 (A103), changed the status of penetration X-1 15 from "Same as X-1 14" to "Glycol supply line to floor cooling coils required to ensure ice condition is maintained."

E1-5

ENCLOSURE I WBN Unit 2 FSAR A104 "Summary Listing of A104 FSAR Changes" Item Change No. Change Area Change Description Package Number

1. On FSAR Table 3.9-25, entitled "Valves Required To Be Active For Design Basis Events," Sheet 14 of 23, added valves FCV-67-66 and FCV-67-67.
2. On FSAR Table 3.9-25, entitled "Valves Required To Be Active For Design Basis Events," Sheet 15 of 23, added valve 1-FCV-67-146.

Section 3. On FSAR Table 3.9-26, entitled "Inservice Inspection Category 9.2 Valves," Sheet 3 of 6, added valves FCV-67-66, FCV-67-67 and 1-FCV-67-146.

7. Tables 2-104-07 3.9-25 4. On FSAR page 9.2-1, removed the asterisks from Item 3 in 3.9-26 Section 9.2.1.2
5. On FSAR page 9.2-10, revised the statements that indicate that ERCW piping to the diesel generators is treated during periods of biocide injection by providing continuous flow to the diesel generators. The statements were changed to indicate that ERCW piping to the diesel generators is treated during periods of train specific biocide injection by opening the associated diesel generator supply valve.
1. Revised the numbers and the titles for FSAR Figures 15.2-42a, 15.2-42b and 15.2-42c on the List of Figures for FSAR Chapter 15.
2. Revised the initial NSSS thermal power output assumed for inadvertent operation of ECCS during power operation on FSAR Table 15.1-2, Page 2 of 4.
8. Section 3. In FSAR Section 15.2.14.1, removed the asterisk from the 2-104-08 15.2-14 boric acid concentration and the associated note. Also remove the extra space in the last sentence of the third paragraph.
4. In FSAR Section 15.2.14.2, revised the discussion included under Method of Analysis; Assumptions 2, 4 and 10; and the discussion included under Results and Pressurizer Filling Case.

E11-6

ENCLOSUREI WBN Unit 2 FSAR A104 "Summary Listing of A104 FSAR Changes" Item Not Change Change Area Change Description Package Number

5. In FSAR Section 15.2.14.3, revised the second paragraph.
6. On FSAR Table 15.2-1, deleted events, "Pressurizer Fills," and "Maximum RCS Pressure Occurs," and the associated time
8. Section under the "Pressurizer Filling Case." Also, added an event entitled "Maximum associated Pressurizer Water Level Occurs," with the 2-104-08 time of 667 seconds.
7. Replaced FSAR Figures 15.2.42a, 15.2.42b and 15.2.42c with new figures.
1. Added new FSAR Section 15.2.15 entitled "Chemical and Volume Control System Malfunction During Power Operation."
2. Added new Table 15.2-6, entitled "Time Sequence of Events for CVCS Malfunction."
3. Added new Figure 15.2-44, entitled "CVCS Malfunction Nuclear Power vs. Time."
9. Section 15.2-15 4. Added new Figure 15.2-45, entitled "CVCS Malfunction RCS Average Temperature Versus Time."
5. Added new Figure 15.2-46, entitled "CVCS Malfunction Pressurizer Pressure Versus Time."

6 Added new Figure 15.2-47, entitled "CVCS Malfunction Pressurizer Water Volume Versus Time."

E1-7

ENCLOSURE1 WBN Unit 2 FSAR A104 "Summary Listing of A104 FSAR Changes" Item Change No. Change Area Change Description Package Number

1. For Section 2.4.3.3, Paragraph 5, added a description of sand baskets installed at Fort Loudoun, Cherokee, Tellico and Watts Bar dams (see References 1 through 8).
2. For Section 2.4.3.4, Concrete Section Analysis, replaced text originally duplicated from Unit 1 which did not reflect the updated PMF analysis and the resulting review of the revised headwater/tailwater conditions at affected dam (see Reference 9).
3. For Section 2.4.3.4, Spillway Gates, replaced text originally duplicated from Unit 1 which did not reflect the updated PMF analysis and the resulting review of the revised headwater Sections conditions at affected dams with Taintor Radial Gates; Vertical Lift gates at Chatuge, Chickamauga, Nottely and Drum Gates
10. 2.4.3.3 at Norris and Valve Control at South Holston and Watauga 2-104-10 2.4.3.4 have not been historically addressed so information related to 2.4.4.1 these gates/devices is not added to the text (see References 5-8 and 10-20).
4. For Section 2.4.4.1, Dam Failure Permutations, Embankment, Paragraph 4, added a description of sand basket seismic analysis installed at Fort Loudoun (see References 21 and 22).
5. For Section 2.4.4.1, Dam Failure Permutations, SSE Concurrent with 25 Year Flood, Multiple Failures, Paragraph 3, added a description of the utilization of sand baskets for the Norris, Cherokee, Douglas and Tellico Dam failure combination in an SSE coincident with a 25-year flood.

