17 2005 FPL L-2005-137 10 CFR 50.36 Dr. William D. Travers Regional Administrator U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, S. W., Suite 23T85 Atlanta, GA 30303 Re: Turkey Point Unit 3 Docket No. 50-250 Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report In accordance with Turkey Point Technical Specification 4.4.5.5.b, the subject Special Report is submitted pursuant to Technical Specification 6.9.2 for Turkey Point Unit 3 as a result of the End of Cycle 20 (EOC 20) inservice inspection of steam generator tubes.

The Turkey Point Unit 3 Steam Generators (SGs) were inspected from October 5, 2004, through October 14, 2004. No tubes required plugging as a result of this examination. Tube plugging for each steam generator is summarized in the following table.

Turkey Point Unit 3 Steam Generator Tube Plu ging Steam Generator SG 3A SG 3B SG 3 Prior Tubes Plugged 47 69 53 EOC 20 Tubes Plugged 0 0 0 Total Tubes Plugged 47 69 53 The number and extent of tubes examined is 100% of all inservice tubes in row 3 and higher, in SGs 3A, 3B and 3C from tube end to tube end using bobbin coil technique. The bobbin coil technique was also used to examine the hot leg and cold leg straight sections of Rows 1 and 2 in all three SGs. The motorized rotating pancake coil techniques (Plus Point) were used to examine 100% of the hot leg tube expansion transitions in SGs 3A, 3B, 3C from 3 inches above to 2 inches below the secondary face of the hot leg tubesheet. Additional Plus Point examinations were.

performed in approximately 50% of the Row 1 and Row 2 U-bends and in approximately 50% of the hot leg straight section dings/dents and approximately 50% of the U-bend region dings/dents.

This is shown in Attachment 1 under "Total Tubes Inspected" on the attached "Form NIS-BB OWNERS' DATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS." The location and percent of wall thickness penetration of the indications is also summarized on the attached form under "Location Indications." Mechanical wear damage was sized using qualified sizing techniques. There were no corrosion type indications reported during this examination.

an FPL Group company

I .

L-2005-137 Attachments 2, 3, and 4, indication reports for steam generators 3A, 3B and 3C respectively were used as source documents for preparation of the "Form NIS-BB."

Should there be any questions, please contact Walter Parker, Licensing Manager at (305) 246-6632.

Very truly yours, Terry O. ones Vice President Turkey Point Nuclear Plant SM Attachment cc: USNRC, Document Control Desk, Washington, D.C.

Senior Resident Inspector, USNRC, Turkey Point Plant

ATTACHMENT I

. ~FR' I~BONERST TIONRRSULTST

... ',...* rgu4je'py he .D* tR.-- -L

-;initialt 7 like "s,1.7V i,!, amid, DRyj'qqBq.T

,N69 PLANT: Turkey Point Unit 3 EXAMINATION DATE: October 5, 2004 to October 14, 2004 TOTAL TOTAL TOTAL TUBES TUBES TOTAL STEAM TUBES TUBES TUBES PREVENTIVELY PLUGGED PLUGGED GENERATOR INSPECTED 20%-39% Z40%. PIT & VOL PLUGGED (PTP) THIS TUBES OUTAGE IN S/G 3E210A (Bobbin) 3167 3o) 0 0 0 See RPC 3E210B (Bobbin) 3145 0 CI1 0O See RPC 3E210C (Bobbin) 3161 16(1) 0 0 0 See RPC 3167 3E210A (RPC) p) 0 0 0 0 47 314 5 3E210B (RPC) p) 0 0 0 0 69 3E210C (RPC) 3161p) 0 0 . 0 0 53 LOCATION OF INDICATIONS

_ (20% - 100%. PIT & VOL. WAR,PLP, SVI)

Tube Tube Freespan Top of Top of Total Total STEAM AVB Supports Supports 6H thru 6C Tubesheet Tubesheet Indications Indications GENERATOR Bars 1 thru 6 1 thru 6 UBEND to #1 to #1 20%-39% k4 0 %. PIT CIL WL Support CA. Support WL &VOL 3

