MONTHYEARL-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2022-149, U4R33 Steam Generator Tube Inspection Report2022-10-0404 October 2022 U4R33 Steam Generator Tube Inspection Report L-2022-109, Inservice Inspection Program - Owner'S Activity Report (OAR-1)2022-06-27027 June 2022 Inservice Inspection Program - Owner'S Activity Report (OAR-1) L-2022-035, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II2022-03-10010 March 2022 Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II L-2022-027, Inservice Inspection Program Owner'S Activity Report (OAR-1)2022-02-17017 February 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2021-183, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 102021-09-30030 September 2021 Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 L-2021-042, Inservice Inspection Program Owner'S Activity Report (OAR-1)2021-02-15015 February 2021 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2020-126, ln-Service Inspection Program Owner'S Activity Report (OAR-1)2020-07-24024 July 2020 ln-Service Inspection Program Owner'S Activity Report (OAR-1) L-2020-074, Response to Request for Additional Information for Relief Request No. 62020-04-15015 April 2020 Response to Request for Additional Information for Relief Request No. 6 L-2020-056, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 62020-03-30030 March 2020 Fifth Ten-Year Inservice Inspection Interval Relief Request No. 6 L-2019-175, Steam Generator Tube Inspection Report2019-09-25025 September 2019 Steam Generator Tube Inspection Report ML19189A3532019-07-0808 July 2019 Inservice Inspection Program: Owner'S Activity Report (OAR-1) L-2019-018, Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-1)2019-02-0707 February 2019 Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2018-232, Metamic Inservice Surveillance Campaign Summary Report2018-12-13013 December 2018 Metamic Inservice Surveillance Campaign Summary Report L-2017-132, Inservice Inspection Program Owner'S Activity Reports2017-07-20020 July 2017 Inservice Inspection Program Owner'S Activity Reports L-2016-138, Inservice Inspection Program Owner'S Activity Report for Fifth Inservice Inspection Interval2016-07-12012 July 2016 Inservice Inspection Program Owner'S Activity Report for Fifth Inservice Inspection Interval L-2016-139, Fifth 10-Year Interval Inservice Testing Program Plan2016-07-0606 July 2016 Fifth 10-Year Interval Inservice Testing Program Plan L-2016-044, Inservice Inspection Program Owner'S Activity Report2016-02-26026 February 2016 Inservice Inspection Program Owner'S Activity Report L-2015-223, Fifth Ten-Year Interval Inservice Testing (IST) Program Relief Request No. PR-01-Resubmittal2015-09-25025 September 2015 Fifth Ten-Year Interval Inservice Testing (IST) Program Relief Request No. PR-01-Resubmittal L-2015-101, Submittal of Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 32015-06-0808 June 2015 Submittal of Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 3 L-2015-098, Fifth Ten-Year Interval Inservice Testing (IST) Program, Relief Request No. PR-012015-05-12012 May 2015 Fifth Ten-Year Interval Inservice Testing (IST) Program, Relief Request No. PR-01 L-2015-040, Submittal of Fifth 10 Year Interval Inservice Inspection (ISI) Program Plan2015-03-11011 March 2015 Submittal of Fifth 10 Year Interval Inservice Inspection (ISI) Program Plan ML15077A2142015-03-0202 March 2015 Inservice Inspection Plan - Fifth Inspection Interval, Relief Request No. 1, Revision 1 L-2015-020, Closeout of the Fourth Ten-Year Inservice Inspection (ISI) Interval Relief Requests Nos. 15, 16, 172015-02-13013 February 2015 Closeout of the Fourth Ten-Year Inservice Inspection (ISI) Interval Relief Requests Nos. 15, 16, 17 L-2015-012, Inservice Inspection Program Owner'S Activity Report (OAR-1)2015-01-16016 January 2015 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2014-105, Inservice Inspection Plan - Fifth Inspection Interval, Unit 3 Relief Request No. 1 - Response to Follow-up Request for Additional Information2014-04-14014 April 2014 Inservice Inspection Plan - Fifth Inspection Interval, Unit 3 Relief Request No. 1 - Response to Follow-up Request for Additional Information L-2014-096, Inservice Inspection Plan - Fifth