Letter Sequence Request |
---|
TAC:MD6311, Clarify Application of Setpoint Methodology for LSSS Functions, Control Room Habitability, Steam Generator Tube Integrity (Approved, Closed) TAC:MD8314, Clarify Application of Setpoint Methodology for LSSS Functions, Control Room Habitability, Steam Generator Tube Integrity (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement
Results
Other: CNL-14-154, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12, CNL-15-137, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13, ML080860026, ML080860040, ML081700293, ML082410088, ML083460177, ML090480486, ML101260469, ML102170077, ML102290258, ML103010299, ML11213A130, ML11362A056, ML12234A688, ML13023A315, ML13213A194
|
MONTHYEARML0732401242007-11-26026 November 2007 Summary of Meeting with Tennessee Valley Authority on Use of Eagle 21 at Watts Bar Unit 2 Project stage: Meeting ML0734400222007-12-0505 December 2007 Westinghouse Eagle - 21 Process Protection System Project stage: Request ML0801705432008-01-0303 January 2008 Summary of December 12, 2007, Meeting with Tennessee Valley Authority on Reconstruction of the Licensing Basis for Watts Bar Unit 2 Project stage: Meeting ML0735209712008-01-0303 January 2008 Summary of Meeting with Tennessee Valley Authority on Reconstitution of the Licensing Basis for Watts Bar, Unit 2 Project stage: Meeting ML0803701852008-02-0101 February 2008 Request to Use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Code Case N-520-2, Alternative Rules for Renewal of Active or Expired N-Type Certificates for Plants Not in Active Construction. Project stage: Other ML0812105062008-05-0707 May 2008 Request for Additional Information Regarding Eagle-21 Process Protection System (Tac No. MD6311) Project stage: RAI ML0810101162008-05-0808 May 2008 Review Topics for Safety Evaluation, Attachment 1 Project stage: Approval ML0808600402008-05-0808 May 2008 Enclosure 1- Watts Bar Nuclear Plant, Unit 2 - Assessment of Remaining Operating License Application Review Scope Project stage: Other ML0808600262008-05-0808 May 2008 Assessment of Remaining Operating License Application Review Scope Project stage: Other ML0814300282008-05-14014 May 2008 Transmittal of Annual Radiological Environmental Operating Report of 2007 Project stage: Request ML0813008092008-05-22022 May 2008 Request for Additional Information, Renewal of Active or Expired N-Type Certificates for Plants Project stage: RAI ML0814901102008-05-28028 May 2008 Status of Generic Communications for Review (Tac No. MD8314) Project stage: Other ML0814901182008-05-28028 May 2008 NRC Review: Generic Communications Status for TVA Watts Bar Unit 2 Project stage: Other ML0817002932008-06-16016 June 2008 Response to Additional Information Request on Regulatory Framework for the Completion of Construction and Licensing, Revision 1 Project stage: Other ML0818504592008-07-0202 July 2008 Response to Request for Additional Information Project stage: Response to RAI ML0818504602008-07-0202 July 2008 Final Supplemental Environmental Impact Statement - Request for Additional Information Project stage: Supplement ML0821402382008-07-29029 July 2008 Generic Communications Status, Revision 1 Project stage: Other ML0824100882008-08-25025 August 2008 Westinghouse Eagle-21 Process Protection System Project stage: Other ML0827500192008-09-26026 September 2008 Regulatory Framework for the Completion of Construction and Licensing Activities for Unit 2 - Corrective Action and Special Programs, and Unresolved Safety Issues Project stage: Other ML0825603732008-10-0202 October 2008 Request for Relief Regarding Alternative Rules for Renewal of Active or Expired N-Type Certificates Project stage: Other ML0834601772008-12-0909 December 2008 Unit 2 - Licensing Basis Preservation and Construction Refurbishment Program for Structures, Systems and Components (Sscs) Project stage: Other ML0904804862009-02-23023 February 2009 TVA December 11, 2008 - Public MtgR1 Project stage: Other ML0904804362009-02-23023 February 2009 Summary of December 11, 2008, Meeting with Tennessee Valley Authority on