Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1)
ML11230A918
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 08/05/2011
From: Kiley M
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2011-254, OAR-1
Download: ML11230A918 (4)


Text

0 FPL.

POWERING TODAY.

AUG 0 5 2011 EMPOWERING TOMORROW L-2011-254 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-00001 Re: Turkey Point Unit 4 Docket No. 50-251 Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner's Activity Report (OAR-1)

Attached find the Owner's Activity Report (Form OAR-1), for Turkey Point Unit 4 Fourth Inservice Inspection Interval, Second Period, Third Refueling Outage (PTN 4-26). The Form OAR-i, Owner's Activity Report, implements Code Case N-532-4.

Should there be any questions concerning this report, please contact Robert J. Tomonto at 305-246-7327.

Very truly yours, Michael Kiley Vice President Turkey Point Nuclear Plant SM Attachment an FPL Group company

Attachment 1 Page 1 of 3 FORM OAR-I OWNER'S ACTIVITY REPORT Report Number: ISI-PTN-4-2011 Plant: Turkey Point Nuclear Power Plant Unit 4 P.O. Box 4332 Florida City, Florida 33032 Commercial Service Date: September 7, 1973 Refueling Outage No.: PTN 4-26 Current Inspection Interval: ISI-Fourth IWE-Second Current Inspection Period: ISI-Second IWE-First Edition and Addenda of Section XI applicable to the inspection plans: ISI-1998 Edition with Addenda through 2000 and IWE-2001 with Addenda through 2003.

Date and Revision of inspection plans: ISI-July 23, 2010 Rev .3 IWE-March 15, 2009, Rev. 0 Edition and Addenda of Section Xl applicable to repairs and replacements, if different than the inspection plan:

Same Code Cases Used: N-460. N-532-4. N-533-1. N-566-1, N-624. N-686 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of PTN 4-26 conform to the requirements of Section XI.

Signed C '- "'-',- Date ,/,"'

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Florida and employed by HSBCT of Hartford Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

  • '. -,./ Commissions /2 -127 114, C, ,,, 2) rIn'spector's Signature National Board, State, Province, and Endorsements Date /

Attachment 1 Page 2 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number D-B/D2.10 Valve 4-12-029 Thru-wall leakage on valve body

Attachment 1 Page 3 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Date Repair/Replacement Description Of Work Completed Plan Number 2 Support Replace corroded 4/17/2011 RR40006832-04 section of beam 2 Snubber Replace Snubber 4/4/2011 RR40016909-01 failed functional test 2 Pump Block Replace Pump Block 3/6/2011 RR39018415-02 Reduced Indications to acceptable limit 2 Piping found during 4/18/2011 RR40080713-01 scheduled ISI exam on a weld-o-let 4"-S1-1401-52 Reduced Indications to acceptable limit 2 Piping found during 4/18/2011 RR40078181-01 scheduled ISI exam on a weld-o-let 4"-S1-1401-53 2 Piping Replace min-wallpipe due to violations 5/4/2011 RR39023458-01 3Tank Repair Corroded 4/23/2011 RR40053145-05 Vent Pipe