Figures 2.4-69 2.4-72 Watts Bar FSAR Figures 2.4-69, 72, 74, 78, 87 and 89 revised to

11. 2.4-74 note the increased height of the embankments at Cherokee, Fort 2-104-11 2.4-78 Loudoun, Tellico and Watts Bar dams.

2.4-87 2.4-89 1 Revised FSAR Chapter 12 Table of Contents and List of Section Tables to add FSAR Table 12.2-13.

12. 12.2.1.3 2. Revised FSAR Section 12.2.1.3 to describe added Table 12.2- 2-104-12 Table 13.

12.2-13 3. Added Table 12.2-13.

E1-8

ENCLOSURE1 WBN Unit 2 FSAR A104 "Summary Listing of A104 FSAR Changes" Item Change No. Change Area Change Description Package Number

1. Revised the text for FSAR Sections 15.5.1, 15.5.4, 15.5.5, and Sections associated Tables 15.5-1, 15.5-2, 15.5-14, 15.5-16, 15.5-17, 15.5.1 15.5-18, and 15.5-19 to reflect changes in calculations 15.5.4 WBNTSR-008, R13; WBNAPS3-077, 15.5.4 R8. The calculations were changed toR13; and corrective support WBNTSR-080, actions in PERs 327968, 327956, and 360041. The revisions Tables include changes in accident source terms, dispersion
13. 15.5-1 coefficients, steam mass releases and offsite and main control 2-104-13 15.5-2 room accident doses for the Main Steam Line Break, Steam 15.5-14 Generator Tube Rupture, and Loss of Off Site Power 15.5-16 accidents.

15.5-17 2. Revised the text for FSAR Sections 15.5.1, 15.5.4, 15.5.5, and 15.5-18 associated Tables 15.5-1, 15.5-2, 15.5-14, 15.5-16, 15.5-17, 15.5-19 15.5-18, and 15.5-19 to correct minor administrative errors.

Incorporate changes to reflect the installation of WINCISE system by revising the following:

1. In Section 3.9.2.4 (page 3.9 Al 03), changed from "35" to "29" in the last sentence of the first paragraph.
2. In Section 3.9.2.4 (page 3.9 A103), deleted item a entitled, "Thermocouple conduits, clamps and couplings,"

item e, "Thermocouple conduit gusset and clamp welds (where applicable)"; and Item f, "Thermocouple conduit end plugs

14. Section Check for tightness," from the Upper Internals list and 2-104-14 3.9.2.4 renumber the remaining list.
3. Replaced Figure 3.9-1 with new figure.
4. On page 7.1-19 (A103) for Item (6), revised WCAP-1 3869 revision from "2" to "1" and removed "September 1994."
5. On page 7.1-37 (A103) for Item (19), revised WCAP-13869 revision from "2" to "1" and removed "September 1994." In addition, corrected the spelling of Westinghouse.

E1-9

ENCLOSURE I WBN Unit 2 FSAR A104 "Summary Listing of A104 FSAR Changes" Item Change No. Change Area Change Description Package Number FSAR Section 2.3.5 (Page 2.3 A103)

Section 2.3 1. Replaced the phrase, "2.3-45 through 2.3-51" with "2.3-68 through 2.3-74" in the first sentence of the second paragraph.

Tables New FSAR Tables:

2.3-68 2.3-69

15. 2.3-70 2. Inserted New Tables 2.3-68 through -74, which provide 2-104-15 2.3-71 updated "JOINT PERCENTAGE FREQUENCIES OF WIND 2.3-72 DIRECTION AND WIND SPEED," for the time frame of 2.3-73 January 1, 1986, to December 31, 2005.

2.3-73 2.3-74 3. Inserted New Table 2.3-75, which provides, "Average Annual 2.3-75 X/Q's and D/Q's out to 50 Miles," data.

Revised Unit 2 FSAR Table 5.2-7, "Reactor Coolant System

16. Table 5.2-7 Design Pressure Setting," to revise PORV's set pressure from 2-104-16 2324 psig to 2335 psig.

FSAR Section 11.1.2

1. Clarification was provided to assure that it was clear the Sections Tritium Producing Burnable Absorber Rods are only applied to 11.1.2 Watts Bar Unit 1.

11.1.4 11.2.65 11.2.6.5 FSAR Section 11.1.4 11.2.9.1 1. Clarification was provided to describe when the relief path 11.3.7.4 from steam generator blowdowns to the river via the cooling 11.3.7.5 tower blowdown line is used. The following text was added:

11.3.8 11.3.9 "This route is used primarily during periods when there is no 11.3.10.1 significant primary to secondary leakage."

11.3.10.1

17. 11.3.10.2 FSAR Section 11.2.6.5 and Tables 11.2-5, 11.2-5c, and 11.2-5d. 2-104-17 Tables 11.2-s The previous FSAR Section 11.2.6.5 has been replaced with new 11.2-Sc Sections 11.2.6.5, 11.2.6.5.1 and 11.2.6.5.2. The primary results 11.2-Sd of these revisions are described below.

