L-97-052, Proposed TS Change Request 243 to License DPR-66,modifying TS Table 3.3-4 Re Emergency Bus Undevoltage Trip Setpoint, Allowable Valve & Time Delay for DG Start

From kanterella
(Redirected from L-97-052)
Jump to navigation Jump to search
Proposed TS Change Request 243 to License DPR-66,modifying TS Table 3.3-4 Re Emergency Bus Undevoltage Trip Setpoint, Allowable Valve & Time Delay for DG Start
ML20198P649
Person / Time
Site: Beaver Valley
Issue date: 11/04/1997
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198P653 List:
References
L-97-052, L-97-52, NUDOCS 9711100070
Download: ML20198P649 (2)


Text

- - - _ _ - - - - - _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ - _ _ - _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _

e v Iley Power Statun

SNppingport. PA 1s077-0004 SUSHIL C.JAIN November 4, 1997 etapes-ssia

[cgP ;Went L-97-052 '" ")"*

  • Nuclear Power DIAlon U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. I Docket No. 50-334, License No. DPR-66 Proposed Operating License Change Request No. 243 Pursuant to 10 CFR 50.90, Duquesne Light Company requests an amendment to the above license in the form of changes to the technical specifications. The proposed change modifies the Table 3.3-4 Emergency Bus Undervoltage trip setpoint, allowable value and time delay for diesel generator start.

The proposed technical specification changes are presented in Attachment A. The safety analysis (including the no significant hazards evaluation) is presented in Attachment B.

This change has been reviewed by the Onsite Safety Committee and Offsite Review Committee. The change was determined to be safe and does not involve a significant hazard consideration as defined in 10 CFR 50.92 based on the attached safety analysis.

An implementation period of up to 60 days is requested following the effective date of this amendment.

Sincerely, Y j Sushil C. Jain

}W~iO ll y {

c: Mr. D. M. Kern, Sr. Resident Inspector I Mr. H. J. Miller, NRC Region I Administrator Mr. D. S. Brinkman, Sr. Project Manager Mr. W. P. Dornsife, Director BRP/DEP Mr. M. P. Murphy (BRP/DEP) DEllVERIH 9711100070 971104 PDR ADOCK 05000334 Iilk P PDR {\.@\.@\.h[\\)\{}

 .                                         AFFIDAVIT FOR APPLICATION OF AMENDMENT COMMONWEALTH OF PENNSYLVANIA)
                                                           ) SS:

COIJNTY OF BEAVER )

Subject:

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Proposed Operating License Change Request No. 243 Before me, the undersigned notary public, in and for the County and Commonwealth aforesaid, this day personally appeared Sushil C. Jain, to me known, who being duly sworn according to law, deposes and says that he is Division Vice President, Nuclear Services of the Nuclear Power Division, Duquesne Light Company, he is duly authorized to execute and file the foregoing submittal on behalf of said Company, and the stater.)ents set forth in the submittal are true and correct to the best of his kno'vledge, information and belief. Sushil C. Jain Subscribed and eworn to before me on this[6/ day of M8)wm/ua,/ff 7