17 2005 FPL L-2005-137 10 CFR 50.36 Dr. William D. Travers Regional Administrator U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, S. W., Suite 23T85 Atlanta, GA 30303 Re:
Turkey Point Unit 3 Docket No. 50-250 Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report In accordance with Turkey Point Technical Specification 4.4.5.5.b, the subject Special Report is submitted pursuant to Technical Specification 6.9.2 for Turkey Point Unit 3 as a result of the End of Cycle 20 (EOC 20) inservice inspection of steam generator tubes.
The Turkey Point Unit 3 Steam Generators (SGs) were inspected from October 5, 2004, through October 14, 2004. No tubes required plugging as a result of this examination. Tube plugging for each steam generator is summarized in the following table.
Turkey Point Unit 3 Steam Generator Tube Plu ging Steam Generator SG 3A SG 3B SG 3 Prior Tubes Plugged 47 69 53 EOC 20 Tubes Plugged 0
0 0
Total Tubes Plugged 47 69 53 The number and extent of tubes examined is 100% of all inservice tubes in row 3 and higher, in SGs 3A, 3B and 3C from tube end to tube end using bobbin coil technique. The bobbin coil technique was also used to examine the hot leg and cold leg straight sections of Rows 1 and 2 in all three SGs. The motorized rotating pancake coil techniques (Plus Point) were used to examine 100% of the hot leg tube expansion transitions in SGs 3A, 3B, 3C from 3 inches above to 2 inches below the secondary face of the hot leg tubesheet. Additional Plus Point examinations were.
performed in approximately 50% of the Row 1 and Row 2 U-bends and in approximately 50% of the hot leg straight section dings/dents and approximately 50% of the U-bend region dings/dents.
This is shown in Attachment 1 under "Total Tubes Inspected" on the attached "Form NIS-BB OWNERS' DATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS." The location and percent of wall thickness penetration of the indications is also summarized on the attached form under "Location Indications." Mechanical wear damage was sized using qualified sizing techniques. There were no corrosion type indications reported during this examination.
an FPL Group company
I L-2005-137 Attachments 2, 3, and 4, indication reports for steam generators 3A, 3B and 3C respectively were used as source documents for preparation of the "Form NIS-BB."
Should there be any questions, please contact Walter Parker, Licensing Manager at (305) 246-6632.
Very truly yours, Terry O. ones Vice President Turkey Point Nuclear Plant SM Attachment cc:
USNRC, Document Control Desk, Washington, D.C.
Senior Resident Inspector, USNRC, Turkey Point Plant
ATTACHMENT I
~FR I~BONERST TIONRRSULTST rgu4je'py he
.D*
tR.--
-L
-;initialt 7
like "s, 1.7V DR 'qq i,!,
- amid, yj Bq. T
,N6 9 PLANT:
Turkey Point Unit 3 EXAMINATION DATE:
October 5, 2004 to October 14, 2004 TOTAL TOTAL TOTAL TUBES TUBES TOTAL STEAM TUBES TUBES TUBES PREVENTIVELY PLUGGED PLUGGED GENERATOR INSPECTED 20%-39%
Z40%. PIT & VOL PLUGGED (PTP)
THIS TUBES OUTAGE IN S/G 3E210A (Bobbin) 3167 3o) 0 0
0 See RPC 3E210B (Bobbin) 3145 CI1 0
0 O See RPC 3E210C (Bobbin) 3161 16(1) 0 0
0 See RPC 3E210A (RPC) 3167 p) 0 0
0 0
47 3E210B (RPC) 314 5p) 0 0
0 0
69 3E210C (RPC) 3161p) 0 0
0 0
53 LOCATION OF INDICATIONS (20% - 100%. PIT & VOL. WAR,PLP, SVI)
Tube Tube Freespan Top of Top of Total Total STEAM AVB Supports Supports 6H thru 6C Tubesheet Tubesheet Indications Indications GENERATOR Bars 1 thru 6 1 thru 6 UBEND to #1 to #1 20%-39%
k40 %. PIT CIL WL Support CA.
Support WL
& VOL 3E210A (Bobbin) 3(1 0
0 0
0 3ci 0
3E210B (Bobbin) 6mu 0
0 0
0 0
6rn 0
3E210C (Bobbin) 22l1 0
0 0
0 0
22(1) 0 3E210A(RPC) 0 0
0 0
.)