11.2-5d 11.3-6 1. The text has been revised to describe Table 11.2.5 columns 11 .3-7c that have been modified. Columns 6, 7 and 8 of this table 11.3-8 have been revised. Column 6 provides the liquid radioactive 11.3.9 waste source term. Column 7 provides the source term for 11.3.10 steam generator blowdown assuming an annual untreated SG 11.3.11 Blowdown concentration of 3.65E-5 uCi/cc. Column 8 is the combined source term from Columns 6 and 7. In addition, FSAR Sections 11.2.6.5, 11.2.6.5.1 and 11.2.6.5.2 have been added to assure the text describes the columns in Table 11.2.5.

El-10

ENCLOSURE1 WBN Unit 2 FSAR Al04 "Summary Listing of A104 FSAR Changes" Item Change Change Area Change Description Package No.

Number

2. The text has been revised to describe the untreated steam generator blowdown.
3. The text has been revised to discuss Tables 11.2-5a, 11.2-5b, and 11.2-5d. This description includes the steps taken to prevent exceeding 10 CFR Part 20.1302(b) limits.
4. The text has been revised to describe the scenarios associated with the columns presented in Table 11.2-5.
5. The text states the rationale and acceptability of operating without Condensate Demineralizer backwash and blowdown Sections effluent considerations as long as primary-to-secondary 11.1.2 leakage is insignificant.

11.1.4 6. Table 11.2-5c has been deleted due to the clarifications 11.2.6.5 incorporated into Section 11.2.6.5.

11.2.9.1 11.3.7.4 11.3.7.4 FSAR Section 11.2.9.1 11.3.7.5 11.3.8 1. This section has been revised to reflect the use of a 1.42 11.3.9 11.3.10.1 growth factor based on the 2000 census, rather than 1.24

.11.3.10.2 factor based on the 1990 census.

17. 12-104-17 (cont.) Tables FSAR Section 11.3.7.4 11.2-S 11.2-Sc 1. Revised the table cited from "11.3-10" to "11.3-7."

11.2-5c 11.2-Sd FSAR Section 11.3.7.5 11.3-6 11.3-7c 1. Clarification has been added to describe the basis for 11.3-5 Table 11.3-7c (the basis is ANSI N18.1-1984).

11.3.9 11.3.10 FSAR Table 11.3-6 11.3.11

1. This table has been revised to more accurately describe the use of a continuous filtered containment vent.
2. Item 2 was revised to state that the activities are based on ANSI N18.1-1984.
3. Corrected typographical error from "WCDT" to "WGDT."

FSAR Table 11.3-7c

1. The table has been revised to demonstrate it was based on ANSI 18.1-1984 and to delete Tritium Production Core value for H-3 (Unit 1 only).

El-11

ENCLOSURE1 WBN Unit 2 FSAR A104 "Summary Listing of A104 FSAR Changes" Item Change No. Change Area Change Description Package Number FSAR Section 11.3.8

1. The description of the Turbine Building vents was revised to describe that non-radioactive ventilation air is exhausted from the Turbine Building rather than "ventilation air".

Sections Table 11.3-8 11.1.2 11.1.4 1. TVA verified the validity of the land census used in FSAR 11.2.6.5 Table 11.3-8.

11.2.9.1 11.3.7.4 2. The distance, X/Q and D/Q were revised to be consistent with 11.3.7.5 the Terrain Adjustment Factor (TAF) determined using the 11.3.8 methodology established in TVAIONRED/A&WR--87/24. The 11.3.9 table provides the TAF used for each point of interest.

11.3.10.1

17. 11.3.10.2 3. The Feeding Factors were revised to reflect the growing season. The table provides the Feeding Factor used for each 2-104-17 (cont.) Tables point of interest.

11.2-5 11.2-5c FSAR Section 11.3.9 11.2-5d 11.3-6 1. The Section has been revised to identify the date of the land-11.3-7c use census that is used and discusses the rationale and 11.3-8 assumptions for the information used.

11.3.9 11.3.10 2. The Section was revised to describe that TAFs X/Q and D/Q 11.3.11 were calculated for the locations based on the 2007 Land Use Survey and 1984 through 2005 meteorology data. Reference is made to Table 11.3-8 which provides the TAF used for each point of interest.

3. Additional text was added describing that the computer code GELC was used with TAFs to account for recirculation effects.

E1-12

ENCLOSURE1 WBN Unit 2 FSAR A104 "Summary Listing of A104 FSAR Changes" Item Change No. Change Area Change Description Package Number FSAR Section 11.3.10.1

1. The Section has been revised to identify the feeding factor that TVA has used and to provide the basis for its use. The tables cited at the end of the Section have changed from "11.3-10 and 11.3-11" to "11.3-11 to 11.3-12". New text has been added to the end of the Section describing the vegetable Sections ingestion is the critical pathway.

11.1.2 11.1.4 11.1.4 FSAR Section 11.3.10.2 11.2.6.5 1. The Section has been revised to update the annual total body 11.2.9.1 dose for the population expected to live within a 50 mile radius 11.3.7.4 of Watts Bar in the year 2040. It also revised the total body 11.3.75 dose from effluents.

