Category:Meeting Briefing Package/Handouts
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23291A1392023-10-18018 October 2023 PSEG Presentation Slides for Pre Submittal Meeting on 10-24-2023 ML23262B2602023-09-19019 September 2023 Slides - Constellation - Pre-Application EP 9/25/2023 Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23174A0012023-06-23023 June 2023 Pre-submittal Meeting Slides Regarding Update to the FitzPatrick Fuel Handling Accident Analysis with Impacts to Technical Specifications, June 26, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23076A2822023-02-23023 February 2023 Licensee Presentation on Defense-in-Depth Process ML23076A2812023-02-23023 February 2023 Licensee Presentation on Pressure Boundary Process ML23053A1562023-02-23023 February 2023 NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial ML23006A2572023-01-10010 January 2023 Digital Modernization Project Installation Support License Amendment Request and Exemption Request Presentation - January 10, 2023 (EPID L-2022-LRM-0099) (Slides) ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request ML22319A2432022-11-17017 November 2022 Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides) ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, Llc'S Presentation for November 10, 2022 Public Meeting with NRC ML22312A4402022-11-10010 November 2022 Public Meeting with Constellation About Acceptance Review: Status of NRC Staff'S Acceptance Review of the Limerick Digital Instrumentation and Controls License Amendment Request ML22249A0972022-09-0808 September 2022 Constellation'S Open Presentation for September 8, 2022 Partially Closed Public Meeting ML22250A4372022-09-0808 September 2022 NRC Staff'S Presentation for September 8, 2022 Partially Closed Public Meeting with Constellation - Review Planning and Tentative Review Timeline ML22249A2202022-09-0606 September 2022 Constellation'S Non-Proprietary Presentation for Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting September 8, 2022 ML22164A8082022-06-13013 June 2022 Westinghouse, Presentation GLIMM-RPS-PM-L1-000008, Revision 0 ML22153A3602022-06-0909 June 2022 Constellation'S Presentation for June 9, 2022 Public Meeting About Limerick Generating Station Digital Modernization Project ML22187A0652022-06-0808 June 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides ML22103A2542022-04-19019 April 2022 Draft Request for Additional Information ML22076A1942022-03-23023 March 2022 Constellation Presentation March 23, 2022 NRC Di_C Workshop ML22080A1522022-03-21021 March 2022 Non-Proprietary Presentation for March 31, 2022 Pre-Submittal Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML22010A0692022-01-10010 January 2022 Jan 11 2022 LGS Digital Modernization Pre-submittal Meeting Slides ML21335A0772021-12-0707 December 2021 Dec 07 2021 LGS Digital Modernization Pre-submittal Meeting Slides ML21294A3692021-11-15015 November 2021 Summary of October 6, 2021, Public Observation Meeting with Exelon Generation Company, LLC Proposed License Amendment Request to Modify Emergency Diesel Generator and Emregency Core Cooling System Surveillance Requirements ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21278A5452021-10-20020 October 2021 Digital Modernization Project LAR Pre-submittal Meeting Presentation Slides October 20, 2021 ML21174A0852021-06-23023 June 2021 Digital Modernization Project LAR Pre-submittal Meeting ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21095A1332021-04-0505 April 2021 Information for April 6, 2021 Public Meeting ML21063A1192021-03-0404 March 2021 Digital Modernization Project LAR Pre-submittal Meeting - March 16, 2021 (EPID L-2020-LRM-0041) (Slides) ML21057A0012021-03-0404 March 2021 PSEG Slides - NRC Pre Submittal Meeting, March 4, 2021 ML21049A3102021-02-19019 February 2021 CFR 50.69 Alternative Categorization LAR ML21034A6032021-02-0303 February 2021 External Presentation Am Connelly_ISG-6 Workshop Presentation ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML20162A0192020-06-10010 June 2020 NRC Staff Presentation for June 12, 2020, Public Pre-Application Meeting: ISG-06 Alternate Review Process Lessons Learned from Pre-Application Meetings ML20160A0532020-06-0808 June 2020 Digital Modernization Project LAR - Presubmittal Meeting - NRC Presubmittal Meeting Telecon June 12, 2020 ML20143A0352020-05-22022 May 2020 Presentation Slides - Ghent Version 2 Probe License Amendment Request - Pre-submittal Phone Call - May 26,2020 ML20143A0422020-05-22022 May 2020 Presentation Slides - Technical Justification for the Ghent Version 2 Probe Qualification and Probability of Detection - May 26, 2020 (Non-Proprietary Version) ML20112F2802020-04-21021 April 2020 NRC Review of Seismic Risk Assessment in Hope Creek 50.69 LAR - PRA Licensing Branch C, Division of Risk Assessment, Office of Nuclear Reactor Regulation - May 4, 2020 2024-01-30