0 0
0 3E210B (RPC) 0 0
0 0
0 0
0 3E210C (RPC) 00 0
0 0
0 0
0 LOCATION OF INDICATIONS Turbe Tube Freespan Top of Top of Total Total STEAM AVB Supports Supports 6H thru 6C Tubesheet Tubesheet Indications Indications GENERATOR Bars 1 thru 6 I thru 6 UBEND to#1 to #1 1%-19%
1%-39%
CJL
.F. HIL*
Support CIL Support HAL Left In Service 3E210A (Bobbin) 14m 0
0 0
0 See RPC See RPC 3E210B (Bobbin) 24(1) 0 0
0
- 0.
0 See RPC See RPC 3E210C (Bobbin) 67(l) 0 0
0 0
0 See RPC See RPC 3E210A (RPC) 0 0
1 0
.ILO m
1n.fl 17,mr2 2 0(irn 3E2108 (RPC) 0 tm 1m 0
0 0
26(am
__32__x 3E210C (RPC) 0 0
1r 0
n 0
69(ix2) 911v)
Remarks:
- 1.
MechanIcal wear damage at antl-vibration bars (AVB) was depth sized using qualified bobbin coil sizing technIque.
- 2.
Mechanical wear damage at locations other than anti-vibration bars (AVB) *as depth sized using qualifed Plus Point rotating coil sizing technique.
- 3.
Indudes tubes In the dent, low row U-bend. hot leg and cold leg tubesheet expanslon transition programs.
4..
ATTACHMENT 2 Turkey Point Unit 3: S/G A Total Tubes with Bobbin 1-19% TWD.
ROW COL VOLTS DEG CHN IND STW LOCATION EXT EXT UTrL 1 UTIL 2 24 10 0.31 147 P 2 TWD 9 AV4
-0.26 TEC TEN 31 13 0.23 46 P 2 TWD 10 AV1
+0.23 TEC TEH 33 15 0.39 154 P 2 TWD 25 AY3
+0.00 TEC TEH 34 31 0.48 65 P 2 TWD 16 AV2
-0.02 TEC TEN 31 41 0.31 102 P 2 TWD 11 AV4
+0.00 TEC TEH 33 43 0.29 83 P 2 TWD 11 AV2
-0.21 TEC TEH 22 44 0.28 100 P 2 TWD 10 AV4
-0.16 TEC TEH 31 44 0.73 112 P 2 TWD 18 AV3
+0.34 TEC TEN 0.36 59 P 2 TWD 10 AV3
-0.36 TEC TEH 28 59 0.63 58 P 2 TWD 16 AV3
-0.31 TEC TEN 0.36 103 P 2 TWO 10 AV4
+0.00 TEC TEN 9
62 0.37 85 P 2 TWD 10 AV4
+0.22 TEC TEN 38 65 0.63 56 P 2 TWD 16 AV3
-0.10 TEC TEH 25 67 0.30 86 P 2 TWD 8 AV2
-0.43 TEC TEH CAL # LEG 30 HOT 27 HOT 27 HOT 22 HOT 20 HOT 20 HOT 20 HOT 21 HOT 21 HOT 9
HOT 9
HOT 13 HOT 9
HOT 9
HOT PROBE 720UL 720UL 720UL 720UL 720UL 72OUL 720UL 720UL 72OUL 720UL 720UL 7200L 720UL 720UL Total Tubes
- 12 Total Records: 14 Turkey Point Unit 3: SIG A Total Tubes-with Bobbin 20-39% TWD.
ROW COL VOLTS DEG CNN IND *TW LOCATION EXT EXT USIL 1 USIL 2 CAL I LEG PROBE 37 47 1.49 e9 P 2 TWD 29 AV3 40.10 TEC TEH 11 HOT 720UL 30 52 0.86 103 P 2 TWD 21 AV3
-0.19 TEC TEH 11 HOT 720UL 28 59 0.91 85 P 2 TWO 21 AV2
-0.38 TEC TEH 9
HOT 720UL Total Tubes : 3 Total Records: 3 Turkey Point Unit 3: SIG A Total Tubes with Bobbin 40-100% TWD, PIT and VOL.
ROW COL VOLTS DEG CNN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL f LEG PROBE 0
_~~~~~~~~~
.__. _.....__.__l_
Total Tubes
- 0 Total Records: O Turkey Point Unit 3: S/G A Total Tubes with Bobbin PTP.
ROW COL VOLTS DEG CNN IND STW LOCATION EXT EXT UTIL 1 UTIL 2 CAL I LEG PROBE Total Tubes
- 0 Total Records: 0 Turkey Point Unit 3: SIG A Total Tubes with RPC 1-19% TWD.
