MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17229A4711997-08-31031 August 1997 Monthly Operating Repts for August 1997 for St Lucie. W/970908 Ltr ML17229A4451997-07-31031 July 1997 Monthly Operating Repts for July 1997 for St Lucie.W/970808 Ltr ML17229A3991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for St Lucie.W/970710 Ltr ML17229A3791997-05-31031 May 1997 Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2.W/970612 Ltr ML17229A3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2.W/970513 Ltr ML17229A3041997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for St. Lucie, Units 1 & 2.W/970410 Ltr ML17229A2651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2.W/970313 Ltr ML17229A2351997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for St Lucie Units 1 & 2.W/970214 Ltr ML17229A2001996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 2.W/970113 Ltr ML17229A1711996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2.W/961216 Ltr ML17229A1361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2 ML17229A0691996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2.W/961011 Ltr ML17229A1391996-09-30030 September 1996 Revised Monthly Operating Rept for Sept 1996 for St.Lucie Unit 2 ML17229A0361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 2.W/960911 Ltr ML17229A0051996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2.W/960812 Ltr ML17228B5701996-06-30030 June 1996 Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2.W/960715 Ltr ML17228B5261996-05-31031 May 1996 Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr ML17228B4941996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 2.W/960510 Ltr ML17228B4651996-03-31031 March 1996 Monthly Operating Repts for March 1996 for SLP.W/960412 Ltr ML17228B4201996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2.W/960312 Ltr ML17228B4021996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for St Lucie.W/960214 Ltr ML17228B3831995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 2.W/960116 Ltr ML17228B3621995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for St Lucie. W/951212 Ltr ML17228B3261995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for St Lucie.W/951112 Ltr ML17228B2911995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17229A9021998-11-0404 November 1998 LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8871998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length ML17229A8781998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length ML17229A8771998-10-14014 October 1998 LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr ML17229A8761998-10-14014 October 1998 LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8511998-09-0202 September 1998 LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17229A8481998-08-0707 August 1998 Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. ML17229A9461998-08-0707 August 1998 Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A8201998-07-29029 July 1998 LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7411998-05-28028 May 1998 LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr 1999-09-30
[Table view] |
Text
. P.O. Box 128, it. Pierce, f t 34%4-0:28 -
[
, October 12, 1992 -
-L-92-286 '
10 CFR 50.36 4
f 1
?
U. S. Nuclear Regulatory Commission Attn: Document-Control Desk Washington, DC 20555 Ret St. Lucie Units 1 and 2 Docket No.2. 50-335 and 50-389 Monthly Operatina Report Attached are the September 1992 Operating Status and Summary of.
Operating Experience Reports for St. Lucie Units 1 and 2..
Should there be any questions on this information, please contact us. _ _ _
'Very truly yours, D. A. ger
-Vice esident '
St. le Plant DAS JJB kW i cc : - Stewart D. Ebneter, Regional-Administrator, Region.II, USNRC -
Senior Resident Inspector,=USNRC, St. Lucie Plant Attachments DAS/PSL- #796-92 I
b$N0{uku.s
-9210150246 920930 '
PDR' ADOCK 05000335 k 1 R PDR ..
)
y-an f rL Group company 1
'_ L/. -- . .
m _ . - . . ~ . . . _ . . _ _ _ _ . . . - . - . . - - - _ _ . _ _ _ _ - . _ _
. - _ . _ . _ ~ . - . . _ _ _ _ __
s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _50-335 UNIT Ot. Lucie #1 DATE COMPLETED BY J.J. Breen TELEPHONE 1407) 468-4248 l