11.3.8 11.3.9 11.3.11 11.3.10.1 Table 11.3.9

17. 11.3.10.2 1. This Table has been revised to ensure consistency with other 2-104-17 (cont.) Tables sections of the FSAR and the FSEIS. Population dose 11.2-5 calculations have been revised.

11.2-5c Table 11.3.10 11.2-5d 11.3-6 11.3-6c 1. The individual doses listed in Table 11.3-10 were determined 11.3-8 using each nuclide's total curies/year listed in Table 11.3-7c 11.3-8 with Continuous Filtered Containment Vent.

11.3.9 11.3.10 2. The doses were revised to incorporate the latest parameters 11.3.11 including use of updated Feeding Factor and TAFs.

Table 11.3.11

1. This Table has been revised to describe the results of TVA's estimate of the radiological impact to regional population groups in the year 2040 from the normal operation of the Watts Bar Nuclear Plant.

E1-13

ENCLOSURE 1 WBN Unit 2 FSAR A104 "Summary Listing of A104 FSAR Changes" Item Change No. Change Area Change Description Package Number For the list of components that are supplied with ERCW:

1. Inserted new item at the bottom of list entitled, "Backup cooling water to the CCP 2A-A lube and gear oil cooler via the CCP 2A-A room cooler."

2-104-18 Section 9.2.1.2 2. Inserted the word, "water" in between "Air Conditioning" and 2-95-17 18.

"Chillers," for Item 12 inadvertently dropped in Amendment 95.

3. Reinserted "Spent fuel pool heat exchangers" inadvertently dropped with items when they were renumbered in Amendment 95.

E1-14

ENCLOSURE2 WBN Unit 2 FSAR Al04 "Summary of Redacted Pages" Chapter Page(S) Section No. Figure No. Basis For Redaction I 1 1.2-15 1.2 1.2-1 Security Related, 10CFR2.390(d)(1) 1 1.2-16 1.2 1.2-2 Security Related, 10CFR2.390(d)(1) 1 1.2-17 1.2 1.2-3 Security Related, 10CFR2.390(d)(1) 1 1.2-18 1.2 1.2-4 Security Related, 10CFR2.390(d)(1) 1 1.2-19 1.2 1.2-5 Security Related, 10CFR2.390(d)(1) 1 1.2-20 1.2 1.2-6 Security Related, 10CFR2.390(d)(1) 1 1.2-21 1.2 1.2-7 Security Related, 10CFR2.390(d)(1) 1 1.2-22 1.2 1.2-8 Security Related, 10CFR2.390(d)(1) 1 1.2-23 1.2 1.2-9 Security Related, 10CFR2.390(d)(1) 1 1.2-24 1.2 1.2-10 Security Related, 10CFR2.390(d)(1) 1 1.2-25 1.2 1.2-11 Security Related, 10CFR2.390(d)(1) 1 1.2-26 1.2 1.2-12 Security Related, 10CFR2.390(d)(1) 1 1.2-27 1.2 1.2-13 Security Related, 10CFR2.390(d)(1) 1 1.2-28 1.2 1.2-14 Security Related, 10CFR2.390(d)(1) 1 1.2-29 1.2 1.2-15 Security Related, 10CFR2.390(d)(1) 2 2.2-7 2.2 2.2-1 Security Related, 10CFR2.390(d)(1) 2 2.2-8 2.2 2.2-2 Security Related, 10CFR2.390(d)(1) 2 2.4-89 2.4 2.4-2 Security Related, 10CFR2.390(d)(1) 2 2.4-159 2.4 2.4-24 Security Related, 10CFR2.390(d)(1) 2 2.4-162 2.4 2.4-27 Security Related, 10CFR2.390(d)(1) 2 2.4-163 2.4 2.4-28 Security Related, 10CFR2.390(d)(1) 2 2.4-168 2.4 2.4-40a Security Related, 10CFR2.390(d)(1)

_____ ___ ____Sheet

____ 1 2 2.4-171 2.4 2.4-40b Security Related, 10CFR2.390(d)(1) 2 2.4-172 2.4 2.4-40c Security Related, 10CFR2.390(d)(1) 2 2.4-173 2.4 2.4-40d Security Related, 10CFR2.390(d)(1)

Sheet 1 2 2.4-178 2.4 2.4-40f Security Related, 10CFR2.390(d)(1)

Sheet 1 2 2.4-181 2.4 2.4-40g Security Related, 10CFR2.390(d)(1) 2 2.4-181 2Sheet 1 2 2.4-206 2.4 2.4-76 Security Related, 10CFR2.390(d)(1) 2 2.4-209 2.4 2.4-79 Security Related, 10CFR2.390(d)(1) 2 2.4-212 2.4 2.4-82 Security Related, 10CFR2.390(d)(1) 2 2.4-213 2.4 2.4-83 Security Related, 10CFR2.390(d)(1) 2 2.4-218 2.4 2.4-88 Security Related, 10CFR2.390(d)(1) 2 2.4-219 2.4 2.4-89 Security Related, 10CFR2.390(d)(1) 2 2.4-220 2.4 2.4-90 Security Related, 10CFR2.390(d)(1) 2 2.5-471 2.5 2.5-185 Security Related, 10CFR2.390(d)(1) 2 2.5-472 2.5 2.5-185a Security Related, 10CFR2.390(d)(1) 2 2.5-513 2.5 2.5-225 Security Related, 10CFR2.390(d)(1) 2 2.5-514 2.5 2.5-226 Security Related, 10CFR2.390(d)(1) 2 2.5-515 2.5 2.5-226a Security Related, 10CFR2.390(d)(1) 2 2.5-575 2.5 2.5-273 Security Related, 10CFR2.390(d)(1) 2 2.5-690 2.5 2.5-358 Security Related, 10CFR2.390(d)(1)

