Letter Sequence Other |
---|
TAC:MD6311, Clarify Application of Setpoint Methodology for LSSS Functions, Control Room Habitability, Steam Generator Tube Integrity (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement
Results
Other: CNL-14-154, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12, CNL-15-137, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13, ML080860026, ML080860040, ML081700293, ML082410088, ML083460177, ML090480486, ML101260469, ML102170077, ML102290258, ML103010299, ML11213A130, ML11362A056, ML12234A688, ML13023A315, ML13213A194
|
MONTHYEARML0732401242007-11-26026 November 2007 Summary of Meeting with Tennessee Valley Authority on Use of Eagle 21 at Watts Bar Unit 2 Project stage: Meeting ML0734400222007-12-0505 December 2007 Westinghouse Eagle - 21 Process Protection System Project stage: Request ML0801705432008-01-0303 January 2008 Summary of December 12, 2007, Meeting with Tennessee Valley Authority on Reconstruction of the Licensing Basis for Watts Bar Unit 2 Project stage: Meeting ML0735209712008-01-0303 January 2008 Summary of Meeting with Tennessee Valley Authority on Reconstitution of the Licensing Basis for Watts Bar, Unit 2 Project stage: Meeting ML0812105062008-05-0707 May 2008 Request for Additional Information Regarding Eagle-21 Process Protection System (Tac No. MD6311) Project stage: RAI ML0810101162008-05-0808 May 2008 Review Topics for Safety Evaluation, Attachment 1 Project stage: Approval ML0808600402008-05-0808 May 2008 Enclosure 1- Watts Bar Nuclear Plant, Unit 2 - Assessment of Remaining Operating License Application Review Scope Project stage: Other ML0808600262008-05-0808 May 2008 Assessment of Remaining Operating License Application Review Scope Project stage: Other ML0814300282008-05-14014 May 2008 Transmittal of Annual Radiological Environmental Operating Report of 2007 Project stage: Request ML0817002932008-06-16016 June 2008 Response to Additional Information Request on Regulatory Framework for the Completion of Construction and Licensing, Revision 1 Project stage: Other ML0818504602008-07-0202 July 2008 Final Supplemental Environmental Impact Statement - Request for Additional Information Project stage: Supplement ML0824100882008-08-25025 August 2008 Westinghouse Eagle-21 Process Protection System Project stage: Other ML0834601772008-12-0909 December 2008 Unit 2 - Licensing Basis Preservation and Construction Refurbishment Program for Structures, Systems and Components (Sscs) Project stage: Other ML0904804862009-02-23023 February 2009 TVA December 11, 2008 - Public MtgR1 Project stage: Other ML0904804712009-02-23023 February 2009 Region II - December 2008 Public Meeting with Notes Project stage: Meeting ML0904804662009-02-23023 February 2009 NRR - Public Meeting WBN2 Status 12-11-08 Project stage: Meeting ML0904804362009-02-23023 February 2009 Summary of December 11, 2008, Meeting with Tennessee Valley Authority on Status of Construction and Licensing Activities Project stage: Meeting ML1001204872009-11-12012 November 2009 Application for Special Nuclear Material License in Accordance with 10 CFR 70, Domestic Licensing of Special Nuclear Material Project stage: Request ML1001916842010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97, Section 3 - Design of Structures, Components, Equipment, and Systems, Page 3.8.5-1 Through Page 3.11-9 Project stage: Request ML1001914212010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97 Project stage: Request ML1012604692010-04-29029 April 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 2, and Status of Generic Communications for Unit 2 - Revision 2 Project stage: Other ML1019402362010-06-18018 June 2010 Instrumentation and Controls Staff Information Requests Project stage: Request ML1021700772010-07-30030 July 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 3, and Status of Generic Communications for Unit 2 - Revision 3 Project stage: Other ML1022902582010-07-31031 July 2010 Final Safety Analysis Report - Response to Preliminary Requests for Additional Information and Requests for Additional Information Project stage: Other ML1030102992010-10-28028 October 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 4, and Status of Generic Communications for Unit 2 - Revision 4 Project stage: Other ML1031207112010-10-29029 October 2010 Instrumentation and Controls Staff Information Requests Project stage: Request ML1031207122010-10-29029 October 2010 Edcr 52321 Draft Scope and Intent, Unit Difference and Technical Evaluation, Enclosure 2, Attachment 1 Project stage: Request ML1031403142010-11-0101 November 2010 OL - TVA Letter to NRC_10-29-10_WBN U2 FSAR 101 Project stage: Request ML1032001462010-11-0909 November 2010 Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information Project stage: Response to RAI ML1032106442010-11-17017 November 2010 Revision of Commitment for Implementation of the Maintenance Rule Project stage: Request ML1035405602010-12-17017 December 2010 Safety Evaluation Report