3E210A (Bobbin) 3(1 0 0 0 0 ci 0 3E210B (Bobbin) 6mu 0 0 0 0 0 6rn 0 3E210C (Bobbin) 22l1 0 0 0 0 0 22(1) 0 3E210A(RPC) 0 0 0 0 .) 0 0 0 3E210B (RPC) 0 0 0 0 0 0 0 3E210C (RPC) 00 0 0 0 0 0 0 LOCATION OF INDICATIONS Turbe Tube Freespan Top of Top of Total Total STEAM AVB Supports Supports 6H thru 6C Tubesheet Tubesheet Indications Indications GENERATOR Bars 1thru 6 I thru 6 UBEND to#1 to #1 1%-19% 1%-39%

CJL .F. HIL* Support CIL Support HAL Left In

._ Service 14 3E210A (Bobbin) m 0 . 0 0 0 See RPC See RPC 3E210B (Bobbin) 24(1) 0 0 0 . 0. 0 See RPC See RPC 67 3E210C (Bobbin) (l) 0 0 0 0 0 See RPC See RPC 17 2 3E210A (RPC) 0 0 1 0 .ILO m 1n.fl ,mr2 0(irn 3E2108 (RPC) 0 tm 1m 0 0 0 26(am __32__x 69 3E210C (RPC) 0 0 1r 0 n 0 (ix2) 911v)

Remarks:

1. MechanIcal wear damage at antl-vibration bars (AVB) was depth sized using qualified bobbin coil sizing technIque.
2. Mechanical wear damage at locations other than anti-vibration bars (AVB) *as depth sized using qualifed Plus Point rotating coil sizing technique. *, .
3. Indudes tubes In the dent, low row U-bend. hot leg and cold leg tubesheet expanslon transition programs.

4..

ATTACHMENT 2 Turkey Point Unit 3: S/G A Total Tubes with Bobbin 1-19% TWD.

ROW COL VOLTS DEG CHN IND STW LOCATION EXT EXT UTrL 1 UTIL 2 CAL # LEG PROBE 24 10 0.31 147 P 2 TWD 9 AV4 -0.26 TEC TEN 30 HOT 720UL 31 13 0.23 46 P 2 TWD 10 AV1 +0.23 TEC TEH 27 HOT 720UL 33 15 0.39 154 P 2 TWD 25 AY3 +0.00 TEC TEH 27 HOT 720UL 34 31 0.48 65 P 2 TWD 16 AV2 -0.02 TEC TEN 22 HOT 720UL 31 41 0.31 102 P 2 TWD 11 AV4 +0.00 TEC TEH 20 HOT 720UL 33 43 0.29 83 P 2 TWD 11 AV2 -0.21 TEC TEH 20 HOT 72OUL 22 44 0.28 100 P 2 TWD 10 AV4 -0.16 TEC TEH 20 HOT 720UL 31 44 0.73 112 P 2 TWD 18 AV3 +0.34 TEC TEN 21 HOT 720UL 0.36 59 P 2 TWD 10 AV3 -0.36 TEC TEH 21 HOT 72OUL 28 59 0.63 58 P 2 TWD 16 AV3 -0.31 TEC TEN 9 HOT 720UL 0.36 103 P 2 TWO 10 AV4 +0.00 TEC TEN 9 HOT 720UL 9 62 0.37 85 P 2 TWD 10 AV4 +0.22 TEC TEN 13 HOT 7200L 38 65 0.63 56 P 2 TWD 16 AV3 -0.10 TEC TEH 9 HOT 720UL 25 67 0.30 86 P 2 TWD 8 AV2 -0.43 TEC TEH 9 HOT 720UL Total Tubes  : 12 Total Records: 14 Turkey Point Unit 3: SIG A Total Tubes-with Bobbin 20-39% TWD.

