JUN 2 8 ME0 L-2006-158 FPL 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Unit 3 Docket No. 50-250 Inservice Inspection Report Attached are the Executive Summary and the following reports for Turkey Point Unit 3 in accordance with the provisions of the ASME Code, Section XI:

Form NIS-1 Owners' Report for Inservice Inspections Form NIS-2 Owners' Report for Repairs or Replacements Summary of Inservice Inspection Examinations Summary of Inservice Inspection IWE Examinations Summary of Visual Examinations and Functional Testing of Snubbers Summary of System Pressure Testing Should there be any questions concerning this report, please contact Walter Parker at 305-246-6632.

Very truly yours, T e'2r . jes Vice President Turkey Point Nuclear Plant SM Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC an FPL Group company

TURKEY POINT PLANT UNIT 3 2006 REFUELING OUTAGE INSERVICE INSPECTION REPORT Executive Summary This Inservice Inspection report is for the 2006 Turkey Point Unit 3 refueling outage. This was the second outage of the first period of the fourth 10-year interval.

Inservice examinations consisted of augmented Feedwater ultrasonic examinations on the A, B and C Steam Generator Feedwater nozzles, adjacent piping, and fittings. Also examined were selected components from the Reactor Pressure Vessel, Reactor Coolant System, Pressurizer, Residual Heat Removal System, Safety Injection System, Main Feedwater System, Feedwater Bypass, Steam Generator "B" Secondary Side, Steam Generator "A" Secondary Side, Chemical and Volume Control System, and RHR Heat Exchanger "A". The attached Inservice Inspection summary tables detail the examinations performed during the outage. The examinations credited to the Fourth Interval are detailed in Attachment 1 and Table 1. This outage completed the first period of the fourth 10-year interval.

The NIS-2 forms document the repair and replacement activities that have taken place since the previous Unit 3 submittal, and those performed during the 2006 refueling outage.

IWE examinations were performed on the containment liner, moisture barrier seal and penetrations this outage.

This was the first outage of the third period of the First 10-year interval. Preservice examinations were performed in areas of coating repairs to the containment metallic liner and moisture barrier seal. Details can be found in Attachment 2 for examination scope and results.

There were no IWL examinations scheduled for this outage.

Snubber visual examinations and functional tests were conducted in accordance with ASME Section XI and Turkey Point Plant Technical Specifications. Details of examination scope and results can be found in , Summary of Visual Examinationsand Functional Testing of Snubbers.

System pressure testing was conducted in accordance with the requirements of ASME Section XI and Turkey Point Technical Specifications. Details of test boundaries and results can be found in Attachment 4, Summary of System PressureTesting.

There were no Steam Generator eddy current examinations scheduled for this outage.

TURKEY POINT UNIT 3 2006 REFUELING OUTAGE

FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS Page 1 of 5

1. Owner: Florida Power and Light Company 700 Universe Blvd.

Juno Beach, Florida 33408

2. Plant: Florida Power & Light Company Turkey Point Nuclear Power Plant 9760 SW 344 Street Florida City, Florida 33035
3. Plant Unit: 3 4. Owner Certificate of Authorization (if required): N/A
5. Commercial Service Date: December 14, 1972 6. National Board Number for Unit: N/A
7. Components Inspected:

Component or Manufacturer or Manufacturer State or Province National Board Appurtenance Installer or Installer No. No.

Serial No.

Reactor Pressure Babcock and 610-0116 N/A N-160 Vessel Wilcox Pressurizer Westinghouse 3T200 N/A N-720 Regenerative Heat 3E200 N/A N/A Exchanger Westinghouse Reactor Coolant Bechtel N/A N/A N/A System Safety Injection Bechtel N/A N/A N/A System Residual Heat Removal Syst Bechtel N/A N/A N/A Removal System Steam Generator 16A-5885-1 & 2 Westinghouse FSGT-3001 & N/A N/A A and B 3002 Main Steam Bechtel N/A N/A N/A System Main Feedwater Bechtel N/A N/A N/A System Feedwater Bypass Bechtel N/A N/A N/A Chemical Volme Cnt and Bechtel N/A N/A N/A Volume Control RH-R xh an Heat Atlas 877 N/A 727 Exchanger A

-FORM NIS-1 Report Page 2 of 5 Owner. Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit 3 Owner Certificate of Authorization (if required) N/A Commercial Service Date: December 14, 1972 National Board Number for Unit: N/A

8. Examination Dates: from 12/2/2004 to 4/10/2006
9. Inspection Period Identification: First Period, from 02/22/2004 to 02/21/2007
10. Inspection Interval Identification: Fourth Interval, from 02/22/2004 to 02/21/2014
11. Applicable Edition of Section XI: 1998 Edition, 2000 Addenda, (IWE/LWL) 1992/1992 Addenda
12. Date/Revision of Inspection Plan: February 22, 2004 Rev. 0.
13. Abstract of examinations and test. Include a list of examinations and tests and a statement concerning status of work required for the inspection plan.

Inservice Examination of selected Class 1, 2 and 3 components and piping systems of Florida Power and Light's (FPL) Turkey Point Unit 3 were performed during the 2006 Refueling Outage.

This cycle began on 12/2/2004 and ended 4/10/2006. This was the second outage of the first period of the fourth 10-year interval.

The components and piping systems examined were selected in accordance with the Fourth Ten-Year Inservice Inspection Program. The inspection plans include an alternative to the examination and Pressure Test requirements of Table IWB-2500-1, Category B-F and B-J piping welds, as defined in American Society of Mechanical Engineers (ASME) Section XM 1998 Edition with Addenda through 2000. This alternative implements a risk informed inspection program for the examination selection for the Class 1, Category B-F and B-J piping welds in lieu of the requirements of Table IWB-2500-1. The alternative Plan allows examination selection for Unit 3 to be in accordance with "Florida Power & Light Turkey Point Unit 3 Risk-Informed Inservice Inspection Program."

Manual ultrasonic, visual, magnetic particle and liquid penetrant non-destructive methods were used to examine components, piping, and their supports. FPL personnel supported by Washington Group International personnel performed the examinations. Details can be found in Attachment 1 and Table 1, Turkey Point Unit 3 Inservice Inspection, for examination scope, results, and percentages completed.

Snubber visual examinations and functional testing were conducted in accordance with ASME Section XI and Turkey Point Technical Specifications. Basic-PSA, Inc supplied examination and testing services. Details of examination scope and results can be found in Attachment 3 Summary of Visual ExaminationsandFunctionalTesting of Snubbers.

-FORM NIS-1 Report Page 3 of 5 Owner. Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit 3 Owner Certificate of Authorization (if required) N/A Commercial Service Date: December 14, 1972 National Board Number for Unit: N/A FPL visual examiners conducted system pressure testing in accordance with the requirements of ASME Section XI and Turkey Point Technical Specifications. Details of test boundaries and results can be found in Attachment 4, Summary of System PressureTesting.

IWE examinations were performed on the containment line, moisture barrier seal and penetrations this outage. This was the first outage of the third period of the First 10-year interval. Preservice examinations were performed in areas of coating repairs to the containment metallic liner and moisture barrier seal. Details of examination scope and results can be found in Attachment 2.

There were no IWL examinations scheduled for this outage.

14. Abstract of Results of Examinations and Tests.

Refer to Attachment 1 for list of components and examination results during the Spring 2006 outage.

15. Abstract of Corrective Measures Residual Heat Removal piping support (SR-251) was found to have the cold setting out of tolerance with the design drawing. Engineering Disposition: Accept As-Is and reexamine next refueling outage (PTN3-Cycle 23) to see if field modification is necessary. This was a follow-up examination from Fall 2004 outage per WO 33021794 and CR 2004-10252.

Reference:

CR No.

2006-8621.

North and South Recirculation Sumps liner plate was found to have complete coating failure and heavy pitting, and the Reactor Drain Sump found complete coatings failure. The minimum liner plate thickness measured between the North and South recirculation pits was .129 inches.

Engineering disposition directed that the coatings be repaired in all sumps with no further action required for the coatings. However, Engineering requested that thickness measurements be taken for the next consecutive three inspection periods until the area examined remains essentially unchanged for the North and South Recirculation Sumps.

Reference:

CR No. 2006-7353.

Personnel Hatch Airlock (Penetration 41) sealing surface was found to have the gouges.

Engineering Disposition: Accept As-Is. The gouges extend approximately 5/8" from the edge of the door into the sealing surface. The edge of the 0-ring sealing surface is located at least one (1) inch from the edge of the door and does not interfere with the proper sealing of the personnel access hatch door.

Reference:

CR No. 2006-7667.

During the repair of the Moisture Barrier, the Containment Liner at Azimuth 186 degrees was found to have coating failure and pitting for approximately 24 inches. This area was originally

FORM NIS-1 Report Page 4 of 5 Owner Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit 3 Owner Certificate of Authorization (if required) N/A Commercial Service Date: December 14, 1972 National Board Number for Unit: N/A inaccessible, but due the severe corrosion of the air chase angle iron in the area, the liner became accessible. The thickness reading in the area of interest is .212 inches at the .250 inch wall and

.343 inches at the .500 inch wall. Engineering Disposition: The concrete floor that was excavated to perform liner plate inspection was grouted back to original floor elevation, the affected section of the embedded liner plate inspection was grouted back to protect it from further corrosion, the severely corroded section of the air chase angle was repaired, and the Moisture Barrier seal was installed to meet the original design intent.

Reference:

WO 34019929-02 & WO 36003813 and CR No. 2006-8555 & CR No. 2006-9040.

_FORM NIS-1 Report Page 5 of 5 Owner. Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit 3 Owner Certificate of Authorization (if required) NIA Commercial Service Date: December 14, 1972 National Board Number for Unit: N/A We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code, Section XM.

Certificate of Authorization No. N/A Expiration Date Date: 601Y-141 Signed: By IC 6/,

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Florida, and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, CT have inspected the components described in this Owner's Report during the period during the period 12/2/2004 to 4/10/2006, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Report in accordance with the Inspection Plan and as required by the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

In'?pector's Signature National Board, State, Province, and Endorsements Date:

TURKEY POINT UNIT 3 2006 REFUELING OUTAGE Abstract of Examinations and Tests Total Population and Percentages 4 th Interval - 1 st Period Table 1

Page 1 of5 Table 1 Turkey Point Unit 3 FOURTH INSPECTION INTERVAL - FIRST PERIOD - SECOND OUTAGE ABSTRACT OF EXAMINATION AND TESTS Total Total Total Total Examination Examinations Examinations Examinations Examinations Category/Item Required for Credited for Credited (%) Credited (%) Remarks the Interval the Period for the period Interval the B-A 5 0 0% 0%

B 1.11 3 Deferral Permissible B 1.21 1 Deferral Permissible B 1.30 1 Code Case N-623 Applied, Deferral Permissible B-B 5 1 100% 20%

B2.11 2 B2.12 2 B2.40 1 B-D 24 5 100% 20.8%

B3.90 6 Deferral Permissible B3.100 6 Deferral Permissible B3.120 6 B3.140 6 B-F 1RR #4 being submitted to implement a risk informed program.

Category R-A population.

The B-F examination category items are included in the Total includes Item B6.190, B6.190, B6.200 (only required if disassembled)

B6.10 3 Deferral Permissible B6.30 3 Deferral Permissible B6.40 3 Deferral Permissible B6.50 6 1Deferral Permissible B6.180 1 Deferral Permissible B6.190 1 Deferral Permissible

Page 2 of 5 Total Total Total Total Examnatons Examinations Examination Examinations Examinations Examinations CEditeom Category/Item Required for Credited for Credited (%) to Date for the the Interval the Period for the period Interval B6.200 1 Deferral Permissible B-G-2 19 9 100% 47.3%

B7.20 1 B7.30 6 B7.50 9 B7.70 3

[RR # being submitted to implement a risk informed program. The B-F examination category items are included in the Category R-A population.

B-K 6 1 100% 16.6%

B 10.10 2 Baseline performed on 6 new welds in the 1St period.

B10.20 3 B 10.30 _

B-L-1 3 0 0% 0%

B12.10 3 Deferral Permissible B-L-2 1 0 0% 0%

B 12.20 1 Examination required only when disassembled B-M-2 3 1 f 33.3%33.31 valve in each group requires examination when B12.50 3 disassembled for maintenance. Deferral Permissible B-N-1 10 7 100% 30% Each item (7) must be examined each period B13.10 10 1 B-N-2 1 0 0% 0%

B 13.60 1 Deferral Permissible

Page 3 of 5 Total Total Total Total Examination Examinations Examinations Examinations Examinations Category/Item Required for Credited for Credited (%) Credited (%) Remarks the Interval the Period for the period Interval B-N-3 27 0 0% 0%

B 13.70 27 Deferral Permissible Baseline performed on 24 new welds in the I" period.

B-O 3 0 0% 0% 25% will be performed in the next two periods.

Deferral Permissible.

B14.10 3 0 0% 0%

B-P System leakage tests are performed each outage (IWB-5220) in accordance with plant procedures.

B-Q Steam Generator tubing is examined in accordance with Plant Technical Specifications.

C-A 7 3 100% 42.8%

Cl.10 4 C1.20 2 CI.30 1 C-B 82 C-B total does not include C2.33 items that are 100% 25% required each period C2.21 2 C2.22 2 C2.31 4 C2.33 6 2 100% 33.3% VT examinations required each period C-C 10 3 100% 30%

C3.10 1 C3.20 9 C-F-1 49 13 100% 26.5%

C5.11 26 C5.21 12

Page 4 of 5 Total Total Total Total Examination Examinations Examinations Examinations Examinations Category/Item Required for Credited for Credited (%) Credited (%) Remarks the Interval the Period for the period Interval the C5.30 10 C5.41 I C-F-2 28 9 100% 32.1% Less than 28 welds would be required if 7.5% criteria is followed, FPL raised the total count to 28 per note 2.

C5.51 25 C5.81 3 C-H ISystem pressure tests are performed in accordance with plant procedures. Quantification of the number of tests is not practical.

D-A 15 4 100% 26.6%

DI.10 5 D1.20 10 D-B System pressure tests are performed in accordance with plant procedures. Quantification of the number of tests is not practical.

(IWE) E-A 4 2 100% 50% Currently in the 3rd period for IWE. 100% General Exam required each period RR 26, Currently in the 3rd period of IWE. Includes exam of 1/3 of moisture barrier. Examination of 8 of the total items required if made accessible. Deferral permissible.

(IWE) E-G 112 50% 81% RR 22, Currently in the 3rd period of IWE, deferral

( permissible.

F-A 120 40 100% 33.3%

171.10 39 F1.20 33 F1.30 30 F1.40 18 I _______

Page 5 of 5 Total Total Total Total Examnatons Examinations Examination Examinations Examinations Examinations CEditeom Category/Item Required for Credited for Credited (%) to Date for the the Interval the Period for the period Interval R-A total does not include item R1.12. RR3 will be submitted to implement a risk informed inspection R-A 33 10 100% 30.3% program for the Fourth Interval. The selections in program are based on the Risk Informed Program approval on November 30, 2000 for Third Interval.

Rl.11 33 R1.12 34 each outage I I I Visual examination is performed each outage

TURKEY POINT UNIT 3 2006 REFUELING OUTAGE NIS-2

Abstract The attached NIS-2 reports detail the repair/replacement of Class 1, 2 and 3 piping and components for Florida Power and Light Company, Turkey Point Unit 3. These repairs or replacements were performed prior to and during the Spring 2006 refueling outage, between the dates of December 2, 2004 and April 10, 2006.

Piping and components were inspected/tested in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, "Rules for Inservice Inspection of Nuclear Power Components," 1998 Edition up to and including the 2000 Addenda.

NIS-2 LOG Report No. Report Date Work OrderNumber ANII Certification 04-069-3 3/23/2005 33022954-01 5/25/2006 06-070-3 4/5/2006 35013768-02 5/19/2006 06-071-3 4/5/2006 33021045-01 5/19/2006 06-072-3 4/5/2006 35000343-01 5/25/2006 06-073-3 4/4/2006 33021045-04 5/25/2006 06-074-3 4/5/2006 33021678-01 5/19/2006 06-075-3 4/4/2005 35014822-01 5/25/2006 06-076-3 4/4/2006 35029066-01 5/25/2006 06-077-3 4/11/2006 33019317-01 6/2/2006 06-078-3 3/26/2006 35009742-01 5/25/2006 06-079-3 4/5/2006 35018946-01 5/25/2006 06-080-3 4/5/2006 35018948-01 5/25/2006 06-081-3 4/5/2006 34010920-01 5/25/2006 06-082-3 4/5/2006 35014535-01 5/25/2006 06-083-3 4/5/2006 34020151-01 5/25/2006 06-084-3 4/11/2006 36006692-01 5/25/2006 06-085-3 4/11/2006 35019712-01 6/2/2006 06-086-3 4/5/2006 36001001-01 5/25/2006 06-087-3 4/11/2006 36006322-01 5/25/2006 06-088-3 4/11/2006 35009109-01 5/25/2006 06-089-3 4/4/2006 35018945-01 5/19/2006 06-090-3 4/4/2006 36008259-01 5/25/2006 06-091-3 4/11/2006 35014536-01 6/2/2006 06-092-3 4/12/2006 36005716-01 6/2/2006 06-093-3 5/9/2006 34015268-01 5/19/2006 06-094-3 5/9/2006 35022747-01 5/19/2006 06-095-3 4/27/2006 36001000-01 5/19/2006

Report No. Report Date Work OrderNumber ANII Certification 06-096-3 4/27/2006 33015351-03 5/19/2006 06-097-3 4/27/2006 35018794-01 5/19/2006 06-098-3 4/26/2006 35019849-01 5/19/2006 06-099-3 4/25/2006 35025145-01 5/19/2006 06-100-3 4/25/2006 36008818-01 5/19/2006 06-101-3 4/25/2006 35014302-01 6/2/2006 06-102-3 4/25/2006 35014303-01 6/2/2006 06-103-3 4/25/2006 35014304-01 6/2/2006 06-104-3 4/25/2006 36008303-01 6/2/2006 06-105-3 4/26/2006 36007812-01 5/19/2006 06-106-3 5/15/2006 36006566-01 5/19/2006 06-107-3 5/15/2006 35025102-01 5/19/2006 06-108-3 5/16/2006 36006616-01 6/2/2006

.9. I 1

.9. I I

4. 9 I I. 9 1

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 31, 23/2005 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 33022954. 01 CR#: WA 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No, etc.

Y Florida Power and Light Co.

3. Work Performed b Type Code Symbol Stamp WA Name Authorization Number NIA 9760 SW 344 Street Florida City, FIL 33035 N/A Address Expiration Date
4. Identification of System: Auxiliary Feedwater System #: .5 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55" Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Check Valve for Aux feed N/A N/A NiA 3-10-087 N/A Corrected steam supply N
7. Description of work:

Replaced bolting material during overhaul of valve

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature NIA deg F 04-069-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date: N/A Signed PvAcý e Date I I S- f ow Owner or Owner's Designee, Titie/

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Co ecticut, have Inspected the components described in this Owners Report during the period of_ ______ to - L, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

___ _ ,;I__ __ ___ ___ __ Commissions --/ -Ye(47 , c, A,, x Inspector's Signature National Board, State, Providence, and Endorsements Date . - o 04-069-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 415/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35013768-I02 CR#: NIA 9760 SW 344 Street Florida City, FL 33035 Address Repair organization, P.O. No, Job No., etc.
3. Work Performed b Y Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: CVCS Charging and Letdown System #: 4I7 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No 3B Charging Pump NIA N/A N/A 3P201B N/A Installed N
7. Description of Work:

Replace pump block

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 2400 psig Test Temperature 116.4 deg F 06.070-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed 01S 'M Date S I 0 Owner or Owner's Designee, TItM*

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of -6 .gJ - 0..* to S-/.7 - 0 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

~~< ~Commissions ~ C Z Inspectors Signature National Board. State, Providence, and Endorsements Date "-If ,"/

06-070-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4115/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 33021045- 01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization. P.O. No, Job No.. etc.
3. Work Performed Iby Florida Power and Light Co. Type Code Symbol Stamp N/A by
1 Name Authorization Number NIA 9760 SW 344 Street Florida City, FL 33035 Address Expiration Date NIA
4. Identification of System: Intake Cooling Water System #: 19 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Editioh, 2000 Addenda. NIA Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Check Valve N/A D3577 N/A 3-50-311 NIA Installed N Check Valve N/A C0006175 WA 3-50-311 N/A Removed N Expansion Joint N/A N/A NIA XJ-3-1406 N/A Installed N
7. Description of Work:

Replace discharge check valve and expansion joint. Pump not replaced

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 19 psig Test Temperature 91.6 deg F 06-071-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A

-date 1nIr to Date I

U Owner or Owners Designee, Title CERTIFICATE OF INSERVICE INSPECTION I.the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, onnecticut, have Inspected the components described In this Owners Report during the period of .--- 7-O.f to - X-/10 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.