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23291A1392023-10-18018 October 2023 PSEG Presentation Slides for Pre Submittal Meeting on 10-24-2023 ML23262B2602023-09-19019 September 2023 Slides - Constellation - Pre-Application EP 9/25/2023 Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23174A0012023-06-23023 June 2023 Pre-submittal Meeting Slides Regarding Update to the FitzPatrick Fuel Handling Accident Analysis with Impacts to Technical Specifications, June 26, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23076A2822023-02-23023 February 2023 Licensee Presentation on Defense-in-Depth Process ML23076A2812023-02-23023 February 2023 Licensee Presentation on Pressure Boundary Process ML23053A1562023-02-23023 February 2023 NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23006A2572023-01-10010 January 2023 Digital Modernization Project Installation Support License Amendment Request and Exemption Request Presentation - January 10, 2023 (EPID L-2022-LRM-0099) (Slides) ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request ML22319A2432022-11-17017 November 2022 Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides) ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, Llc'S Presentation for November 10, 2022 Public Meeting with NRC ML22250A4372022-09-0808 September 2022 NRC Staff'S Presentation for September 8, 2022 Partially Closed Public Meeting with Constellation - Review Planning and Tentative Review Timeline ML22249A0972022-09-0808 September 2022 Constellation'S Open Presentation for September 8, 2022 Partially Closed Public Meeting ML22249A2202022-09-0606 September 2022 Constellation'S Non-Proprietary Presentation for Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting September 8, 2022 ML22195A2172022-07-12012 July 2022 D3 Audit Open Items List (Non-Proprietary) (07-12-22)_redacted ML22164A8082022-06-13013 June 2022 Westinghouse, Presentation GLIMM-RPS-PM-L1-000008, Revision 0 ML22153A3602022-06-0909 June 2022 Constellation'S Presentation for June 9, 2022 Public Meeting About Limerick Generating Station Digital Modernization Project ML22187A0652022-06-0808 June 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides ML22132A0042022-05-26026 May 2022 PSEG Pre-submittal Meeting Slides - May 26, 2022 ML22076A1942022-03-23023 March 2022 Constellation Presentation March 23, 2022 NRC Di_C Workshop ML22080A1522022-03-21021 March 2022 Non-Proprietary Presentation for March 31, 2022 Pre-Submittal Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML22061A1392022-03-0202 March 2022 Pre-submittal Meeting Slides for Planned License Amendment Request to Consolidate Fuel Decay Time Requirements ML22010A0692022-01-10010 January 2022 Jan 11 2022 LGS Digital Modernization Pre-submittal Meeting Slides ML21335A0772021-12-0707 December 2021 Dec 07 2021 LGS Digital Modernization Pre-submittal Meeting Slides ML21294A3692021-11-15015 November 2021 Summary of October 6, 2021, Public Observation Meeting with Exelon Generation Company, LLC Proposed License Amendment Request to Modify Emergency Diesel Generator and Emregency Core Cooling System Surveillance Requirements ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21278A5452021-10-20020 October 2021 Digital Modernization Project LAR Pre-submittal Meeting Presentation Slides October 20, 2021 ML21294A3792021-10-0606 October 2021 WCAP-17308 Implementation Licensing Amendment Request Pre-Submittal Meeting Presentation, October 6, 2021 ML21175A1732021-06-29029 June 2021 Digital Modernization Project LAR Pre-submittal Meeting ML21174A0852021-06-23023 June 2021 Digital Modernization Project LAR Pre-submittal Meeting ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML21083A2852021-03-24024 March 2021 Ultimate Heat Sink (UHS) - NRC Pre-submittal Meeting, March 