Status of Construction and Licensing Activities Project stage: Meeting ML0904804662009-02-23023 February 2009 NRR - Public Meeting WBN2 Status 12-11-08 Project stage: Meeting ML0904804712009-02-23023 February 2009 Region II - December 2008 Public Meeting with Notes Project stage: Meeting ML1001204872009-11-12012 November 2009 Application for Special Nuclear Material License in Accordance with 10 CFR 70, Domestic Licensing of Special Nuclear Material Project stage: Request ML1001916842010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97, Section 3 - Design of Structures, Components, Equipment, and Systems, Page 3.8.5-1 Through Page 3.11-9 Project stage: Request ML1001914212010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97 Project stage: Request ML1012002042010-04-20020 April 2010 Preservice Inspection Program Plan and Additional Information Project stage: Other ML1012604692010-04-29029 April 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 2, and Status of Generic Communications for Unit 2 - Revision 2 Project stage: Other ML1016805612010-06-17017 June 2010 Preservice Inspection Program Plan and Additional Information Project stage: Other ML1019402362010-06-18018 June 2010 Instrumentation and Controls Staff Information Requests Project stage: Request ML1017602222010-06-25025 June 2010 Request to Use ASME Boiler and Pressure Vessel Code, Code Case N-520-3, Alternative Rules for Renewal of Active or Expired N-Type Certificates for Plants Not in Active Construction, Section III, Division 1 Project stage: Other ML1021700772010-07-30030 July 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 3, and Status of Generic Communications for Unit 2 - Revision 3 Project stage: Other ML1022902582010-07-31031 July 2010 Final Safety Analysis Report - Response to Preliminary Requests for Additional Information and Requests for Additional Information Project stage: Other ML1025001712010-09-0101 September 2010 OL - TVA Letter to NRC - WBN U2 FSAR A100 Project stage: Request ML1027005272010-09-29029 September 2010 Request for Relief Regarding Alternative Rules for Renewal of Active or Expired N-Type Certification Project stage: Other ML1030102992010-10-28028 October 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 4, and Status of Generic Communications for Unit 2 - Revision 4 Project stage: Other ML1031207112010-10-29029 October 2010 Instrumentation and Controls Staff Information Requests Project stage: Request ML1031207122010-10-29029 October 2010 Edcr 52321 Draft Scope and Intent, Unit Difference and Technical Evaluation, Enclosure 2, Attachment 1 Project stage: Request ML1031403142010-11-0101 November 2010 OL - TVA Letter to NRC_10-29-10_WBN U2 FSAR 101 Project stage: Request ML1032001462010-11-0909 November 2010 Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information Project stage: Response to RAI ML1032106442010-11-17017 November 2010 Revision of Commitment for Implementation of the Maintenance Rule Project stage: Request ML1035405602010-12-17017 December 2010 Safety Evaluation Report Supplement 22 (SSER22) - Response to Requests for Additional Information Project stage: Supplement ML1102104862011-01-21021 January 2011 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 5 and Status of Generic Communications for Unit 2 - Revision 5 Project stage: Other ML1106202192011-02-25025 February 2011 Instrumentation and Controls Staff Information Requests Project stage: Request ML1110500092011-04-0808 April 2011 OL - FW: Updated OI List Project stage: Request ML11136A0532011-04-18018 April 2011 OL - TVA Letter to NRC_04-15-11_I&C RAI Response Project stage: Request ML11129A2052011-05-0606 May 2011 Instrumentation and Controls Staff Information Requests Project stage: Request ML11178A1552011-06-0303 June 2011 Final Safety Analysis Report (Fsar), Amendment 104 Project stage: Request 2010-10-28
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) 2024-09-05
[Table view] Category:Financial Assurance Document