~ ~~~27Commissions J L 47-7 (4 "9CAl Inspector's Signature National Board. State. Providence, and Endorsements Date .- /9--.

06-071-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/5/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35000343-01 CR#: NIA 9760 SW 344 Street Florida City, FL 33035 Address Repair Orggantzation. P.O. No, Job No.. etc.
3. Work Performed by - Florida Power and Llght Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Address Expiration Date N/A
4. Identification of System: Component Cooling Water System #: 30 Quality Group C
5. (a) Applicable Construction Code ASME Viii 19 65 Edition, 66 Addenda, NIA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board identification Built Installed Yes/No 3X CCW Heat Exchanger N/A N/A N/A 3E207C NIA Corrected N
7. Description of Work:

Replace channel head bolting during cleaning 8, Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A pslg Test Temperature N/A deg F 06-072-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: NIA Signed f___ _- 0'f) tý) vv'.- ,,_ - Date 6 51s 0(10 4J Owner or Owners Designee, Tt06 CERTIFICATE OF INSERVICE INSPECTION I.the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described In this Owners Report during the period of 4-i-O..< to S-?d--0,,

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

1-/1~t~ c Commissions , 44??(*4 ZZ .)

Inspectors Signature Nalional Board, Slate. Providence, and EndorsemenG Date .

06-072-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 41412006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 33021045-04 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number WA 9760 SW 344 Street Florida City. FL 33035 N/A Address Expiration Date
4. Identification of System: Intake Cooling Water System #: 19 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No 3A ICW Pump N/A IST-4 N/A 3P9A N/A Corrected N Pump N/A IST-1 N/A 3P9A N/A Removed N
7. Description of Work:

Replace Pump and bolting

8. Tests Conducted: Hydrostatic: WA Pneumatic N/A Nominal Operating Pressure X Other VT-2 Pressure 25 psig Test Temperature 93.4 deg F 06-073-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION. NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code.Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Sinned E ý (945 r-- MVAjr Date sits-6/ Owner or Owners Designee, Title /

CERTIFICATE OF INSERVICE INSPECTION I1the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford Connecticut, have Inspected the components described In this Owners Report during the period of to <- o06 S' 2-4/--O-and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code.Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

  • z';4 eZ5 *e ý Commissions / -Y?/ 4 , -J Inspector's Signature National Board. State, Providence. and Endorsements

'V 4" Date 06-073-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/ 5/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant Turkev Point Plant Unit 3 Name WO#: 33021678- 01 CR#: NIA 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No.. etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Auxiliary Feedwater System #: j 75 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No "A' Aux Feed Pump N/A 368-87 N/A P2A N/A Installed N

"A" Aux Feed Pump N/A 368-86 N/A P2A N/A Removed N

7. Description of Work:

Replace pump

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 1440 psig Test Temperature 90 deg F 06-074-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp NIA Certificate of Authorization No. NIA Expiration Date: N/A Sinned L" Date. '51191011 0 Owner or Owner's Designee, Title &/

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of *-g- 05" to .I/,.-Os' and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

7~f~r~ <4~ Commissions 477(,, C. C2 i ,7-.)

National Board, State, Providence, and Endorsements Inspector's Signature Date "i-,-

06-074-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/4/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35014822-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job NO., etc.

Y Florida Power and Light Co.

3. Work Performe db) Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 N/A Address Expiration Date
4. Identification of System: Component Cooling Water System #: 30 Quality Group C
5. (a) Applicable Construction Code ASME VIii 19 65 Edition, 66 Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, NIA Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No 3B CCW Heat Exchanger N/A N/A N/A 3E207B N/A Corrected N
7. Description of Work:

Replace channel head bolting after cleaning

8. Tests Conducted: Hydrostatic: WA Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 06-075-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp TypeCodeSymol SampN/A Certificate of Authorization No. NIA Expiration Date: N/A Signed ýe_ ýý 0-5 E,ý M c,r o~~:~Vc~Date if 15~ (0 g (2 Owner or Owner's Designee, Titlel CERTIFICATE OF INSERVICE INSPECTION I.the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described In this Owners Report during the period of I/-17-o" to r-zO (.,

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report In accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.

___ ___ ___ Commissions 44-!77(LX CodiJ C Inspector's Signature National Board, State, Providence, and Endorsements Date . 4"- 0 A 06-075-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/ '4/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#t: 35029066- .1 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.

Y

3. Work Performec Iby Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Component Cooling Water System #: 30 Quality Group C
5. (a) Applicable Construction Code ASME VIII 19 65 Edition, 66 Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replaceiments 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No 3B CCW Heat Exchanger N/A NIA NIA 3E207B N/A Corrected N
7. Description of Work:

Replace bolting on channel head during cleaning

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure NIA Other N/A Pressure N/A psig Test Temperature N/A deg F 06-076-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code.Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. NWA Expiration Date: N/A Signed ýE, ýý- 0"5 fF, C&A ck ,-

Owner or Owner's Designee, Title/

c' AcrDate 6CI 5- [0c; CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described In this Owners Report during the period of /- r- 06 to 5 - 7"r- o6 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code.Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied.

concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

Commissions :Z'77.'L ý Inspectors Signature National Board, State. Providence. and Endorsements Date -<. o 06-076-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi

1. Owner Florida Power and Light Co. Date 4111/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 33019317- 01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035

. . Address.. Repair Organization, P.O. No. Job No., etc.

! Florida Power and Liaht Co.

3. Work Performed Iby Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Spent Fuel Pit Cooling System #: 33 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Nameof Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No iso Valve from Demin water to N/A N/A N/A 3-821 N/A Installed Spent Fuel Pit N
7. Description of Work:

Replace diaphram valve with ball valve, Includes small section of inlet pipe

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other WA Pressure 65 psig Test Temperature 88.6 deg F 06-077-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED INACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Autholization No. N/A Expiration Date: N/A Signed 0-515 mtýo, Date 151-15' 1 0 (0

() Owner or Owners Designee, Title' CERTIFICATE OF INSERVICE INSPECTION I.the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described in this Owners Report during the period of 5-3/--or- to - /,-- ,Z-and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report In accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.

4Commissions A2 477,(, CA z)

Inspector's Signature National Board, State, Providence, and Endorsements Date 6_-Z-06 06-077-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 3r,26/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35009742- 01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No.. etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Spent Fuel Pit Cooling System #: 3 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, NIA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Spent Fuel Heat Exchanger N/A N/A N/A 3-820 NIA Installed Outlet Valve N Pipe to Valve N/A N/A N/A 3-820 N/A Corrected N
7. Description of Work:

Replace bolted in Valve, add a spacer and repair through-wall leak

8. Tests Conducted: Hydrostatic: NIA Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 65 psig. Test Temperature 88.6 deg F 06-078-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp TypeCodeSymol SampN/A Certificate of Authorization No. N/A Expiration Date: N/A Signed Date 5156 Owner or Owner's Designee, Titl6 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described In this Owners Report during the period of___________ to S"-.-z4 -*&

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.

< ~~~~Commissions  ;(,4 J Inspector's Signature National Board, State. Providence. and Endorsements Date rzd,, v 06-078-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section X1

1. Owner Florida Power and Light Co. Date 4/5/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35018946-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date NIA Address
4. Identification of System: Containment Emergency Flters System #. 56 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Solenoid Valve for Emergency N/A N/A N/A SV-3-2907 N/A Corrected Filter"B" N
7. Description of Work:

Reweld canopy seal weld after overhaul

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 06-079-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed I l ý 0-$6 kh- - Dae--f~oe Date Owner or Owner's Designee, Title "

U CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford,.onnecticut, have Inspected the components described In this Owners Report during the period of - to .'t4f- t' and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code.Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

>~4$ ~~Commissions Ac-4t77K,4c A/,,,V I Inspector's Signature National Board, State, Providence, and Endorsements Date "T.__-_o 06-079-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/ 15/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 35018948-I01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Liaht Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 N/A Address Expiration Date
4. Identification of System: Containment Emergency Filters System #: _ 56 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Solenoid Valve for Emergency N/A N/A N/A SV-3-2909 N/A Corrected Filter "C" N
7. Description of Work:

Reweld canopy seal weld after overhaul

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 06-080-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed Llýý Date 5 1- o~

O(.0 U Owner or Owners Designee, Title/

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have ins ect~d the components described in this Owners Report during the period of 3 0 ' to . k and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

__________________ ~Commissions /~1?(,C ~

Inspectors Signature National Board, State, Providence, and Endorsements Date AZ*- Z7 C4-,

06-080-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/5/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 34010920-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc,
3. Work Performed by Florida Power and Licht Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Auxiliary Feedwater System #: 75 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, NIA Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Control Valve for Aux Feed to N/A N/A N/A CV-3-2831 N/A Corrected S/G "A" N
7. Description of Work:

Replace boiling during overhaul

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other NIA Pressure N/A psig Test Temperature N/A deg F 06-081-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section Xi.

Type Code Symbol Stamp TypeCodeSymol SampN/A Certificate of Authorization No. N/A Expiration Date: N/A Signed . 6 ý- ý, Date 51,-IDt L) Owner or Owner's Designee, Title -1 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartfprd, Connecticut, have Inspected the components described in this Owners Report during the period of .Z-.o G to ,. W'.-o0 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

nspec'sS Commissions Pro47ide c,aEVdo Inspector's Signature Natlonal Board, State, Providence, anid Endorsements Date e~

06-081-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4,/5/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35014535- 01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed b Y Florida Power and Ught Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Containment Spray System #: 58 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000.Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No "A"Cont. Spray Discharge N/A N/A N/A 3-890A N/A Corrected Check Valve N
7. Description of Work:

Replace bolting during overhaul

8. Tests Conducted: Hydrostatic: NIA Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 06-082-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp TypeCodeSymol SampN/A Certificate of Authorization No. N/A Expiration Date: N/A Signed Date -5 b !- I,.(

() Ownriior Owner's Designee, liftle CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described in this Owners Report during the period of 3-z..-CC, to r- 74-- (

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

__ __ __ __ __ __Commissions A4. 47, , ArjC-Inspector's Signature National Board, State, Providence, and Endorsements Date 06-082-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4)/52006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 34020151- 01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organzation. P.O. No, Job No., etc.

Y Florida Power and Light Co.

3. Work Performe d b Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date NIA Address
4. Identification of System: Intake Cooling Water System #: 19 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Discharge Check Valve "C" N/A D-3575 N/A 3-50-331 N/A Installed N Check Valve N/A 0046590 N/A 3-50-331 N/A Removed N
7. Description of Work:

Replace Check Valve

8. Tests Conducted: Hydrostatic. N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 16 psig Test Temperature 83.4 deg F 06-083-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp NIA Certificate of Authorization No. N/A Expiration Date: N/A Signed 0, 6 OsCI Owner or Owners Designee. Title 1 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Uartford. Connecticut. have Inspected the components described in this Owners Report during the period of ,-&,,-5 to .'-7,- ,06 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied.

concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions - -,z (4C, 4 XJ Inspector's Minature National Board, State. Providence, and Endorsements Date .5-z- ZU_

06-083-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4111/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant T

Unit 3 Name WO#: 36006692-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization. P.O. No. Job No., etc.

! Florida Power and Light Co.

3. Work Performed Iby Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Main Steam System #: 72 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda. N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacen nents 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Coimponents ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Main Steam Safety Valve N/A BL-0393 N/A RV-3-1411 N/A Corrected N
7. Description of Work:

Replace inlet bolting during overhaul

8. Tests Conducted: Hydrostatic: WA Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 06-084-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp NIA Certificate of Authorization No. N/A Expiration Date: N/A Signed oDate i-1 0k U Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspect!ed the components described In this Owners Report during the period of .3 -/o..-0o - to S- Z**ý-o/,

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

______________________Commissions ' 2 ~ ,2 Inspector's Signature National Board. State, Providence, and Endorsements Date ,,* - V (0 06-084-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/1112006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet I of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35019712-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.

! Florida Power and Liaht Co.

3. Work Performed Iby Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Addess Expiration Date N/A
4. Identification of System: CVCS Charging and Letdown System #M 47 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacen *ents 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Co mponents ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Seal Injection to RCP B Check N/A N/A N/A 3-298B N/A Corrected Valve N
7. Description of Work:

Reweld canopy seal weld and perform base metal weld repair

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure N/A psig Test Temperature N/A deg F 06-085-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code.Section XI.

Type Code Symbol Stamp TypeCodeSymol SampN/A Certificate of Authorization No. N/A Expiration Date: N/A Signed Date 151g15 1 0.

() Owner or Owner's Designee, Title "

CERTIFICATE OF INSERVICE INSPECTION I.the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Ha ord, Connecticut, have Inspected the components described in this Owners Report during the period of I/-O.. to 6-oZ..-0(

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.

________________Commissions 11'2-4774, e- 4, Z Inspector's Signature National Board, State, Providence, and Endorsements Date Z, of 06-085-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Daate: NIA

, 4511.,6o.

Signed Date CERTIFICATE OF INSERVICE INSPECTION I,the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Haoford, Connecticut, have Inspected the components described In this Owners Report during the period of ,l-4-,.-7 to , - /f.* --

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

___ ___ __ ___ __ ___ __ Commissions )e 'Z ý~( C, A z Inspector's Signature National Board, State. Providence, and Endorsements Date 9- 0 e 06-089-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi

1. Owner Florida Power and Light Co. Date 4/5/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet I of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 36001001-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by - Florida Power and Light Co. Type Code Symbol Stamp NIA Name Authorization Numt ier NIA 9760 SW 344 Street Florida City, FL 33035 NA Address Expiration Date
4. Identification of System: Safety Injection System #: 62 Quality Group
5. (a) Applicable Construction Code B31.1 19 55 Edition, NIA Addenda. N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, NIA Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No RWST MOV Isolation valve N/A N/A NIA MOV-3-864B N/A Corrected N
7. Description of Work:

Replace bolting during overhaul

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 06-086-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp NIA Certificate of Authorization No. N.A Expiration Date: N/A Signed.. ý:z O'51 mc,ýV- Date 2 51)s0

() Owner or Owner's Designee, Title' CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described In this Owners Report during the period of 2-to-7O . to S.-7e- .06 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.

~ ~ - ~Commissions A4 4W? 1,4 L4', -r)

Inspector's Signature National Board, State, Providence, and Endorsements Date _ -.Z__

_ --a 06-086-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/1112006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 36006322-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and ight Co. Type Code Symbol Stamp N/A Name Authorization NumbPer NIA 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Main Steam System #: 72 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition. N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1998 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Main Steam Safety Valve N/A BL 0392 N/A RV-3-1406 N/A Corrected N
7. Description of Work:

Replace Inlet bolting during overhaul

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A pslg Test Temperature N/A deg F 06-087-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed Date i Owner or Owner's Designee, Titd' CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford. Connecticut. have Inspected the components described in this Owners Report during the period of .3-/0 o . to . 6 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

" .. ,o Commissions 2 `74 .4 Inspector's Signature National Board, State, Providence, and Endorsements Date 4 4&-a 06-087-3

FORM NIS.2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner Florida Power and Light Co. Date 41 11/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant TurkeyF Point Plant Unit 3 Name WO#: 35009109- 01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.

Y Florida Power and Llaht Co.

3. Work Performed b Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Main Steam System #: 72 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, NIA Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Main Steam Safety Valve N/A BL0389 N/A RV-3-1410 N/A Corrected N
7. Description of Work:

Replace inlet bolting during overhaul

8. Tests Conducted: Hydrostatic: NIA Pneumatic N/A Nominal Operating Pressure N/A Other NIA Pressure N/A psig Test Temperature WA deg F 06"088-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date: N/A Signed i,05 M55t-- Date Date a Owner or Owner's Designee, Title '

CERTIFICATE OF INSERVICE INSPECTION I1the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described In this Owners Report during the period of _3-/1--0 .o to ___ .- .5_..o_

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

. 4 .,'* ,* .C Commissions .*/d Inspector's Signature National Board. State, Providence, and Endorsements Date 5 A 06-088-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 414/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35018945-I01 CR#: NIA 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
y. Florida Power and Llaht Co.
3. Work Performed Iby Type Code Symbol Stamp N/A Name Authorization Number NIA 9760 SW 344 Street Florida City, FL 33035 Address Expiration Date N/A
4. Identification of System: Containment Emergency Filters System #: 56 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Cont. Emergency Filter A N/A N/A N/A SV-3-2906 N/A Corrected Charcoal Spary Back-up Solenoid valve
7. Description of Work:

Reweld canopy seal weld after valve overhaul

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 06-089-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/4/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet I of 2 Addross
2. Plant Turkey Point Plant Unit 3 Name WO#: 36008259-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair OrganizaUlon, P.O. No, Job No., etc.
3. Work Performed by - Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date NIA Address
4. Identification of System: Containment Spray System #: 68 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Appricable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Pipe Support N/A N/A N/A 3-RCSH-106 NIA Corrected N
7. Description of Work:

Replace U-bolt on support

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other VT-3 Pressure N/A psig Test Temperature N/A deg F 06-090-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed Owner's Date . S T0 U Onror OnrsDesignee, CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described In this Owners Report during the period of_ _ _-N__-0_ _ to 5- zC- o06 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report In accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

iCommissions / ,e7' (,7 . C, Inspector's Signature National Board, State, Providence. and Endorsements Date _ 5"____________

06-090-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner Florida Power and Light Co. Date 4111/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35014536-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair OrganlzatJon, P.O. No. Job No., etc.
3. Work Performed by Florida Power and Linht Co. Type Code Symbol Stamp N/A Name Authorization Number NIA 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Main Steam System #: '2 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Sedal National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Main Steam Isolation Valve N/A N/A N/A POV-3-2604 N/A Corrected N
7. Description of Work:

Replace one bonnet stud and nut and all rockshaft cover bolting

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 06-091-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed Date U Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut. have inspected the components described in this Owners Report during the period of 5-74 -o &, to 6- Z--o6 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xi.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, conceming the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

~ ~ Commissions 1--e zY224'4 c, C .

Inspector's Signature National Board. State, Providence, and Endorsements Date (-Z-o" 06-091-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/12/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 36005716-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No.. etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Auxiliary Feedwater System #: 75 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, NIA Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected. Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No AFW steam supply check valve N/A NIA N/A AFSS-3-005 N/A Corrected N
7. Description of Work:

Replace one bonnet capscrew

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 06-092-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp NIA Certificate of Authorization No. N/A Expiration Date: N/A Signed O0SE-7 frV\I>, Date 25 15- 1,9(

() Owne-ir Owner's Designee, Title /

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford Connecticut, have inspected the components described In this Owners Report during the period of

  • oa (, to C -Z-2 6, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.

  • 4

~'Commissions (w0,cx ) 1,-,4 iýv Inspector's Signature National Board, State. Providence, and Endorsements Date a'- Z- 7 L 06-092-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 51/9/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 34015268- 01 CR#: NIA 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp NIA Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Address Expiration Date N/A
4. Identification of System: Auxiliary Feedwater System #: '5 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda. _N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 -Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Aux Feed Check Valve to N/A N/A N/A AFPD-3-010 NIA Corrected Steam Gen A N h
7. Description of Wor:

Replace bonnet capscrew

8. Tests Conducted: Hydrostatic: NIA Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 06-093-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp TypeCodeSymol SampN/A Certificate of Authorization No. N/A Expiration Date: N/A Signed L"ý .e;ý 15 " e- .e -~Date 65h57L (0 J Owner or Owner's Designee, M*le CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described In this Owners Report during the period of _ 5- ?-o, to .-- ,

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

_,,_,,__SCommissions ,_ /S C1 Al Inspectors Signature National Board, State, Providence, and Endorsements Date .5"1./f- 0 06-093-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 5/912006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 35022747-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and LUaht Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 N/A Address Expiration Date
4. Identification of System: Reactor Vessel System #: 43 Quality Group A
5. (a) Applicable Construction Code III CL A 19 55 Edition, N/A Addenda, NIA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, NIA Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Reactor Vessel RVLMS adapter N/A N/A N/A 3T237 N/A Corrected N
7. Description of Work:

Replace RVLMS Adapter

8. Tests Conducted: Hydrostatic: N/A Pneumatic NIA Nominal Operating Pressure X Other N/A Pressure 2290 pslg Test Temperature 548 deg F 06-094-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed 6J. A 0,5 " V4 9 Date '5 (f *- to 6

'Owneror Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspecteý1 the components described in this Owners Report during the period of -4 3Z- to  !ýr/ V-00 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report In accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

A/ tK nCommissions _.9 477-(6 C,.

Inspectors Signature National Board. State. Providence, and Endorsements Date %r_/- P- 0 06-094-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 41, 27/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 36001000- 01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.