Supplement 22 (SSER22) - Response to Requests for Additional Information Project stage: Supplement ML1106202192011-02-25025 February 2011 Instrumentation and Controls Staff Information Requests Project stage: Request ML1110500092011-04-0808 April 2011 OL - FW: Updated OI List Project stage: Request ML11136A0532011-04-18018 April 2011 OL - TVA Letter to NRC_04-15-11_I&C RAI Response Project stage: Request ML11129A2052011-05-0606 May 2011 Instrumentation and Controls Staff Information Requests Project stage: Request ML11178A1552011-06-0303 June 2011 Final Safety Analysis Report (Fsar), Amendment 104 Project stage: Request ML11167A1102011-06-10010 June 2011 Instrumentation and Controls Staff Information Requests Project stage: Request ML11213A1302011-07-27027 July 2011 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 6 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 6 Project stage: Other ML11213A2612011-07-28028 July 2011 Results from Cost-Benefit Analysis of Radwaste System Enhancements Project stage: Request ML11292A1992011-10-17017 October 2011 Revision of Commitment for Unit 2's Implementation of the Maintenance Rule Project stage: Request ML11362A0562011-12-20020 December 2011 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 7 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 7 Project stage: Other ML12234A6882012-08-15015 August 2012 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 8 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 8 Project stage: Other ML12249A1952012-08-30030 August 2012 Instrumentation and Controls Staff Request for Additional Information (RAI) Related to Supplemental Safety Evaluation Report (Sser) Open Item 80 Project stage: Supplement ML12284A5132012-10-0404 October 2012 NRC Bulletin No. 88-08, Thermal Stresses in Piping Connected to Reactor Coolant System (RCS) - Clarification Project stage: Request ML12284A5142012-10-0404 October 2012 Revision of Commitment for Unit 2's Implementation of the Maintenance Rule Project stage: Request ML12312A1672012-10-25025 October 2012 Unit 1 & 2, Watts Bar, Units 1 & 2, 90-Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System. Project stage: Request ML12349A3792012-12-10010 December 2012 Instrumentation and Controls Staff Request for Additional Information (RAI) Related to Supplemental Safety Evaluation Report (Sser) Open Item 80 Project stage: Supplement ML13023A3152013-01-17017 January 2013 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 9 (TAC No. MD6311), and Status of Generic Communications for Unit 2 -Revision 9 Project stage: Other ML13030A0322013-01-24024 January 2013 Documentation of Liability Insurance Coverage Requested Per Supplemental Safety Evaluation Report (Sser) Open Item 25 Project stage: Request ML13213A1942013-07-25025 July 2013 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 10 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 10 Project stage: Other 2010-06-18
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) 2024-09-05
[Table view] |
Text
May 8, 2008 Mr. Ashok Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 2 - ASSESSMENT OF REMAINING OPERATING LICENSE APPLICATION REVIEW SCOPE AND REQUESTS FOR ADDTIONAL INFORMATION (TAC NO. MD6311)
Dear Mr. Bhatnagar:
This letter forwards the Nuclear Regulatory Commissions (NRCs) initial assessment of the remaining operating license review scope for the Tennessee Valley Authoritys (TVAs) Watts Bar Nuclear Plant (WBN) Unit 2. The NRC staff finds that many existing topics within the scope of licensing review have already been addressed. However, the staffs review to date does not completely agree with TVAs position regarding the status of all topics. The staff needs additional information from TVA to resolve differences between the NRC and TVA scope assessments.
The staff has also determined that there are circumstances that could result in re-opening a previously reviewed topic. The attached assessment also outlines processes that should be applied to confirm the relevance of previously-completed NRC safety evaluations to the final WBN Unit 2 design, or identify topics that require supplemental review. The staff requests additional information regarding how TVA will complete this confirmation.
NRC Assessment Results provides the staffs initial inventory of licensing issues that must be resolved to complete the operating license review for WBN Unit 2. The assessment is summarized in six tables.
Table 1 describes the Table of Contents for the review, and is derived from the Table of Contents for NUREG-0847, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Units 1 and 2, with sections added to address (1) generic issues, (2) topics identified from NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants such as the maintenance rule (Section 50.65 of Title 10, Code of Federal Regulations), (3) TVA Nuclear Performance Plan topics, and (4) other issues, such as orders and conditions on the WBN Unit 1 license that will also be applied to Unit 2.