30, 2021 (EPID L-2021-LRM-0036) (Slides) ML21063A1192021-03-0404 March 2021 Digital Modernization Project LAR Pre-submittal Meeting - March 16, 2021 (EPID L-2020-LRM-0041) (Slides) ML21057A0012021-03-0404 March 2021 PSEG Slides - NRC Pre Submittal Meeting, March 4, 2021 ML21049A3102021-02-19019 February 2021 CFR 50.69 Alternative Categorization LAR ML21034A6032021-02-0303 February 2021 External Presentation Am Connelly_ISG-6 Workshop Presentation ML20294A0632020-10-20020 October 2020 Presentation Replacement of SRMs and IRMs with Digital Numac Wide Range Neutron Monitor System for October 27, 2020, Public Meeting ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6542020-06-18018 June 2020 2020 NRC Annual Assessment Webinar Presentation - Pennsylvania and Maryland Facilities (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, Susquehanna) ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) 2024-01-30
[Table view] |
Text
2021 Annual Assessment Webinar Beaver Valley - Calvert Cliffs Limerick - Peach Bottom - Susquehanna Hope Creek - Salem FitzPatrick - Ginna - Nine Mile Point Nuclear Regulatory Commission - Region I King of Prussia, PA June 8, 2022
Panelists Jonathan Greives Brice Bickett Branch Chief Branch Chief Branch 4 Branch 3 Limerick Salem Peach Bottom Hope Creek Susquehanna Calvert Cliffs 2
Panelists Erin Carfang Matt Young Branch Chief Branch Chief Branch 1 Branch 2 Ginna Beaver Valley FitzPatrick Nine Mile Point 3
Meeting Conduct
- All participants will be muted during presentations by NRC staff
- The chat is enabled to allow you to ask questions during the meeting.
- We encourage mutual respect on the part of NRC staff and attendees.
4
How to Ask a Question
- Type in your question at any time using Microsoft Teams.
- or -
- You can wait until the question-and-answer session to ask your question verbally 5
Agenda
- Reactor Oversight Process (ROP)
- 2021 Safety Performance Overview
- Beaver Valley - Hope Creek
- Calvert Cliffs - Salem
- Limerick - Ginna
- Peach Bottom - Nine Mile Point
- Susquehanna - FitzPatrick
- Question-and-answer Session 6
Our Mission To license and regulate the Nations civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety and to promote the common defense and security and protect the environment.
7
Reactor Oversight Process 8
NRC Independent Safety Inspections Reactor Oversight Process
- NRC inspectors have unfettered access to all plant activities related to nuclear safety and security 9
Onsite Presence during Covid-19 10
Beaver Valley Resident Inspectors Gwynne Eatmon Ronald Rolph Senior Resident Inspector Resident Inspector 11
Beaver Valley 2021 Assessment Summary
- 6700 hours0.0775 days <br />1.861 hours <br />0.0111 weeks <br />0.00255 months <br /> of inspection and related activities
- Green Performance Indicators
- Baseline inspection in 2022 12
Calvert Cliffs Resident Inspectors Louis Dumont Sarah Obadina Senior Resident Inspector Resident Inspector 13
Calvert Cliffs 2021 Assessment Summary
- 7200 hours0.0833 days <br />2 hours <br />0.0119 weeks <br />0.00274 months <br /> of inspection and related activities
- Green Performance Indicators
- Baseline inspection in 2022 14
Limerick Resident Inspectors Adam Ziedonis Larry Grimes Senior Resident Inspector Resident Inspector 15
Limerick 2021 Assessment Summary
- 5900 hours0.0683 days <br />1.639 hours <br />0.00976 weeks <br />0.00224 months <br /> of inspection and related activities
- Green Performance Indicators
- Baseline inspection in 2022 16
Peach Bottom Resident Inspectors Scott Rutenkroger Peter Boguszewski Senior Resident Inspector Resident Inspector 17
Peach Bottom 2021 Assessment Summary
- 6200 hours0.0718 days <br />1.722 hours <br />0.0103 weeks <br />0.00236 months <br /> of inspection and related activities
- Green Performance Indicators
- Baseline inspection in 2022 18
Susquehanna Resident Inspectors Christopher Highley Matthew Rossi Senior Resident Inspector Resident Inspector 19
Susquehanna 2021 Assessment Summary
- 7100 hours0.0822 days <br />1.972 hours <br />0.0117 weeks <br />0.0027 months <br /> of inspection and related activities
- Green Performance Indicators
- Baseline inspection in 2022 20
Susquehanna Plant Status
- On May 9th, Talen Energy Supply, LLC, and its subsidiary Susquehanna Nuclear, LLC filed for bankruptcy under Chapter 11 of the U.S.