3.Work Performed by Florida Power and Light Co. Type Code Symbol Stamp NIA by

3. Work Performed Name Authorization Number NIA 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Containment Spray System #: 6 .8 Quality Group
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, NIA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Cont. Spray B pump discharge N/A N/A N/A 3-890B N/A Corrected check valve
7. Description of Work:

Replace bonnet bolting

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 06-095-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed Date ' r; " o Owner or Owner's Designee, Titre CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspeted the components described in this Owners Report during the period of_ _ 3__Z__/o_ to ._ __/_0_

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

_______ _______Commissions /Z44 Inspector's Signature National Board, State, Providence. and Endorsements Date -

06-095-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/27/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet I of 2 Address
2. Plant Turkev Point Plant Unit 3 Name WO#: 33015351-03 CR#: NIA 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and light Co. Type Code Symbol Stamp WA Name Authorization Number N/A 9760 SW 344 Street Florida City. FL 33035 Expiration Date N/A Address
4. Identification of System: CVCS Charging and Letdown System #: 417 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, _N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Reactor Coolant Pump Seal N/A N/A N/A 3P200A N/A Corrected Leak off N
7. Description of Work:

Add Flanges to #1 seal leak off line

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 2290 psig Test Temperature 548 deg F 06-096-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED INACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed ______ Date ________________

C Owner or Owner's DeslgneK, Title CERTIFICATE OF INSERVICE INSPECTION I.the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described in this Owners Report during the period of /V-/3-- o4 to _...__.__

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.

-. ~~~::4-/ Commissions A 1?( ,A Z Inspector's Signature National Board, State, Providence, and Endorsements Date .*/* I 06-096-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/27/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35018794-01 CR#: NIA 9760 SW 344 Street Florida City, FL 33035 Address Repair On panlzation, P.O. No, Job No., etc.
3. Work Performed by - Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760I SW 344 Street Florida City, FL 33035 N/A Address Expiration Date
4. Identification of System: Main Feedwater -System #: 74 Quality Group B
5. (a) Applicable Construction Code B31 .1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda. NIA Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No SIG A Main FW Flow Control NWA N/A NIA FCV-3-478 N/A Corrected Valve N
7. Description of Work:

