Summary of Meeting with Tennessee Valley Authority on Reconstitution of the Licensing Basis for Watts Bar, Unit 2
ML073520971
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/03/2008
From: Chernoff M
NRC/NRR/ADRO/DORL/LPLIII-1
To:
Tennessee Valley Authority
Chernoff M, NRR/DORL, 415-4041
Shared Package
ML073520705 List:
References
TAC MD6311
Download: ML073520971 (5)


Text

January 3, 2008 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Plant, Unit 2

SUBJECT:

SUMMARY

OF DECEMBER 12, 2007, MEETING WITH TENNESSEE VALLEY AUTHORITY ON RECONSTITUTION OF THE LICENSING BASIS FOR WATTS BAR UNIT 2 (TAC NO. MD6311)

On December 12, 2007, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the reconstitution of the licensing basis and the content of TVAs forthcoming regulatory framework document for Watts Bar Unit 2. A list of attendees is provided as Enclosure 1.

The applicant provided an overview of the licensing history of Watts Bar Unit 2. The applicant described the development logic used for identifying open items and the alignment of the logic with the applicable Staff Requirements Memorandum. The applicant also provided some examples of the type of information and level of detail that will be included in the regulatory framework letter. The meeting handout is contained in Enclosure 2.

The NRC staff described its planned approach to identifying topics for additional technical review. After some discussion, it was concluded that the applicants and the staffs approaches were not in conflict with each other. A graphical depiction of the staffs planned approach is included in Enclosure 3.

The applicant confirmed its intent to submit the regulatory framework letter by January 31, 2008.

The applicant also confirmed its intent to submit a red-line version of the Final Safety Analysis Report for Units 1 and 2 by January 31, 2008. Additionally, the applicant stated its intention to submit a request for an extension of the Watts Bar Unit 2 construction permit in the first quarter of 2008.

The staff encouraged TVA to carefully consider the need for a revision to the Physical Security Plan to support construction activities. If a revision requiring staff approval is needed, TVA should submit the request promptly to allow adequate time for staff review.

No commitments were made by the applicant. No regulatory decisions were made at the meeting.

Please direct any inquiries to me at 301-415-4041 or mhc@nrc.gov.

/RA/

Margaret H. Chernoff, Senior Project Manager Watts Bar 2 Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosures:

1. List of Attendees
2. Applicant Handout
3. Scope of Watts Bar Nuclear Plant Unit 2 Licensing Review cc w/encls: See next page

No commitments were made by the applicant. No regulatory decisions were made at the meeting.

Please direct any inquiries to me at 301-415-4041 or mhc@nrc.gov.

/RA/

Margaret H. Chernoff, Senior Project Manager Watts Bar 2 Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosures:

1. List of Attendees
2. Applicant Handout
3. Scope of Watts Bar Nuclear Plant Unit 2 Licensing Review cc w/encls: See next page Distribution:

PUBLIC RidsNrrPMJWilliams LPLWB2 r/f RidsNrrPMMChernoff DLivermore RidsRgn2MailCenter(JBartley)

LRaghavan RidsNrrLABClayton RidsOgcRp CPittiglio RidsAcrsAcnwMailCenter JParillo TLiu, NRR JMcHale SCampbell, EDO BSchnetzler KWood FLyon DFrumkin AKlein Accession Number: ML073520971 OFFICE NRR/LPL/PM NRR/LPL/LA NRR/LPL/BC NAME MChernoff BClayton LRaghavan DATE 01 / 02 /2008 12 / 27 /2007 01 / 03 /2008 OFFICIAL RECORD COPY

PARTICIPANTS NUCLEAR REGULATORY COMMISSION MEETING WITH TENNESSEE VALLEY AUTHORITY DECEMBER 12, 2007 Gordon P. Arent TVA Masoud Bajestani TVA L. Raghavan NRC/NRR/DORL C. Pittiglio NRC/NRR J. Parillo NRC/NRR/DRA J. McHale NRC/NRR/DCI B. Schnetzler NRC/NSIR/DSP/RSPLB K. Wood NRC/NRR/DSS/SRXB F. Lyon NRC/NRR/DORL J. Williams NRC/NRR/DORL S. Dolley Platts/Inside NRC D. Frumkin NRC/NRR/DRA/AFPB A. Klein NRC/NRR/DRA/AFPB M. Chernoff NRC/NRR/DORL J. Bartley (via telecom) RII/DCP/DPB3 ENCLOSURE 1

Tennessee Valley Authority WATTS BAR NUCLEAR PLANT, UNIT 2 cc:

Mr. Gordon P. Arent General Counsel New Generation Licensing Manager Tennessee Valley Authority Tennessee Valley Authority 6A West Tower 5A Lookout Place 400 West Summit Hill Drive 1101 Market Street Knoxville, TN 37902 Chattanooga, TN 37402-2801 Mr. Michael J. Lorek, Plant Manager Mr. Masoud Bajestani, Vice President Watts Bar Nuclear Plant Watts Bar Unit 2 Tennessee Valley Authority Watts Bar Nuclear Plant P.O. Box 2000 Tennessee Valley Authority Spring City, TN 37381 P.O. Box 2000, EQB 1B Spring City, TN 37381 Mr. Lawrence E. Nanney, Director Tennessee Dept. of Environmental Health &

Senior Resident Inspector Conservation Watts Bar Nuclear Plant Division of Radiological Health U.S. Nuclear Regulatory Commission 3rd Floor, L&C Annex 1260 Nuclear Plant Road 401 Church Street Spring City, TN 37381 Nashville, TN 37243-1532 Mr. Michael K. Brandon, Manager Mr. Larry E. Nicholson, General Manager Licensing and Industry Affairs Performance Improvement Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 4X Blue Ridge P.O. Box 2000 1101 Market Street Spring City, TN 37381 Chattanooga, TN 37402-2801 Mr. William R. Campbell, Jr. Mr. Michael D. Skaggs Chief Nuclear Officer and Site Vice President Executive Vice President Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 3R Lookout Place P.O. Box 2000 1101 Market Street Spring City, TN 37381 Chattanooga, TN 37402-2801 Mr. Ashok S. Bhatnagar County Executive Senior Vice President 375 Church Street Nuclear Generation Development Suite 215 and Construction Dayton, TN 37321 6A Lookout Place 1101 Market Street County Mayor Chattanooga, TN 37402-2801 P. O. Box 156 Decatur, TN 37322 Mr. John C. Fornicola, General Manager Nuclear Assurance Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801