ROW COL VOLTS DEG CHN IND STW LOCATION EXT EXT TIL 1 UTIL 2 CAL I LEG PROBE 16 4
0.33 106 P S WAR 11 TSH 41.42 TSH TSH 969101 72 NOT 720PP 1
5 0.08 93 P S WAR 3 TSC
+3.77 TSC TSC 969101 2
COLD 720PP 12 19 0.31 90 P S WAR 10 03H
-0.67 03H 03H 969101 65 HOT 720PP Total Tubes
- 3 Total Records: 3 Turkey Point Unit 3: S/G A Total Tubes with RPC 20-391 TWD.
ROW COL VOLTS DEG CNN IND %TW LOCATION EXT EXT UTIL 1-UTIL 2 CAL I LEG PROBE aas ~
aS
,a.=5 5
Total Tubes
- 0 Total Records: 0 PTP - Preventative Tube Plug TWD -
Through Wall Depth WAR -
Wear I*
ATTACHMENT 3 Turkey Point Unit 3: SIG B Total Tubes with Bobbin 1-19%TWD.
ROW COL VOLTS 26 20 0.47 34 20 0.55 32 27 0.38 17 31 0.33 0.18 34 31 0.28 0,65 0.53 34 33 0.49 41 34.0.37 44 37 0.19 30 42 0.51 0.86 45 46 0.49 40 47 0.56 45 49 0.26 34 52 0.41 34 53 0.50 42 53 0.38 0.50 0.33 34 59 0.53 0.34 34 73 0.34 DEC 149 28 38 132 136 127 82 97 58 33 115 45 56 70 116 0
73 122 94 47 53 54 61 43 CHN IND %TW P 2 TWD 16 P 2 TWO 18 P 2 TWO 10 P 2 TWO 9 P 2 TWO S P 2 TWD 7 P 2 TWO 16 P 2 TWD 13 P 2 TWO 17 P 2 TWO 10 P 2 TWO 9 P 2 TWO 13 P 2 TWO 19 P 2 TWO 17 P 2 TWD 14 P 2 TWOI P 2 TWO 10 P 2 TWD 12 P 2 TWO 10 P 2 TWO 12 P 2 TWDO P 2TWD 19 P 2 TWO 13 P 2 TWO 13 LOCATION EXT EXT UTIL 1 UTIL 2 AV4 40.00 TEC TER AV3
-0.59 TEC TER AV2
-0.05 TEC TER AV3
-0.52 TEC TER AV4
-0.19 TEC TEH AV4
-0.05 TEC TEH AV3
+0.00 TEC TEN AV2
-0.05 TEC TER AV3
-0.05 TEC TEN AV2 40.05 TEC TEH AV4 40.13 TEC TER AVI
+0.00 TEC TER AV2
+0.02 TEC TEN AV2
-0.07 TEC TER AV3
+0.19 TEC TEN AV4
-0.12 TEC TEN AV4
-0.09 TEC TEH AV3
-0.42 TEC TEH AV4
-0.12 TEC TEN AV3
+0.26 TEC TEH AV3
-0.14 TEC TEH AV2
-0.16 TEC TER AV4
-0.16 TEC TEH AV2
-0.32 TEC TEH CAL I LEG 56 HOT 56 HOT 38 8OT 44 HOT 44 HOT 38 HOT 38 HOT 38 HOT 37 HOT 40 HOT 39 HOT 41 HOT 41 HOT 42 NOT 35 NOT 33 HOT 33 HOT 33 HOT 33 HOT 33 HOT 33 HOT 32 HOT 32 HOT 27 HOT PROBE 720UL 720UL 720UL 7200L 720UL 720UL 720UL 7200L 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 7200L 720UL 720UL 720UL 720UL Total Tubes
- 17 Total Records: 24 Turkey Point Unit 3: S/G B Total Tubes with Bobbin 20-39% TWO.
.ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT DTIL 1 0TIL 2 CAL
- LEG PROBE 30 42 1.17 114 P 2 TWO 24 AV3 p0.10 TEC TEN 41 HOT 720UL 0.96 89 V 2 TWO 21 AV4
-0.22 TEC TEN 41 NOT 720UL 35 48 0.61 79 P 2 TWD 20 AV2
-0.09 StC TEN 34 HOT 7200L 0.72 96 P 2 TWO 23 -AV3 40.14 TEC TEN 34 NOT 720UL 34 53 0.91 103 P,2 TWO 20'Avl
+0.07 TEC TEN 33 NOT 720UL 1.03 100 P 2 TWO 22 AV2
+0.12 TEC TEH 33 HOT 720UL Total Tubes
- 3 Total Records: 6 Turkey Point Unit 3: SIG B Total Tubes with Bobbin 401 TS8, PIT and VOL.