Replace three bonnet nuts

8. Tests Conducted: Hydrostatic: NIA Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure NIA pslg Test Temperature N/A deg F 06-097-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. NWA Expiration Date: NIA Signed Date 5I It.. oO(o wrineror Owner's Designee. Titld' CERTIFICATE OF INSERVICE INSPECTION I,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by' HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of 3-/,-0-T to .V-/-0.., 6 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

~~~ ~Commissions PŽAC, <.2 Inspector's Signature National Board, State, Providence, and Endorsements Date 06-097-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner Florida Power and Light Co. Date 412612006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35019849-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co._ Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: CVCS Charging and Letdown System #: 47 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Seal Water Injection Check N/A N/A N/A 3-298E N/A Installed Valve N
7. Description of Work:

Replace valve, pipe and coupling by welding

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 2290 psig Test Temperature 548 deg F 06-098-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed 61/21 ý -

O9 sti Mlcr-Owner or Owner's Designee, Tit" Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of 3-d-- to Z-9--:O(-6 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

_ _ _ _ _ ._,. _ _,,_ _ _Commissions C/,

/ Inspector's Signature National Board, State. Providence, and Endorsements Date .S"- -,5106 s-06-098-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/2512006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet SOf2of Address Turkey Point Plant Unit 3
2. Plant Name WO#: 35025145-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Address Expiration Date N/A
4. Identification of System: Main Feedwater System #: 74 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No S/G C Main Feedwater Flow N/A N/A N/A FCV-3.498 N/A Corrected Control Valve
7. Description of Work:

Replace bonnet bolting

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure NIA psig Test Temperature N/A dog F 06-099-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed VkA CL Date X5? Is 5 Owner orOwner's Designee, Title /1 CERTIFICATE OF INSERVICE INSPECTION I.the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartfor on ectlcut, have Inspected the components described In this Owners Report during the period ofk..- . 4dýf'- 4% to *- /9, -4 and state that to the best of my knowledge and belief, the Owvner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions "/, !

Cc-.z?' ,)

. Inspector's Signature National Board, State, Providence, and Endorsements Date 9- .:

06-099-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4r,25/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 36008818-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Reactor Coolant System 0: 1 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, NIA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No 3" Pressurizer pipe between N/A WA N/A Press. Pipe N/A Corrected MOV-3-535 and PCV-3-456 N
7. Description of Work:

Repair drilled hole by adding branch connection with pipe cap

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other NIA Pressure 2290 pslg Test Temperature 548 deg F 06-100-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A

~r%)

Signed v056 f- Mq~- Dae Date -S I I S- ( 0 t,ý,

6r Owner or Owner's Designee, TitI CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford Connecticut, have Inspected the components described in this Owners Report during the period of 3-- -41,' to .- /'-06 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

Commissions A113 4-, C, A1, KJ Inspectors Signature Naltonal Board, State, Providence, and Endorsements Date 06-100-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner Florida Power and Light Co. Date 4/25/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35014302-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job NO., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Reactor Coolant System #: 41 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, NA Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Pressurizer Safety Valve N/A H51249- N/A RV-3-551A N/A Installed N 1362 Pressurizer Safety Valve N/A N69877- N/A RV-3-551A N/A Removed N 01-0008
7. Description of Work:

Replace valve with spare

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 2290 psig Test Temperature 548 deg F 06-101-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expirafion Date: N/A Signed 1ý'7 ýýý _ Date 0(

U Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I.the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described In this Owners Report during the period of________ to 1/0 _ _ __

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.

,__ ___ __ Commissions '~.74C, Aj,25)

Inspectors Signature National Board, State. Providence, and Endorsements Date 6-7-o, 06-101-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Ught Co. Date 4125/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35014303-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No. Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Numbber N/A 9760 )SW 344 Street Florida City, FL 33035 N/A Address Expiration Date
4. Identification of System: Reactor Coolant System #: 41 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, WA Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp

.Component Number Board Identification Built Installed Yes/No Pressurizer Safety Valve N/A N69877- N/A RV-3-551B N/A Installed 00-0005 N Pressurizer Safety Valve N/A H51249- N/A RV-3-551B N/A Removed N 1580

7. Description of Work:

Replace valve with spare

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 2290 psig Test Temperature 548 deg F 06-102-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION. NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed

!g7$1(~j

() Owner or Owner's Designee, Title "

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described In this Owners Report during the period of 2-3 to 4-2O ('

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

.- ~~<4 ~ Commissions /Z7(/ Cg,.)

Inspector's Signature National Board. State, Providence, and Endorsements Date 4-0.-

06-102-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/25/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 2of Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35014304-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No. Job No., etc.
3. Work Performed by - Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number WA 9760 SW 344 Street Florida City, FL 33035 N/A Address Expiration Date
4. Identification of System: Reactor Coolant .System #: 41 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Pressurizer Safety Valve N/A H51249- N/A RV-3-551C N/A Installed 1361 N Pressurizer Safety Valve N/A 69877 N/A RV-3-551C NIA Removed N 009
7. Description of Work:

Replace valve with spare and one nut replaced

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 2290 psig Test Temperature 548 deg F 06-103-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed C4ý 7,ýý r o$SIF, MVL I- - Dat Date 5 1 Itr /0 to Q Owner or Owners Designee, Title -'

CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford. Connecticut, have Inspected the components described In this Owners Report during the period of 2-3-04 to to-oZ-660 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report In accordance with the requirements of ASME Code.Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

_ e" 11;11 Commissions_ _ _ _ _ _

Inspector's Signature National Board. State. Providence, and Endorsements Date Z- 0,Z 06-103-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 4/25/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Nam* WO#: 36008303-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization,P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: CVCS Charging and Letdown System #: 47 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition. 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Excess Letdown Ht Ex. Relief N/A N-88298- RV-3-304 N/A Installed N Valve 00-0007 Relief Valve N/A N-88298- RV-3-304 N/A Removed N 00-0002
7. Description of Work:

Replace relief valve

8. Tests Conducted: Hydrostatic: NIA Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 2290 psig Test Temperature 548 deg F 06-104-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A V Date -5(df (

C) Owner or Owner's Designee, "PAie CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartord, Connecticut, have Inspected the components described in this Owners Report during the period of _ 3_z_ -d_ _ to _ _-Z-O_,,

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

_Commissions 177(4 C,41J .?

Inspector's Signature National Board, State, Providence. and Endorsements Date 06-104-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section X1

1. Owner Florida Power and Light Co. Date 4r.26/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address Turkev Point Plant Unit 3
2. Plant Name WO#: 36007812- 02 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address RepaIr Organization, P.O. No, Job No., etc.
3. Work Performe d I, Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 N/A Address Expiration Date
4. Identification of System: Safety Injection System #: 652 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No SI to Cold Leg C Check valve N//A N/A N/A 3-873C N/A Installed N
7. Description of worK:

Replace Valve by welding

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 1200 psig Test Temperature 68 deg F 06-105-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED INACCORDANCE WiTH THE FPL WELD CONTROL MANUAL CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code.Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. NWA Expiration Date: NJA Signed L ýýý Date .. II C0 Owýer or Owners DesIgneeWite CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described In this Owners Report during the period of 5ii 0"-- to .<-/ 4- 0 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

d/e4 Commissions ..112 (Z Lw, Inspector's Signature National Board, State, Providence. and Endorsements Date ,,-,a"&/ ,

06-105-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 5/115/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant Turkey Point Plant

.. ... d ........ .

Unit 3 Name WO#: 36006566-401 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address RepaIr Organization, P.O. No, Job No., etc.

3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Address Expiration Date N/A
4. Identification of System: Main Steam - System #: r2 Quality Group B 19 55 Edition, N/A Addenda, N/A -Code Case
5. (a) Applicable Construction Code B31.1 19 98 Edition, 2000 Addenda, NIA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Main Steam Safety Valve N/A BL-00405 N/A RV-3-1412 N/A Installed N Safety Valve N/A BL-00397 N/A RV-3-1412 N/A Removed N
7. Description of Work:

Replace Safety Valve

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 1005 psig Test Temperature 545 deg F 06-106-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A I., Vdc~v U

Date 5 .'10(

(J Owner or Owners Designee, "Kttle CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut. have inspe,-ted the components described in this Owners Report during the period of 3-.0 , to _" _/'__-__,

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied.

concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

Commissions Inspector's Signature National Board, State, Providence. and Endorsements Date 06-106.3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 51 15/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant Turkev Point Plant Unit 3 Name WO#: 35025102- 01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No. Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Component Cooling Water System #: 30 Quality Group C
5. (a) Applicable Construction Code 831.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, NIA Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No 3C CCW Heat Exchanger N/A N/A N/A 3E207C NIA Corrected N iN
7. Description of Work:

Replace Channel head bolting during cleaning

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure N/A psig Test Temperature N/A deg F 06..107-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION. NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed 6ý- Date 5 IS- 0 (a Owner or Owner's Designee, Tit%

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described In this Owners Report during the period of /-_/Z______ to ".-/* O 6' and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report In accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

AI<~Commissions 0'77 (-4, -CL4/

Inspector's Signature National Board. State, Providence, and Endorsements Date __ "_ ___' __-.-___

06-107-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 5/ 16/2006 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 36006616- 01 CR#: 06-14195 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed byY Florida Power and Lloht Co. Type Code Symbol Stamp NIA Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Auxiliary Feedwater System #: 7'5 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Aux Feed Steam Supply Check N/A N/A NIA 3-10-382 N/A Corrected Valve N
7. Description of Work:

Replace bonnet bolting

8. Tests Conducted: Hydrostatic: N/A Pneumatic NIA Nominal Operating Pressure X Other NIA Pressure N/A psig Test Temperature N/A deg F 06-108-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed Date (, ( Ifat 0 Owner or Owner's Designee, title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford Connecticut, have Inspegted the components described in this Owners Report during the period of 3- Z-* O* to *- 0 t..o and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

_ I_ _ _ _ _ _ _ C o mm is s ion s 4 2 ( ~ 4i ~ 7 Inspector's Signature National Board, State, Providence, and Endorsements Date _ " Z,_16 06-108-3

TURKEY POINT UNIT 3 2006 REFUELING OUTAGE Summary of Inservice Inspection Examinations 4 th Interval - 1 st Period Attachment 1

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTN1 - Unit 3 Page 1 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1. Outaqe 2 (06)

Completed Components (C. B. R. E, A)

REACTOR PRESSURE VESSEL Zone # 3-001 N I 0 ASME Status 0 N G T SecXi R S E H Summary Examination Area Categ E I 0 E Number Identification ISO # Item No Method Data Sheet Number C G M R Remarks 001900 VESSEL INTERIOR B-N-I C VT-3 4.3-004 X - - - 3/18/2006 - VT-3 complete. No ACCESSIBLE AREAS B 13.10 Recordable Indications ISO# 5613-M-4000 003201 VESSEL TO CLOSURE HI B-N-I C VT-3 4.3-003 X 3/18/2006 - VT-3 complete. No MATING SURFACE ON B 13.10 Recordable Indications HEAD ISO# 5613-M-4000 013090 VESSEL TO CLOSURE HI B-N-I C VT-3 4.3-004 X - 3/18/2006 - VT-3 complete. No MATING SURFACE ON B 13.10 Recordable Indications VESSEL ISO# 3-V01

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTNJ - Unit 3 Page 2 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1, Outa~qe 2 (06)

Completed Components (C, B, R. E. A)

PRESSURIZER Zone # 3-006 N I 0 ASME Status 0 N G T SecXl[ R S E H Summary Examination Area Categ E I 0 E Number Identification /ISO # Item No Method Data Sheet Number C G M R Remarks 041800 3-SRGN-01-IR B-D C UT 5.13-001 - - - - 3/16/2006 - UT Complete. No SURGE NOZZLE INNER B3.120 60SA2.25 X - - - Recordable Indications. Scan is limited RADIUS SECTION around the heaters. Pull back from ISO# 5613-M-4002 Nozzle is 3.9" to heater, each heater is 1.16" wide, there is 3" between the heaters, and 20 heaters in exam zone.

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTN1 - Unit 3 Page 3 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1, Outaqe 2 (06)

Completed Components (C, B, R, E. A)

REACTOR COOLANT SYSTEM PRESSURIZER SURGE UI Zone # 3-016 N I 0 ASME Status 0 N G T SecXl/ R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 052400 12"-RC-1301-8 R-A C UT 5.4-004 - - - - 3/16/2006 - UT Complete. No PIPE TO REDUCER RI.11 45SC2.25 X - - - Recordable Indications.

70SA2.25 X - - -

ISO# 5613-P-766-S SH. 2 052500 12"-RC-1301-8A R-A C UT 5.4-005 - - - - 3/16/2006 - UT Complete. No REDUCER TO SAFE RI .11 45SC2.25 X - - - Recordable Indications.

END 70SA2.25 X - - -

ISO# 5613-P-766-S SH. 2

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTN1 - Unit 3 Page 4 REVISION: 0 Inservice Inspection Results Summary Interval 4. Period 1, Outaqe 2 (06)

Completed Components (C. B. R, E, A)

REACTOR COOLANT SYSTEM PRESSURIZER SAFETY L Zone # 3-019 N I 0 ASME Status 0 N G T SecXll R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 056600 4"-RC-1303-FB B-G-2 C VT-I 4.1-001 X - - - 3/8/2006 - VTI Complete. No PIPING FLANGE B7.50 Recordable Indications BOLTING ISO# 5613-P-660-S SH. 2

DATE: 06108/2006 Turkey Point Nuclear Plant [PTN1 - Unit 3 Page 5 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1. Outaqe 2 (06)

Completed Components (C, B, R, E, A)

REACTOR COOLANT SYSTEM PRESSURIZER RELIEF Ul Zone # 3-022 N 1 0 ASME Status 0 N G T Sec Xl R S E H Summary Examination Area Categ E 1 0 E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 071010 3"-RC-1304-806 R-A B PT 9.5-003 X 4/1/2006 - PT Complete. Preservice PIPE TO BRANCH RI.12 examination. Examination performed CONNECTION per WO 36008818-01. Pipe segment ISO# 5613-P-660-S SH.1 modification with a 1/2" branch connection due to a 3/16" hole being drilled into the 3" pipe wall.

071014 1/2"-RC-1304-906 R-A B PT 9.5-003 X - - - 4/1/2006 - PT Complete. Preservice BRANCH CONNECTION RI.12 examination. Examination performed TO PIPE per WO 36008818-01. Pipe segment ISO# 5613-P-660-S SH.1 modification with a 1/2" branch connection due to a 3/16" hole being drilled into the 3" pipe wall.

071018 3"-RC-1304-1006 R-A B PT 9.5-004 X - - - 4/1/2006 - PT Complete. Preservice VALVE 3-535 TO RI.12 examination. Examination performed ELBOW per WO 36008818-01. Pipe segment ISO# 5613-P-660-S SH. modification with a 1/2" branch connection due to a 3/16" hole being drilled into the 3" pipe wall.

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTN1 - Unit 3 Page 6 REVISION: 0 Inservice Inspection Results Summary Interval 4. Period 1. Outaqe 2 (06)

Completed Components (C, B, R, E. A)

REACTOR COOLANT SYSTEM AUXILIARY SPRAY LINE Zone # 3-035 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification /ISO # Item No Method Data Sheet Number C G M R Remarks 114400 2"-RC-1310-2 R-A C VT-2 4.2-001 X - - - 3/6/2006 - VT2 Complete. No VALVE 3-313 TO PIPE RI.12 VT-2 4.2- - - - Recordable Indications ISO# 5613-P-661-S SH. 2 120900 2"-RC-1310-38 R-A C VT-2 4.2-001 X - - - 3/6/2006 - VT2 Complete. No REDUCER TO PIPE R1.12 Recordable Indications ISO# 5613-P-661-S SH. 2

DATE: 06/08/2006 Turkey Point Nuclear Plant FPTNI - Unit 3 Page 7 REVISION: 0 Inservice Inspection Results Summary Interval 4. Period 1. Outaqe 2 (06)

Completed Components (C. B, R, E, A)

HIGH HEAD SAFETY INJECTION LOOP C INSIDE CTMT Zone # 3-042 N I 0 ASME Status 0 N G T Sec X1 R S E H Summary Examination Area Categ E I O E Number IdentlficatlonllSO# ItemNo Method Data Sheet Number C G M R Remarks 144501 2"-SI-1303-106 R-A B PT 9.5-002 X - - - 3/28/2006 - PT complete. This is a VALVE 3-873C TO PIPE RI.12 preservice examination per WO 36007812-01 due to replacement of ISO# 5613-P-648-S SH. I Valve 3-873C. Construction weld number is FW-I.

144601 2"-SI-1303-206 R-A B PT 9.5-002 X - - 3/29/2006 - PT complete. This is a PIPE TO ELBOW RI.12 preservice examination per WO 36007812-01 due to replacement of ISO# 5613-P-648-S SH. 1 Valve 3-873C. Construction weld number is FW-5.

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 8 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1. Outaqe 2 (06)

Completed Components (C. B, R, E, A)

CHEMICAL & VOLUME CONTROL TO RC LOOP C HOT I Zone # 3-045 N I 0 ASME Status 0 N G T SecXl R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 161900 3-VCH-115 F-A C VT-3 4.3-001 X - - - 3/10/2006 - VT-3 complete. No DOUBLE ACTING F1.10 Recordable Indications RESTRAINT ISO# 5613-P-661-S SH. 1

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTN1 - Unit 3 Page 9 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1. Outaqe 2 (06)

Completed Components (C, B, R. E, A)

CHEMICAL &VOLUME CONTROL SEAL INJECTION LO Zone # 3-050 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E 1 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 181140 I"-CH-1351-I R-A C VT-2 4.2-002 X - - - 3/6/2006 - VT2 Complete. No RCP 3P-200A TO PIPE RI.12 Recordable Indications ISO# 5613-P-5070 SH. I 181148 3/4"-CH-1357-2 R-A C VT-2 4.2-002 X - - - 3/6/2006 - VT2 Complete. No l" x 3/4" REDUCER TO R1.12 Recordable Indications PIPE ISO# 5613-P-5070 SH. 1 181190 I"-CH-1348-3 R-A C VT-2 4.2-002 X - - - 3/6/2006 - VT2 Complete. No REDUCER TO FLANGE RI .12 Recordable Indications ISO# 5613-P-5070 SH. 1 181192 1"-CH-1354-1 R-A C VT-2 4.2-002 X - - 3/6/2006 - VT2 Complete. No FLANGE TO 1"x 3/4" R1.12 Recordable Indications REDUCER ISO# 5613-P-5070 SH. I

DATE: 06108/2006 Turkey Point Nuclear Plant [PTNI - Unit 3 Page 10 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)

Completed Components (C, B, R, E, A)

CHEMICAL &VOLUME CONTROL SEAL INJECTION LO; Zone # 3-051 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification / ISO # Item No Method Data Sheet Number C G M R Remarks 182800 1"-CH-1353-1 R-A C VT-2 4.2-003 X - - - 3/6/2006 - VT2 Complete. No RCP 3P-200C TO PIPE RI.12 Recordable Indications ISO# 5613-P-5070 SH. 1 182809 3/4"-CH-1359-6 R-A C VT-2 4.2-003 X - - - 3/6/2006 - VT2 Complete. No ELBOW TO PIPE RI.12 Recordable Indications ISO# 5613-P-5070 SH. 1 182820 I"-CH-1350-3 R-A C VT-2 4.2-003 X - - - 3/6/2006 - VT2 Complete. No REDUCER TO FLANGE RI.12 Recordable Indications ISO# 5613-P-5070 SH. 1 182825 3/4"-CH-1356-5 R-A C VT-2 4.2-003 X - - - 3/6/2006 - VT2 Complete. No PIPE TO ELBOW RI.12 Recordable Indications ISO# 5613-P-5070 SH. 1 182836 3/4"-CH-1341A-2 R-A C VT-2 4.2-004 X - - - 3/6/2006 - VT2 Complete. No CONNECTION TO PIPE RI.I 2 Recordable Indications ISO# 5613-P-5071 SH. 3 182838 3/4"-CH-1341B-I R-A C VT-2 4.2-004 X - 3/6/2006 - VT2 Complete. No FLANGE TO PIPE RI.12 Recordable Indications ISO# 5613-P-5071 SH. 3 182854 3/4"-CH-1344-5 R-A C VT-2 4.2-004 X - - - 3/6/2006 - VT2 Complete. No VALVE 3-304L TO PIPE R!.12 Recordable Indications ISO# 5613-P-5071 SH. 3

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTNM - Unit 3 Page 11 REVISION: 0 Inservice Inspection Results Summary Interval 4. Period 1. Outaqe 2 (06)

Completed Components (C. B. R. E, A)

