FENOC Remarks at the NRC Annual Assessment Meeting for Beaver Valley Power Station March 25, 2008
2 Beaver Valley Power Station Beaver Valley Presenters Beaver Valley Presenters Safe Plant Operations Reliable Plant Operations Cost-Effective Plant Operations Pete Sena - Site Vice President Kevin Ostrowski - Director, Site Operations Larry Freeland - Director, Performance Improvement Mark Manoleras - Director, Nuclear Engineering Pete Sena - Site Vice President Kevin Ostrowski - Director, Site Operations Larry Freeland - Director, Performance Improvement Mark Manoleras - Director, Nuclear Engineering
3 Beaver Valley Power Station Operational Performance Q Safety
- Personnel
- Radiological
- Environmental Q Security Q Human Performance
- Human Performance Expo
- Target Zero Safe Plant Operations Reliable Plant Operations Cost-Effective Plant Operations
4 Beaver Valley Power Station Performance Improvement Q Corrective Action Program Q Emergency Preparedness Q Training Q Workforce Replenishment Safe Plant Operations Reliable Plant Operations Cost-Effective Plant Operations
5 Beaver Valley Power Station Materiel Condition and Equipment Reliability Q Equipment Reliability Upgrades Q Maintenance Strategy Q Containment Sump Modifications Q Pressurizer Weld Overlays Safe Plant Operations Reliable Plant Operations Cost-Effective Plant Operations
6 Beaver Valley Power Station Moving Forward Q BV-2 Outage Execution Q BV-2 Extended Power Uprate Q Materiel Condition Improvements Q License Renewal Q National Fire Protection Association (NFPA) 805 Safe Plant Operations Reliable Plant Operations Cost-Effective Plant Operations