Inspection Interval Unit 3 Relief Request No. 12014-04-0404 April 2014 Inservice Inspection Plan - Fifth Inspection Interval Unit 3 Relief Request No. 1 L-2014-040, Letter Regarding Inservice Testing Program-Extension of Interval for Turkey Point, Units 3 and 42014-02-13013 February 2014 Letter Regarding Inservice Testing Program-Extension of Interval for Turkey Point, Units 3 and 4 L-2013-113, Inservice Inspection Plan Submittal of Relief Request No. 122013-05-24024 May 2013 Inservice Inspection Plan Submittal of Relief Request No. 12 L-2012-435, Inservice Inspection Program Fourth Interval-Third Period-First Refueling Outage Owner'S Activity Report (OAR-1)2012-12-0303 December 2012 Inservice Inspection Program Fourth Interval-Third Period-First Refueling Outage Owner'S Activity Report (OAR-1) L-2012-214, License Renewal Commitment, Submittal of Pressurizer Surge Line Welds Inspection Program2012-05-16016 May 2012 License Renewal Commitment, Submittal of Pressurizer Surge Line Welds Inspection Program ML11361A3812012-01-27027 January 2012 Summary of the Staff'S Review of the Steam Generator Tube Inservice Inspection Refueling Outage 25 L-2011-254, Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1)2011-08-0505 August 2011 Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1) L-2011-119, Submittal of Steam Generator Tube Inspection Report2011-04-19019 April 2011 Submittal of Steam Generator Tube Inspection Report L-2011-042, Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1)2011-02-0707 February 2011 Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1) L-2010-250, Fourth Inservice Inspection Interval, Relief Request No. 9, Visual Examination of Containment Liner Repair2010-10-27027 October 2010 Fourth Inservice Inspection Interval, Relief Request No. 9, Visual Examination of Containment Liner Repair L-2010-042, Inservice Inspection Program Fourth Interval-Second Period-Second Refueling Outage Owner'S Activity Report (OAR-1)2010-02-26026 February 2010 Inservice Inspection Program Fourth Interval-Second Period-Second Refueling Outage Owner'S Activity Report (OAR-1) L-2009-167, Inservice Inspection Program Fourth Interval-Second Period-Second Refueling Outage Owner'S Activity Report (OAR-1)2009-08-0606 August 2009 Inservice Inspection Program Fourth Interval-Second Period-Second Refueling Outage Owner'S Activity Report (OAR-1) L-2008-003, Inservice Inspection Report2008-01-10010 January 2008 Inservice Inspection Report L-2007-036, Inservice Inspection Report2007-03-0808 March 2007 Inservice Inspection Report L-2006-158, Inservice Inspection Record2006-06-28028 June 2006 Inservice Inspection Record L-2006-062, Response to Request for Additional Information Regarding Steam Generator Tube Plugging Inservice Inspection Report2006-02-27027 February 2006 Response to Request for Additional Information Regarding Steam Generator Tube Plugging Inservice Inspection Report L-2005-190, 2005 Inservice Inspection Report2005-09-0808 September 2005 2005 Inservice Inspection Report L-2005-137, Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report2005-06-17017 June 2005 Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report L-2005-046, Refueling Outage Summary of Inservice Inspection Examinations.2005-02-15015 February 2005 Refueling Outage Summary of Inservice Inspection Examinations. L-2004-217, Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report2004-10-12012 October 2004 Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report L-2004-046, Inservice Inspection (ISI) Program Missing Pages from Fpl'S Letter L-2004-046, Dated March 11, 20042004-04-29029 April 2004 Inservice Inspection (ISI) Program Missing Pages from Fpl'S Letter L-2004-046, Dated March 11, 2004 L-2004-043, Submittal of Fourth 10-year Testing Interval IST Program, Revision 0, Beginning February 22, 2004 for Turkey Point Unit 3 and April 15, 2004 for Turkey Point Unit 42004-03-11011 March 2004 Submittal of Fourth 10-year Testing Interval IST Program, Revision 0, Beginning February 22, 2004 for Turkey Point Unit 3 and April 15, 2004 for Turkey Point Unit 4 L-2004-025, Transmittal of Inservice Inspection Report2004-01-30030 January 2004 Transmittal of Inservice Inspection Report 2024-01-18