MONTHYEARCNL-17-030, Guarantee of Payment of Deferred Premiums - 2016 Annual Report2017-03-31031 March 2017 Guarantee of Payment of Deferred Premiums - 2016 Annual Report CNL-16-005, Guarantee of Payment of Deferred Premiums - 2015 Annual Report2016-04-0606 April 2016 Guarantee of Payment of Deferred Premiums - 2015 Annual Report CNL-16-006, Annual Insurance Status Report2016-03-29029 March 2016 Annual Insurance Status Report ML16042A1772016-01-11011 January 2016 Certificate of Liability Insurance CNL-15-223, Proof of Financial Protection, Nuclear Liability and Property Insurance and Indemnity Agreement2015-10-22022 October 2015 Proof of Financial Protection, Nuclear Liability and Property Insurance and Indemnity Agreement CNL-15-211, Financial Protection Requirements and Indemnity Agreements - Insurance Status Second Supplement2015-09-29029 September 2015 Financial Protection Requirements and Indemnity Agreements - Insurance Status Second Supplement CNL-15-176, Financial Protection Requirements and Indemnity Agreements, Insurance Status2015-08-26026 August 2015 Financial Protection Requirements and Indemnity Agreements, Insurance Status CNL-15-051, Guarantee of Payment of Deferred Premiums - 2014 Annual Report2015-04-0707 April 2015 Guarantee of Payment of Deferred Premiums - 2014 Annual Report CNL-15-052, Annual Insurance Status Report2015-04-0101 April 2015 Annual Insurance Status Report CNL-14-049, CNL-14-049, TVA Guarantee of Payment of Deferred Premiums - 2013 Annual Report2014-04-0303 April 2014 CNL-14-049, TVA Guarantee of Payment of Deferred Premiums - 2013 Annual Report ML13093A3702013-04-0101 April 2013 Annual Insurance Status Report ML13093A3712013-04-0101 April 2013 Guarantee of Payment of Deferred Premiums - 2012 Annual Report ML13030A0322013-01-24024 January 2013 Documentation of Liability Insurance Coverage Requested Per Supplemental Safety Evaluation Report (Sser) Open Item 25 ML12094A3052012-04-0202 April 2012 Guarantee of Payment of Deferred Premiums - 2011 Annual Report ML12094A3042012-04-0202 April 2012 Annual Insurance Status Report. ML1123800232011-11-14014 November 2011 2010 DFS Report Analysis for Watts Bar Nuclear Plant, Unit 1 ML1109506832011-04-0101 April 2011 Submittal of Annual Insurance Status Report ML1109600732011-03-31031 March 2011 Submittal of Decommissioning Funding Status Report ML1109600722011-03-31031 March 2011 Guarantee of Payment of Deferred Premiums - 2010 Annual Report ML1012503002010-04-29029 April 2010 Financial Protection Requirements & Indemnity Agreements - Insurance Status ML0933800462009-12-10010 December 2009 Status of Decommissioning Funding Assurance ML0925200202009-09-0404 September 2009 Decommissioning Funding Assurance ML0909302852009-04-0101 April 2009 Watts Barr (WBN) Nuclear Plants - Insurance Status ML0711705732007-03-28028 March 2007 TVA - Decommissioning Funding Status Report ML0706800402007-03-0707 March 2007 Tennessee Valley Authority - 2006 Annual Report ML0609502462006-04-0303 April 2006 (Bfn), Sequoyah (Sqn), and Watts Bar (WBN) Nuclear Plants - Insurance Status ML0509402222005-03-30030 March 2005 TVA- Decommissioning Funding Status Report - Browns Ferry (Bfn), Sequoyah (SQN) and Watts Bar (WBN) Nuclear Plants 2017-03-31
[Table view] |
Text
-1 ,
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 January 24, 2013 10 CFR 140.11 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No.:50-391
Subject:
Watts Bar Nuclear Plant Unit 2 - Documentation of Liability Insurance Coverage Requested Per Supplemental Safety Evaluation Report (SSER)
Open Item 25 SSER Appendix HH Open Item 25 states that TVA is required to provide satisfactory documentation that TVA has obtained the maximum secondary liability insurance coverage pursuant to 10 CFR 140.11 (a)(4) and not less than the amount required by 10 CFR 50.54(w).
The enclosed letter provides the requested Certificate of Insurance for Watts Bar Nuclear Plant Unit 2. The submittal of this letter completes TVA's actions associated with SSER Open Item 25.
There are no new regulatory commitments contained in this letter. If you have any questions, please contact Gordon Arent at (423) 365-2004.
Respectfully, Raymond A. Hruby, Jr.