HONTH REPTEMDER, 1992 DAY AVERAGE DAILY POWER LEVEL (MWo-Net) 9/ 1/92 843 9/ 2/92 841 9/ 3/92 846 9/ 4/92 846 9/ 5/92 848 9/ 6/92 845 9/ 7/92 041 9/ 8/92 837 9/ 9/92 831 9/10/92 832 9/11/92 837 9/12/92 838 9/13/92- 834 9/14/92 518 9/15,'92 -23 9/16/92 -1C 9/17/92 -8 9/10/92 -8 9/19/92 -8 9/20/92 -10 9/21/92 -11 9/22/92 -13 9/23/92 -26 9/24/92 124 9/25/92 -32 9/26/92 -32 9/27/92 -32 9/28/92 717 9/29/92 845 '
9/30/92 846
OPERATING DATA REPORT DOCHET NU 50 - 335 DATE C0hPLETED DY J. J. BREEN TELEPHONE 407/460/4240 OPERATING STATUS
- 1. UNIT NAME! ST. LUCIE UNIT 1
- 2. REPORTING PERIOD!SEPTEMDER 1992
- 3. LICENSED THERMAL POWER (MWT)! ______________ 2700
- 4. NAMEPLATE RATING (GROSS MWE)! ________.,_____ 050
- 5. DESIGN ELECTRICAL RATING (NET MWE)! ________ 030
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)! ___ 872
- 7. MAXIMUM DEPENDADLE CAPACITY (NET MWE)! _____ 839
- 8. IF CHANGES OCCW IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS! ______.._________________________________
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________.._____________,__
- 10. REASONS FOR RESTRICTIONS, IF ANY1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,
_______________________m.________________-________________________________
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIODI _________________ 720 6575 130311.0 11, NUMDER OF HOURS REACTOR WAS CRITICAL _____ 497.0 6352 0 106461.6
- 13. REACTOR RESERVE SHUTDOWN HOURS __________ 0.0 0.0 ?05 3
- 14. HOURS GENERATOR ON-LINE _________________ 415.6 6270.6 105466.5
- 15. UNIT RESERVE SHUTDOWN HOURS _________.___ ______C.0 ______0.0 _____39.3
- 16. GROSS THERMAL ENERGY GENERATED (MWH) ____ 1004799 16692041 272420093
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) _ 354430 5569440 89902260
- 10. NET ELECTRICAL ENERGY GENERATED (MWH) ___ 330101 5284157 04967853
- 19. UNIT SERVICE FACTOR ______, .____________ 57.7 95.4- 76.3
- 20. UNIT AVAILABILITY FACTOR . ____________ 57.7 95.4 76.3
- 21. CAPACITY FACTOR (USING MDC , .T ) ____,____ 54.7 95.8 75.8 22.- CAPACITY FACTOR (USING DER NOT) _________ 55.3 96.8 75 0
- 23. UNIT FORCED OUTAGE RATE ____ ____________ __42.3 ___4.4 .._4.2
- 24. SHUTDOWNS SCHEDULED DVER NEX1 6 MONTHS t SCHEDULED 3/25/931 FORREFUELING______________________,__________-______
- 23. IF SHUT DOWN AT END OF REPOR1 PERIOD, ESTIMATED DATE OF STARTUP! ________
l l
- n. -- -
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-335 UNTT NAME ST LUCIE UNTT I DATE COMPLETED BY J. J. BRFEN TI'T FPHONE (407) 468-4238 REPORT MONTH SEIrTEMBER 1002 i
Type' Duratica Reason2 Methat of Lacen-ee Syssen ! Component Cause & Correve No. Date Shutting l Event Report Cale* Cald - AhN (Ifours) ,
Down # Prevent Recurrence Remetor' 0.0 B 5 N/A HA i VALVEX Unit I was downpowered f4 turbine valve enting.
6 920914 S F 0.0 B 4- N/A CI VALVEX Unit I further dowurv-mJ to repdr safety valve 6 - 920914 V1202.
2 N/A CJ VALVEX Unit I taken omine to repair safety valve V1202.
6 920914 F 2!9.3 B F 85.1 A 3 LEP. 92-06 IA INSTRU Unit I tripped due to a hinwn capacitor <m a 7 920924 eg circuit in the DEH Omtrol System.
3 4
.I 2 Method Eshd>h G - Imeructwas for
'F Forced - Reason Frepersimmaef Desa Emery S Scheduled A - Egs pmess feihne (engdoin) 1 - Manual 2 - Mamal Scra.e $ beets Exensee Evesa Report B - Mainterance or Test C - Rebetwq 3 - Aimr= wie Scr== (1.ER) File (NUREMM1)
D - Regulaary restriction 4 - Continued E - & water Tra ning & Scense Euminatim 5 - Lead Redmetwa 3 9 - Other (Esg4a n) Embite t - Same Source F - Adsniaisuative G - Operanenal Error (Expaho H - twher (Emplain) esesrr art.
.s .
E
I
- UMMAP.Y OF OPERbTING EXPJ_ILIJJiGE DOCKET NO. 50-335 UNIT St. Lupie #1 DATE COMPLETED BY J.J. Breen TELEPHONE (407) 468-4241 REPORT MONTH REf1EjiREL_1991 The average daily power of Unit 1 was 100% from September 1, 1992, until September 14, 1992. On September 14, 1992, Unit 1 was downpevered for turbino valvo testing; the Unit was downpowered further and then taken offline to repair Safety Valve V1202. The repairwork was completed on September 23, 1992. On September 24, '
1992, while Unit 1 was at approximately 42% power and increasing, a reactor /turbino trip caused by a blown capacitor on a speed sensing circuit of the Deli Control System occurred. Unit 1 was offline until September 28, 1992, when the problems were resolved.