CHEMICAL & VOLUME CONTROL SEAL INJECTION LO, Zone # 3-052 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification /ISO # Item No Method Data Sheet Number C G M R Remarks 185798 1"-CH-1352-1 R-A C VT-2 4.2-005 X - - - 3/6/2006 - VT2 Complete. No RCP 3P-200B TO PIPE RI.12 Recordable Indications ISO# 5613-P-5070 SH. 1 185805 3/4"-CH-1358-4 R-A C VT-2 4.2-005 X - - - 3/6/2006 - VT2 Complete. No ELBOW TO PIPE Rl.12 Recordable Indications ISO# 5613-P-5070 SH. I 185819 1"-CH-1349-2 R-A C VT-2 4.2-005 X - - - 3/6/2006 - VT2 Complete. No PIPE TO REDUCER RI.12 Recordable Indications ISO# 5613-P-5070 SH. 1 185824 3/4"-CH-1355-3 R-A C VT-2 4.2-005 X - - - 3/6/2006 - VT2 Complete. No PIPE TO ELBOW R1I.12 Recordable Indications ISO# 5613-P-5070 SH. I

DATE: 06108/2006 Turkey Point Nuclear Plant [PTNM - Unit 3 Page 12 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1, Outaqe 2 (06)

Completed Components (C, B, R, E, A)

CHEMICAL &VOLUME CONTROL, REGENERATIVE HEA Zone # 3-059 N I 0 ASME Status 0 N G T SecXl R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 204100 RGX 3E200 C VT-2 4.2-006 X - - - 3/6/2006- VT2 Complete. No VISUAL FOR LEAKAGE VT-2 4.2-008 X - - - Recordable Indications 4/10/2006 - VT2 Complete. No ISO# 5613-M-4009 Recordable Indications

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTN1 - Unit 3 Page 13 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1. Outaqe 2 (06)

Completed Components (C, B. R. E, A)

STEAM GENERATOR A SECONDARY SIDE Zone # 3-060 N I 0 ASME Status 0 N G T SecXI R S E H Summary Examination Area Categ E I 0 E Number IdentIfication IISO # Item No Method Data Sheet Number C G M R Remarks 210500 3-SGA-SS A VT 4.4-001 X - - 3/21/2006 - VTcomplete. No Recordable SECONDARY SIDE Indications EXAMINATION ISO# 5613-M-4003

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTN1 - Unit 3 Page 14 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1, Outaqe 2 (06)

Completed Components (C, B, R, E, A)

STEAM GENERATOR B SECONDARY SIDE Zone # 3-061 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 211300 3-SGB-P C-A C UT 5.1-001 - - - - 3/18/2006 - UT complete. Slag UPPER SHELL TO C 1.20 PLWRV2 - - - - inclusions recorded in several areas with HEAD 45SA2.25 - - - X the 45 deg and 60 deg transducers. After ISO# 5613-M-4004 60SA2.25 - - - X evaluation the 45 deg. indication 2 and 3 45SC2.25 X _ _ _ & the 60 deg. indication 8 and 9 are still 60SC2.25 X _ _ rejectable per the aspect ratios method 45SA5.0 -- - but acceptable using the beam spread method (This is the same slag indication 05SA5.0 - - - Xrecorded with both transducers from both 45SA5.0 X - - " sides of the weld). RT film could not be 60SA5.0 - X found in the Central Vault. Limitations recorded due to weld pads located 1/2" from toe of weld in 4 areas.

211400 3-SGB-ST C-B C MT 2.2-005 X - - - 3/17/2006 - MT Complete. No STEAM NOZZLE TO C2.21 UT 5.1-002 - - - - Recordable Indications. Insulation ring HEAD OLWRV2. X - - - was removed.

ISO# 5613-M-4004 45SA2.25 X - - - 3/18/2006 - UT Complete. No 60SA2.25 X - Recordable Indicaitons. Insulation ring was removed.

211500 3-SGB-ST-IRS C-B C UT NDE 5.13 - - - - 3/18/2006 - UT Complete. No STEAM NOZZLE INNER C2.22 45STAN2 X Recordable Indications.

RADIUS SECTION ISO# 5613-M-4004

DATE: 06/08/2006 Turkey Point Nuclear Plant IPTNM - Unit 3 Page 15 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1, Outaqe 2 (06)

Completed Components (C. B. R, E, A)

RESIDUAL HEAT REMOVAL TO RESID.HEAT REMOVAL Zone # 3-063 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification/ ISO # Item No Method Data Sheet Number C G M R Remarks 215700 SR-251 F-A C VT-3 4.3-002 - - - X 3/20/2006 - VT-3 complete. Spring can SPRING HANGER F 1.20 setting is out of tolerance. Engineering Disposition: Accept as is and reexamine ISO# 5613-P-600-S SH. I next refueling outage (PTN3-Cycle 23) to see if field modification is necessary.

This was a follow-up examination from Fall 2004 outage reference WO 33021794 and CR 2004-10252.

Reference CR 2006-8621

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTNM - Unit 3 Page 16 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1. Outaqe 2 (06)

Completed Components (C. B, R, E, A)

RESIDUAL HEAT REMOVAL FROM CONTAINMENT SUIV Zone # 3-067 N I 0 ASME Status 0 N G T Sec Xl R S E H Summary Examination Area Categ E I 0 E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 223400 14"-RHR-2306-ILU C PT 3.3-002 X - - - 3/3/2006 - PT Complete. No Recordable LONGITUDINAL SEAM UT 5.4-002 - - - - Indications.

WELD UPSTREAM 45SA5.0 X - - - 3/3/2006 - UT Complete. No Recordable ISO# 5613-P-600-S SH. 2 45SC5.0 X - - - Indications.

60SA5.0 X - - -

223500 14"-RHR-2306-1 C-F-I C PT 3.3-002 X - - - 3/3/2006 - PT Complete. No Recordable PIPE TO ELBOW C5.11 UT 5.4-002 - - - Indications.

45SA5.0 X - - - 3/3/2006 - UT Complete. Root ISO# 5613-P-600-S SH. 2 45SC5.0 X - - - Geometry was recorded.

60SA5.0 - - X -

70SA2.25 X - - -

223520 14"-RHR-2306-ILDO C PT 3.3-002 X - - - 3/3/2006 - PT Complete. No Recordable LONG SEAM WELD UT 5.4-002 - - - - Indications.

DOWNSTREAM 45SA5.0 X - - - 3/3/2006 - UT Complete. No Recordable ISO# 5613-P-600-S SH. 2 45SC5.0 X - - - Indications.

60SA5.0 X - - -

223540 14"-RHR-2306-ILDI C PT 3.3-002 X - - - 3/3/2006 - PT Complete. No Recordable LONG SEAM WELD UT 5.4-002 - - - - Indications.

DOWNSTREAM INSIDE 45SA5.0 X - - - 3/3/2006 - UT Complete. No Recordable ISO# 5613-P-600-S SH. 2 45SC5.0 X - - - Indications.

60SA5.0 X - - -

223800 14"-RHR-2306-4 C-F-I C PT 3.3-002 X - - - 3/3/2006 - PT Complete. No Recordable VALVE MOV-3-860B TO C5.11 UT 5.4-002 - - - - Indications.

PIPE 45SA5.0 X - - - 3/3/2006 - UT Complete. No Recordable ISO# 5613-P-600-S SH. 2 45SC5.0 X - - - Indications.

60SA5.0 X - - -

70SA2.25 X - - -

223820 14"-RHR-2306-4LD C PT 3.3-002 X - 3/3/2006 - PT Complete. No Recordable LONGITUDINAL SEAM UT 5.4-002 - - - - Indications.

WELD DOWNSTREAM 45SA5.0 X - - - 3/3/2006 - UT Complete. No Recordable ISO# 5613-P-600-S SH. 2 45SC5.0 X - - - Indications.

60SA5.0 X - - -

DATE: 06/08/2006 Turkey Point Nuclear Plant IPTM - Unit 3 Page 17 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1, Outaqe 2 (06)

Completed Components (C, B, R. E, A)

RESIDUAL HEAT REMOVAL INSIDE & OUTSIDE CONTAII Zone # 3-069 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I O E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 228400 12"-RHR-2302-I C-F-I C PT 3.3-001 X - - -3/3/2006 - PT Complete. No Recordable REDUCER TO PIPE C5.11 UT 5.4-001 - - - Indications 45SC5.0 X - - - 3/3/2006 - UT Complete. No Recordable ISO# 5613-P-602-S SH. I 60SA5.0 X - - - Indications.

70SA2.25 X - - -

228800 12"-RHR-2302-4 C-F-I C PT 3.3-001 X - 3/3/2006 - PT Complete. No Recordable TEE TO PIPE C5.11 UT 5.4-001 - - - - Indications 45SC5.0 X - - - 3/3/2006 - UT Complete. Root ISO# 5613-P-602-S SH. 1 60SA5.0 - - X - Geometry was recorded.

70SA2.25 X - -

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTN1 - Unit 3 Page 18 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)

Completed Components (C, B. R, E, A)

RESIDUAL HEAT REMOVAL SYSTEM INSIDE CONTAINIV Zone # 3-089 N I 0 ASME Status 0 N G T SecXI R S E H Summary Examination Area Categ E I 0 E Number Identification /ISO # Item No Method Data Sheet Number C G M R D Remarks 268000 8"-SI-2309-20 C-F-I C PT 3.3-003 X 3/13/2006 - PT Complete. No PIPE TO ELBOW C5.1I1 UT 5.4-003 Recordable Indications.

45LA2.25 X 3/14/2006 - UT Complete. No ISO# 5613-P-587-S SH. 1 45SC2.25 X Recordable Indications.

60SA2.25 X 0 11 1) V I UV tZ.. .-

268100 8"-SI-2309-21 C-F-I C PT 3.3-003 X - - - 3/13/2006 - PT Complete. No ELBOW TO PIPE C5.11 UT 5.4-003 - - - - Recordable Indications.

45LA2.25 X - - - 3/14/2006 - UT Complete. No ISO# 5613-P-587-S SH. I 45SC2.25 X - - - Recordable Indications.

60SA2.25 X - - -

70SA2.25 X - - -

268200 8"-SI-2309-22 C-F-I C PT 3.3-003 X - - - 3113/2006 - PT Complete. No PIPE TO TEE C5.1 I UT 5.4-003 - - - - Recordable Indications.

45LA2.25 X - - - 3/14/2006 - UT Complete. No ISO# 5613-P-587-S SH. 1 45SC2.25 X - - - Recordable Indications. Examination is 60SA2.25 X - limited in Tee radius for 4.5" from one 70SA2.25 X . . - side only due to configuration.

70LA4.0 X - - -

268300 g"-SI-2309-23 C-F-I C PT 3.3-003 X - - - 3/13/2006 - PT Complete. No TEE TO PIPE C5.11 UT 5.4-003 - - - - Recordable Indications.

45LA2.25 X - - - 3114/2006 - UT Complete. No ISO# 5613-P-587-S SH. 1 45SC2.25 X - - - Recordable Indications. Examination is 60SA2.25 x - - - limited in Tee radius for 12" from one 70SA2.25 X - - - side only due to configuration.

70LA4.0 X - - -

268400 8"-SI-2309-24 C-F-I C PT 3.3-003 X - - - 3/13/2006 - PT Complete. No PIPE TO VALVE 3-876E C5.11 UT 5.4-003 - - - - Recordable Indications.

45LA2.25 X - - - 3/14/2006 - UT Complete. No ISO# 5613-P-587-S SH. 1 45SC2.25 X - . . Recordable Indications. Examination is 60SA2.25 X _ _ _ limited to pipe side only due to valve 70SA2.25 X . . . configuration. 100% CRV from pipe side, 70LA4.0 X - - - 0% from Valve side.

DATE: 06108/2006 Turkey Point Nuclear Plant [PTNM - Unit 3 Page 19 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1, Outa.pe 2 (06)

Completed Components (C,B, R, E. A)

HIGH HEAD SAFETY INJECTION INSIDE CONTAINMENT Zone # 3-0 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I O E Number Identification /ISO # Item No Method Data Sheet Number C G M R Remarks 288780 2"-SI-2309-506 C-F-I B PT 9.5-002 X - 3/28/2006 - PT complete. This is a PIPE TO VALVE 3-873C C5.30 preservice examination per WO 36007812-01 due to replacement of ISO# 5613-P-648-S SH.1 Valve 3-873C. Construction weld number is FW-2.

288782 2"-SI-2309-606 C-F-I B PT 9.5-001 X - - - 3/29/2006 - PT complete. This is a PIPE TO COUPLING C5.30 preservice examination per WO 36007812-01 due to replacement of ISO# 5613-P-648-S SH.q Valve 3-873C. Construction weld number is FW-3.

288783 2"-SI-2309-706 C-F-I B PT 9.5-001 X - - - 3/28/2006 - PT complete. This is a COUPLING TO PIPE C5.30 preservice examination per WO 36007812-01 due to replacement of ISO# 5613-P-648-S SH.1 Valve 3-873C. Construction weld number is FW-4.

DATE: 06108/2006 Turkey Point Nuclear Plant IPTNM - Unit 3 Page 20 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)

Completed Components (C,B, R, E, A)

MAIN STEAM SYSTEM LOOP B OUTSIDE CONTAINMEN Zone # 3-101 N I 0 ASME Status 0 N G T Sec Xl R S E H Summary Examination Area Categ E I O E Number Identification /ISO # Item No Method Data Sheet Number C G M R Remarks 305500 26"-MSB-2305-12 C-F-2 C MT 2.2-002 X - - - 3/15/2006 - MT Complete. No 6" WELDOLET C5.81 Recordable Indications ISO# 5613-P-654-S SH. 2 305900 26"-MSB-2305-14 C-F-2 C MT 2.2-002 X - - - 3/15/2006 - MT Complete. No 12" WELDOLET C5.81 Recordable Indications ISO# 5613-P-654-S SH. 2

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTN1 - Unit 3 Page 21 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1, Outage 2 (06)

Completed Components (C, B, R, E, A)

MAIN FEEDWATER SYSTEM LOOP A Zone # 3-109 N I 0 ASME Status 0 N G T SecXl R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 327300 14"-FWA-2301-2A C-F-2 C MT 2.2-004 X - - - 3/16/2006 - MT Complete. No 6" WELDOLET C5.81 Recordable Indications ISO# 5613-P-817-S SH. 4 330500 AUGMENTED EXAMIN/ AUG A UT 5.16-001 - - - 3/18/2006 - UT Complete. Root FROM NOZZLE RAMP 60SA2.25 - - X - Geometry was recorded.

TO I DIAMETER ON 70SA2.25 - - X -

ISO# 5613-P-651-S SH. 1 60SA5.0 - - X -

70SA5.0 - - X -

DATE: 06/08/2006 Turkey Point Nuclear Plant IPTNM - Unit 3 Page 22 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1, Outaqe 2 (06)

Completed Components (C. B. R, E, A)

MAIN FEEDWATER SYSTEM LOOP B Zone# 3-110 N I 0 ASME Status 0 N G T SecXl R S E H Summary Examination Area Categ E I 0 E Number Identification /ISO # Item No Method Data Sheet Number C G M R Remarks 333800 AUGMENTED EXAMINIAUG A UT 5.16-002 - - - - 3/15/2006 - UT Complete. Root FROM NOZZLE RAMP 60SA2.25 - - X - Geometry and Backing Ring was recorded.

TO I DIAMETER ON 70SA2.25 - - X -

ISO# 5613-P-652-S SH. 1 60SA5.0 - - X -

70SA5.0 - - x -

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 23 REVISION: 0 Inservice Inspection Results Summary Interval 4. Period 1. Outaqe 2 (06)

Completed Components (C. B, R, E, A)

MAIN FEEDWATER SYSTEM LOOP C Zone# 3-111 N I 0 ASME Status 0 N G T SecXi R S E H Summary Examination Area Categ E I 0 E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 334500 14"-FWC-2305-1 C-F-2 C MT 2.2-003 X - - - 3/16/2006 - MT Complete. No PIPE TO ELBOW C5.51 UT 5.2-002 - - - - Recordable Indications.

45SA2.25 X - - - 3/16/2006 - UT Complete. Backing Ring ISO# 5613-P-817-S SH. 6 45SC2.25 X - - - was recorded.

60SA2.25 - - X 338200 AUGMENTED EXAMIN/ AUG A UT NDE 5.16 - - - - 3/16/2006 - UT Complete. Root FROM NOZZLE RAMP 60SA2.25 - - X - Geometry, Counterbore Geometry and TO I DIAMETER ON 70SA2.25 - - X - Backing Ring was recorded.

ISO# 5613-P-178-S SH. 1 60SA5.0 - X -

70SA5.0 - X -

DATE: 06/08/2006 Turkey Point Nuclear Plant [PTN1 - Unit 3 Page 24 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1. Outaqe 2 (06)

Completed Components (C. B. R, E, A)

MAIN FEEDWATER BYPASS LOOP A Zone# 3-112 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E l 0 E Number Identification/ISO # Item No Method Data Sheet Number C G M R Remarks 338500 6"-FWA-2301-2 C-F-2 C MT 2.2-001 X - - - 3115/2006 - MT Complete. No REDUCER TO VALVE C5.51 UT 5.2-001 Recordable Indications 3-20-131 45SA5.0 X - - - 3/16/2006 - UT Complete. Root ISO# 5613-P-817-S SH. 4 45SC5.0 X - - - Geometry was recorded.

60SA5.0 X

DATE: 06/08/2006 Turkey Point Nuclear Plant IPTN1 - Unit 3 Page 25 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 1. Outaqe 2 (06)

Completed Components (C, B, R. E. A)

RESIDUAL HEAT EXCHANGER A Zone # 3-115 N I 0 ASME Status 0 N G T SecXl R S E H Summary Examination Area Categ E I O E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 341400 3-RHE-A3 C-B C VT-2 4.2-007 X - - - 3/21/2006 - VT2 Complete. No INLET NOZZLE TO C2.33 Recordable Indications SHELL ISO# 5613-M-4010 341600 3-RHE-A5 C-B C VT-2 4.2-007 X - - - 3/21/2006 - VT2 Complete. No OUTLET NOZZLE TO C2.33 Recordable Indications SHELL ISO# 5613-M-4010

TURKEY POINT UNIT 3 2006 REFUELING OUTAGE Summary of Inservice Inspection IWE Examinations I Attachment 2

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 1 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-001 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 400000 LINER PLATE E-A C GEN. 4.7-006 X - - - 03/06- General Exam Complete.

LINER PLATE (GENERAL El.1 I VISUAL)

ISO# 5610-C-165 400010 PENETRATION 40 E-A C GEN. 4.7-006 X - - - 03/06- General Exam Complete.

EQUIPMENT HATCH EL.1 (GENERAL VISUAL)

ISO# 5610-C-165 400060 LINER PLATE E-A C VT-3 4.7-006 X - - - 03/06- VT-3 Exam Complete.

LINER PLATE (VISUAL) EI.12 ISO# 5610-C-165 400070 PENETRATION 40 E-A C VT-3 4.7-006 X - - - 03/06- VT-3 Exam Complete.

EQUIPMENT HATCH EI.12 (VISUAL)

ISO# 5610-C-165 400150 MOISTURE BARRIER E-D B VT-3 4.7-007A - - - X 03/06- VT-3 Pre removal inspection LINER PLATE TO FLOOR E5.30 VT-3 4.7-007B X - - - complete. Random disbondment of sealant (MOISTURE BARRIER) VT-3 4.7-007C X - - - thru-out zone. Inspection per CR 04-I 2917.

Post removal inspection completed 3/8/06.

ISO# 5610-C-165 Concrete spalling noted in various areas at the floor to sealant interface.

3117/06-Spalled concrete area inspected after prep (Sht C) per CR 2006-7669.

400190 CONTAINMENT LINER E-A C GEN. 4.7-015 X - - - 03/06- General Exam Complete.

LINER PLATE-GENERAL E1.1 I VISUAL ISO# 5610-C-165 400220 CONTAINMENT LINER E-A C VT-3 4.7-015 X - - - 03/06- VT-3 Exam Complete.

LINER PLATE VISUAL ELI. I ISO# 5610-C-165 400270 PENETRATION 39 E-D C VT-3 4.7-003 X - - - VT-3 complete of flange sealing surfaces.

FUEL TRANSFER TUBE E5.20 GASKET ISO# 5610-C-204 400280 MOISTURE BARRIER E-D B VT-3 4.7-408A - - - X 03/06- VT-3 Complete. Random LINER PLATE TO FLOOR E5.30 VT-3 4.7-408B X - - - disbondment of sealant thru-out zone.

(MOISTURE BARRIER) VT-3 4.7-008C X - - - Inspection per CR 04-12917. 3/14/06 Post removal exam partial (Sh B). 3/23/06 Post ISO# 5610-C-165 removal exam of remaining area. (Sh.C).

400290 PENETRATION 39 BOLTINE-G C VT-I 4.7-003 X - - - 03/06- VT-I Exam of Bolting Complete.

BOLTING (FUEL E8.10 TRANSFER TUBE)

ISO# 5610-C-204

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 2 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-003 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification / ISO # Item No _ Method Data Sheet Number C G M R Remarks 400300 CONTAINMENT LINER E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

LINER PLATE-GENRAL El .I1 VISUAL ISO# 5610-C-165 400320 PENETRATION #1 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

RESID.HT.REMOVAL El. 11 ISO# 5610-C-167 400330 PENETRATION #2 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

RESID.HT.REMOVAL El. 11 ISO# 5610-C-167 400340 PENETRATION #3 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

R/C COOLING IN EI.1I ISO# 5610-C-167 400350 PENETRATION #4 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

R/C COOLING OUT EI .1I ISO# 5610-C-167 400360 PENETRATION #5 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

PZR RELIEF TANK VENT El.1I ISO# 5610-C-167 400370 PENETRATION #6 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

PZR RELIEF TANK N2 El.11 SUPPLY ISO# 5610-C-167 400380 PENETRATION #7 E-A C GEN. 4.7-013 X 03/06- General Exam Complete.

PZR RELIEF TANK 1120 ElI I DEMIN.

ISO# 5610-C-167 400390 PENETRATION #8 E-A C GEN. 4.7-013 X 03/06- General Exam Complete.

PZR STEAM SPACE EI.I SAMP.

ISO# 5610-C-167 400400 PENETRATION #9 E-A C GEN. 4.7-013 X 03/06- General Exam Complete.

PZR LIQUID SPACE EIAlI SAMP.

ISO# 5610-C-167 400410 PENETRATION #10 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

R/C DRAIN TANK VENT El.Il ISO# 5610-C-167

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 3 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-003 N I 0 ASME Status O N G T SecX I R S E H Summary Examination Area Categ E I 0 E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 400430 PENETRATION #11 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

LOW HEAD SAFTEY INJ. El.l I ISO# 5610-C-167 400440 PENETRATION#12 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

EXCESS LETDOWN HX El .11 IN ISO# 5610-C-167 400450 PENETRATION #13 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

EXCESS LETDOWN HX El.l1 OUT ISO#5610-C-167 400460 PENETRATION #14 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

LETDOWN TO NON ElI11 REGEN HX ISO# 5610-C-167 400470 PENETRATION #15 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

CHARGING TO REGEN EI.l I HX ISO# 5610-C-167 400480 PENETRATION #16 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

SPARE ElI I ISO# 5610-C-167 400490 PENETRATION #17 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

SAFETY INJ, TEST & EI. I PURGE ISO# 5610-C-167 400500 PENETRATION #18 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

SAFETY INJECTION EI .1 ISO# 5610-C-167 400510 PENETRATION #19 (2) E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

CONTAINMENT SPRAY El.l1 ISO# 5610-C-167 400520 PENETRATION #20 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

R/C HOTLEG SAMPLE E1.1 1 ISO# 5610-C-167 400530 PENETRATION #21 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

VENT COOLER CW LINE E1.11 ISO# 5610-C-167

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 4 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-003 N I 0 ASME Status 0 N G T SecXI I R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 400540 PENETRATION #22 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

VENT COOLER CW El.11 RETURN ISO# 5610-C-167 400550 PENETRATION #23 E-A C GEN. 4.7-013 X 03/06- General Exam Complete.

CONTSUMP EI.l I PUMP/HOLD UP ISO# 5610-C-167 400560 PENETRATION #24 (3) E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

CHARGEPUMP DIS TO El. 11 RC PUMP ISO# 5610-C-167 400570 PENETRATION #25 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

COOLANTPUMP DIS TO El.I RC PUMP ISO# 5610-C-167 400580 PENETRATION #31 E-A C GEN. 4.7-013 X 03/06- General Exam Complete.

RC DRAIN TK 12 ANAL E1.11 ISO# 5610-C-167 400590 PENETRATION #32 E-A C GEN. 4.7-013 X 03/06- General Exam Complete.

CONTAIRSAMPLEIN E .1I ISO# 5610-C-167 400600 PENETRATION #33 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

CONT AIR SAMPLE OUT El.11 ISO# 5610-C-167 400610 PENETRATION #37 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

PLUGGED W/CONCRETE El.1 i ISO# 5610-C-167 400620 PENETRATION #43 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

R/C PUMP CW OUTLET El.l1 ISO# 5610-C-167 400630 PENETRATION #44 (3) E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

CW TO EMERG CONT EIl11 COOLERS ISO# 5610-C-167 400640 PENETRATION #45 (3) E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

CW FROM EMERG CONT EI.1l COOLERS ISO# 5610-C-167

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 5 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-003 N I 0 ASME Status 0 N G T SecXl I R S E H Summary Examination Area Categ E I 0 E Number Identification ISO # Item No i Method Data Sheet Number C G M R Remarks 400650 PENETRATION #51 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

SPARE EL.I I ISO# 5610-C-167 400660 PENETRATION #52 E-A C GEN. 4.7-013 X 03/06- General Exam Complete.

R/C DRAIN TANK DISCIl. EI.I 1 ISO# 5610-C-167 400670 PENETRATION #53 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

S/G SAMPLE E1.1 I ISO# 5610-C-167 400680 PENETRATION #55 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

ACCUM. SAMPLE LINE El.I 1 ISO# 5610-C-167 400690 PENETRATION #56 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

SPARE EAl.1 ISO# 5610-C-167 400700 PENETRATION #57 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

SPARE EI. I ISO# 5610-C-167 400710 PENETRATION #59 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

HIGH HEAD INJ. TO EI.1 I LOOP B ISO# 5610-C-167 400720 PENETRATION #60 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

HIGH HEAD INJ. TO EI.1 I LOOP C ISO# 5610-C-167 400730 PENETRATION #61 TYPE E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

PZR DEAD WEIGHT E1. 11 TESTER ISO# 5610-C-167 400740 PENETRATION #61 TYPE E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

SPARE EL.I1 ISO# 5610-C-167 400750 PENETRATION #63 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

INSTR. AIR BLEED EI.11 ISO# 5610-C-167

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 6 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-003 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ J E I 0 E Number Identification IISO # Item No j Method Data Sheet Number C G M R Remarks 400760 PENETRATION #64 E-A C GEN. 4.7-013 X - - - 03/06- General Exam Complete.