General Manager, Technical Services Watts Bar Unit 2
Enclosure:
Letter from E. Visor (Marsh USA Inc.) to I. Dinitz (NRC), "Watts Bar Unit 2: Bond Payment of Retrospective Premium," dated October 3, 2011 o hL
U.S. Nuclear Regulatory Commission Page 2 January 24, 2013 cc (Enclosure):
U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381
Enclosure I Letter from E. Visor (Marsh USA Inc.) to I. Dinitz (NRC),
"Watts Bar Unit 2: Bond Payment of Retrospective Premium,"
dated October 3, 2011
Eugina A Visor, ARM Nuclear Client Advisor MARSH Marsh USA Inc.
100 North Tryon Street Suite 3200 Charlotte, NC 28202 704 374 8241 Eugina.A.Visor@marsh.com www.marsh.com Mr. Ira Dinitz Insurance & Indemnity Policy Analyst U.S. Nuclear Regulatory Commission Mail Stop 12E4 Washington, DC 20555 October 03, 2011
Subject:
Watts Bar Unit 2: Bond for Payment of Retrospective Premium
Dear Ira,
Enclosed please find the certified copy of the Bond for Payment of Retrospective Premiums for Watts Bar Unit 2 in accordance with 10CFR140.15. Please note that the certificate is worded so that it will not become effective until the effective date of the Nuclear Regulatory Commission's Facility Operating License.
If you have any questions or concerns, please do not hesitate to contact me at (704) 374-8241 or Shannon Moyer at (215) 246-1463.
Sincerely, Eugina A Visor, ARM Nuclear Client Advisor Copy:
Vicki Harkleroad, Gordon Arent, William D. Couch, Tim Fischer, and Shannon Moyer LEADERSHIP, KNOWLEDGE, SOLUTIONS...WORLDWIDE.
"*1* MARSH & McLENNAN COMPANIES
NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION Certificate No. N -0120 Forming Part of Master Policy No. I CERTIFICATE OF INSURANCE DECLARATIONS AND BOND FOR PAYMENT OF RETROSPECTIVE PREMIUMS Certificate of Insurance This is to certify that the persons and organizations designated in Item I of the Declarations are named insureds under the Master Policy - Nuclear Energy Liability Insurance (Secondary Financial Protection), herein called the "Master Policy", issued by Nuclear Energy Liability Insurance Association.
Such insurance as is provided by the Master Policy applies, through this certificate, only:
(a) to the insureds identified in Items I and 2 of the Declarations, (b) for the certificate period stated in Item 6 of the Declarations, (c) to bodily iniury or property damage (1) with respect to which the primary financial protection described in Item 4 of the Declarations would apply but for exhaustion of its limit of liability as described in Condition 6 of the Master Policy, and (2) which is caused during the certificate period stated in Item 6 of the Declarations by a nuclear incident arising out of or in connection with the nuclear reactor described in Item 3 of the Declarations, and NSFC-1 (1/1/83) Page I
(3) which is discovered and for which written claim is made against the insured not later than ten years after the end of the certificate period stated in Item 6 of the Declarations.
However, with respect to bodily injury or property damage caused by an extraordinary nuclear occurrence this subparagraph (3) shall not operate to bar coverage for bodil jury or property damage which is discovered and for which written claim is made against the insured not later than twenty years after the date of the extraordinary nuclear occurrence.
Declarations Item I. Named insureds and addresses:
(a) Tennessee Valley Authority - 1101 Market Street, Mail Stop "T! Q,,
Chattanooga, TN 37402 (b)
Item 2. Additional insureds:
Any other person or organization who would be insured under the primary financial protection identified in Item 4 of the Declarations but for exhaustion of the limit of liability of such primarY financial protection.
Item 3. Description and location of nuclear reactor: Unit 2 of the Watts Bar Nuclear Plant located in Rhea County, Tennessee.
Page 2 of Certificate No. N- 0120
Item 4. (a) Identification of primary financial protection applicable to the nuclear reactor and limit(s) of liability thereof:
Nuclear Energy Liability Insurance Association's Policy NF- 0256 $375,000,000 Mutual Atomic Energy Liability Underwriter's Policy MF- N/A $ N/A (b) The following endorsements, attached to the primary financial protection policies listed in Item 4 (a) also apply to the insurance afforded by the Master Policy through this certificate as though they were attached hereto:
(I) Waiver of Defenses Endorsement (Extraordinary Nuclear Occurrence) and (2) Supplementary Endorsement - Waiver of Defenses - Reactor Construction at the Facility, (c) The limits of liability provided under the primary financial protection specified in Item 4 (a) above are not shared with any other reactor except as follows:
Item 5. Limits of Liability: The amount of retrospective premium actually received by the companies plus the amount of the companies' contingent liability, if any, pursuant to Conditions 2, 3 and 4 of the Master Policy.