Table 2 is based on this Table of Contents, and documents the staffs review of NUREG-0847 through Supplement 20, providing an initial determination as to whether a topic is open (with additional review required), or closed (review was documented in NUREG-0847 through Supplement 20).
Ashok Bhatnagar Table 3 summarizes topics that the staff considers closed based on this initial review, while Table 4 summarizes open topics. The information presented in Tables 3 and 4 is the same as that given in Table 2.
In compiling the information presented in Tables 2, 3, and 4, the NRC staff reviewed only NUREG-0847 and its supplements; the staff did not review TVA submittals or other documents.
The staff made conservative status assessments, keeping a topic open when the discussion within NUREG-0847 or its supplements did not clearly apply to WBN Unit 2.
In many cases, the staffs initial review concluded that topics remain open for WBN Unit 2, contrary to an assertion by TVA that those topics are closed per TVAs January 29, and March 13, 2008, submittals. Upon additional review of background documentation used in the initial review, the staff may conclude that some of those topics have actually been previously reviewed and resolved for WBN Unit 2. In other cases, TVA will need to submit additional information before a topic can be considered closed. Table 5 provides a list of topics where the NRCs initial conclusions do not match the status proposed by TVA. Table 6 lists topics considered open by the NRC staffs initial review where no submittal is planned by TVA, per its March 13, 2008, submittal. Additional information will be required to resolve the topics listed in Table 6.
Table 7 lists NUREG-0847 supplements examined by the staff as part of this assessment. In comparing this list to information submitted by TVA, the staff found many cases where tables provided in TVAs January 29, and March 13, 2008, submittals did not identify every supplement to NUREG-0847 where a given topic was addressed. For example, TVAs March 13, 2008, submittal states that SER subsection 5.2.5, Reactor Coolant System Boundary Leakage Detection, was resolved in NUREG-0847 for both WBN units. The NRC staff determined that this topic is also addressed in NUREG-0847 Supplements 9, 11, and 12. Table 8 lists cases where the staff found that TVA did not identify all NUREG-0847 supplemental safety evaluation reports (SSERs) relevant to a particular topic. Additional information will be required to address these discrepancies.
TVA has also provided information regarding the status of generic issues for WBN Unit 2 in two letters dated September 7, 2007, and in a letter dated March 20, 2008. The NRC staffs review of this information is not part of this assessment and will be completed at a later date.
Methodology for Evaluation of Previously-Reviewed Topics Even if a topic was previously reviewed and closed within NUREG-0847 and its supplements, there are circumstances that could lead to revision of a previous evaluation, or a new evaluation being performed. Therefore, the assessment also outlines a methodology to screen previously-reviewed topics to determine if a revised safety evaluation is necessary. As the staffs review proceeds, this methodology may be revised.
Requests for Additional Information (RAIs)
In the course of developing this assessment, the NRC staff has identified several areas where additional information will be needed from TVA to complete screening of review topics and to ensure compliance with regulatory requirements. These requests for additional information are described in Attachment 2 of the Enclosure.
Ashok Bhatnagar You should particularly note the last RAI, where the staff requests that TVA address all supplements to NUREG-0847 pertinent to a given topic in future revisions of the regulatory framework letter, updating the review status for WBN Unit 2, as necessary. The staff found that for many of the topics described by the NUREG-0847 table of contents, TVA did not identify all NUREG-0847 supplements affecting those topics. The staff expects TVA to ensure that its submittals thoroughly address all relevant licensing information. Please take appropriate corrective actions to ensure your future submittals address all relevant licensing information.
We request that you respond to these requests or provide a schedule for your response within 30 days of the date of this letter.
Please contact Joe Williams at 301-415-1470 or joseph.williams@nrc.gov if you have questions regarding this assessment.
Sincerely,
/RA/
L. Raghavan, Chief Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
Assessment of Remaining Review Scope cc w/encl: See next page
Ashok Bhatnagar You should particularly note the last RAI, where the staff requests that TVA address all supplements to NUREG-0847 pertinent to a given topic in future revisions of the regulatory framework letter, updating the review status for WBN Unit 2, as necessary. The staff found that for many of the topics described by the NUREG-0847 table of contents, TVA did not identify all NUREG-0847 supplements affecting those topics. The staff expects TVA to ensure that its submittals thoroughly address all relevant licensing information. Please take appropriate corrective actions to ensure your future submittals address all relevant licensing information.
We request that you respond to these requests or provide a schedule for your response within 30 days of the date of this letter.
Please contact Joe Williams at 301-415-1470 or joseph.williams@nrc.gov if you have questions regarding this assessment.