S/G SAMPLE El.I1 ISO# 5610-C-167 400770 CONTAINMENT LINER E-A C VT-3 4.7-013 X - - 03/06- VT-3 Exam Complete. Chipped LINER PLATE- VISUAL El .12 paint at various locations (primer intact).

ISO# 5610-C-165 400790 PENETRATION #1 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

RESID.JT.REMOVAL El .12 ISO# 5610-C-167 400800 PENETRATION #2 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

RESID.HT.REMOVAL El.12 ISO# 5610-C-167 400810 PENETRATION #3 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

R/C COOLING IN EI.12 ISO# 5610-C-167 400820 PENETRATION #4 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

R/C COOLING OUT El.12 ISO# 5610-C-167 400830 PENETRATION #5 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

PZR RELIEF TANK VENT El.12 ISO# 56110-C-167 400840 PENETRATION #6 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

PZR RELIEF TANK N2 EI.12 SUPPLY ISO# 56110-C-167 400850 PENETRATION #7 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

PZR RELIEF TANK 1120 El.12 DEMIN.

ISO# 56110-C-167 400860 PENETRATION #8 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

PZR STEAM SPACE EI.12 SAMP.

ISO# 56110-C-1167 400870 PENETRATION #9 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

PZR LIQUID SPACE EI.12 SAMP.

ISO# 56110-C-167

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 7 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-003 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 400880 PENETRATION#10 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

R/C DRAIN TANK VENT E1.12 ISO# 5610-C-167 400890 PENETRATION #11 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

LOW HEAD SAFTEY INJ. EI.12 ISO# 5610-C-167 400900 PENETRATION #12 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

EXCESS LETDOWN HX EI.12 IN ISO# 5610-C-167 400910 PENETRATION #23 E-A C VT-3 4.7-023 X - - - 03/06- VT-3 Exam Complete.

EXCESS LETDOWN FIX E1.12 OUT ISO# 5610-C-167 400920 PENETRATION #14 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

LETDOWN TO NON E1.12 REGEN HX ISO# 5610-C-167 400930 PENETRATION #15 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

CHARGING TO REGEN El.12 HX ISO# 5610-C-167 400940 PENETRATION #16 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

SPARE E1.12 ISO# 5610-C-167 400950 PENETRATION #17 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

SAFETY INJ. TEST & EI.12 PURGE ISO# 5610-C-167 400960 PENETRATION #18 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

SAFETY INJECTION El .12 ISO# 56110-C-167 400970 PENETRATION #19 (2) E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

CONTAINMENT SPRAY E1.12 ISO# 5610-C-167 400980 PENETRATION #20 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

R/C HOTLEG SAMPLE E1.12 ISO# 56110-C-167

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 8 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-003 N I 0 ASME Status 0 N G T Sec XI IR S E H Summary Examination Area Categ E I 0 E Number Identification ISO # Item No Method Data Sheet Number C G M R Remarks 400990 PENETRATION #21 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

VENT COOLER CW LINE El.12 ISO# 5610-C-167 401000 PENETRATION #22 E-A C VT-3 4.7-013 X - - - 03106- VT-3 Exam Complete.

VENT COOLER CW El.12 RETURN ISO# 5610-C-167 401010 PENETRATION #23 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

CONTSUMP EI.12 PUMP/HOLD UP ISO# 5610-C-167 401020 PENETRATION #24 (3) E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

CHARGEPUMP DIS TO EI.12 RC PUMP ISO# 5610-C-167 401030 PENETRATION #25 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

COOLANTPUMP DIS TO El.12 RCPUMP ISO# 5610-C-167 401040 PENETRATION #31 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

RC DRAIN TK 112 ANAL EI.12 ISO# 5610-C-167 401050 PENETRATION #32 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

CONTAIRSAMPLEIN EI.12 ISO# 5610-C-167 401060 PENETRATION #33 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

CONT AIR SAMPLE OUT EI.12 ISO# 5610-C-167 401070 PENETRATION #37 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

PLUGGED W/CONCRETE El.12 ISO#5610-C-167 401080 PENETRATION #43 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

R/C PUMP CW OUTLET EI.12 ISO# 5610-C-167 401090 PENETRATION #44 (3) E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

CW TO EMERG CONT El.12 COOLERS ISO# 5610-C-167

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 9 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-003 N I 0 ASME Status 0 N G T SecXl I R S E H Summary Examination Area Categ E I O E Number Identification /ISO # Item No I Method Data Sheet Number C G M R Remarks 401100 PENETRATION #45 (3) E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

CW FROM EMEROCONT El.12 COOLERS ISO# 5610-C-167 401110 PENETRATION #51 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

SPARE E1.12 ISO# 5610-C-167 401120 PENETRATION #52 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

R/C DRAIN TANK DISCH. EI.12 ISO# 5610-C-167 401130 PENETRATION #53 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

S/G SAMPLE EI.12 ISO# 5610-C-167 401140 PENETRATION #55 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

ACCUM. SAMPLE LINE E1.12 ISO# 5610-C-167 401150 PENETRATION #56 E-A C VT-3 4.7-013 X 03/06- VT-3 Exam Complete.

SPARE EI.12 ISO# 5610-C-167 401160 PENETRATION #57 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

SPARE E1.12 ISO# 5610-C-167 401170 PENETRATION #59 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

HIGH HEAD INJ. TO E1.12 LOOP B ISO# 5610-C-167 401180 PENETRATION #60 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

HIGH HEAD INJ. TO EI.12 LOOP C ISO# 5610-C-167 401190 PENETRATION #61 TYPE E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

PZR DEAD WEIGHT E1.12 TESTER ISO# 5610-C-167 401200 PENETRATION #61 TYPE E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

SPARE El.12 ISO# 5610-C-167

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 10 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-003 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification / ISO # Item No Method Data Sheet Number C G M R Remarks 401210 PENETRATION #63 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

INSTR. AIR BLEED EI.12 ISO# 5610-C-167 401220 PENETRATION #64 E-A C VT-3 4.7-013 X - - - 03/06- VT-3 Exam Complete.

S/G SAMPLE EI.12 ISO# 56110-C-167 401250 MOISTURE BARRIER E-D C VT-3 4.7-009 - - - X 03/06- VT-3 Complete. Random LINER PLATE TO FLOOR E5.30 disbondment of sealant thru-out zone.

(MOISTURE BARRIER) Inspection per CR 04-12917 ISO# 5610-C-165 401260 LINER PLATE E-A C GEN. 4.7-014 X - - - 03/06- General Exam Complete. Chipped LINER PLATE (GENERAL EI.I I GEN. 4.7-033 X paint at various locations (primer intact)

VISUAL) 3/22/06 Area made accessible by repair of air chase channel @ AZ 186. Pitting. Refer ISO# 5610-C-165 to CR 2006-9040 401290 PENETRATION 38A (28) E-A C GEN. 4.7-014 X - - - 03/06- General Exam Complete.

ELECTRICAL El .I PENETRATIONS ISO# 5610-C-1i67 401300 PENETRATION 48 (4) E-A C GEN. 4.7-014 X - - - 03/06- General Exam Complete.

ELECTRICAL PEN. (RC E1.1 I PUMP)

ISO# 5610-C-167 401310 PENETRATION 46 (3) E-A C GEN. 4.7-014 X - - - 03/06- General Exam Complete.

CONT. PRESSURE INSTR. El.l1 ISO# 5610-C-1i68 401320 LINER PLATE E-A C VT-3 4.7-014 X - - - 03/06- VT-3 Exam Complete. Chipped paint LINER PLATE(VISUAL) EI.12 VT-3 4.7-033 - - - X at various locations (primer intact). 3/22/06 Area made accessible by repair of air chase channel @ AZ 186. Pitting. Refer to CR ISO# 56110-C-165 2006-9040 401350 PENETRATION 38A (28) E-A C VT-3 4.7-014 X - - - 03/06- VT-3 Exam Complete.

ELECTRICAL EI.12 PENETRATIONS ISO# 5610-C-167 401360 PENETRATION 48 (4) E-A C VT-3 4.7-014 X - - - 03/06- VT-3 Exam Complete.

ELECTRICAL PEN. (RC EI.12 PUMP)

ISO# 5610-C-167 401370 PENETRATION 46 (3) E-A C VT-3 4.7-014 X - - - 03/06- VT-3 Exam Complete.

CONT. PRESSURE INSTR. EI.12 ISO# 5610-C-1i68

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 11 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-004 N I 0 ASME Status 0 N G T SecXI IR S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No _ Method Data Sheet Number C G M R Remarks 401380 TOE PLATE @ 186 DEGRE E-C C VT-I 4.7-034 - - - X 03/06- Toe plate is not part of containment TOE PLATE @ 186 E4.Ii liner plate and does not fall under Section XI DEGREES VISIBLE successive exam rules. Exam will be removed from augmented exam ISO#561 0-C-i65 requirements. Area of concern was replaced in Spring 2003.

3/22/06 Area of liner plate made accessible by repair of air chase channel @ AZ 186.

Pitting. Refer to CR 2006-9040. Area will be inaccessible after repair. No further exams required per Engineering.

401390 TOE PLATE @ 186 DEGRE E-C C VOL 5.18-014 - - - X 03/06- Toe plate is not part of containment TOE PLATE (MIN WALL E4.12 liner plate and does not fall under Section XI THICKNESS LOC) successive exam rules. Exam will be ISO# 561 0-C-165 removed from augmented exam requirements. Area of concern was replaced in Spring 2003. 3/22/06 Area of liner plate made accessible by repair of air chase channel @ AZ 186. Pitting. Refer to CR 2006-9040. Area will be inaccessible after repair. No further exams required per Engineering.

401400 MOISTURE BARRIER E-D B VT-3 4.7-01OA - - - X 03/06- VT-3 complete (Sh. A). Random LINER PLATE TO FLOOR E5.30 VT-3 4.7-0101B X - - - disbondment of sealant thru-out zone.

(MOISTURE BARRIER) VT-3 4.7-01OC X - - - Inspection per CR 04-12917. 3/17/06 Post cleaning exam not including repair at AZ ISO# 5610-C-165 186 (Sh. B). 3/23/06 Post cleaning @ AZ 186 (Sh.C) 401410 LINER PLATE E-A C GEN. 4.7-014 X - - - 03/06- General Complete.

LINER PLATE (GENERAL El.l 1 VISUAL)

ISO# 5610-C-165 401420 PENETRATION 38B (28) E-A C GEN. 4.7-016 X - - - 03/06- General Complete ELECTRICAL EI. I PENETRATIONS TYPEIII ISO# 5610-C-167 401430 PENETRATION 41 E-A C GEN. 4.7-016 . . . X 03/06-General complete. Gouging observed PERSONNEL AIRLOCK ELI I on airlock door. CR2006-7667 initiated.

SPECIAL ISO# C-49-360 V 401440 LINER PLATE E-A C VT-3 4.7-016 X - - - 03/06- General complete.

LINER PLATE (VISUAL) EI.12 ISO# 5610-C-167 401450 PENETRATION 38B (28) E-A C VT-3 4.7-016 X - - - 03/06- VT-3 complete.

ELECTRICAL El .12 PENETRATIONS TYPEIII ISO# 5610-C-1 67 401460 PENETRATION 41 E-A C VT-3 4.7-016 - - - X 03/06- VT-3 complete. Gouging observed PERSONNEL AIRLOCK El.12 on airlock door. Reference CR2006-7667.

SPECIAL ISO# C-49-360 V

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 12 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-005 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ J E I 0 E Number Identification/ISO # Item No I Method Data Sheet Number C G M R Remarks 401490 PENETRATION 41 E-D C VT-3 4.7-016 X - - - 03/06- VT-3 complete.

PERSONNEL AIRLOCK E5.10 SEALS SPECIAL ISO# C-49-360 V 401510 MOISTURE BARRIER E-D B VT-3 4.7-011 - - - X 03/06- VT-3 Complete. Random LINER PLATE TO FLOOR E5.30 disbondment of sealant thru-out zone.

(MOISTURE BARRIER) Inspection per CR 04-12917 ISO# 5610-C-165 401530 LINER PLATE E-A C GEN. 4.7-017 X - - - 03/06- General complete.

LINER PLATE (GENERAL EI.11 VISUAL)

ISO# 5610-C-165 401540 PENETRATION 28 (3) E-A C GEN. 4.7-017 X - - - 03/06- General complete.

S/G BLOWDOWN EI.Il ISO# 5610-C-167 401550 PENETRATION 29 E-A C GEN. 4.7-017 X - - - 03/06- General complete.

INSTRUMENT AIR EI.1 I ISO# 5610-C-167 401560 PENETRATION 30 E-A C GEN. 4.7-017 X - - - 03/06- General complete.

SPARE EIl.1 ISO# 5610-C-167 401570 PENETRATION 65 (2) E-A C GEN. 4.7-017 X - - - 03/06- General complete.

CONT. ITEGRETY&LEAK ElI 1 RATE ISO# 5610-C-167 401580 LINER PLATE E-A C VT-3 4.7-017 X - - - 03/06- VT-3 complete.

LINER PLATE (VISUAL) EI.12 ISO# 5610-C-165 401590 PENETRATION 28 (3) E-A C VT-3 4.7-017 X - - - 03/06- VT-3 complete.

S/G BLOWDOWN EI.12 ISO# 5610-C-167 401600 PENETRATION 29 E-A C VT-3 4.7-017 X - - - 03/06- VT-3 complete.

INSTRUMENT AIR EI.12 ISO# 5610-C-167 401610 PENETRATION 30 E-A C VT-3 4.7-017 X - - - 03/06- VT-3 complete.

SPARE EI.12 ISO# 5610-C-167

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 13 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-006 N I 0 ASME Status 0 N G T SecXI I R S E H Summary Examination Area Categ E I 0 E Number Identification ISO # Item No Method Data Sheet Number C G M R Remarks 401620 PENETRATION 65 (2) E-A C VT-3 4.7-017 X - - - 03/06- VT-3 complete.

CONT. ITEGRETY&LEAK El.12 RATE ISO# 5610-C-167 401624 PENETRATION 65 C BOLTE-G C VT-I 4.7-017 X - - - 03/06- VT-I of bolting complete.

BOLTING E8.10 (disassembled)

(PENETRATION 65 C)

ISO# 56110-C-167 401650 MOISTURE BARRIER E-D C VT-3 4.7-012 - - - X 03/06-VT-3 Complete. Random LINER PLATE TO FLOOR E5.30 disbondment of sealant thru-out zone.

(MOISTURE BARRIER) Inspection per CR 04-12917 ISO# 5610-C-165 401660 LINER PLATE E-A C GEN. 4.7-018 X - - - 03/06- General complete.

LINER PLATE (GENERAL E13.11 VISUAL)

ISO# 5610-C-165 401700 LINER PLATE E-A C VT-3 4.7-018 X - - - 03/06- VT-3 complete.

LINER PLATE (VISUAL) E13.12 ISO# 56110-C-165 401760 LINER PLATE E-A C GEN. 4.7-019 X - - - 03/06- General complete.

LINER PLATE (GENERAL EI.I I VISUAL)

ISO# 5610-C-165 401780 PENETRATION 49 E-A C GEN. 4.7-019 X - - - 03/06- General complete.

EMERGENCY ESCAPE El. 11 HATCI I ISO# C-49-360 V 401790 LINER PLATE E-A C VT-3 4.7-019 X - - - 03/06- VT-3 complete.

LINER PLATE (VISUAL) E1.12 ISO# 5610-C-165 401810 PENETRATION 49 E-A C VT-3 4.7-019 X - - - 03/06- VT-3 complete.

EMERGENCY ESCAPE EI.12 HATCH ISO# C-49-360 V 401860 LINER PLATE E-A C GEN. 4.7-020 X - - - 03/06- General complete.

LINER PLATE (GENERAL El.! 1 VISUAL)

ISO# 5610-C-165 401890 LINER PLATE E-A C VT-3 4.7-020 X - - - 03/06- VT-3 complete.

LINER PLATE (VISUAL) El.12 ISO# 5610-C-165

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 14 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-010 N I 0 ASME Status 0 N G T SecXl R S E H Summary Examination Area Categ E I 0 E Number Identification ISO # Item No i Method Data Sheet Number C G M R Remarks 401940 LINER PLATE E-A C GEN. 4.7-021 X - - - 03/06- General complete.

LINER PLATE (GENERAL El.I!

VISUAL)

ISO# 5610-C-165 401970 PENETRATION 62 (3) E-A C GEN. 4.7-021 - - - - 03/06- General complete.

CONT. PRESSURE INST. El.!!

ISO# 5610-C--168 401980 LINER PLATE E-A C VT-3 4.7-021 X - - - 03/06- VT-3 complete.

LINER PLATE (VISUAL) El.12 ISO# 5610-C-165 402010 PENETRATION 62 (3) E-A C VT-3 4.7-021 X 03/06- VT-3 complete.

CONT. PRESSURE INST. EI.12 ISO# 5610-C-168 402040 LINER PLATE E-A C GEN. 4.7-013 X 03/06- General complete.

LINER PLATE (GENERAL El.11 VISUAL)

ISO# 5610-C-165 402070 PENETRATION 48 (3) E-A C GEN. 4.7-022 X 03/06- General complete.

R/C PUMP POWER EI 1I ISO# 5610-C-165 402080 PENETRATION 26 (2) E-A C GEN. 4.7-022 X - - - 03/06- General complete.

MAIN STEAM El. I ISO# 5610-C-167 402090 LINER PLATE E-A C VT-3 4.7-022 X - - - 03/06- VT-3 complete.

LINER PLATE (GENERAL E13.12 VISUAL)

ISO# 5610-C-165 402120 PENETRATION 48 (3) E-A C VT-3 4.7-022 X - - - 03/06- VT-3 complete.

RCPUMPPOWER EI.12 ISO# 5610-C-165 402130 PENETRATION 26 (2) E-A C VT-3 4.7-022 X - - - 03/06- VT-3 complete.

MAIN STEAM EI.12 ISO# 5610-C-167 402160 LINER PLATE E-A C GEN. 4.7-023 X - - - 03/06- General complete.

LINER PLATE (GENERAL El.!!

VISUAL)

ISO# 5610-C-165

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 15 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-012 N I 0 ASME Status 0 N G T SecXI I R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No i Method Data Sheet Number C G M R Remarks 402180 PENETRATION 26 (1) E-A C GEN. 4.7-023 X - - - 03/06- General complete.

MAIN STEAM E13.11 ISO# 5610-C-167 402190 PENETRATION 27 (3) E-A C GEN. 4.7-023 X - - - 03/06- General complete.

FEEDWATER E1.l1 ISO# 5610-C-167 402200 LINER PLATE E-A C VT-3 4.7-023 X - - - 03/06- VT-3 complete.

LINER PLATE (VISUAL) EI.12 ISO# 5610-C-165 402220 PENETRATION 26 (1) E-A C VT-3 4.7-023 X - - - 03/06- VT-3 complete.

MAIN STEAM EI.12 ISO# 5610-C-167 402230 PENETRATION 27 (3) E-A C VT-3 4.7-023 X - - - 03/06- VT-3 complete.

FEEDWATER E1.12 ISO# 5610-C-167 402260 LINER PLATE E-A C GEN. 4.7-025 X - - - 03/06- General complete.

LINER PLATE (GENERAL EI.11 VISUAL)

ISO# 5610-C-165 402300 LINER PLATE E-A C VT-3 4.7-025 X - - - 03/06- VT-3 complete.

LINER PLATE(VISUAL) E1.12 ISO# 5610-C-165 402360 LINER PLATE E-A C GEN. 4.7-026 X - - - 03/06- General complete.

LINER PLATE (GENERAL EI.1 1 VISUAL)

ISO# 5610-C-165 402400 LINER PLATE E-A C VT-3 4.7-026 X - - - 03/06- VT-3 complete.

LINER PLATE (GENERAL E!.12 VISUAL)

ISO# 5610-C-165 402460 LINER PLATE E-A C GEN. 4.7-027 X - - - 03/06- General complete.

LINER PLATE (GENERAL E1.11 VISUAL)

ISO# 5610-C-165 402520 LINER PLATE E-A C VT-3 4.7-027 X - - - 03/06- VT-3 complete.

LINER PLATE (VISUAL) EI.12 ISO# 5610-C-165

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 16 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone # 3-016 N I 0 ASME Status O N G T Sec XI R S E H Summary Examination Area Categ f E 1 0 E Number Identification IISO # Item No i Method Data Sheet Number C G M R Remarks 402600 LINER PLATE E-A C GEN. 4.7-024 X - - - 03/06- General complete.

LINER PLATE (GENERAL El.11 VISUAL)

ISO# 5610-C-165 402680 PENETRATION 35 E-A C GEN. 4.7-024 X 03106- General complete.

CONTAINMENT PURGE El.II ISO# 5610-C-170 402690 PENETRATION 36 E-A C GEN. 4.7-024 X - - - 03/06- General complete.

CONTAINMENT PURGE El.II ISO# 5610-C-170 402710 LINER PLATE E-A C VT-3 4.7-024 X - - - 03/06- VT-3 complete.

LINER PLATE (VISUAL E1.12 ISO# 5610-C-1665 402780 PENETRATION 35 E-A C VT-3 4.7-024 X - - - 03/06- VT-3 complete.

CONTAINMENT PURGE EI.12 ISO# 5610-C-170 402790 PENETRATION 36 E-A C VT-3 4.7-024 X - - - 03/06- VT-3 complete.

CONTAINMENT PURGE E1.12 ISO# 5610-C-170 402840 LINER PLATE E-A C GEN. 4.7-028 X - - - 03/06- General complete.

LINER PLATE (GENERAL El.!I VISUAL)

ISO# 5610-C-165 402880 LINER PLATE E-A C VT-3 4.7-028 X - - - 03/06- VT-3 complete.

LINER PLATE (VISUAL) EI.12 ISO# 5610-C-165 402940 LINER PLATE E-A C GEN. 4.7-029 X - - - 03/06- General complete.

LINER PLATE (GENERAL Ei.1 I VISUAL)

ISO# 5610-C-165 402990 LINER PLATE E-A C VT-3 4.7-029 X - 03/06- VT-3 complete.

LINER PLATE (VISUAL) EI.12 ISO# 5610-C-165 403060 LINER PLATE E-A C GEN. 4.7-030 X 03/06- General complete. Inaccessible areas DOME (GENERAL EL.II above crane rail included in this inspection.

VISUAL)

ISO# 5610-C-165

DATE: 6/15/2006 IWE Program-All Plants [IWE] - Unit 3 Page 17 REVISION: 0 IWE Results Summary Interval 1, Period 3, Outage 1 (06)

Completed Components (C, B, E, R, A)

METALLIC CONTAINMENT LINER Zone# 3-019 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ [ E I 0 E Number Identification/ ISO # Item No j Method Data Sheet Number C G M R Remarks 403070 LINER PLATE E-A C VT-3 4.7-018 X - - - 03/06- VT-3 complete. Inaccessible areas DOME (VISUAL) El.!2 above crane rail included in this inspection.

ISO# 5610-C-165 403100 LINER PLATE E-A B GEN. 4.7-001 X 03/06- General complete. per SOUTH RECIRC SUMP El.1 CR2004-15130, CR2006-7553 initiated.

ISO# 5610-C-150 403110 LINER PLATE E-A B GEN. 4.7-001 - - - X 03/06- General complete.

NORTH RECIRC SUMP ELI.11 ISO# 5610-C-150 403120 LINER PLATE E-A B GEN. 4.7-002 X - - - 03/06- General complete. per REACTOR VESSEL SUMP El.11 CR2004-15130, CR2006-7553 initiated.

ISO# 561 0-C-1 50 403130 LINER PLATE E-A B VT-3 4.7-001 - - - X 03/06-VT-3 complete per CR2004-15130.

SOUTH RECIRC SUMP E1.12 VT-3 4.7-031 X - - - Complete coating failure and heavy pitting VT-3 4.7-032 X - thru-out. CR2006-7353 initiated. Pre-grout exam per CR2006-7553 completed 3/15/06.

ISO# 5610-C-150 Final Exam complete 3/22/06 403140 LINER PLATE E-A B VT-3 4.7-001 . . . X 03/06- VT-3 Complete per CR2004-15130.

NORTH RECIRC SUMP EI.12 VT-3 4.7-032 X - - - Complete coating failure and heavy pitting thru-out. CR2006-7353 initiated. Final ISO# 5610-C-150 Exam complete 3/22/06.

403150 LINER PLATE E-A B VT-3 4.7-002 - - - X 03/06- VT-3 Complete per CR-2004-15130.

REACTOR VESSEL SUMP El.12 Complete coating failure in sump drain pit.

CR2006-7353 initiated.

ISO# 5610-C-150 403160 LINER PLATE E-C C VT-I 4.7-005 - - - X 03/06-VT-I complete. Heavy pitting SOUTH RECIRC SUMP E4.11 through out. Inspection per CR 2004-15130.

(AUGMENTED VT-I) Refer to CR2006-7353 ISO# 5610-C-150 403170 LINERPLATE E-C C VOL 5.18-006 - - - X 03/06- Volumetric Exam Complete. Heavy SOUTH RECIRC SUMP E4.12 pitting through out. Lowest reading .140".

(AUGMENTED VOL) Acceptable per Plant Engineering Evaluation. Inspection per CR 2004-15130.

ISO# 5610-C-150 Refer to CR2006-7353.

403180 LINER PLATE E-C C VT-I 4.7-004 - - - X 03/06-VT-I Complete. Heavy pitting NORTH RECIRC SUMP E4.11 thru-out. Inspection per CR 2004-15130.

(AUGMENTED VT-I) Refer to CR2006-7353.

ISO# 5610-C-150 403190 LINER PLATE E-C C VOL. 5.18-004 - - - X 03/06- Volumetric Exam Complete. Heavy NORTH RECIRC SUMP E4.12 pitting through out. Lowest reading .129".

(AUGMENTED VOL) Acceptable per Plant Engineering Evaluation. Inspection per CR 2004-15130.

ISO# 5610-C-150 Refer to CR2006-7353

TURKEY POINT UNIT 3 2006 REFUELING OUTAGE Summary of Visual Examinations and Functional Testing of Snubbers Attachment 3

BASIC-PSA, INC.

FINAL REPORT Florida Power & Light Turkey Point Nuclear Plant Unit # 3 Client's P.O. # 00081442 Rel. 003 BPI Job # FN2182 Florida Power & Light Turkey Point Nuclear Plant Unit # 3 Snubber Functional Testing & Overhauls Spring 2006 PREPARED BY: DATE:.4Z/

REVIEWED BY: DATE:___

I

CERTIFICATE OF COMPLIANCE Testing and Overhaul activities described in this Final Report were Conducted in accordance with the Project Plan PP-06-001 And the applicable requirements of Florida Power &

Light Purchase Order # 00081442 Rel. 003 a ager o Quality Assurance Date 2

CERTIFICATE OF COMPLIANCE VT-3 inspection activities described in this Final Report were conducted in accordance with the Project Plan PP-06-001 and the applicable requirements of Florida Power &

Light Purchase Order # 00081442 Rel. 003 Manager of Quality Assurance Date 3

ABSTRACT To satisfy the requirements of ASME Section XI and Turkey Point Power Plant Unit # 3 Technical Specifications, functional testing of Basic- PSA, Inc.

snubbers were performed during Turkey Point Power Plant's Unit #3 Spring 2006 Outage.

Functional tests and failure analysis were accomplished only on those snubbers designated by the Site Representative. Functional testing using Basic-PSA, Inc. (BPI) on-site mobile test equipment confirmed the required operational parameters.

All activities performed by Basic-PSA, Inc. at Turkey Point Power Plant were performed by qualified and certified individuals using calibrated tools, instruments and equipment.

4

INTRODUCTION Florida Power & Light, Turkey Point Nuclear Power Plant Unit # 3 was shut down for a scheduled outage in March, 2006. During this Outage, functional testing activities were performed by Basic-PSA, Inc. personnel in accordance with the BPI Project Plan, PP-06-001 which implemented the requirements of Turkey Point Nuclear Plant Technical Specifications and ASME Section X1.