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL 8 LEG PROBE
.n..
Total Tubeas
- 0 Total Records: 0 Turkey Point Unit 3: S/G B Total Tubes with Bobbin PTP.
ROW COL VOLTS DEG CNN IND ITW LOCATION EXT. EXT UTIL 1.01IL 2 CAL f LEG PROBE
- s.
_._m.
-l s
s n.. l Total Tubes
- 0 Total Records: 0 Turkey Point Unit 3: SIG B Total Tubes with RPC 1-19% TWO.
ROW COL VOLTS DEG 7
45 0.24 0
33 73 0.07 0
CNN IND %TW LOCATION EXT EXT UTIL 1 TIL 2 CAL 4 LEG PROBE P 5 WAR 13 02C
+0.61 02C 02C 969101 1
COLD 720YP P 5 WAR 6 02H
-Q.70 02H 02H-969101 64 HOT 720PP Total Tubes
- 2 Total Records: 2 pTP - Preventative Tube Plug TWD -
Through Wall Depth WAR -
Wear 4
ATTACHMENT 3 continued Turkey Point Unit 3: S/G B Total Tubes with RPC 20-391 TWD.
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL f LEG PROBE Total Tubes
- 0 Total Records: 0 Turkey Point Unit 3: S/G B Total Tubes with RPC PTP.
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL J LEG PROBE
____-l__
Total Tubes
- 0 Total Records: 0 PTP -
Preventative Tube Plug TWD - Through Wall Depth WAR - Wear i
ATTACHMENT 4 Turkey Point Unit 3: SIG C Total Tubes with Bobbin 1-19% TWD.
ROW COL VOLTS DEG CNN IND ITW LOCA 24 11 0.25 85 P2 TWO 7 AV4 31 15 0.34 76 P 2 TWO 9 AV1 30 18 0.44 131 P2 TWD 12 AV1 38 25 0.34 66 P 2 TWO 10 AV3 40 25 0.78 94 P2TWO 19 AV3 0.51 90 P2TWO 14 AV2 18 26 0.30 32 P2TWO 12 AV2 39 28 0.23 42 P2TWO 11 AV4 30 30 0.39 67 P2TWD 11 AV4 0.29 146 P2TWO 9 AV3 0.25 132 P 2 TWO 7 AV2 0.29 38 P 2 TWO 9 AV1 30 31 0.71 74 P2TWD 18 AV3 0.59 126 P2TWD 16 AV2 0.57 72 P2TWD 15 AVI 33 31 0.24 148 P 2 TWO 11 AV2 34 31 0.77 101 P2TWD 19 AV2 42 31 0.51 44 P2TWD 14 AV3 33 32 0.29 55 P2TWO 13 AV4 0.44 128 P2TWDO18 AV2 43 33 0.41 44 P2TWO 12 AV3 35 35 0.50 71 P2TWDO14 AV3 43 35 0.28 69 P2TWO 9 AV3 21 38 0.38 75 P2TWO 19 AV3 33 38 0.28 145 P 2 TWO 15 AV3 24 43 0.19 134 P2TWD 6 AV2 34 44 0.54 47 P2TWD 15 AV4 0.48 118 P2TWO 14 AV3 40 44 0.25 57 P2TWO 13 AV3 23 45 0.33 157 P 2 TWO 10 AV3 30 45 0.20 46 P2TWO 11 AV2 33 45 0.23 108 P2TWO 7 AV2 34 45 0.23 31 P2TWO 13 AV2 33 46 0.26 37 P2TWD 8 AV3 40 46 0.19 113 P2TWO 11 AV4 26 49 0.24 116 P2TWD 12 AV3
- 35
- 49. 0.64 51 P 2 TWD 17 AV4 35 51 0.39 135 P2 TWO 17 AV2 34 52 0.26 144 P 2 TWO 12 AV3 35.52 0.41 115 P 2 TWO 12 AV3 45 52 0.17 92 P2TWD 8 AV4 35 54 0.45 50 P2TWD 13, AV2 0.25 58 P2TWD8 AV1