[Table view] Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-061, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report L-2023-062, Cycle 33 Core Operating Limits Report2023-04-27027 April 2023 Cycle 33 Core Operating Limits Report L-2023-060, Radiological Emergency Plan, Revision 752023-04-26026 April 2023 Radiological Emergency Plan, Revision 75 L-2023-054, Submittal of Periodic Reports2023-04-12012 April 2023 Submittal of Periodic Reports L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2023-037, Annual Radioactive Effluent Release Report2023-03-0101 March 2023 Annual Radioactive Effluent Release Report L-2023-017, Radiological Emergency Plan Revision 73 and Revision 7 42023-02-17017 February 2023 Radiological Emergency Plan Revision 73 and Revision 7 4 L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-182, Emergency Response Data System (Eros) Changes2022-11-17017 November 2022 Emergency Response Data System (Eros) Changes L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-171, 10 CFR 50.59(d)(2) Summary Report2022-10-20020 October 2022 10 CFR 50.59(d)(2) Summary Report L-2022-167, Submittal of Periodic Reports2022-10-13013 October 2022 Submittal of Periodic Reports L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-149, U4R33 Steam Generator Tube Inspection Report2022-10-0404 October 2022 U4R33 Steam Generator Tube Inspection Report L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-148, Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication2022-09-16016 September 2022 Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication L-2022-151, Evacuation Time Estimate Study2022-09-15015 September 2022 Evacuation Time Estimate Study L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-109, Inservice Inspection Program - Owner'S Activity Report (OAR-1)2022-06-27027 June 2022 Inservice Inspection Program - Owner'S Activity Report (OAR-1) L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 22022-06-0909 June 2022 Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2 2024-01-25
[Table view] |
Text
FEB 2 7 2006 L-2006-062 FPL 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555
Subject:
Turkey Point Unit 3 Docket No. 50-250 Response to Request for Additional Information Regarding Steam Generator Tube Plugging Inservice InsDection Report (TAC NO. MC8112)
By letter L-2005-137 dated June 17, 2005, Florida Power & Light Company (FPL) submitted, in accordance with the requirements of Technical Specification 6.9.2, the Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report for Turkey Point Unit 3.
On December 22, 2005, the NRC Staff requested additional information needed to complete the review of the special report. The attachment to this letter provides the additional information requested.
Please contact Walter Parker at (305) 246-6632, if there are any questions.
Very truly yours, Terry 0. Jones Vice President Turkey Point Nuclear Plant OIH Attachment cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point AswV an FPL Group company
Attachment 1 to L-2006-062 Page 1 of 2 Response To Request For Additional Information Regarding Turkey Point Unit 3 Steam Generator Tube Inspection Regort NRC Question:
Attachment 1 of the inservice inspection report indicated that mechanical wear damage was identified in locations other than anti vibration bars (e.g., tube supports, top of tubesheet) in steam generator (SG) A, B, and C. Please explain the cause of these indications. If the indications are attributed to possible loose parts, please discuss whether a foreign object search and retrieval was performed in each SG and whether the loose parts were removed from the SGs. If the parts were not removed or the locations were not visually inspected, please discuss the results of any evaluations performed to ensure these parts (or suspected parts) would not result in a loss of tube integrity for the period of time between inspections.
FPL Response:
During the Unit 3 October 2004 (EOC-20) steam generator (SG) eddy current (ECT) examination, seven mechanical wear indications at locations other than anti-vibration bars were reported; three in SG 3A, two in SG 3B, and two in SG 3C. Table 1 identifies the seven mechanical wear indications and their locations in each SG.
