ML061370431

From kanterella
Jump to navigation Jump to search
Summary of Annual Assessment Meeting with Firstenergy (Beaver Valley Station) with Attendee List and Licensee Slides
ML061370431
Person / Time
Site: Beaver Valley  FirstEnergy icon.png
Issue date: 05/10/2006
From: Bellamy R
NRC/RGN-I/DRP/PB7
To:
FirstEnergy Nuclear Operating Co
References
Download: ML061370431 (10)


Text

May 10, 2 0 0 6 MEETING

SUMMARY

LICENSEE: FIRSTENERGY NUCLEAR OPERATING COMPANY FAClLITY: BEAVER VALLEY POWER STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY

OF MARCH 28,2006, ANNUAL ASSESSMENT MEETING WITH FIRSTENERGY On March 28,2006, at 1:00 p.m., an Annual Assessment Meeting was conducted at the Beaver Valley Power Station Training Building in Shippingport, PA, between the Nuclear Regulatory Commission (NRC) and FirstEnergy Nuclear Operating Company (FENOC). The NRC requested the meeting with FENOC management to discuss NRC's assessment of the safety performance of the Beaver Valley Power Station, Units 1 and 2, for calendar year 2005.

The NRC presented and discussed its assessment of the safety performance of Beaver Valley Units 1 and 2 for the period between January 1 through December 31,2005. The NRC presentation included background on the Reactor Oversight Process (ROP), summary of national performance assessment results, an overview of Beaver Valley Units 1 and 2's performance during calendar year 2005, and a discussion of general NRC issues. As part of this regulatory performance meeting, FENOC presented an overview of their performance(Attachment 2).

NRC's assessment letter can be found in ADAMS with an Accession Number of ML060620158.

This meeting notice with the enclosed agenda can be located in ADAMS with an Accession Number of ML060660509. The NRC slides for the meeting can be accessed with the Accession Number ML060680441. ADAMS is accessible for the NRC Web Site at http://www.nrc.qov/readinu-rm/adams.html.

The public observed this meeting and was offered the opportunity to communicate with the NRC regarding FENOC's performance at Beaver Valley Power Station and the role of the agency in ensuring safe plant operations. At the end of the meeting between the NRC and FENOC, the NRC offered to answer questions from the public.

Sincerely, Ronald R. Bellamy, PhD, Chief Projects Branch 7 Division of Reactor Projects

Enclosures:

1. Meeting Attendees
2. FENOC Presentation Slides

Meeting Attendees Name Title/Orqanization Dr. Ronald Bellamy Chief, Projects Branch 7/USNRC RI Paul Cataldo Senior Resident Inspector/USNRC RI Roy Fuhrmeister Senior Project Engineer/USNRC RI Galen Smith Resident InspectoriUSNRC RI Benjamin Parks USNRC/NRR Ken Husk Raccoon TWP EMA Mary Husk Raccoon TWP EMA Jim Lash Site Vice PresidentlFENOC Rick Mende Plant Manager/FENOC Larry Freeland Performance ImprovementlFENOC Mack Manolears FENOC Rob Klindworth FENOC Doug Reeves FENOC Rich Bologna FENOC Dan Schwer FENOC Stan Baker FENOC Ralph Hansen FENOC Todd Schweider FENOC Ray Lieb FENOC Ed Hubley FENOC Roy Brosi FENOC Dan Craine FENOC Bill Kanda FENOC Dawn Laitres FENOC Fred Frey DZNPS Enclosure

MRC Annual Assessment Meetinq Beaver Valley Power Station March 28,2006

perat ionaI Performance II Plant Safety and Security

- Safety Culture / Safety Co~lsciousWork Environment

- Security

- Human Performance

- t-t 3 UJ (D

< 0)

CD 0 m I I TI (D

0 0

3 S

-m i!

D 3

3 TI 0 0 1

-m (D 0 3

e 3

ajor Licensing Initiatives Approved License Amendments:

- Replacement Steam Generator

- Containment Conversion

- Best Estimate LOCA Methodology Extended Power Uprate

OC Strategies II Safe Plant Operations II Reliable Plant Operations Cost-Effective Plant Operations II Effective use of People, Processes & Procedures

2 Distribution:

R. Bellamy, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP P. Cataldo, DRP, SRI G. Smith, DRP, RI P. Garrett, DRP, OA DOCUMENT NAME: G:\DRP\BRANCH7\ROP Assessment Folders\ROP-G\ROPG BV AA Meeting Summary.wpd OFFICE Rl/DRP I R1 /DRP I NAME ARosebrook oay RBellamy fJ/ddk2, DATE 05/ID/06 05/ 13 / 0 6