E2-1

ENCLOSURE 2 WBN Unit 2 FSAR A104 "Summary of Redacted Pages" Chapter IPageSI Section No. Figure No. Basis For Redaction I 2 2.5-934 2.5 2.5-592 Security Related, 10CFR2.390(d)(1) 3 3.5-53 3.5 3.5-3 Security Related, 10CFR2.390(d)(1) 3 3.5-54 3.5 3.5-4 Security Related, 10CFR2.390(d)(1) 3 3.6-73 3.6 3.6-21 Security Related, 10CFR2.390(d)(1) 3 3.6-74 3.6 3.6-22 Security Related, 10CFR2.390(d)(1) 3 3.6-75 3.6 3.6-23 Security Related, 10CFR2.390(d)(1) 3 3.6-76 3.6 3.6-24 Security Related, 10CFR2.390(d)(1) 3 3.7-217 3.7 3.7-39 Security Related, 10CFR2.390(d)(1) 3 3.7-218 3.7 3.7-40 Security Related, 10CFR2.390(d)(1) 3 3.7-219 3.7 3.7-41 Security Related, 10CFR2.390(d)(1) 3 3.7-222 3.7 3.7-44 Security Related, 10CFR2.390(d)(1) 3 3.8.3-60 3.8.3 3.8.3-6 Security Related, 10CFR2.390(d)(1) 3 3.8.3-61 3.8.3 3.8.3-7 Security Related, 10CFR2.390(d)(1) 3 3.8.4-94 3.8.4 3.8.4-2 Security Related, 10CFR2.390(d)(1) 3 3.8.4-95 3.8.4 3.8.4-3 Security Related, 10CFR2.390(d)(1) 3 3.8.4-96 3.8.4 3.8.4-4 Security Related, 10CFR2.390(d)(1) 3 3.8.4-97 3.8.4 3.8.4-5 Security Related, 10CFR2.390(d)(1) 3 3.8.4-98 3.8.4 3.8.4-6 Security Related, 10CFR2.390(d)(1) 3 3.8.4-101 3.8.4 3.8.4-9 Security Related, 10CFR2.390(d)(1) 3 3.8.4-109 3.8.4 3.8.4-17 Security Related, 10CFR2.390(d)(1) 3 3.8.4-110 3.8.4 3.8.4-18 Security Related, 10CFR2.390(d)(1) 3 3.8.4-111 3.8.4 3.8.4-19 Security Related, 10CFR2.390(d)(1) 3 3.8.4-112 3.8.4 3.8.4-20 Security Related, 10CFR2.390(d)(1) 3 3.8.4-116 3.8.4 3.8.4-24 Security Related, 10CFR2.390(d)(1) 3 3.8.4-120 3.8.4 3.8.4-28 Security Related, 10CFR2.390(d)(1) 3 3.8.4-127 3.8.4 3.8.4-35 Security Related, 10CFR2.390(d)(1) 3 3.8.4-128 3.8.4 3.8.4-36 Security Related, 10CFR2.390(d)(1) 3 3.8.4-129 3.8.4 3.8.4-36a Security Related, 10CFR2.390(d)(1) 3 3.8.4-132 3.8.4 3.8.4-37 Security Related, 10CFR2.390(d)(1) 3 3.8.4-149 3.8.4 3.8.4-50 Security Related, 10CFR2.390(d)(1) 3 3.8.4-150 3.8.4 3.8.4-51 Security Related, 10CFR2.390(d)(1) 3 3.8.6-19 3.8.6 3.8.6-7 Security Related, 10CFR2.390(d)(1) 6 6.2.2-24 6.2.2 6.2.2-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-76 6.2.3 6.2.3-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-77 6.2.3 6.2.3-5 Security Related, 10CFR2.390(d)(1) 6 6.2.3-78 6.2.3 6.2.3-6 Security Related, 10CFR2.390(d)(1) 6 6.2.3-79 6.2.3 6.2.3-7 Security Related, 10CFR2.390(d)(1) 6 6.2.3-80 6.2.3 6.2.3-8 Security Related, 10CFR2.390(d)(1) 6 6.2.3-81 6.2.3 6.2.3-9 Security Related, 10CFR2.390(d)(1) 6 6.2.3-82 6.2.3 6.2.3-10 Security Related, 10CFR2.390(d)(1) 6 6.2.3-92 6.2.3 6.2.3-18 Security Related, 10CFR2.390(d)(1) 6 6.2.3-93 6.2.3 6.2.3-19 Security Related, 10CFR2.390(d)(1) 8 8.1-21 8.1 8.1-1 Security Related, 10CFR2.390(d)(1l) 8 8.2-14 8.2 Text only Security Related, 10CFR2.390(d)(1) 8 8.2-15 8.2 Text only Security Related, 10CFR2.390(d)(1)