.39 54 0.45 79 P 2 TWO 13 AV3 0.31 108 P 2 TWO 9 AV4 33 55 0.35 115 P2TWD 10 AV3 39 55 0.47 45 P2TWO 13 AV2 36 56 0.26 50 P 2 TWO 12 AV3 24 57 0.41 53 P2 TWO 18: AV2 26 58 0.42 61 P2TWO 18 AV3 24 59 0.26 94 P2TWD 8 AV3 0.43 28 P2TWD 12 AV2 0.43 124 P 2 TWO 12 AV1 28 60 0.29 85 P2TWD 13 AV2 30 60 0.21 38 P2TWO 10 AV2 43 60 0.11 268 P2TWD 5 AV2 30 61 0.30 50 P2TWO 13 AV4 38 61 0.38 143 P2TWD 17 AV2 21 62 0.33 31 P2TWO 10 AV1 0.25 48 P2TWD 7 AV2 25 62 0.70 94 P2TW S
17 AV3 0.61 49 P2TWO 16 AV2 24 63 0.48 58 P 2TWD 19 AV2 38 63 0.45 38 P2TWO 18 AV2 38 65 0.73 110 P2TWO 18 AV2 0.42 132 P 2 TWO 12 AV3 38 66 0.32 96 P2TWO 14 AV3 PION EXT EXT UTIL 1 UTIL 2
+0.00 TEC TER
+0.02 TEC TEN
-0.31 TEC TEH
-0.11 TEC TEN
-0.11 TEC TER
-0.04 TEC TEN
-0.09 TEC TEH
+0.00 TEC TEN
+0.09 TEC TEH
-0.11 TEC TEH
+0.18 TEC TEH
-0.02 TEC TER
+0.02 TEC TEH
+0.09 TEC TER
-0.35 TEC TEH
+0.00 TEC TEH
+0.00 TEC TER
-0.07 TEC TEH
+0.00 TEC TEN
+0.37 TEC TEN
-0.04 TEC TEH
+0.07 TEC TEH
+0.09 TEC TER
+0.00 TEC TEN
+0.00 TEC TEH
-0.24 TEC TEN
-0.07
- .TEC TEN
-0.02 TEC TEH
-0.09 TEC TEN
+0.33 TEC TEN
'+0.07 TEC TER
-0.29 TEC TEN
+0.02 TEC TEH
+0.00 TEC TEN
+0.05 TEC TEH
-0.07 TEC TEH
+0.02 TEC TEN
,-'0.20 TEC TEH
+0.00 TEC TEN
-0.15 TEC TER
+0.17 TEC TEN
-0.18 TEC TEH
+0.07 TEC TEN
-0.13 TEC TEH
-0.09 TEC TEN
-0.18 TEC TEN
+0.00 TEC TEN
+0.11 TEC TEH
+0.00 TEC TEN
-0.13 TEC TEN
-0.18 TEC TEN
-0.04 TEC TEN
+0.00 TEC TEN
-0.22 TEC TEN
-0.04 TEC TEN
+0.07 TEC TEN
+0.13 TEC TEN
+0.04 TEC TEH
-0.07 TEC TEH
-0.09 TEC TEH
+0.02 TEC TEN
-0.11 TEC TEN
+0.04 TEC TER
+0.17 TEC TEH
+0.07 TEC TEN' a0.02 TEC TEH
+0.07 TEC TEH CAL I LEG 3
HOT 5
HOT 5
HOT 9
HOT 9
HOT 9
HOT 14 HOT 10 HOT 9
HOT 9
HOT 9
HOT 9
HOT 9
HOT 9
HOT 9
HOT 10 HOT 9
HOT 9
HOT 10 HOT 10 HOT 9
HOT 11 HOT 11 HOT 12 HOT 12 HOT 11 HOT 11 HOT 11 HOT 12 HOT 11 HOT 12 HOT 11 HOT 12 HOT 11 NOT 12 HOT 23 HOT 22 HOT 23 HOT 23 NOT 22' HOT 23 HOT 22 HOT 22 HOT 22 HOT 22 HOT 24 NOT 22 HOT 25 HOT 25 HOT 25 HOT 24 HOT 24 HOT 24 HOT 25 HOT 25 NOT 25 MOT 25 HOT 25 HOT 24 HOT 24 HOT 24 NOT 24 HOT 25 HOT 25 HOT 24 HOT 24 HOT 25 HOT PROBE 720UL 720UL 720UL 720UL 72OUL 720VL 720UL 720UL 720UL 720UL 72OUL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720VL 720UL 720UL 720UL 720UL 7200L 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 72OUL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 72OUL 7200UL 7200L 720UL 72OUL 72OUL 720UL 720UL 720UL 720UL 7200L 720UL 720UL 720UL 720UL 720UL 720UL Total Tubes
- 52 Total Records: 67 PTP - Preventative Tube Plug TWO - Through Wall Depth WAR -
Wear I
A
ATTACHMENT 4 continued
.T~brkey Point Unit 3: S/G C Total Tubes with Bobbin 20-39% TWO.
