FENOC 3-25-08 Annual Assessment Mtg Slides
ML080880088
Person / Time
Site: Beaver Valley
Issue date: 03/25/2008
From:
FirstEnergy Nuclear Operating Co
To:
NRC Region 1
BELLAMY, RR
References
Download: ML080880088 (6)


Text

FENOC Remarks at the NRC Annual Assessment Meeting for Beaver Valley Power Station March 25, 2008

2 Beaver Valley Power Station Beaver Valley Presenters Beaver Valley Presenters Safe Plant Operations Reliable Plant Operations Cost-Effective Plant Operations Pete Sena - Site Vice President Kevin Ostrowski - Director, Site Operations Larry Freeland - Director, Performance Improvement Mark Manoleras - Director, Nuclear Engineering Pete Sena - Site Vice President Kevin Ostrowski - Director, Site Operations Larry Freeland - Director, Performance Improvement Mark Manoleras - Director, Nuclear Engineering

3 Beaver Valley Power Station Operational Performance Q Safety

- Personnel

- Radiological

- Environmental Q Security Q Human Performance

- Human Performance Expo

- Target Zero Safe Plant Operations Reliable Plant Operations Cost-Effective Plant Operations

4 Beaver Valley Power Station Performance Improvement Q Corrective Action Program Q Emergency Preparedness Q Training Q Workforce Replenishment Safe Plant Operations Reliable Plant Operations Cost-Effective Plant Operations

5 Beaver Valley Power Station Materiel Condition and Equipment Reliability Q Equipment Reliability Upgrades Q Maintenance Strategy Q Containment Sump Modifications Q Pressurizer Weld Overlays Safe Plant Operations Reliable Plant Operations Cost-Effective Plant Operations

6 Beaver Valley Power Station Moving Forward Q BV-2 Outage Execution Q BV-2 Extended Power Uprate Q Materiel Condition Improvements Q License Renewal Q National Fire Protection Association (NFPA) 805 Safe Plant Operations Reliable Plant Operations Cost-Effective Plant Operations