On September 29, 1992, the Unit was returned to 100% power and remained there for the rest of the month.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challongos to the PORVs or safety valves during the report period.
p-. ___-e-- - - , - , . - --
- -+ ,+, , ,.- .-. . -
t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _J0-309 UNIT St. Lucid #2 DATE COMPLETZD BY J J. .Breen TELEPHONE (407) .460-4248 MONTH SEPTEMDER, 199[
DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) 9/ 1/92 8's2 9/ 2/92 g5g 9/ 3/92 855 9/ 4/92 856 9/ 5/92 856 9/ 6/92 855 9/ 7/92 051 9/ 8/92 848 9/ 9/92 846 9/10/92 g49 9/11/92 g5g 9/12/92 851 9/13/92 g47 9/14/92 g49, 9/15/92 850
"/16/92 g47 9/17/92 847 9/18/92 850 9/19/92 850 9/20/92 849-9/21/92 840 9/22/92 g 4..,
- _ 9/23/92 g47 l 9/24/92 844 l 9/25/92 g44
! 9/26/92 g44 l 9/27/92 845 !
t 9/28/92 g47 p 9/29/92 g4g 9/30/92 849- l 1
i OPERATING PATA REPORT !
00CHET NO 50 - 389 i DATE COMPLETED BY J. J. BREEN TELEPHONE 407/468/4248 OPERATING STATUS
- 1. UNIT NAME! ST. LUCIE UNIT 2
- 2. REPCRTING PERIODISEPTEMBER 1992
- 3. LICENSED THERMAL POWER (MWT): ______________ 2700 4.'NAMFPLATE RATING (GROSS MWE)! _________.____ 850
- 5. DES;0N ELECTRICAL RATING (NET MWE)! ________ 830 *
- 6. MAXIMUM DEPENDABLE CAPACITY-(GROSS MWE)i ___ 882
- 7. MAXIMUM DEPENDABLE CAPACITY-(NET MWE)! _____ -839
- 8. IF CHANGES OCCUR'IN CAPACITY RATINGS (ITEMS NUME'ER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS! ________________________________________
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________.
- 10. REASONS FOR RESTRICTIONS, IF ANY! _________________________________.,_____
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIODI _________________ 720 6575 80208.0
- 12. NUNDER OF HOURS. REACTOR WAS CRITICAL _____ 720.0 4949.3 68569.6
- 13. REACTOR RESERVE SHUTDOWN HOURS __________ 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE _________________ 720.0 4830.6 67434.9
- 13. UNIT RESERVE EHUTDOWN HOURS _____________ ______0.0 ______0.0 ______0.0
- 16. GROSS THERMAL ENERGY GENERATED (HWH) ____ 1942866 12494066 176606672
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) _ 643960 4173450 58899270
- 18. NET ELECTRICAL' ENERGY GENERATED (MWH; ___ 611109 3930959 55701306
- 19. bHIT-SERVICE FACTOR._____,_______________ 100.0 73.5 84.1 ~
- 20. UNIT AVAILABILITY FACTOR ________________ 100.0 73.5 84.1
- 21. CAPACITY FACTOR'(USING MDC NET) _________ 101.2 71.4 84.0
- 22. CAPACITY FACTOR (USING DER NET) _________ 102.3 72.2 84.3
- 23. . UNIT FORCED OUTAGE RATE _________________ ___0.0 ___2.9 ___5.0
- 24. SHUTDOHNS SCHEDULED DVER NEXT 6 MCnTHS 3 25.-IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED _DATE OF STARTUPt ________
m e
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-389 UNIT NAME ST LUCIE UNIT 2 DATE COMFLETED BY J. J. BREEN TELEPHONE F 468-4248
, REPORT MONTH SEI'TEMBER.1992 Date Type' - Duration Reason: Me3cxlof Licensee System Cou w ucat Cause & Corrective No. (hours) ~ Shutting Event Report Code' caw Action to Down # Prevent Recurrence Reactor 8 The average daily power ?! Unit 2 for the amonth of September was 100%.
I 1
i I
i i
1 i
I 2 3 4 e F Forted Reewn Method Eshitnt G - Ins:ructmwis fiw -
i e S Scheduled A - Equipsiens failues (explain) 1 - Manual 3%pershomof Ds:a Endry B - Maineenance or Test 2 - Mama! Scram Sheets Licensee Event Repert l
- ' C - Refuermg 3 - Aueomstic Screm (LER) Fsie (N1JR EG4861) -l D - Regulatory restriction .
4 - Conunned
, E - Operator Training A Ilcense Exenunne 5 - I.ced steducten 5 F - Adamenstrative 9 - Other (Explain) Exhibit 1 - Same Soisrce a
3 G - Operational Error (Expelin)
- H - Other (Empin) j e=ost art. l i:
+<r - , q w n -
? m rv -
+ *a -
. = +--~-e - *w - - - - - -
. . 1 i
DEJJARLOS._QPlBATJNG EXPI;RIEEE j I
DOCKET NO. 50-389 UNIT St. Lucio #2 DATE _
COMPLETED DY.J.J. Droon TELEPHONE (407) 468-4248 REPORT AONTH HEPTEMDER, 1992 The average daily power of Unit 2 for the month of September was 1001.
In accordance with the requiremontu of Technical Specification 6.9.1.6, there were no challenges to the PORVs or cafety valves during the report period.