ROW COL VOLTS 37 33 34 33 35 21 34 33 30 28 40 26 30 24 38 38 2e 31 31 32 36 38 41 43 45 48 55 58 61 63 65 71 0.65 0.59 1.10 0.53 0.57 0.46 0.52 0.97 1.01 0.99 0.95 0.91 0.60 0.41 1.18 0.58 0.92 0.54 0.81 0.69 0.93 0.73 DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL I LEG PROBE 77 P 2 TWO 23 AV4
+0.00 TEC TER 10 HOT 720UL 104 P 2 TWO 22 AV3
-0.02 TEC TEH 10 HOT 720UL 102 P 2 TWO 24 AV3
-0.02 TEC TER 9
HOT 720UL 123 P 2 TWD 20 AV3
+0.22 TEC TER 10 HOT 720UL 54 P 2 TWO 24 AV2
+0.11 TEC TER 12 HOT 720UL 146 P 2 TWO 21 AV3
-0.07 TEC TEN 12 HOT 720UL 78 P 2 TWO 23 AV2
+0.00 TEC TER 12 HOT 720UL 94 P 2 TWO 23 AV1
+0.04 TEC TEN 11 HOT 720UL 96 P 2 TWO 23 AV2
-0.18 TEC TER 11 HOT 720UL 97 P 2 TWO 23 AV3
-0.09 TEC TEN 11 HOT 720UL 108 P 2 TWO 22 AV4
+0.02 TEC TEN 11 HOT 7200L 71 P 2 TWD 32 AV3
-0.33 TEC TEN 12 HOT 720UL 94 P 2 TWD 25 AV2
+0.20 TEC TEN 12 HOT 720UL 105 P 2 TWO 20 AV3
-0.02 TEC TEN 12 HOT 720UL 97 P 2 TWO 33 AV2
+0.18 TEC TER 23 HOT 720UL 64 P 2 TWO 23 AV3
+0.09 TEC TEN 23 HOT 720UL 93 P 2 TWO 29 AV2
+0.13 TEC TER 25 HO 720UL 86 P 2 TWO 21 AVI
+0.00 TEC TEN 25 HOT 720UL 118 P 2 TWO 27 AV2
+0.00 TEC TEN 25 HOT 720UL 96 P 2 TWO 25 AV3
-0.02 TEC TER 25 HOT 720UL 86 P 2 TWO 21 AV4
-0.04 TEC TER 24 HOT 720UL 126 P 2 TWO 26 AV3
-0.02 TEC TEN 31 HOT 720UL Total Tubes
- 16 Total Records: 22 Turkey Point Unit 3: S/G C Total Tubes with Bobbin 40-100% TWO, PIT and VOL.
ROW COL VOLTS DEG CHN INO %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL I LEG PROBE
- s.
Total Tubes'
- 0 Total Records: 0 Turkey Point Unit 3: S/G C Total Tubes with Bobbin PTP.
,ROW COL VOLTS DEG CHN IOD %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL f LEG PROBE Total Tubes
- 0 Total Records: 0 Turkey Point Unit 3: S/G C Total Tubes with RPC 1-19% TWO.
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL I LEG PROBE
.s..-
32 19 0.11 134 P 5 WAR 5 03H
-0.60 03H 03H 969101 68 HOT 720PP 42 63 0.10 0
P 5 WAR 5 TSC 40.73 TSC TSC 969101 14 COLD 720PP Total Tubes
- 2 Total Records: 2 Turkey Point Unit 3: S/I C Total Tubes with RPC 20-39% TWO.
ROW COL VOLTS DEG CNN IND %TW LOCATION EXT EXT UT5L 1 PSIL 2 CAL I LEG PROBE Total Tubes
- 0 Total Records:
0 PSP -
Preventative Tube Plug TWO -
Through Wall Depth WAR -
Wear