Letter Sequence Request |
|---|
TAC:MD6311, Clarify Application of Setpoint Methodology for LSSS Functions, Control Room Habitability, Steam Generator Tube Integrity (Approved, Closed) TAC:MD8203, (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement
Results
Other: CNL-14-154, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12, CNL-15-137, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13, ML080860026, ML080860040, ML081700293, ML082410088, ML083460177, ML090480486, ML101200204, ML101260469, ML101600477, ML101680561, ML102170077, ML103010299, ML11213A130, ML11362A056, ML12234A688, ML13023A315, ML13213A194
|
MONTHYEARML1011304092004-05-15015 May 2004 Drawing, Distribution of Tritium Concentration in Groundwater at Power Block, March 2004, Attachment K Project stage: Other ML1011304082004-05-15015 May 2004 Drawing, Distribution of Tritium Concentrations in Groundwater, March 2004, Attachment J Project stage: Other ML1011304072004-05-15015 May 2004 Drawing, Water Table at Power Block, March 2004, Attachment I Project stage: Other ML1011304052004-05-15015 May 2004 Drawing, Water Table, Attachment H Project stage: Other ML1011304042004-05-15015 May 2004 Drawing, Hydrogeologic Cross-Section D-D, Attachment G Project stage: Other ML1011304032004-05-15015 May 2004 Drawing, Hydrogeologic Cross-Section C-C, Attachment F Project stage: Other ML1011304012004-05-15015 May 2004 Drawing, Hydrogeologic Cross-Section B-B, Attachment E Project stage: Other ML1011303992004-05-15015 May 2004 Drawing, Hydrogeologic Cross-Section A-A, Attachment D Project stage: Other ML1011303982004-08-10010 August 2004 Map, Bedrock Contours, Attachment C Project stage: Other ML1011700962004-08-12012 August 2004 Groundwater Investigation Report Project stage: Other ML1011303972004-08-12012 August 2004 Block Site Map, Plate B Project stage: Other ML1011303952004-08-12012 August 2004 Site Map. Attachment a Project stage: Other ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists Project stage: Request ML0732401242007-11-26026 November 2007 Summary of Meeting with Tennessee Valley Authority on Use of Eagle 21 at Watts Bar Unit 2 Project stage: Meeting ML0734400222007-12-0505 December 2007 Westinghouse Eagle - 21 Process Protection System Project stage: Request ML0801705432008-01-0303 January 2008 Summary of December 12, 2007, Meeting with Tennessee Valley Authority on Reconstruction of the Licensing Basis for Watts Bar Unit 2 Project stage: Meeting ML0735209712008-01-0303 January 2008 Summary of Meeting with Tennessee Valley Authority on Reconstitution of the Licensing Basis for Watts Bar, Unit 2 Project stage: Meeting ML0733300822008-02-15015 February 2008 IMC 2517, Watts Bar Unit 2 Construction Inspection Program Project stage: Request ML0807702372008-03-13013 March 2008 Regulatory Framework for the Completion of Construction and Licensing Activities for Unit 2 - Restructured Tables Project stage: Request ML0812105062008-05-0707 May 2008 Request for Additional Information Regarding Eagle-21 Process Protection System (Tac No. MD6311) Project stage: RAI ML0808600262008-05-0808 May 2008 Assessment of Remaining Operating License Application Review Scope Project stage: Other ML0808600402008-05-0808 May 2008 Enclosure 1- Watts Bar Nuclear Plant, Unit 2 - Assessment of Remaining Operating License Application Review Scope Project stage: Other ML0810101162008-05-0808 May 2008 Review Topics for Safety Evaluation, Attachment 1 Project stage: Approval ML0814300282008-05-14014 May 2008 Transmittal of Annual Radiological Environmental Operating Report of 2007 Project stage: Request ML0812102702008-06-0303 June 2008 Request for Supplemental Information to Support Acceptance Review of Final Supplemental Environmental Impact Statement Project stage: Acceptance Review ML0817002932008-06-16016 June 2008 Response to Additional Information Request on Regulatory Framework for the Completion of Construction and Licensing, Revision 1 Project stage: Other ML0818504602008-07-0202 July 2008 Final Supplemental Environmental Impact Statement - Request for Additional Information Project stage: Supplement ML0824100882008-08-25025 August 2008 Westinghouse Eagle-21 Process Protection System Project stage: Other ML0834601772008-12-0909 December 2008 Unit 2 - Licensing Basis Preservation and Construction Refurbishment Program for Structures, Systems and Components (Sscs) Project stage: Other ML1006301392008-12-12012 December 2008 WB-DC-20-20, Revision 0009, Traveling Water Screens and Trashracks, Project stage: Other