This report summarizes the on-site activities performed by Basic-PSA, Inc.

All original data regarding functional tests and failure analysis were presented to the customers representative prior to the conclusion of the on-site activities; these documents (which are incorporated by reference), the Project Plan, the Snubber Test Reports and this summary report comprise the BPI Final Report.

Personnel performing testing activities are qualified and certified in accordance with the BPI QA manual. A copy of all personnel certifications is provided in the Project Plan.

Basic-PSA Test equipment and tools used at Turkey Point Nuclear Plant were calibrated and traceable to NIST. A copy of all calibration certificates for equipment provided by Basic-PSA, Inc. Is included in the Project Plan.

5

SCOPE OF SERVICES The original scope for testing consisted of seventy-one (71) snubbers.

These snubbers were identified by the customer as needing to be tested.

Those with a degraded condition were disassembled, re-greased, rebuilt and then as-left tested.

6

FUNCTIONAL TESTING Of the seventy-one (71) snubbers at Turkey Point Unit # 3 tested, seventy-one (71) were Basic-PSA, Inc. mechanical snubbers.

TEST RESULTS Tap Number Exam Number Serial Number Mfg./Cap. Results 3-1005 TP-06-3-1005 11931 PSA-35 HS SAT 3-1007 TP-06-3-1007 10035 PSA-35 AF SAT AL SAT 3-1008 TP-06-3-1 008 8084 PSA-35 AF SAT AL SAT 3-1011 TP-06-3-1011 12376 PSA-10 AF SAT AL SAT 3-1031 TP-06-3-1031 27086 PSA-3 HS SAT 3-1032 TP-06-3-1032 24410 PSA-1 HS SAT 3-1033 TP-06-3-1033 19328 PSA-3 HS SAT 3-1034 TP-06-3-1034 24429 PSA-1 HS SAT 3-1035 TP-06-3-1035 19330 PSA-3 HS SAT 3-1036 TP-06-3-1036 27100 PSA-3 HS SAT 3-1037 TP-06-3-1037 11922 PSA-35 HS SAT 3-1038 TP-06-3-1038 11934 PSA-35 HS SAT 3-1039 TP-06-3-1039 7782 PSA-10 HS SAT 3-1040 TP-06-3-1040 16239 PSA-10 HS SAT 3-1041 TP-06-3-1041 16234 PSA-10 HS SAT 3-1042 TP-06-3-1042 12365 PSA-10 HS SAT 3-1043 TP-06-3-1043 12377 PSA-10 HS SAT 3-1044 TP-06-3-1044 17905 PSA-10 HS SAT AF SAT 3-1045 TP-06-3-1045 10172 PSA-10 HS SAT 3-1046 TP-06-3-1046 10174 PSA-10 HS SAT 3-1047 TP-06-3-1047 16251 PSA-10 HS SAT AF SAT 3-1048 TP-06-3-1048 16238 PSA-10 HS SAT 3-1049 TP-06-3-1049 11461 PSA-10 HS SAT

.7

Tag Number Exam Number Serial Number MfQ./Cap. Results 3-1050 TP-06-3-1050 17841 PSA-10 HS SAT AF SAT 3-1051 TP-06-3-1051 16249 PSA-1 0 AF SAT 3-1052 TP-06-3-1052 16233 PSA-1 0 AF SAT 3-1053 TP-06-3-1053 2462 PSA-1 0 HS SAT 3-1054 TP-06-3-1054 16248 PSA-10 HS SAT 3-1055 TP-06-3-1055 13697 PSA-10 HS SAT 3-1057 TP-06-3-1057 27106 PSA-3 AF SAT 3-1058 TP-06-3-1058 27102 PSA-3 HS SAT 3-1060 TP-06-3-1060 19728 PSA-3 HS SAT 3-1069 TP-06-3-1069 27072 PSA-3 HS SAT 3-1070 TP-06-3-1070 27079 PSA-3 HS SAT 3-1071 TP-06-3-1071 27069 PSA-3 HS SAT 3-1072 TP-06-3-1072 27073 PSA-3 HS SAT 3-1073 TP-06-3-1073 27090 PSA-3 HS SAT 3-1074 TP-06-3-1074 27104 PSA-3 AF SAT 3-1075 TP-06-3-1075 18072 PSA-1/2 HS SAT 3-1076 TP-06-3-1076 19725 PSA-3 HS SAT 3-1077 TP-06-3-1077 16230 PSA-10 HS SAT 3-1078 TP-06-3-1078 16244 PSA-10 HS SAT 3-1079 TP-06-3-1079 10176 PSA-10 HS SAT 3-1080 TP-06-3-1080 12396 PSA-10 AF SAT AL SAT 3-1081 TP-06-3-1081 11921 PSA-35 HS SAT 3-1082 TP-06-3-1082 11932 PSA-35 HS SAT 3-1083 TP-06-3-1083 11925 PSA-35 HS SAT 3-1084 TP-06-3-1084 7000 PSA-35 AF SAT 3-1091 TP-06-3-1091 27087 PSA-3 HS SAT 3-1092 TP-06-3-1092 27105 PSA-3 HS SAT 3-1093 TP-06-3-1093 27091 PSA-3 HS SAT 3-1094 TP-06-3-1094 27092 PSA-3 AF SAT 3-1095 TP-06-3-1095 16733 PSA-1/2 AF SAT 3-1096 TP-06-3-1096 11993 PSA-1/2 HS SAT 3-1097 TP-06-3-1097 16724 PSA-1/2 HS SAT 3-1098 TP-06-3-1098 33628 PSA-1/4 AF SAT 3-1099 TP-06-3-1099 38481 PSA-1/4 HS SAT 3-1100 TP-06-3-1100 17819 PSA-1/2 AF SAT 3-1101 TP-06-3-1101 33626 PSA-1/4 HS SAT 3-1102 TP-06-3-1102 29451 PSA-1/4 HS SAT 3-1103 TP-06-3-1103 11996 PSA-1/2 HS SAT 3-1104 TP-06-3-1104 24412 PSA-1 HS SAT 3-1105 TP-06-3-1105 16134 PSA-1 AF SAT 3-1106 TP-06-3-1106 38479 PSA-1/4 HS SAT 3-1110 TP-06-3-1110 16136 PSA-1 AF SAT 8

Tag Number Exam Number Serial Number Mfg./Cap. Results 3-1111 TP-06-3-1 111 2875 PSA-3 HS SAT 3-1112 TP-06-3-1112 27083 PSA-3 HS SAT 3-1120 TP-06-3-1120 18325 PSA-1/2 HS SAT 3-1121 TP-06-3-1121 24430 PSA-1 HS SAT 3-1136 TP-06-3-1136 19884 PSA-112 HS SAT 3-1137 TP-06-3-1137 19885 PSA-1/2 HS SAT 9

SPARE SNUBBERS Eleven (11) snubbers were chosen by FP&L representative to be functionally tested to used as spares or placed in dry storage.

Exam Number Serial Mfcq./Cap. Result Location Number TP-06-SPARE-001 17906 PSA-10 SAT Replacement for Tag# 3-1047 TP-06-SPARE-002 11446 PSA-10 SAT Replacement for Tag# 3-1050 TP-06-SPARE-003 11125 PSA-10 SAT Replacement for Tag# 3-1044 TP-06-SPARE-004 3932 PSA-10 SAT Dry Storage TP-06-SPARE-005 3919 PSA-10 SAT Dry Storage TP-06-SPARE-006 20899 PSA-3 SAT Replacement for Tag# 3-1094 TP-06-SPARE-007 17905 PSA-10 N/A Dry Storage, frozen retainer nut TP-06-SPARE-008 17841 PSA-10 SAT Dry Storage TP-06-SPARE-009 16251 PSA-10 SAT Dry Storage TP-06-SPARE-010 27081 PSA-3 SAT Dry Storage TP-06-SPARE-01 1 27092 PSA-3 SAT Dry Storage 10

In summary, eighty-seven (87) functional tests were preformed. Fifty-six (56) of these were hand strokes, eighteen (18) were as found test, and thirteen (13) were as left tests. Of the thirteen (13) as left test ten (10) were spares.

NOTE: All of the above had an initial VT-3 performed.

11

MECHANICAL SHOCK ARRESTOR FINAL REPORT TURKEY POINT UNIT 3 2006 CYLCE 22 REFUELING OUTAGE Commercial Service Date: December 14, 1972 Prepared by:

Inservice Inspection Group Florida Power & Light Turkey Point Nuclear 9760 S.W. 344 St.

Florida City, FL 33035 Melba Campblell Originated by: Date

-D ate.0 Date Reviewed by: -.. 7 Riely Spillman Approved by: Ed Lyons Date Word:ptnsfo2lvo).ilcommon/frp198

Mechanical shock arrestors (snubbers) were visually inspected/handstroked and functionally tested under purchase order #00081442 by Basic-PSA personnel in accordance with the following plant procedures:

O-OSP-105.1 O-OSP-105.2 A technical specification visual inspection, ASME Section XI VT-3 and a hand stroking was performed at the following tag locations:

3-1005 3-1031 3-1032 3-1033 3-1034 3-1035 3-1036 3-1037 3-1038 3-1039 3-1040 3-1041 3-1042 3-1053 3-1054 3-1055 3-1058 3-1069 3-1070 3-1071 3-1072 3-1073 3-1075 3-1076 3-1077 3-1078 3-1079 3-1081 3-1082 3-1083 3-1091 3-1092 3-1093 3-1095 3-1096 3-1097 3-1099 3-1101 3-1102 3-1103 3-1104 3-1106 3-1111 3-1112 3-1120 3-1121 3-1136 3-1137 A technical specification visual inspection, ASME Section XI VT-3, NO HAND STROKE, and a functional test was performed at the following tag locations:

3-1057 3-1074 3-1080 3-1084 3-1095 3-1098 3-1100 3-1105 3-1110 3-1008 3-1011 3-1051 3-1052 3-1007 3-1094 Italics indicatesSR Sample snubbers Bold indicates QR Sample snubbers Underline indicates previous rebuilds The following snubbers located in the Pressurizer Cubical are separate from the sample plan. These snubbers are tested for prevented maintenance. A technical specification visual inspection, ASME Section XI VT-3 and a hand stroke was performed at the following tag locations 3-1043, 3-1045, 3-1046, 3-1048, 3-1049, and 3-1060. Upon completion of the technical specification visual inspection and an ASME Section XI VT-3 snubbers 3-1044, 3-1047, and 3-1050 were changed out with previously rebuilt and functionally tested snubbers. The removed snubbers were rebuilt and functionally tested and will be utilized as spares for future outages.

Word:ptnsfo2lvol.1common/frp198

TURKEY POINT NUCLEAR PLANT OUTAGE

SUMMARY

REPORT UNIT 3 C22 OUTAGE REPORT WO # 35014590-01 TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENTSIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1005 11931 N/A 316/2006 PASS N/A 26.25 PASS YES PASS Visual Inspection -SAT, "L7 Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (N/A IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1007 42387 NIA 3(6/2006 PASS 0306/06 PASS 42387 PASS NO N/A Visual Inspection -SAT, "L7 Dimension FUNCTIONAL TEST PERFORMED? YES acceptable. Snubber removed and transported to the test traer for a STATUS PASS (WA IF NOT PERFORMED) functional test. Functional test was SAT, Snubber was tom down and re- TENSION COMPRE-SSION CRITERIA greased and an as left functional test was performed - SAT. Load studs were TEST 1 382.1 0.0 2500.0 torqued to 125 ft. lbs., torque wrench TEST 2 884.7 781.5 2500.0

  1. M881 cal due date 5/6/06. Lubricated load pin and spherical bearings with neo- TEST 3 0.001 0.001 .02g's lube UTC # 449261. Re-Installed snubber, as-left v¶sual Inspection was TEST 4 2270.6 1268.4 2500.0 SAT.

TEST SAMPLE? NO SAMPLE CLASS N/A DATE.REINSTALLED: 03/07/06

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT SIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1008 8084 N/A 3/6/2006 PASS 03/066 PASS 27.625 PASS NO N/A Visual Inspection -SAT, "L!Dimension FUNCTIONAL TEST PERFORMED? YES acceptable. Snubber removed and transported to the test trailer for a STATUS PASS (WA IF NOT PERFORMED) functional test Functional test was SAT, Snubber was torn down and re- TENSION COMPRESSION CRITERIA greased and an as left functional test was performed - SAT. Load studs were TEST 1 59.7 295.4 2500.0 torqued to 125 ft. lbs., torque wrench TEST 2 418.4 383.6 2500.0

  1. M881 cal due date 516/06. Lubricated load pin and spherical bearings with neo- TEST 3 0.006 0.008 .02g's lube UTC # 449261. Re-installed snubber, as-left visual inspection was TEST 4 463.1 717.7 2500.0 SAT.

TEST SAMPLE? YES SAMPLE CLASS OR DATE REINSTALLED: 03/07/06 3-1011 12376 WA 3/6/2006 PASS 03/06/06 PASS 20.187 PASS NO N/A Visual Inspection -SAT, "L"Dimension FUNCTIONAL TEST PERFORMED? YES acceptable. Snubber removed and transported to the test trailer for a STATUS PASS (N/A IF NOT PERFORMED) functional test. Functional test was SAT, Snubber was tom down and re- TENSION COMPRESSION CRITERIA greased and an as left functional test was performed - SAT. Transition tube TEST 1 33.0 88.3 750.0 was torqued to 37 ft. lbs., torque wrench TEST 2 93.1 102.4 750.0 M1000 cal due date 6/28/06. Lubricated load pin and spherical bearings with neo- TEST 3 0.006 0.002 .02g's lube UTC # 449261. Re-Installed snubber, as-left visual Inspection was TEST 4 76.3 64.2 750.0 SAT.

TEST SAMPLE? YES SAMPLE CLASS OR DATE REINSTALLED: 03/07/06

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENTS/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1031 27086 N/A 3/812006 PASS N/A 18.125 PASS YES PASS Visual Inspection -SAT, 'L Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstke - SAT.

Lubricated load pin and spherical STATUS NIA (NfA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1032 24410 NIA 3/812006 PASS N/A 13.812 PASS YES PASS Visual Inspection -SAT, *L!Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1033 19328 N/A 3/8=086 PASS NIA 16.437 PASS YES PASS Vitsual Inspection -SAT, *L!Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (N/A IF NOT PERFORMED) bearig with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1034 24429 N/A 3/82006 PASS WA 13.625 PASS YES PASS Visual Inspection -SAT, 'L! Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstrcke - SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1035 19330 N/A 3/W'2006 PASS WA 16.50 PASS YES PASS Visual Inspection -SAT, "L"Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS NIA (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1036 27100 N/A 3/8/2006 PASS WA 16.250 PASS YES PASS Visual Inspection -SAT, "L"Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (NA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT SIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1037 11922 N/A 3/17/2006 PASS WA 26.75 PASS YES PASS Visual Inspection -SAT, "L"Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS N/A (N/A IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1038 42410 N/A 3/17/2006 PASS WA 26.937 PASS YES PASS Visual Inspection -SAT, 'L' Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS NIA (N/A IF NOT PERFORMED) bearing with neo-tube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS WA DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1039 7782 N/A 3/17=2006 PASS WA 19.875 PASS YES PASS Visual Inspection -SAT, PL Dimension FUNCTIONALTEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS NIA (WA IF NOT PERFORMED) bearing wIth neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS NIA DATE REINSTALLED:

3-1040 16239 NIA 3/17/2006 PASS N/A 19.875 PASS YES PASS Visual Inspection -SAT, *L Dhmension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS WA (N/A IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1041 16234 WA 3/16/2006 PASS WA 20.375 PASS YES PASS Visual Inspection-SAT, "L Dimension FUNCTIONALTEST PERFORMED? NO acceptable, handstroke- SAT.

Lubdcated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) beating with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS NIA DATE REINSTALLED:

3-1042 12365 N/A 3/16/2006 PASS WA 20.562 PASS YES PASS Visual Inspection -SAT. 'L Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENTS/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1043 17900 N/A 3/10/2006 PASS WA 21.875 PASS YES PASS Visual Inspection -SAT, "L Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1044 17905 11125 3/10/2006 PASS 03/10/06 PASS 21.250 PASS YES PASS Visual Inspection -SAT, 'L Dimension FUNCTIONAL TEST PERFORMED? YES acceptable, handstroke - SAT. Removed SIN 17905 and replaced with tested STATUS PASS (NtA IF NOT PERFORMED) spare S/N 11125. Lubricated load pin and spherical bearing with neo-lube UTC TENSION COMPRESSION CRITERIA

  1. 449261.Performed an as-left visual inspection- SAT. SIN 17905 tested SAT TEST 1 36.20 38.60 750.00 and will be stored as a spare.

TEST 2 40.10 49.70 750.00 TEST 3 0.009 0.011 .02g's TEST 4 46.80 57.00 750.00 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 03/10/06

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1045 17189 N/A 3/10/2006 PASS N/A 21.375 PASS YES PASS Visual Inspection -SAT, ILV Dimension FUNCTIONALTEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (NIA IF NOT. PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1046 17903 N/A 3/10/2006 PASS WA 20.687 PASS YES PASS Visual Inspection -SAT, "I" Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS N/A (NIA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS WA DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE .A DATE A A  ? A T T T T 3-1047 16251 17906 3/10/2006 PASS 03/10/06 PASS 20.875 PASS YES PASS Visual Inspection -SAT, "L"Dimension FUNCTIONALTEST PERFORMED? YES acceptable, handstroke - SAT. Removed S/N 16251 and replaced with tested STATUS PASS (WA IF NOT PERFORMED) spare SIN 17906. Lubricated toad pin and spherical bearing with neo-lube UTC TENSION COMPRESSION CRITERIA

  1. 449261. Performed an as4eft visual inspection. SAT S/N 16251 tested SAT TEST 1 31.50 42.60 750.0 and will be stored as a spare. TEST 2 47.00 47.70 750.0 TEST 3 0.008 0.007 .02g's TEST 4 36.90 57.50 750.0 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 03/10/06 3-1048 16238 N/A 3/10/2006 PASS N/A 19.375 PASS YES PASS Visual Inspection -SAT, "L Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG# SERIAL# REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT /N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1049 11461 NIA 3/10/2006 PASS N/A 20.50 PASS YES PASS Visual Inspection -SAT, 'L Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (N/A IF NOT PERFORMED) bearing wth neo4ube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1050 17841 11446 3110/20 PASS 03/10/0 PASS 22.00 PASS YES PASS Visual Inspection -SAT, "V Dimension FUNCTIONALTEST PERFORMED? YES acceptable, handstroke - SAT. Removed S/N 17841 and replaced with tested STATUS PASS (WA IF NOT PERFORMED) spare S/N 11446. Lubricated load pin and spherical bearing with neo-lube UTC TENSION COMPRESSION CRITERIA

  1. 449261. Performed an as-left visual Inspection-SAT. S/N 17841 tested SAT TEST 1 34.90 35.00 750.00 and will be stored as a spare. TEST 2 38.60 44.90 750.0 TEST 3 0.007 0.007 .02g's TEST 4 37.10 43.20 750.00 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 03/10/06

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1051 16249 N/A 3/16/2006 PASS 03/16/06 PASS 21.50 PASS NO N/A Visual Inspection-SAT, 'L Dimension FUNCTIONAL TEST PERFORMED? YES acceptable. Snubber removed and transported to the test trailer for STATUS PASS (NIA IF NOT PERFORMED) functional test Functional test was SAT. Snubber was torqued to extension TENSION COMPRESSION CRITERIA plece at 37 ft Ibs. (Torque wrench M814 cal due date 5/1/06). Lubricated load pin TEST 1 32.10 46.30 750.00 and spherical bearings with neo-lube TEST 2 38.90 60.70 750.00 UTC # 449261. Re-installed snubber, as-left visual inspection was SAT. TEST 3 0.010 0.010 .02g's TEST 4 41.30 64.70 750.00 TEST SAMPLE? YES SAMPLE CLASS OR DATE REINSTALLED: 03/16/06 3-1052 16233 NIA 3/16/2006 PASS 03/16/06 PASS 21.875 PASS NO N/A Visual Inspection -SAT, 1L! Dimension FUNCTIONALTEST PERFORMED? YES acceptable. Snubber removed and transported to the test trailer for STATUS PASS (WA IF NOT PERFORMED) functional test Functional test was SAT. Snubber was torqued to extension TENSION COMPRESSION CRITERIA piece at 37 ft lbs. (Torque wrench M814 cal due date 5/1/06). Lubricated load pin TEST 1 31.80 36.50 750.00 and spherical bearings with neo-lube TEST 2 33.80 45.30 750.00 UTC # 449261. Re-installed snubber, as-left visual Inspection was SAT. TEST 3 0.008 0.007 .02g's TEST 4 35.80 38.50 750.00 TEST SAMPLE? YES SAMPLE CLASS OR DATE REINSTALLED: 03/16/06

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1053 2462 N/A 3/16/2006 PASS N/A 20.437 PASS YES PASS Visual Inspection -SAT, IL Dimension FUNCTIONALTEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1054 16248 WA 3/16/2006 PASS N/A 20.375 PASS YES PASS Visual Inspection -SAT, IV Dimension FUNCTIONALTEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (N/A IF NOT PERFORMED) bearing with neo-Iube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1055 13697 WA 3/162006 PASS N/A 20.750 PASS YES PASS Visual Inspection -SAT, 'L" Dimension FUNCTIONALTEST PERFORMED? NO acceptable, handsloke - SAT.

Lubricated load pin and spherical STATUS N/A (N/A IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

31057 27106 N/A 3/11/2006 PASS 03/11/06 PASS 16.250 PASS NO N/A Visual InspecNon -SAT, 'L Dimension FUNCTIONAL TEST PERFORMED? YES acceptable. Snubber removed and transported to the test trailer for STATUS PASS (WA IF NOT PERFORMED) functional test. Functional test was SAT, ext. piece torqued to 120 in. lbs., TENSION COMPRESSION CRITERIA torque wrench M828 cal due date 8/21/06. Lubricated load pin and TEST 1 25.10 32.70 300.00 spherical bearings with neo-lube UTC #

449261. Re-installed snubber, as-left TEST 2 43.90 41.00 300.00 visual Inspection was SAT. TEST 3 0.002 0.02 .02g's TEST 4 44.90 39.30 300.00 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED: 03/12206

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT SIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1058 27102 N/A 3/1212006 PASS WA 16.1875 PASS YES PASS Visual Inspection acceptable. -SAT, -"L!

handstroke Dimension SAT. FUNCTIONAL TEST PERFORMED? NO Lubricated load pin and spherical STATUS N/A (N/A IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1060 19728 N/A 3/10/2006 PASS N/A 18.437 PASS YES PASS Visual Inspection -SAT, "ILDimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (N/A IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT SIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1069 27072 N/A 3/13/2006 PASS WA 16.625 PASS YES PASS Visual Inspection -SAT, 'L Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1070 27079 N/A 3/13/2006 PASS N/A 17.687 PASS YES PASS Visual Inspection -SAT, 'L Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1071 27069 N/A 3/11/2006 PASS N/A 15.687 PASS YES PASS Visual Inspection -SAT, "L Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

Snubber Is located is Inside bio-wall next TENSION COMPRESSION CRITERIA to RCP "C"under fuel transfer canal all the way to the left. Can be seew before TEST 1 entering transfer canal. TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS WA DATE REINSTALLED:

3-1072 27073 N/A 3/1612006 PASS N/A 16.00 PASS YES PASS Visual Inspection -SAT, 1L" Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (N/A IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL# REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1073 27090 N/A 3/14/2006 YES N/A 17.260 PASS YES PASS Visual Inspection -SAT, "L" Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1074 27104 N/A 3/12/2006 PASS 03/12/06 PASS 17.687 PASS NO N/A Visual Inspection -SAT, "L"Dimension FUNCTIONAL TEST PERFORMED? YES acceptable. Snubber removed and transported to the test traller for STATUS PASS (WA IF NOT PERFORMED) functional test. Functional test was SAT. Ext. piece torqued to 120 In. lbs., TENSION COMPRESSION CRITERIA torque wrench M828 cal due date 8/20/06. Lubricated load pin and TEST 1 38.80 24.50 300.00 spherical bearings with neo4ube UTC #

449261. Re-installed snubber. As-left TEST 2 47.30 38.70 300.00 visual inspection was SAT. TEST 3 0.002 0.003 .02g's TEST 4 39.80 33.40 300.00 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED- 03/12/06

TAG # SERIAL# REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT SIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1075 18072 WA 3/11/2006 PASS N/A 8.625 PASS YES PASS Visual Inspection -SAT, "ILDimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS WA (WAIF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1076 19725 N/A 3/11/2006 PASS N/A 18.00 PASS YES PASS Visual Inspection -SAT, "L Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3.

TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1077 16230 N/A 3/1512006 PASS N/A 20.50 PASS YES PASS Visual Inspection -SAT, "L!Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1078 16244 WA 3/15/2006 PASS N/A 20.00 PASS YES PASS Visual Inspection -SAT, "LDimension FUNCTIONALTEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS NIA (N/A IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL# REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1079 10176 N/A 3/15/2006 PASS N/A 21.93 PASS YES PASS Visual Inspection -SAT, "LV Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1080 12396 N/A 3/15/2006 PASS 03/15/06 PASS 20.812 PASS NO N/A Visual Inspection -SAT, 'L` Dimension FUNCTIONAL TEST PERFORMED? YES acceptable. Snubber removed and transported to the test trailer for STATUS PASS (NA IF NOT PERFORMED) functional test. Functional test was SAT. Snubber was torn down for re- TENSION COMPRESSION CRITERIA geasing and noted as the thrust bearing was worn, the thrust bearing was TEST 1 118.90 237.80 750.00 replaced, re-greased, as-left functional TEST 2 746.00 470.90 750.00 test- SAT. Ext. piece torqued to 137 ft.