Bankruptcy Code
- No impact to safe plant operations
- Decommissioning funds are not affected by the filing.
Salem Resident Inspectors Jake Dolecki Matthew Hardgrove Senior Resident Inspector Resident Inspector 22
Salem 2021 Assessment Summary
- 6300 hours0.0729 days <br />1.75 hours <br />0.0104 weeks <br />0.0024 months <br /> of inspection and related activities
- Green Performance Indicators
- Baseline inspection in 2022 23
Hope Creek Resident Inspectors Jigar Patel Daniel Beacon Senior Resident Inspector Resident Inspector 24
Hope Creek 2021 Assessment Summary
- 5800 hours0.0671 days <br />1.611 hours <br />0.00959 weeks <br />0.00221 months <br /> of inspection and related activities
- Green Performance Indicators
- Baseline inspection in 2022 25
Ginna Resident Inspectors Jason Schussler Corey Dukehart Senior Resident Inspector Resident Inspector 26
Ginna 2021 Assessment Summary
- 5500 hours0.0637 days <br />1.528 hours <br />0.00909 weeks <br />0.00209 months <br /> of inspection and related activities
- Green Performance Indicators
- Baseline inspection in 2022 27
Nine Mile Point Resident Inspectors Greg Stock Beth Sienel Chris Kline Senior Resident Inspector Resident Inspector Resident Inspector 28
Nine Mile Point 2021 Assessment Summary
- 8200 hours0.0949 days <br />2.278 hours <br />0.0136 weeks <br />0.00312 months <br /> of inspection and related activities
- Green Performance Indicators
- Baseline inspection in 2022 29
James A. FitzPatrick Resident Inspectors Eric Miller Jennifer England Senior Resident Inspector Resident Inspector 30
James A. FitzPatrick 2021 Assessment Summary
- Licensee Response Column (4Q 2021)
- 8200 hours0.0949 days <br />2.278 hours <br />0.0136 weeks <br />0.00312 months <br /> of inspection and related activities
- Green Performance Indicators
- Baseline inspection in 2022 31
James A. FitzPatrick Action Matrix Transition Multiple/Repetitive Licensee Regulatory Degraded Unacceptable Degraded Response Response Performance Performance Cornerstone Supplemental inspection (IP 95001) was completed in response to a White Finding (December 2020) related to a high-pressure coolant injection oil system pressure-control valve failure and the station transitioned from Regulatory Response to Licensee Response Columns effective October 2021 32
Supplemental Meeting Feedback We are looking for specific feedback on the format of this meeting https://forms.office.com/Pages/ResponsePage.aspx?id=dRTQ6LXDakOgZV3vTGT1Ls D1Bn3D5NBAjDF_RnF-FrVUMjZDR1kyNVAwQ1gyR1IxWkpXQTY5QjAySi4u 33
Question-and-Answer Session Type in your question at any time via the Microsoft Teams chat function
- or -
Raise your hand in Microsoft Teams.
34
Office of Public Affairs Diane Screnci Neil Sheehan Diane.Screnci@nrc.gov Neil.Sheehan@nrc.gov 610-337-5330 610-337-5331 35
NRC Social Media Channels
- Facebook: www.facebook.com/nrcgov/
- Flickr: www.flickr.com/photos/nrcgov/
- Twitter: twitter.com/#!/nrcgov
- YouTube: www.youtube.com/user/NRCgov
- RSS: www.nrc.gov/public-involve/listserver.html#rss 36
More Information
- https://www.nrc.gov/reactors/operating/oversight/listofrpts-body.html
- Reactor Oversight Process
- https://www.nrc.gov/reactors/operating/oversight.html
- Fact Sheets and Brochures
- https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/
- https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/
- https://www.nrc.gov/reading-rm/doc-collections/cfr/
37
Supplemental Meeting Feedback We are looking for specific feedback on the virtual format of this meeting https://forms.office.com/Pages/ResponsePage.aspx?id=dRTQ6LXDakOgZV3vTGT1Ls D1Bn3D5NBAjDF_RnF-FrVUMjZDR1kyNVAwQ1gyR1IxWkpXQTY5QjAySi4u 38