E2-2

ENCLOSURE 2 WBN Unit 2 FSAR A104 "Summary of Redacted Pages" Chapter Page(S) Section No. Figure No. Basis For Redaction 8 8.2-30 8.2 8.2-3 Security Related, 10CFR2.390(d)(1) 8 8.2-31 8.2 8.2-4 Security Related, 10CFR2.390(d)(1) 8 8.2-44 8.2 8.2-11 Security Related, 10CFR2.390(d)(1) 8 8.3-97 8.3 8.3-1 Security Related, 10CFR2.390(d)(1) 8 8.3-99 8.3 8.3-2 Security Related, 10CFR2.390(d)(1) 8 8.3-100 8.3 8.3-3 Security Related, 10CFR2.390(d)(1) 8 8.3-102 8.3 8.3-4b Security Related, 10CFR2.390(d)(1) 8 8.3-205 8.3 8.3-46 Security Related, 10CFR2.390(d)(1) 8 8.3-218 8.3 8.3-59 Security Related, 10CFR2.390(d)(1) 9 9.2-211 9.2 9.2-40 Security Related, 10CFR2.390(d)(1) 9 9.4-276 9.4 9.4-21 Security Related, 10CFR2.390(d)(1) 9 9.4-280 9.4 9.4-22c Security Related, 10CFR2.390(d)(1) 9 9.4-281 9.4 9.4-23 Security Related, 10CFR2.390(d)(1) 9 9.4-282 9.4 9.4-24 Security Related, 10CFR2.390(d)(1) 12 12.3-39 12.3 12.3-1 Security Related, 10CFR2.390(d)(1) 12 12.3-40 12.3 12.3-2 Security Related, 10CFR2.390(d)(1) 12 12.3-41 12.3 12.3-3 Security Related, 10CFR2.390(d)(1) 12 12.3-42 12.3 12.3-4 Security Related, 10CFR2.390(d)(1) 12 12.3-43 12.3 12.3-5 Security Related, 10CFR2.390(d)(1) 12 12.3-44 12.3 12.3-6 Security Related, 10CFR2.390(d)(1) 12 12.3-45 12.3 12.3-7 Security Related, 10CFR2.390(d)(1) 12 12.3-46 12.3 12.3-8 Security Related, 10CFR2.390(d)(1) 12 12.3-47 12.3 12.3-9 Security Related, 10CFR2.390(d)(1) 12 12.3-48 12.3 12.3-10 Security Related, 10CFR2.390(d)(1) 12 12.3-49 12.3 12.3-11 Security Related, I0CFR2.390(d)(1) 12 12.3-50 12.3 12.3-12 Security Related, 10CFR2.390(d)(1) 12 12.3-51 12.3 12.3-13 Security Related, 10CFR2.390(d)(1) 12 12.3-52 12.3 12.3-14 Security Related, 10CFR2.390(d)(1) 12 12.3-53 12.3 12.3-15 Security Related, 10CFR2.390(d)(1) 12 12.3-54 12.3 12.3-16 Security Related, 10CFR2.390(d)(1) 12 12.3-55 12.3 12.3-17 Security Related, 10CFR2.390(d)(1) 12 12.4-5 12.4 12.4-1 Security Related, 10CFR2.390(d)(1)

E2-3

ENCLOSURE 3 WBN Unit 2 FSAR A104 "List Of Files And File Sizes On The Security-Related OSM (OSM #1)"

E3-1

ENCLOSURE 3 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 104 - List of Files on Security-Related OSM File Name File Size - Bytes TVA_WBN-2_FSARFiles 001 TVA WB_FSAR TOC.pdf 361,989 002_TVAWBFSARLRP.pdf 94,749 003_TVA WB FSAR Section_l.pdf 4,631,932 004 TVA WB FSAR Section 2 A.pdf 10,460,967 005_TVAWBFSARSection 2 B Part 1 of 2.pdf 44,610,674 005 TVA WB FSAR Section 2 B Part 2 of 2.pdf 49,572,722 006_TVA WB FSARSection 2_C.pdf 2,107,382 007 TVA WB FSAR Section 2 D.pdf 31,323,867 008 TVA WB FSAR Section 2 E.pdf 47,312,484 009_TVA WB FSAR Section_3 A.pdf 2,617,354 010_TVAWBFSARSection_3_B.pdf 7,063,010 011 TVA WB FSAR Section 3 C.pdf 30,016,072 012 TVA WB FSAR Section 3 D.pdf 11,765,449 013_TVA WB FSAR Section 4.pdf .12,544,471 014 TVA WB FSAR Section 5.pdf 9,904,544 015_TVA WB FSAR Section_6 A.pdf 26,018,757 016 TVA WB FSAR Section 6 B.pdf 8,063,667 017 TVA WB_FSARSection 7. pdf 13,985,504 018 TVA WB FSAR Section 8.pdf 29,712,111 019 TVA WB FSAR Section 9 A.pdf 24,504,563 020_TVA WB_FSARSection_9_B.pdf 16,486,274 021 TVA WB FSAR Section_ 10.pdf 14,150,430 022_TVA WB FSAR Section 1 .pdf 3,958,578 023 TVA WB FSAR Section 12.pdf 5,975,010 024 TVA WB FSAR Section_ 13.pdf 3,236,111 025 TVA WB FSAR Section 14.pdf 1,166,799 Page 1 of 3

