1 Beaver Valley License Renewal Inspection Exit Meeting November 12, 2008

2 Welcome & Opening Remarks Richard Conte Chief Engineering Branch 1, DRS

3

Introductions

NRC Representatives R. Conte, Chief, Engineering Branch 1, DRS, Region I J. Richmond, Inspection Team Leader, DRS, Region I D. Tifft, Inspection Team Member, DRS, Region I First Entergy Representatives P. Sena, Site Vice President M. Manoleras, Director Site Engineering R. Brosi, Director Site Performance Improvement

4 Meeting Purpose

  • Present Inspection Results to First Energy
  • Provide First Energy an Opportunity to Respond Agenda Overview - License Renewal Process Exit Meeting with First Energy Public Questions to NRC

5 License Renewal Process

  • Process
  • Safety Review Track

6 License Renewal Process Environmental Environmental Review Review NRC Decision NRC Decision On Application On Application License Renewal License Renewal Application Application submitted to NRC submitted to NRC Safety Safety Review Review Independent Independent Review Review (ACRS)

(ACRS)

Hearings*

Hearings*

7 Safety Review Track Application August 28 AMP Audit Mar 3 Inspection Jun - July SER With open Items Dec 29 Final SER May 29 Decision Sept 28, 2009 Scoping Audit Dec 3 Public Meeting LR Overview Nov 27 Full ACRS July 09 TODAY Nov 12 ACRS Subcommittee Feb 4 Sept 2007 Jan 2008 Nov 2008 July 2008 May 2009 Jan 2009 Mar 2008 Sept 2009

8 Verify in-plant aspects of scoping, material condition, aging management program development, and documentation that supports the license renewal application.

  • Performed by Region I
  • Six inspectors for two weeks, in June-July, 2008 Inspection Objective

9 Inspection Activities

  • Walk downs of plant systems & structures
  • Review of procedures and records
  • Review of BVs operational experience reviews

10 Inspection Methods Inspectors Reviewed

- Effects of non-safety structures & components on safety related equipment

- Aging Management Programs (AMPs)

  • Implementation checks for existing programs
  • Feasibility of Implementation for new or modified programs

- Documentation is auditable, retrievable, & supports the application

11

  • 19 of 42 Proposed AMPs (~45%)
  • Scoping & Screening of Non-Safety Systems
  • Operating Experience Review

- Conformance to NEI 95-10

  • Two Focused System Reviews

- Security Diesel

- BV-1 Dedicated Auxiliary Feedwater Inspection Review Scope

12 Inspection Results

  • Supports a conclusion there is Reasonable Assurance that aging effects will be adequately managed
  • Scoping of non-safety systems was acceptable
  • Documentation supporting the application was auditable & retrievable

13 Application Revisions

  • Selective Leaching

- Operating experience showed a history of buried fire water pipe leaching damage

- Added plant specific program to monitor

  • One Time Inspections

- Sample selection criteria unclear

- Enhanced to add a representative sample size

14 Application Revisions

  • Inaccessible Medium Voltage Cables

- Operating experience showed a history of flooded manholes

- Added a plant specific program for cable testing

  • Fuel Oil Chemistry

- No testing of wall thickness for fuel oil tanks

- Enhanced to add appropriate testing

15 Application Revisions

- No internal inspection of buried pipe

- Enhanced to add opportunistic inspections

- Added an Exception to not flush some stagnate lines (to spent fuel pool & aux feedwater)

  • External Surfaces Monitoring

- Enhanced to clarify areas not readily accessible will be periodically monitored

16 Application Revisions

  • Structural Monitoring

- Enhanced existing program to provide administrative controls needed for an AMP

- Enhanced existing program to add established acceptance criteria

  • Masonry Wall Program

- Enhanced existing program to provide administrative controls needed for an AMP

17 Other Observations

  • Identified two instances of missed plant specific operational experience

- Selective leaching damage of fire water piping

- Inaccessible cables in flooded manholes

  • In response, you performed an apparent cause evaluation an extend of condition review

- No other gaps were identified

18 Other Observations

  • In addition, based on inspection observations, you made several less significant aging management program changes, which may not have required an application revision.

19 First Energy Response

20 Public Questions for the NRC

  • NRC will reply to your items of interest
  • NRC Staff members will be available after the meeting
  • Please fill out a meeting feedback form

http://www.nrc.gov/reactors/operating/licensing/renewal/applications.html