Out of these seven mechanical wear indications reported, three wear indications were detected at broached tube support (TSP) locations that were caused by tube contact with the broached land-contact area; one in SG3A (R12, C19), one in SG3B (R33, C73), and one in SG3C (R32 C19). These indications, identified in Table 1 as TSP wear type, are not related to foreign objects, and possible loose part (PLPs) were not detected during the ECT examination. Two of these TSP wear indications were newly detected at the EOC-20 inspection. The third TSP wear indication was detected in the prior inspection and allowed to remain in service. None of the tubes exhibiting wear at TSP locations required tube plugging.
Four of the seven mechanical wear indications reported were associated with wear from foreign objects, and are identified in Table 1 as possible loose part (PLP) wear. A summary of the Condition Monitoring and Operational Assessment analysis performed for tubes associated with wear from foreign objects is provided in Attachment 2. Three of the four possible PLP wear indications were detected near the top-of-tubesheet; two in SG3A and one in SG3C. These wear indications were shallow, and PLPs were not detected during the ECT examination. A Foreign Object Search and Retrieval (FOSAR) examination was performed at the three top-of-tubesheet locations, and no foreign objects were identified. Since no PLPs were detected during the ECT examination and no foreign objects were identified during the FOSAR examination, tube integrity is not affected.
There was also a wear indication reported by ECT examination in SG3B, at the 2nd broached tube support location (02C TSP) in R07 C45. This wear indication is due to a probable loose part (seen by ECT), which could not be confirmed by visual examination due to restricted access. The wear depth was shallow [13% through-wall (TW)], and the wear rate is low based on tracking data covering 14 years of past operation. Because of the shallow measured depth, long service history without significant change in voltage, as well as the lack of physical evidence of wear to adjacent tubes, the loose part is most likely small and immobile. (1)Tube integrity is not affected. This tube remains in service and will be tracked during future inspections.
(1) Engineering Evaluation PTN-ENG-SESJ-05-006 "Condition Monitoring and Operational Assessment for the Turkey Point Unit 3 Steam Generators Based on Eddy Current Examination End of Cycle 20, October 2004, APTECH Document AES 04055412-10-2"
Attachment 1 to L-2006-062 Page 2 of 2 Table 1 PLP FOREIGN SG / TUBE LOCATION WEAR TYPE WEAR DEPTH DETECTED OBJECT in 2004? PRESENT?
SG3A R 6 C04 TSH + 1.42" PLP WEAR 11% NO NO1 SG3A R01 C05 TSC + 3.77" PLP WEAR 3% NO NO' SQ3A 0R12C19 03H -0.67" TSP WEAR 12% NO NOU SG3B j R07 C45 I 02C+0.61" l PLP WEAR l 13% l YES' NOj SG3Bl R33 C73 I 02H - 0.70" TSP WEAR 6% NO NV SG3CI R32 C19 I 03H - 0.60" I TSP WEAR 5% NO I NO6 SG3C R42 C63 TSC + 0.73" PLP WEAR 4% NO NO' 1 The wear indications above the top-of-tubesheet in SG3A R1 6 C04 and SG3C R42 C63 are both traceable to prior ECT examinations, and are attributed to the prior existence of a foreign object.
There were no PLPs detected by ECT or foreign objects confirmed by FOSAR during the 2004 examinations. The foreign objects that caused these two wear indications were likely removed by FOSAR during a prior refueling outage. Tube integrity is not an issue for these two locations.
2 In 1990, a small wire was observed next to R01 C06 (tube adjacent to R01 C05) by FOSAR but was not retrievable. The wire was not observed in the two inspections prior to 2004 with FOSAR or ECT. The current location of this foreign object is unknown. Since no PLP or foreign objects are currently present, tube integrity is not an issue for this wear indication.
3 The three hot-leg TSP wear indications are attributed to broached tube support land-contact wear and are unrelated to foreign objects. No PLPs were detected at these locations during the ECT examination.
4 A PLP was detected during the ECT examination, but the location of the wear indication in R07 C45 at the 2nd tube support was inaccessible by FOSAR. Because of the shallow measured depth, long service history without significant change in signal characteristics, as well as the lack of any wear to adjacent tubes, the PLP is most likely small and immobile and tube integrity is not affected.