ENCLOSURE 3 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 104 - List of Files on Security-Related OSM File Name File Size - Bytes 026_TVA WB FSAR Section 15.pdf 46,548,252 027 TVA WBFSAR Section 16.pdf 157,966 028_TVA WB FSAR Section_ 17.pdf 156,649 Total 458,508,337 TVAWBN-2_Oversized_FSAR_Figures 001 TVA WB FSAR Figure 2.5 3.pdf 1,757,743 002 TVA WBFSAR Figure 2.5 11.pdf 1,689,538 003 TVA WBFSAR Figure 2.5 71.pdf 2,263,087 004 TVA WBFSAR Figure 2.5 222.pdf 909,429 005 TVA WB FSARFigure 2.5 281_1.pdf 2,155,627 006_TVAWBFSAR Figure 2.5 281 2.pdf 2,117,562 007 TVA WB FSAR Figure 2.5 549_1.pdf 3,600,807 008_TVA WB FSAR Figure 2.5 549 2.pdf 3,989,180 009 TVA WBFSAR Figure 2.5 549 3.pdf 2,863,719 010_TVAWBFSAR Figure 2.5 549 4.pdf 2,809,599 011_TVA WB FSAR Figure 2.5 550.pdf 1,803,985 012_TVA WB FSAR Figure 2.5 551.pdf 1,996,869 013_TVA WB FSAR Figure 2.5 554 1.pdf 3,081,060 014_TVA WB FSAR Figure 2.5 554 2.pdf 1,996,707 015_TVA WB FSAR Figure 2.5 555.pdf 1,993,312 016_TVA WBFSAR Figure 2.5 556.pdf 2,998,087 017_TVAWBFSARFigure 2.5 571_1.pdf 844,484 018_TVAWBFSAR Figure 2.5 571_2.pdf 3,128,329 019 TVA WB FSARFigure 2.5 571_3.pdf 3,284,555 020 TVA WB FSAR Figure 2.5 571 4.pdf 2,142,316 021_TVAWBFSAR Figure 2.5 572.pdf 2,196,945 Page 2 of 3

ENCLOSURE 3 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 104 - List of Files on Security-Related OSM File Name File Size - Bytes 022_TVA WB FSAR Figure 2.5 573.pdf 2,013,286 023_TVA WB FSAR Figure 2.5 576 1.pdf 3,238,525 024_TVAWBFSAR Figure 2.5 576 2.pdf 2,151,750 025_TVAWBFSAR Figure 2.5 577.pdf 2,207,622 026_TVAWBFSAR Figure 2.5 578.pdf 2,080,032 027_TVAWBFSAR Figure 2.5 579.pdf 2,308,985 028_TVA WB FSAR Figure 2.5 583.pdf 2,487,346 029_TVA WB FSAR Figure 2.5 588.pdf 2,528,515 030_TVAWBFSAR Figure 2.5 589.pdf 2,480,438 031 TVA WB FSAR Figure 2.5 594.pdf 13,054,127 032 TVA WB FSAR Figure 2.5 595.pdf 2,323,267 033_TVA WBFSAR Figure 2.5 596.pdf 5,732,107 034_TVAWBFSAR Figure 2.5 597.pdf 1,287,336 035 TVA WB FSAR Figure 2.5 602.pdf 5,549,537 036 TVA WB FSAR Figure 2.5 603.pdf 4,830,835 037_TVA WBFSAR Figure 2.5 604.pdf 6,392,279 038 TVA WB FSAR Figure 2.5 605.pdf 20,823,108 Total 131,112,035 TVA_WBN-2_Oversized_FSARTable 001_TVA WB FSAR Table 6.2.4-1 .pdf 1,215,571 Total 1,215,571 Page 3 of 3

ENCLOSURE 4 WBN Unit 2 FSAR A104 "List Of Files And File Sizes On The Publicly Available OSM (OSM #2)"