Sincerely,
/RA/
L. Raghavan, Chief Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
Assessment of Remaining Review Scope cc w/encl: See next page Accession Number: PKG:ML080860033; LTR: ML080860026; ASSES: ML080860040; TABLE: ML081010116
- Via E-mail OFFICE WBN2/PM WBN2/LA AADB/BC AFPB/BC CPNB/BC CSGB/BC NAME JWilliams BClayton RTaylor AKlein* TChan* AHiser*
DATE / /08 / /08 4/9/08 04/03/08 04/02/08 4/2/08 OFFICE CVIB/BC EEEB/BC EICB/BC EMCB/BC EQVB/BC IOLB/BC NAME MMitchell* GWilson* WKemper KManoly* DThatcher* NSalgado*
DATE 04/04/08 4/9/08 4/9/08 4/9/08 04/07/08 04/04/08 OFFICE IRIB/BC ITSB/BC PFPB/BC SBPB/BC SCVB/BC SNPB/BC NAME TKobetz* RElliott ACosta* DHarrison* RDennig* AMendiola*
DATE 04/07/08 4/9/08 4/9/08 4/9/08 04/04/08 04/02/08 OFFICE SRXB/BC NSIR/LIB/BC NSIR/RSPLB/BC OGC, NLO WBN2-BC CPTB/BC NAME GCranston* KWilliams* DHuyck* DRoth LRaghavan JMcHale*
DATE 04/04/08 04/04/08 04/07/08 05/01/08 / /08 4/2/08 OFFICIAL RECORD COPY
Letter to Ashok Bhatnagar from L. Raghavan dated
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 2 - ASSESSMENT OF REMAINING OPERATING LICENSE APPLICATION REVIEW SCOPE (TAC NO. MD6311)
DISTRIBUTION:
PUBLIC RidsNrrPMJWilliams RidsNrrLABClayton L. Raghavan WBSPB r/f RidsAcrsAcrnw&mMailCenter RidsRgn2MailCenter RidsOgcRp RidsNrrAADB RidsNrrAFPB RidsNrrCPNB RidsNrrCPTB RidsNrrCSGB RidsNrrCVIB RidsNrrEEEB RidsNrrEICB RidsNrrEMCB RidsNrrEQVB RidsNrrIOLB RidsNrrIRIB RidsNrrITSB RidsNSIR-RSPLB RidsNSIR-LIB RidsNrrPFPB RidsNrrSBPB RidsNrrSCVB RidsNrrSNPB RidsNrrSRXB
TABLES (8)
REVIEW TOPICS FOR SAFETY EVALUATION WATTS BAR NUCLEAR PLANT, UNIT 2 ATTACHMENT 1
Ashok S. Bhatnagar Tennessee Valley Authority WATTS BAR NUCLEAR PLANT, UNIT 2 cc:
Mr. Gordon P. Arent Mr. John C. Fornicola, General Manager New Generation Licensing Manager Nuclear Assurance Tennessee Valley Authority Tennessee Valley Authority 5A Lookout Place 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Chattanooga, TN 37402-2801 General Counsel Mr. Masoud Bajestani, Vice President Tennessee Valley Authority Watts Bar Unit 2 6A West Tower Watts Bar Nuclear Plant 400 West Summit Hill Drive Tennessee Valley Authority Knoxville, TN 37902 P.O. Box 2000, EQB 1B Spring City, TN 37381 Mr. Michael J. Lorek, Plant Manager Watts Bar Nuclear Plant Senior Resident Inspector Tennessee Valley Authority Watts Bar Nuclear Plant P.O. Box 2000 U.S. Nuclear Regulatory Commission Spring City, TN 37381 1260 Nuclear Plant Road Spring City, TN 37381 Mr. Lawrence E. Nanney, Director Tennessee Dept. of Environmental Health &
Mr. Michael K. Brandon, Manager Conservation Licensing and Industry Affairs Division of Radiological Health Watts Bar Nuclear Plant 3rd Floor, L&C Annex Tennessee Valley Authority 401 Church Street P.O. Box 2000 Nashville, TN 37243-1532 Spring City, TN 37381 Mr. Larry E. Nicholson, General Manager Mr. William R. Campbell, Jr. Performance Improvement Chief Nuclear Officer and Tennessee Valley Authority Executive Vice President 3R Lookout Place Tennessee Valley Authority 1101 Market Street 3R Lookout Place Chattanooga, TN 37402-2801 1101 Market Street Chattanooga, TN 37402-2801 Ms. Ann P. Harris 341 Swing Loop Road County Executive Rockwood, TN 37854 375 Church Street Suite 215 Dayton, TN 37321 County Mayor P. O. Box 156 Decatur, TN 37322