NOTE: For each wear indication associated with a PLP or foreign object, the tubes directly surrounding the tube with the wear indication(s) were examined. No additional PLPs, wear indications, or foreign objects were detected during these bounding examinations.
Attachment 2 to L-2006-062 Page 1 of 3 Condition Monitoring and Operational Assessment Summary A Condition Monitoring and Operational Assessment (CMOA) was completed for this examination and documented in Engineering Evaluation PTN-ENG-SESJ-05-006 "Condition Monitoring and Operational Assessment for the Turkey Point Unit 3 Steam Generators Based on Eddy Current Examination End of Cycle 20, October 2004", with APTECH Engineering document AES 04055412-10-2, February 2005.
The CMOA provides the following evaluation results and conclusions for foreign objects left in service.
Condition Monitoring Results There were four indications detected associated with wear from foreign objects. A comparison of these wear indications with the CM structural limits is given in Figure 4-3. Three of these indications were detected at the top of tube sheet. The wear damage was shallow and there was no evidence that the loose part was still present. The other wear indication was detected at a TSP and is due to a probable loose part. All loose part wear met the NEI 97-06 structural limit performance criterion for burst and leak integrity. No tubes required to be plugged. These tubes remain in service and will be tracked during future inspections.
Operational Assessment Results Wear Rate Assessment The rates determined for wear at TSPs from the October 2001 are shown in Figure 5-5. These rates are based on two cycle calculations. Due to the limited data, the growth rates for all TSP indications (including those identified as wear from foreign object) were used to establish a wear rate by TSP contact. Lumping the apparent loose-part wear data with the other wear tube-to-TSP contact data is conservative. The average wear rate was about 2.7% TW/EFPY and a standard deviation of about 2.5% TW/EFPY. The tube exhibiting the largest wear rate was used to define the wear rate to apply in the OA. That wear rate is 8.8% TW/EFPY.
Foreign Object Assessment The FOSAR activities identified several small objects located throughout all three-S/Gs. Bounding calculations for wear were performed by FPL and the results have been incorporated in Revision 7 of the 10CFR50.59 evaluation Report. This evaluation has determined that the identified foreign objects within the secondary side of the Unit 3 S/Gs have a minimal impact on tube integrity. The most restrictive requirement for future eddy current inspection shown in Table 1 (not included in this text) of the FPL evaluation is September 2009. Therefore, foreign objects remaining in the Unit 3 S/Gs will not challenge operation through Cycle 22.
S.- I Attachment 2 to L-2006-062 Page 2 of 3 Wear from Loose Parts - PTN-3 (October2004) 100
-__Leak
_ __ Screening__
90 l ____ -- Burst Screening i -- TW Structural Limit 03 SIG A
- ~SIG B 80 ASIG C 70 60 . _
50 0.
E E 40 30 20 10
- Open Points <0.5 volts
'Solid Points = > 0.5 volts I I . I I 0
).0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 Axial Degradation Length, L (in) l'isurc 4 Condition Monitoriniv Results ror Loose Part Wear at EOC 20.
Attachment 2 to L-2006-062 Page 3 of 3 16 -- 1.0 0.9 14
--0.8 12 0.7 10 a
0
. 8 LL U..
0.6 2-
_ 0.4 6
0.3U 4
2 0.1 0 __ -0.0
-3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Wear Rate, WR (%TWIEFPY)
Figure 5-5 -Wcar Rates at T.SP Tube Intersections from PTN-3 October 2001 I xamination Data.
I' _
FPL FEB 2 7 2006 L-2006-064 10 CFR 50.36 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 2005 Annual Report of Reactor Coolant Specific Activity Limits In accordance with Technical Specification 6.9.1.2 the reactor coolant specific activity limits of 1OO/E-bar microcuries per gram of gross radioactivity, and 1.0 microcurie per gram Dose Equivalent 1-131 defined by Technical Specification 3.4.8 for Units 3 and 4, were not exceeded during 2005.
Should there be any questions regarding this information, please contact us.
Very truly yours, Terry 0. Jones Vice President Turkey Point Nuclear Plant SM NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.