ML0903605892009-01-21021 January 2009 Enclosure 1 - Watts Bar, Unit 2 Severe Accident Management Alternatives Analysis Project stage: Other ML0903605882009-01-27027 January 2009 Final Supplemental Environmental Impact Statement - Severe Accident Management Alternatives Project stage: Supplement ML0904804362009-02-23023 February 2009 Summary of December 11, 2008, Meeting with Tennessee Valley Authority on Status of Construction and Licensing Activities Project stage: Meeting ML0904804662009-02-23023 February 2009 NRR - Public Meeting WBN2 Status 12-11-08 Project stage: Meeting ML0904804712009-02-23023 February 2009 Region II - December 2008 Public Meeting with Notes Project stage: Meeting ML0904804862009-02-23023 February 2009 TVA December 11, 2008 - Public MtgR1 Project stage: Other ML1006302642009-11-0707 November 2009 Map of the Wetlands Streams Project stage: Other ML1006302632009-11-0707 November 2009 Map - Final Map of the Watts Bar Nuclear Plant Project stage: Other ML0922300242009-11-30030 November 2009 Watts, Unit 2, RAI, Regarding Severe Accident Management Alternatives Project stage: RAI ML0930301482009-12-0303 December 2009 RAI, Regarding Environmental Review Project stage: RAI ML0932900732009-12-0303 December 2009 Environmental RAI Enclosure Project stage: RAI ML1001201072009-12-14014 December 2009 December 14, 2009, TVA Letter Additional Information Regarding Environmental Review - Cultural Resources Project stage: Other ML0936300392009-12-22022 December 2009 Severe Accident Management Alternatives Additional Information Project stage: Other ML0935613292009-12-23023 December 2009 Notice of Meeting with Tennessee Valley Authority to Discuss Tennessee Valley Authoritys (TVA) Use of Digital Instrumentation Platforms on Watts Bar Unit 2 Project stage: Request ML1002103502009-12-23023 December 2009 Submittal of Additional Information Regarding Environmental Review Project stage: Other ML1006301672010-01-15015 January 2010 Intact Containment Loss of Coolant Accident (LOCA) Analysis Project stage: Other ML1006302332010-01-26026 January 2010 Response to Tennessee Valley Authority Request for Plant Water Flow Information Project stage: Request ML1006301782010-02-25025 February 2010 Drawing, Plot: 5645 Cl Watts Bar-Athens Project stage: Other ML1006301772010-02-25025 February 2010 Plot: 608 1CL Watts Bar NP-Sequoyah Np 2 Project stage: Other ML1006301922010-02-25025 February 2010 Drawing, Plot: 6084KX Watts Bar NP-Roane Project stage: Other 2008-06-16
[Table View] |
Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 MAY 14 2008 10 CFR 50.36a(a)(2)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.' 20555-0001 Gentlemen:
In the Matter of the
)
Docket No. 50-390 Tennessee Valley Authority
)
WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 - ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT - 2007 In accordance with the requirements of the WBN Unit 1 Technical Specifications, Section 5.9.2, "Annual Radiological Environmental Operating Report," and the WBN Offsite Dose Calculation Manual (ODCM), Administrative Control Section 5.1, the 2007 Annual Radiological Environmental Monitoring Program (REMP) results and Data Supplement for WBN are enclosed. The REMP implements 10 CFR 50, Appendix I, Sections IV.B.2, IV.B.3, and IV.C.
The report describes and s6mmarizes the results of radioactivity measurements made in the vicinity of WBN and laboratory analyses of samples collected in the area. The results of the analysis indicate that exposure to members of the general public that may have been attributable to the operation of WBN is negligible. The radioactivity identified in this report was primarily the result of fallout or natural background. Any activity which may be present in the environment as a result of plant operations does not representa significant contribution to the exposure of members of the public.
There.are no regulatory commitments in this letter. If you should have any questions, please contact me at (423) 365-1824.
Sincerely, M. K. Brandon Manager, Site Licensing and Industry Affairs Enclosure cc: See page 2
U.S. Nuclear Regulatory Commission Page 2 HAY 1 -'2008 Enclosures cc (Enclosures):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 ATTN: Patrick D. Milano, Project Manager U.S. Nuclear Regulatory Commission Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation MS 08H4 Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
Enclosure Watts Bar Nuclear Plant 2007 Annual Radiological Environmental Monitoring Program (REMP) and Data Supplement