E4-1

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 104 List of Files on PubliclyAvailable OSM File Name File Size - Bytes TVAWBN-2_FSAR_Files 001 TVA WB_FSARTOC.pdf 361,989 002_TVAWBFSARLRP.pdf 94,749 003_TVA WBFSARSection 1.pdf 825,347 004fTVA WB FSAR Section_2_A.pdf 10,124,439 005 TVA WB FSAR Section 2 B Part 1 of_2.pdf 34,361,906 005WTVAWBFSARSection 2 B Part_2.of_2.pdf 43,314,619 006 TVA WB FSAR Section_2 C.pdf 2,107,382 007_TVAWBFSARSection_2_D.pdf 31,323,867 008 TVA WB FSAR Section 2_E.pdf 45,933,070 009WTVAWBFSAR Section 3_A.pdf 2,325,945 010 WTVA WB FSAR Section 3_B.pdf 5,661,316 011WTVAWBFSARSection 3 C.pdf 25,183,661 012 TVA WB FSAR Section 3_D.pdf 11,496,763 013 TVA WB FSAR Section 4.pdf 12,544,471 014 TVA WB FSAR Section 5.pdf 9,904,544 015 TVA WB FSAR Section 6_A.pdf 23,138,284 016_TVAWBFSAR Section 6_B.pdf 8,063,667 017 TVAWBFSARSection_7.pdf 13,985,504 018 TVA WB FSAR Section 8.pdf 26,751,991 019WTVA WBFSARSection 9_A.pdf 24,243,527 020 TVA WB FSAR Section 9_B.pdf 15,271,761 021 TVA WB FSAR Section_ 10.pdf 14,150,430 022_TVAWBFSARSection-l 1.pdf 3,958,578 023 TVA WB FSAR Section 12.pdf 1,706,993 024 TVAWBFSARSection_ 13.pdf 3,236,111 025 TVA WB FSAR Section 14.pdf 1,166,799 Note: Byte amounts in italics are redacted files. Page 1 of 3

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 104 List of Files on PubliclyAvailable OSM File Name File Size - Bytes 026 TVAWBFSARSection 15.pdf 46,548,252 027 TVA WB FSAR Section 16.pdf 157,966 028 TVA WB FSAR Section 17.pdf 156,649 Total 418,100,580 TVA_WBN-2_Oversized_FSARFigures 001_TVA_WB_FSAR Figure 2.5 3.pdf 1,757,743 002_TVA WB FSAR Figure 2.5 11.pdf 1,689,538 003 TVA WB FSAR Figure 2.5 71.pdf 2,263,087 004 TVA WB FSAR Figure 2.5 222.pdf 909,429 005_TVA WB FSAR Figure 2.5 281_1.pdf 2,155,627 006_TVA WB FSAR Figure 2.5 281_2.pdf 2,117,562 007 TVA WB FSAR Figure 2.5 549_1.pdf 3,600,807 008_TVAWBFSAR Figure 2.5 549_2.pdf 3,989,180 009 TVA WB FSAR Figure 2.5 549_3.pdf 2,863,719 010_TVAWBFSAR Figure 2.5 549 4.pdf 2,809,599 011_TVA WB FSAR Figure 2.5 550.pdf 1,803,985 012_TVA WB FSAR Figure 2.5 551.pdf 1,996,869 013_TVAWBFSAR Figure 2.5 554_1.pdf 3,081,060 014_TVAWBFSAR Figure 2.5 554 2.pdf 1,996,707 015_TVA WBFSAR Figure 2.5 555.pdf 1,993,312 016_TVAWBFSAR Figure 2.5 556.pdf 2,998,087 017_TVAWBFSAR Figure 2.5 571_1.pdf 844,484 018 TVA WB FSAR Figure 2.5 571 _2.pdf 3,128,329 019 TVAWBFSAR Figure 2.5 571_3.pdf 3,284,555 020 TVA WB FSAR Figure 2.5 571 4.pdf 2,142,316 021_TVAWBFSAR Figure 2.5 572.pdf 2,196,945 Note: Byte amounts in italics are redacted files. Page 2 of 3

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 104 List of Files on PubliclyAvailable OSM File Name File Size - Bytes 022_TVAWBFSAR Figure 2.5 573.pdf 2,013,286 023_TVA WB FSARFigure 2.5 5761 .pdf 3,238,525 024_TVAWBFSAR Figure 2.5 576 2.pdf 2,151,750 025 TVA WB FSAR Figure 2.5 577.pdf 2,207,622 026 TVA WB FSAR Figure 2.5 578.pdf 2,080,032 027_TVAWB FSAR Figure 2.5 579.pdf 2,308,985 028_TVAWBFSAR Figure 2.5 583.pdf 2,487,346 029 TVA WB_FSAR Figure 2.5 588.pdf 2,528,515 030 TVAWBFSAR Figure 2.5 589.pdf 2,480,438 031 TVA WB FSAR Figure 2.5 594.pdf 13,054,127 032 TVA WB FSAR Figure 2.5 595.pdf 2,323,267 033 TVAWBFSAR Figure 2.5 596.pdf 5,732,107 034 TVA WB FSAR Figure 2.5 597.pdf 1,287,336 035_TVA WB FSAR Figure 2.5 602.pdf 5,549,537 036_TVAWBFSAR Figure 2.5 603.pdf 4,830,835 037 -TVAWBFSAR Figure 2.5 604.pdf 6,392,279 038 TVA WBFSAR Figure 2.5 605.pdf 20,823,108 Total 131,112,035 TVA_WBN-2_OversizedFSARTable 001 TVA WB FSAR Table 6.2.4-1.pdf 1,215,571 Total Note: Byte amounts in italics are redacted files. Page 3 of 3