November 17, 2004 LICENSEE: Union Electric Company FACILITY:
Callaway Plant
SUBJECT:
SUMMARY
OF MEETING WITH UNION ELECTRIC COMPANY -
PRESENTATION ON REPLACEMENT OF THE STEAM GENERATORS IN THE FALL OF 2005 (TAC NO. MC4437)
A meeting was held on Thursday, November 4, 2004, between the NRC staff and representatives of the Union Electric Company, the licensee for the Callaway Plant. The meeting was requested by the licensee to present the technical issues in its license amendment request application dated September 17, 2004, to support the replacement steam generators (RSGs) to be installed in Refueling Outage (Refuel) 14 in the Fall of 2005. is the list of attendees and Enclosure 2 is the handout from the licensee. There was no handout from the NRC staff.
The agenda (the first page of Enclosure 2) for the meeting was the following:
1.
Introduction 2.
General Description of RSG 3.
Westinghouse Nuclear Steam Supply System (NSSS) RSG Analyses 4.
RSG Licensing Activities 5.
Application of Leak Before Break (LBB) to Pressurizer Surge Line 6.
Other Refuel 14 Operating License (OL) Submittals 7.
Adjourn Meeting In Item No. 2 above, the licensee explained the reasons for the steam generators (SGs) replacement at Callaway and provided a comparison between the current SGs and the RSGs and the special features of the RSGs.
In Items Nos. 3 and 4 above, the licensee explained the Technical Specification (TS) changes and the new methodologies being proposed for Callaway in the September 17, 2004, application. The NRC staff asked the licensee questions to clarify what is being proposed in the application.
In Item No. 5 above, the licensee presented the mitigative measures it is considering for its application of LBB for the pressurizer surge line. The licensee stated that its application is now expected to be submitted in January 2005, instead of the November 19, 2004, date given in its September 17, 2004, application. The NRC staff gave its views on the two different approaches shown on page 12 of Enclosure 2. The weld overlay approach would require a relief request submittal from the licensee in addition to the application to apply LBB for the pressurizer surge line.
In Item No. 6 above, the licensee presented the two other license amendment requests for Refuel 14 that will propose changes to the TSs. These other amendment requests are described on page 11 of Enclosure 2.
The licensee completed its presentation and the meeting was adjourned. There were no decisions made by the NRC staff related to the licensees September 17, 2004, application, or the other applications to be made by the licensee for Refuel 14.
/RA/
Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosures:
- 1. List of Meeting Attendees
- 2. Licensee's Handout (ADAMS Accession No. ML043090388) cc w/encls: See next page
Callaway Plant, Unit 1 cc:
Professional Nuclear Consulting, Inc.
19041 Raines Drive Derwood, MD 20855 John ONeill, Esq.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.
Washington, D.C. 20037 Mr. Mark A. Reidmeyer, Regional Regulatory Affairs Supervisor Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 U.S. Nuclear Regulatory Commission Resident Inspector Office 8201 NRC Road Steedman, MO 65077-1302 Mr. Les H. Kanuckel Manager, Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251 Missouri Public Service Commission Governor Office Building 200 Madison Street Jefferson City, MO 65102-0360 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Mr. Ronald A. Kucera Deputy Director for Public Policy Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KA 66839 Mr. Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 63130 Mr. Lee Fritz, Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, MO 65151 Mr. David E. Shafer Superintendent, Licensing Regulatory Affairs AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149 Mr. Keith D. Young Manager, Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Mr. Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 65102-0570 Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 Mr. Garry L. Randolph Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251
ML043090388) cc w/encls: See next page DISTRIBUTION:
PUBLIC JFair PDIV-2 Reading EMurphy RidsNrrDlpm (TMarsh/JLyons)
MHart RidsNrrDlpmLpdiv (HBerkow)
PPatnaik RidsNrrPMJDonohew JTsao RidsNrrLAEPeyton KWichman KDesai TMensah HLi RidsNrrDlpmPdiv2 (RGramm)
RHernandez RLobel RTjader RidsRgn4MailCenter (AHowell)
RidsOgcRp RidsAcrsAcnwMailCenter Package No.: ML043220634 Meeting Notice No.: ML042930481 ADAMS Accession No.: ML043130289 NRC-001 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME JDonohew EPeyton RGramm DATE 11/16/04 11/15/04 11/17/04 DOCUMENT NAME: E:\\Filenet\\ML043130289.wpd
MEETING WITH UNION ELECTRIC COMPANY NOVEMBER 4, 2004 LIST OF MEETING ATTENDEES NAME AFFILIATION J. Donohew NRC/NRR/PDIV-2 R. Tjader NRC/NRR/TSS R. Hernandez NRC/NRR/SPLB J. Fair NRC/NRR/EMEB K. Desai NRC/NRR/SRXB H. Li NRC/NRR/EEIB M. Hart NRC/NRR/SPSB R. Lobel NRC/NRR/SPSB E. Murphy NRC/NRR/EMCB J. Tsao NRC/NRR/EMCB P. Patnaik NRC/NRR/EMCB K. Wichman NRC/NRR/EMCB D. Shafer UE T. Herrmann UE B. Yates UE K. Mills UE B. Huhmann UE J. Andrachek Westinghouse M. Watson Westinghouse D. Horner McGraw Hill Where:
NRC
= Nuclear Regulatory Commission NRR
= Office of Nuclear Reactor Regulation PDIV-2
= Project Directorate IV-Section 2 EEIB
= Electrical and Instrumentation and Control Branch EMCB
= Materials and Chemical Engineering Branch EMEB
= Mechanical and Civil Engineering Branch SPLB
= Plant Systems Branch SRXB
= Reactor Systems Branch SPSB
= Probabilistic Safety Assessment Branch UE
= Union Electric Company Westinghouse
= Westinghouse Electric Company ENCLOSURE 1
LICENSEE'S HANDOUT FOR NOVEMBER 4, 2004, MEETING ENCLOSURE 2