lbs., torque wrench M814 cal due date 5- TEST 3 0.008 0.005 .02g's 1-06. Lubricated load pin and spherical bearings with neo-lube UTC # 449261. TEST 4 604.70 489.30 750.00 Re-installed snubber. As-left visual Inspection was SAT.

TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED: 03/16/06

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1081 11921 N/A 3/15/2006 PASS N/A 25.062 PASS YES PASS Visual Inspection -SAT, ILtDimension FUNCTIONALTEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS NIA (N/A IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1082 11932 N/A 3/15/2006 PASS N/A 27.31 PASS YES PASS Visual Inspection -SAT, "L"Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS NIA (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG# SERIAL# REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A 7 A T T T T 3-1083 11925 N/A 3/16/006 PASS N/A 25.250 PASS YES PASS Visual Inspection -SAT, 'L Dimension FUNCTIONALTEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1084 7000 N/A 3/8/2006 PASS 03/09/06 PASS 24.937 PASS NO N/A Visual Inspection -SAT, "L Dimension FUNCTIONAL TEST PERFORMED? YES acceptable. Snubber removed and transported to the test trailer for STATUS PASS (N/A IF NOT PERFORMED) functional test Functional test was SAT. Transition tube plate bolting TENSION COMPRESSION CRITERIA torqued to 500 ft. lbs. And load studs torqued to 125 ft. lbs., torque wrench TEST 1 294.60 79.30 2500.00 M804 cal due date 8/26406. Exdenstion TEST 2 294.60 248.70 piece torqued to 150 ft. lbs. Torque 2500.00 wrench M1000 cal due 6/28/06. TEST 3 0.004 0.004 .02g's Lubricated load pin and spherical bearings with neo-lube UTC # 449261. TEST 4 564.80 186.30 2500.00 Re-installed snubber. As-left visual Inspection was SAT. Component end was Inspected on 3/14/06 using the TEST SAMPLE? YES SAMPLE CLASS SR manbasket-SAT.

DATE REINSTALLED: 03/09/06

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1091 27087 N/A 3/1212006 PASS WA 18.812 PASS YES PASS Visual Inspection -SAT, "V Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubdcaed load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1092 27105 N/A 3/12/2006 PASS WA 17.937 PASS YES PASS Visual Inspection -SAT, "L' Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1093 27091 NIA 31122006 PAS NIA 17.375 PASS YES PASS Visual Inspection-SAT, "LW Dimension FUNCTIONALTEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1094 27081 20899 3/111/2006 PASS 03/11/06 PASS 15.00 PASS NO NIA Visual Inspection -SAT, 'L Dimension FUNCTIONAL TEST PERFORMED? YES acceptable. Removed snubber S/N 27081 and replaced with a functional STATUS PASS (NIA IF NOT PERFORMED) test spare S/N 20899, transported S/N 27081to the test trailer for functional TENSION COMPRESSION CRITERIA test Functional test was SAT.

extension piece for S/N 20899 was TEST 1 20.20 37.10 300.00 torqued to 120 in. lbs., torque wrench TEST 2 55.10 46.50 300.00 M1012 cal due date 5110/06. Lubricated load pin and spherical bearings with neo- TEST 3 0.002 0.002 .02g,s lube UTC # 449261. Re-installed snubber, as-left visual Inspection was TEST 4 40.70 46.60 300.00 SAT. Snubber is connected to extension piece with 114" alien bolts. This snubber was replaced per CR 01-1993 TEST SAMPLE? NO SAMPLE CLASS N/A supplement 1.

DATE REINSTALLED: 03/11/06

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT SIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1095 16733 N/A 32006 PASS NIA 8.62 PASS YES PASS Visual Inspection -SAT, "L' Dimension FUNCTIONALTEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST i TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1095 16733 NIA 3/15/2006 PASS 03/11506 PASS 8.750 PASS NO N/A Visual Inspection -SAT, "L'Dimension FUNCTIONAL TEST PERFORMED? YES acceptable. Snubber removed and transported to the test trailer for STATUS PASS (WA IF NOT PERFORMED) functional test Functional test was SAT. Lubricated load pin and spherical TENSION COMPRESSION CRITERIA bearings with neo-lube UTC # 449261.

Re-Installed snubber, as-left visual TEST 1 3.90 3.70 32.50 inspection was SAT, (added to scope). 3.90 32.50 TEST 2 5.60 TEST 3 0.006 0.006 .02g's TEST 4 5.70 3.80 32.50 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED: 03/15/06

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1096 11993 NIA 3/9/2006 PASS N/A 9.437 PASS YES PASS Visual Inspection -SAT, "L7 Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1097 16724 N/A 3/9/2006 PASS N/A 8.937 PASS YES PASS Visual Inspection -SAT, "L Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (N/A IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL# REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT SIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1098 33628 WA 3/8/2006 PASS 03/08/06 PASS 10.50 PASS NO N/A Visual Inspection -SAT, "L"Dimension FUNCTIONALTEST PERFORMED? YES acceptable. Snubber removed and transported to the test trailer for STATUS PASS (WA IF NOT PERFORMED) functional test. Functional test was SAT. Ext. piece torqued to 22 In.fbs., TENSION COMPRESSION CRITERIA torque wrench M835 cal due date 8/20/06. Lubricated load pin and TEST 1 3.30 2.00 17.50 spherical bearings with neo-lube UTC # TEST 2 3.60 2.90 17.50 449261. Re-Installed snubber. As-left visual inspection was SAT. TEST 3 0.013 0.013 .02o's TEST 4 4.30 2.10 17.50 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED: 03/08/06 3-1099 38481 WA 3/8/2006 PASS N/A 11.750 PASS YES PASS Visual Inspection -SAT, "V Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS WA (N/A IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT SIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1100 17819 N/A 3006 PASS 03/08/06 PASS 8.375 PASS NO N/A Visual Inspection -SAT, 'L"Dimension FUNCTIONAL TEST PERFORMED? YES acceptable. Snubber removed and transported to the test trailer for STATUS PASS (N/A IF NOT PERFORMED) functional test. Functional test was SAT. Lubricated load pin and spherical TENSION COMPRESSION CRITERIA bearings with neo-lube UTC # 449261.

Re-Installed snubber, as-left visual TEST 1 1.20 4.80 32.50 inspection was SAT. -re'- 1 0 In r An I" C TEST 3 0.012 0.012 .02g's TEST 4 2.10 3.50 32.50 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED:. 03/08/06 3-1101 33626 NIA 3/12f2006 PASS N/A 11.3125 PASS YES PASS Visual Inspection -SAT, "L' Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS WA (N/A IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENTS/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1102 29451 N/A 3/12/2006 PASS WA 11.00 PASS YES PASS Visual Inspection-SAT, "L Dimension FUNCTIONALTEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with nso-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1103 11996 WA 3/11/2006 PASS WA 8.375 PASS YES PASS Visual Inspection -SAT, "L"Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS WA (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1104 24412 N/A 3/2/2008 PASS N/A 13.50 PASS YES PASS Visual Inspection -SAT. "VL Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS WA (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

This snubber Is located outside of the TENSION COMPRESSION CRITERIA blo-wall under the transfer canal at 3 ft.

off 14 ft elevation. TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1105 16134 NIA 3/9/2006 PASS 03,09/06 PASS 12.875 PASS NO N/A Visual Inspection -SAT, "L'Dimension FUNCTIONALTEST PERFORMED? YES acceptable. Snubber removed and transported to the test trailer for STATUS PASS (WA IF NOT PERFORMED) functional test Functional test was SAT. Lubricated load pin and spherical TENSION COMPRESSION CRITERIA bearings with neo-lube UTC # 449261.

Re-installed snubber, as-left visual TEST 1 7.30 17.30 75.00 inspection was SAT.

TEST 2 8.80 21.60 75.00 TEST 3 0.008 0.009 .02gs TEST 4 9.30 15.20 75.00 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED:. 03/10106

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT SIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1106 38479 N/A 32006 PASS WA 11.250 PASS YES PASS Visual Inspection-SAT, "L" Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pln and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST I TEST2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1110 16136 N/A 3/912006 PASS 0309/06 PASS 13.062 PASS NO N/A Visual Inspection -SAT. "L!Dimension FUNCTIONAL TEST PERFORMED? YES acceptable. Snubber removed and transported to the test trailer for STATUS PASS (WA IF NOT PERFORMED) functional test Functional test was SAT. Lubricated load pin and spherical TENSION COMPRESSION CRITERIA bearings with neo-lube UTC # 449261. 5.70 75.00 TEST 1 8.60 Re-installed snubber, as-left visual Inspection was SAT. TEST 2 12.00 6.30 75.00 TEST 3 0.007 0.007 .02g's TEST 4 11.70 7.20 75.00 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED: 03/10106

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND. S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1111 2875 N/A 3/11/2006 PASS N/A 17.00 PASS YES PASS Visual Inspection -SAT, *L!Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS N/A (N/A IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS WA DATE REINSTALLED:

3-1112 27083 N/A 3/1212006 PASS N/A 16.375 PASS YES PASS Visual Inspection -SAT, "L!Dimension FUNCTIONAL TEST PERFORMED? NO acceptable. handstroke- SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS NIA DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT SIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1120 18325 N/A 3/9/2006 PASS WA 8.625 PASS YES PASS Visual Inspection-SAT, 'L"Dimnsion FUNCTIONALTEST PERFORMED? NO acceptable, handstroke- SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-Iube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1121 24430 N/A 3/912006 PASS WA 12.750 PASS YES PASS Visual Inspection -SAT, "L Dimension FUNCTIONAL TEST PERFORMED? NO acceptable, handstroke - SAT.

Lubricated load pin and spherical STATUS WA (WAIF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENTSIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1136 19884 N/A 3/11/2006 PASS N/A 8.750 N/A YES PASS Visual Inspection -SAT, 'L" Dimension FUNCTIONALTEST PERFORMED? NO acceptable. handstroke - SAT.

Lubricated load pin and spherical STATUS N/A (WA IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

3-1137 19885 N/A 3/12/2006 PASS N/A 8.687 PASS YES PASS Visual Inspection -SAT, "L!Dimension FUNCTIONALTEST PERFORMED? NO acceptable, handsthke - SAT.

Lubricated load pin and spherical STATUS N/A (N/A IF NOT PERFORMED) bearing with neo-lube UTC # 449261.

TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED-

TURKEY POINT UNIT 3 2006 REFUELING OUTAGE Summary of System Pressure Testing Attachment 4

TURKEY POINT UNIT 3 CYCLE 22 SYSTEM PRESSURE TESTING FINAL REPORT Owner: Florida Power and Light Company 700 Universe Blvd.

Juno Beach, Florida, 33408 Plant: Florida Power and Light Company Turkey Point Nuclear Power Plant Unit 3 9760 SW 34 4 " St.

Florida City, Florida, 33035 Commercial Service Date: December 14, 1972 Cycle 22 Service Dates: December 02, 2004 to April 10, 2006 Refueling Outage Dates: March 06, 2006 to April 10, 2006 Prepared By: 41. Date: S"///_/6_

Date: S-I a= O1C)

  • Reviewed By: /,- / ',i._

Date:

Approved By:

Page 1 of 9

Abstract This report details the pressure testing of selected ASME Class 1, 2 and 3 piping and components of Florida Power and Light Company's Unit 3 at the Turkey Point Nuclear Power Station. These tests were performed during Unit 3 cycle

22. The refueling outage occurred between the dates of March 06, 2006 and April 10, 2006. The complete cycle 22 was from December 02, 2004 to April 10, 2006. This pressure testing is being reported following the second outage of the first period for fourth ten-year interval for Turkey Point Unit 3.

Piping and components were selected and tested in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code "Rules for Inservice Inspection of Nuclear Power Components",

1998 Edition, 2000 addenda with specific relief as granted under 10 CFR 50.55a.

Procedures The following Florida Power and Light (FPL) procedures and documents have been implemented to provide instructional guidance for the performance of the required ASME XI pressure testing and subsequent inspections.

O-ADM-523 ASME Section XI Pressure Tests for Quality Group A, B, C Systems/Components.

3-OSP-041.25 RCS Overpressure Leak Testing 3-OSP-045.1 ASME Section XI Quality Group A Bolting Examination 3-OSP-045.2 ASME Section XI Quality Group B Bolting Examination 3-OSP-041.2 Reactor Coolant System Visual Leak Inspection and Leak Evaluation.

NDE-4.2 Visual Examination VT-2 Conducted During System Pressure Tests.

System Summary The following safety related Class 1, 2, and 3 systems, or sections thereof were pressure tested in accordance with the requirements of the 1998 Edition, 2000 addenda ASME Section XI Code.

System Name System Number Condensate Storage 18 Intake Cooling Water 19 Component Cooling Water 30 Spent Fuel Pool Cooling 33 Reactor Coolant 41 Chemical and Volume Control 47 Residual Heat Removal 50 Safety Injection 62 Safety Injection Accumulators 64 Containment Spray 68 Main Steam 72 Feedwater 74 Auxiliary Feedwater 75 Page 2 of 9

Acronyms:

ADM: Administrative AFW: Auxiliary Feedwater ASME: American Society of Mechanical Engineers CSS: Containment Spray System CST: Condensate Storage Tank CCW: Component Cooling Water CVCS: Chemical Volume Control System ECC: Emergency Containment Cooler FW: Feedwater HX: Heat Exchanger ICW: Intake Cooling Water MS: Main Steam NDE: Nondestructive Examination PWO: Plant Work Order PZR: Pressurizer RCP: Reactor Coolant Pump RCS: Reactor Coolant System RHR: Residual Heat Removal RO: Restricting Orifice RV: Relief Valve RX: Reactor SFPC: Spent Fuel Pool Cooling SI: Safety Injection SIA: Safety Injection Accumulators SG: Steam Generator XJ: Expansion Joint WO: Work Order Page 3 of 9

Test Package Development:

The specific pressure test boundaries were selected after review of the applicable plant operating diagram/code boundary drawings. The piping systems were broken into sub systems. The sub-systems were selected based on Technical Specifications operability requirements, acceptable isolation points and availability of test connections and vent valves. The sub-systems were then assigned test package numbers, which could be tested in entirety, or based on availability could be broken down further into numerous tests within the specific sub-system.

The pressure test package numbers contain six (6) segments of Information, Sample: 04-CCW-30110 -L-01 1 2 3456

1. Unit Number (00) common to both units 3 and 4. (03) Unit 3 specific and (04) Unit 4 specific.
2. System abbreviation
3. System number [First (2) digits].
4. Sub-system number [(2) or (3) digits].
5. Type of test (H) Hydrostatic, (P) Pneumatic, (L) Leakage
6. Number of test performed within the specific sub-system.

PRESSURE TESTS THAT WERE PERFORMED DURING CYCLE 22 CONDENSATE STORAGE SYSTEM (018) 03-CST-1 801 -L-01 Test Date: 11/17/2005 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

INTAKE COOLING WATER SYSTEM (19) 03-ICW-1 970-L-01 Test Date: 11/07/2005 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-lCW-19148-L-01 Test Date: 04/10/2005 This test performed due to the replacement of valve 3-50-331 and downstream elbow per WO#34020151-01. There was no leakage observed.

03-ICW-19154-L-01 Test Date: 07/01/2005 This test performed due to the replacement of valve 3-50-311 and downstream elbow per WO#33021045-01. There was no leakage observed.

Page 4 of 9

03-ICW-19155-L-01 Test Date: 09/10/2005 This test performed due to the replacement of 3A ICW pump per WO#33021045-

04. There was no leakage observed.

COMPONENT COOLING WATER SYSTEM (30) 03-CCW-30202-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-CCW-30203-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-CCW-30204-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-CCW-30205-L-01 Test Date: 12/19/2005 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-CCW-30206-L-01 Test Date: 03/13/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements.. No leakage was observed.

03-CCW-30207-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.

03-CCW-30208-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-CCW-30209-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.

03-CCW-30210-L-01 Test Date: 03/14/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-CCW-3021 1-L-01 Test Date: 02/15/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.

03-CCW-30212-L-01 Test Date: 03/08/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-CCW-30213-L-01 Test Date: 2/15/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

Page 5 of 9

SPENT FUEL PIT COOLING SYSTEM (033) 03-SFPC-3328-L-01 Test Date: 02/15/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-SFPC-3359-L-01 Test Date: 12/14/2005 This test performed due to replacement of valve 3-821 per WO#33019317-01.

There was no leakage observed during this test.

03-SFPC-3360-L-01 Test Date: 12/14/2005 This test performed due to replacement of valve 3-820 and weld branch connection to pipe per WO#35009742-01. There was no leakage observed.

REACTOR COOLANT SYSTEM (41) 03-RCS-4101-L-02 Test Date: 04/06/2006 This test involved the leakage test of the Reactor Coolant System piping inside containment following th e Unit 3 Cycle 22 Refueling Outage. This leakage test also addressed the following replacements:

Component Work Order # Description RV-3-551 A 35014302-01 Remove, install spare RV-3-551B 35014303-01 Remove, install spare RV-3-551C 35014304-01 Remove, install spare 3P200A(leak off) 33015351-03 Add new flanges to leak off line 3T237 35022747-01 Replace RVLMS adapter hub 3-298E 35019849-01 Replace valve 3-RC-2501 R-22 36008818-01 Add branch connection No leakage was observed during this test.

CHEMICAL AND VOLUME CONTROL SYSTEM (47) 03-CVCS-4747-L-01 Test Date: 12/28/2005 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-CVCS-4748-L-01 Test Date: 12/28/2005 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-CVCS-4749-L-01 Test Date: 12/28/2005 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-CVCS-4750-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-CVCS-4751-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-CVCS-4752-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

Page 6 of 9

03-CVCS-4753-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-CVCS-4780-L-01 Test Date: 06/24/2005 This test performed due to the replacement of valve 3-293B, pipe and elbow per WO#32018647-01. There was no leakage during this test.

03-CVCS-4791-L-01 Test Date: 06/24/2005 This test performed due to replacement of the 3B Charging pump block per WO#35013768-02. There was no leakage observed during this test.

RESIDUAL HEAT REMOVAL SYSTEM (050) 03-RHR-5014-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.

03-RHR-5017-L-01 Test Date: 03/22/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-RHR-5026-L-01 Test Date: 01/28/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

SAFETY INJECTION SYSTEM (62) 03-SIS-6224-L-01 Test Date: 3/11/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-SIS-6229-L-01 Test Date: 03/10/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-SIS-6230-L-01 Test Date: 02/24/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.

03-SIS-6236-L-01 Test Date: 03/12/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-SI-6243-L-01 Test Date: 03/31/2006 This test performed due to replacement of valve 3-873C per WO#36007812-01.

There was no leakage observed during this test.

SAFETY INJECTION ACCUMULATOR SYSTEM (064) 03-SIA-6402-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

CONTAINMENT SPRAY SYSTEM (068) 03-CSS-6814-L-01 Test Date: 01/31/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

Page 7 of 9

MAIN STEAM SYSTEM (072) 03-SG-7201-L-01 Test Date: 11/03/2005 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.

03-SG-7202-L-01 Test Date: 11/03/2005 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.

03-SG-7203-L-01 Test Date: 11/03/2005 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-SG-7214-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.

03-SG-7215-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-SG-7216-L-01 Test Date: 03/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.

03-SG-7217-L-01 Test Date: 02/15/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

FEEDWATER SYSTEM (74) 03-FW-7422-L-01 Test Date: 11/03/2005 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.

03-FW-7423-L-01 Test Date: 11/03/2005 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-FW-7424-L-01 Test Date: 11/03/2005 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.

03-FW-7428-L-01 Test Date: 11/03/2005 This test was performed meet the 1998 Edition 2000 Addenda of ASME to Section XI periodic pressure test requirements. No leakage was observed.

03-FW-7429-L-01 Test Date: 11/03/2005 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-FW-7430-L-01 Test Date: 11/03/2005 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.

Page 8 of 9

AUX FEEDWATER SYSTEM (75) 03-AFW-7501 -L-01 Test Date: 02/13/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section X1 periodic pressure test requirements. No leakage was observed.

03-AFW-7502-L-01 Test Date: 02/13/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-AFW-7546-L-01 Test Date: 01/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

03-AFW-7547-L-01 Test Date: 01/06/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.

03-AFW-7548-L-01 Test Date: 01/09/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section Xl periodic pressure test requirements. No leakage was observed.

03-AFW-7550-L-01 Test Date: 01/09/2006 This test was performed to meet the 1998 Edition 2000 Addenda of ASME Section XI periodic pressure test requirements. No leakage was observed.

BOLTED JOINT EXAMINATIONS The bolted joint examinations were performed in accordance with 3-OSP-045.1 for ASME Class I and 3-OSP-045.2 for ASME Class 2 and 3 components. The inspections for class 1, 2 and 3 components consisted of all insulated bolted connections. The insulation was removed for inspection. The inspections identified thirteen bolted connections that had evidence of leakage. They are listed below with the corresponding condition report number. All leakage was evaluated by engineering as required by ASME XI.

Component Condition Report Number Code Class 3-757A 2006-6080 B 3-757B 2006-6080 B 3-757C 2006-6080 B 3-757D 2006-6080 B 3-759A 2006-6341 B FCV-3-605 2006-6341 B FE-3-605 2006-6341 B FE-3-608 2006-6384 B HCV-3-758 2006-6341 B MOV-3-861 B 2006-6080 B MOV-3-862A 2006-6341 B RO-3-1468 2006-4606 B RO-3-1469 2006-6080 B Page 9 of 9