Page 3 of Certificate No. N-0 120
Item 6. Certificate Period: Beginning at the same time and date that the Facility Operating License issued by the United States Nuclear Regulatory Commission for the reactor described in Item 3 of this certificate becomes effective and continuing to the effective date and time of cancellation or termination of the Master Policy or this certificate, whichever first occurs, eastern standard time.
Item 7. Maximum retrospective premium (exclusive of allowance for premium taxes) payable pursuant to Condition 2 of the Master Policy with respect to each nuclear incident: $117,495,000.
Item 8. Portion of the annual premium payable for the companies' contingent liability described in Condition 4 of the Master Policy from the effective date hereof to the end of calendar year 2011 :
The pro rata portion of $ 9,492 for the period from the effective date of this certificate to the end of the calendar year during which such effective date occurs.
Page 4 of Certificate No. N-0120
BOND FOR PAYMENT OF RETROSPECTIVE PREMIUMS Know All Men By These Presents, that the undersigned do hereby acknowledge that they are named insureds under the Master Policy described in the above Certificate of Insurance and Declarations. The named insureds do hereby covenant with and are held and are firmly bound to the members of Nuclear Energy Liability Insurance Association subscribing the Master Policy (hereinafter called the "companies") to pay to the companies all retrospective premiums and allowances for premium taxes which shall become due and payable in accordance with the Master Policy, as it may be changed from time to time, with interest on such premiums and allowances for taxes to be computed at the rate provided in the Master Policy from the date payment thereof is specified to be due the companies in written notice to the first named insured as provided in Condition 2 of the Master Policy until paid; And it is hereby expressly agreed that copies of written notices of retrospective premiums and allowances for premium taxes due and payable or other evidence of such amounts due and payable sworn to by a duly authorized representative of the companies shall be prima facie evidence of the fact and extent of the liability of the named insureds for such amounts; And it is further expressly agreed that the named insureds will indemnify the companies against any and all liability, losses and expenses of whatsoever kind or nature (including but not limited to interest, court costs, and counsel fees) which the companies may sustain or incur (1) by reason of the failure of the named insureds to comply with the covenants and provisions of this Bond and (2) in enforcing any of the covenants or provisions of this Bond, or any provisions of the Master Policy relating to such covenants or provisions; For the purpose of recording this agreement, a photocopy acknowledged before a Notary Public to be a true copy hereof %hall be regarded as an original.
Page 5 of Certificate No. N-0120
The preceding Certificate of Insurance, Declarations and Bond form a part of the Master Policy.
Cancellation or termination of the Master Policy or the Certificate of lnurance shall not affect the named insured's obligationsLunder the policy or the Bond to pay the retrospective premiums and allowances for premium taxes, as provided in this Certificate and Condition 2 of the Master Policy.
IN WITNESS WHEREOF, the named insureds have caused this Certificate, these Declarations and this Bond for Payment of Retrospective Premiums, to be signed and sealed by a duly authorized officer, to be effective as of the time and date of the inception of the Certificate period.
Attest or Witness Named Insureds:
TennestwidVY1110,*ut hority (N " STAT ".9 or Print)
Z:* OF ,% S (Type or Print Name atnnd Title)
~ j~j~RM:I/43/4=13
( t (Date)
Page 6 of Certificate No. N-0120
IN WITNESS WHEREOF, the companies subscribing the Master Policy have caused the Certificate of Insurance and Declarations to be signed on their behalf by the President of Nuclear Energy Liability Insurance Association to be effective as of the time and date of the inception of the Certificate period, and countersigned below by a duly authorized representative.
Attest or Witness For the Subscribing Companies of NUCLEAR ENERGY LIABILITY INS tNC Countersigned by utAhorized Representative)
Page 7 of Certificate No. N-0 120