ROW COL VOLTS DEG CNN IND *TW LOCATION EXT EXT USIL 1 USIL 2 CAL I LEG PROBE 37 47 1.49 e9 P 2 TWD 29 AV3 40.10 TEC TEH 11 HOT 720UL 30 52 0.86 103 P 2 TWD 21 AV3 -0.19 TEC TEH 11 HOT 720UL 28 59 0.91 85 P 2 TWO 21 AV2 -0.38 TEC TEH 9 HOT 720UL Total Tubes : 3 Total Records: 3 Turkey Point Unit 3: SIG A Total Tubes with Bobbin 40-100% TWD, PIT and VOL.

ROW COL VOLTS DEG CNN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL f LEG PROBE

  • .__ 0 _~~~~~~~~~ .. ... _ .__. _.....__.__l_ . .,_. _____.___..

Total Tubes  : 0 Total Records: O Turkey Point Unit 3: S/G A

  • Total Tubes with Bobbin PTP.

ROW COL VOLTS DEG CNN IND STW LOCATION EXT EXT UTIL 1 UTIL 2 CAL I LEG PROBE Total Tubes :0 Total Records: 0 Turkey Point Unit 3: SIG A Total Tubes with RPC 1-19% TWD.

ROW COL VOLTS DEG CHN IND STW LOCATION EXT EXT TIL 1 UTIL 2 CAL I LEG PROBE 16 4 0.33 106 P S WAR 11 TSH 41.42 TSH TSH 969101 72 NOT 720PP 1 5 0.08 93 P S WAR 3 TSC +3.77 TSC TSC 969101 2 COLD 720PP 12 19 0.31 90 P S WAR 10 03H -0.67 03H 03H 969101 65 HOT 720PP Total Tubes  : 3 Total Records: 3 Turkey Point Unit 3: S/G A Total Tubes with RPC 20-391 TWD.

ROW COL VOLTS DEG CNN IND %TW LOCATION EXT EXT UTIL 1-UTIL 2 CAL I LEG PROBE aas ~ aS 5 . ,a .=5 Total Tubes  : 0 Total Records: 0 PTP - Preventative Tube Plug TWD - Through Wall Depth WAR - Wear I*

ATTACHMENT 3 Turkey Point Unit 3: SIG B Total Tubes with Bobbin 1-19%TWD.

ROW COL VOLTS DEC CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL I LEG PROBE 26 20 0.47 149 P 2 TWD 16 AV4 40.00 TEC TER 56 HOT 720UL 34 20 0.55 28 P 2 TWO 18 AV3 -0.59 TEC TER 56 HOT 720UL 32 27 0.38 38 P 2 TWO 10 AV2 -0.05 TEC TER 38 8OT 720UL 17 31 0.33 132 P 2 TWO 9 AV3 -0.52 TEC TER 44 HOT 7200L 0.18 136 P 2 TWO S AV4 -0.19 TEC TEH 44 HOT 720UL 34 31 0.28 127 P 2 TWD 7 AV4 -0.05 TEC TEH 38 HOT 720UL 0,65 82 P 2 TWO 16 AV3 +0.00 TEC TEN 38 HOT 720UL 0.53 97 P 2 TWD 13 AV2 -0.05 TEC TER 38 HOT 7200L 34 33 0.49 58 P 2 TWO 17 AV3 -0.05 TEC TEN 37 HOT 720UL 41 34 .0.37 33 P 2 TWO 10 AV2 40.05 TEC TEH 40 HOT 720UL 44 37 0.19 115 P 2 TWO 9 AV4 40.13 TEC TER 39 HOT 720UL 30 42 0.51 45 P 2 TWO 13 AVI +0.00 TEC TER 41 HOT 720UL 0.86 56 P 2 TWO 19 AV2 +0.02 TEC TEN 41 HOT 720UL 45 46 0.49 70 P 2 TWO 17 AV2 -0.07 TEC TER 42 NOT 720UL 40 47 0.56 116 P 2 TWD 14 AV3 +0.19 TEC TEN 35 NOT 720UL 45 49 0.26 0 P 2 TWOI AV4 -0.12 TEC TEN 33 HOT 720UL 34 52 0.41 73 P 2 TWO 10 AV4 -0.09 TEC TEH 33 HOT 720UL 34 53 0.50 122 P 2 TWD 12 AV3 -0.42 TEC TEH 33 HOT 720UL 42 53 0.38 94 P 2 TWO 10 AV4 -0.12 TEC TEN 33 HOT 720UL 0.50 47 P 2 TWO 12 AV3 +0.26 TEC TEH 33 HOT 7200L 0.33 53 P 2 TWDO AV3 -0.14 TEC TEH 33 HOT 720UL 34 59 0.53 54 P 2TWD 19 AV2 -0.16 TEC TER 32 HOT 720UL 0.34 61 P 2 TWO 13 AV4 -0.16 TEC TEH 32 HOT 720UL 34 73 0.34 43 P 2 TWO 13 AV2 -0.32 TEC TEH 27 HOT 720UL Total Tubes  : 17 Total Records: 24 Turkey Point Unit 3: S/G B Total Tubes with Bobbin 20-39% TWO.

.ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT DTIL 1 0TIL 2 CAL

  • LEG PROBE 30 42 1.17 114 P 2 TWO 24 AV3 p0.10 TEC TEN 41 HOT 720UL 0.96 89 V 2 TWO 21 AV4 -0.22 TEC TEN 41 NOT 720UL 35 48 0.61 79 P 2 TWD 20 AV2 -0.09 StC TEN 34 HOT 7200L 0.72 96 P 2 TWO 23 -AV3 40.14 TEC TEN 34 NOT 720UL 34 53 0.91 103 P,2 TWO 20'Avl +0.07 TEC TEN 33 NOT 720UL 1.03 100 P 2 TWO 22 AV2 +0.12 TEC TEH 33 HOT 720UL Total Tubes  : 3 Total Records: 6 Turkey Point Unit 3: SIG B Total Tubes with Bobbin 401 TS8, PIT and VOL.

ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL 8 LEG PROBE

.n.. . ._.....__.... _...._........... .. _..._

Total Tubeas : 0 Total Records: 0 Turkey Point Unit 3: S/G B Total Tubes with Bobbin PTP.

ROW COL VOLTS DEG CNN IND ITW LOCATION EXT. EXT UTIL 1.01IL 2 CAL f LEG PROBE

.. - -l s.

_._m. . ..... s... .. - n.. l _.._

Total Tubes :0 Total Records: 0 . .

Turkey Point Unit 3: SIG B -

Total Tubes with RPC 1-19% TWO.

ROW COL VOLTS DEG CNN IND %TW LOCATION .. EXT EXT UTIL 1 TIL 2 CAL 4 LEG PROBE 7 45 0.24 0 P 5 WAR 13 02C +0.61 02C 02C 969101 1 COLD 720YP 33 73 0.07 0 P 5 WAR 6 02H -Q.70 02H 02H- 969101 64 HOT 720PP Total Tubes : 2 Total Records: 2 pTP - Preventative Tube Plug TWD - Through Wall Depth ,

WAR - Wear 4

ATTACHMENT 3 continued Turkey Point Unit 3: S/G B Total Tubes with RPC 20-391 TWD.

ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL f LEG PROBE Total Tubes :0 Total Records: 0 Turkey Point Unit 3: S/G B Total Tubes with RPC PTP.

ROW COL VOLTS DEG CHN IND %TWLOCATION EXT EXT UTIL 1 UTIL 2 CAL J LEG PROBE

............ ____-l__

Total Tubes :0 Total Records: 0 PTP - Preventative Tube Plug TWD - Through Wall Depth WAR - Wear i

ATTACHMENT 4 Turkey Point Unit 3: SIG C Total Tubes with Bobbin 1-19% TWD.

ROW COL VOLTS DEG CNN IND ITW LOCA PION EXT EXT UTIL 1 UTIL 2 CAL I LEG PROBE 24 11 0.25 85 P2 TWO 7 AV4 +0.00 TEC TER 3 HOT 720UL 31 15 0.34 76 P 2 TWO 9 AV1 +0.02 TEC TEN 5 HOT 720UL 30 18 0.44 131 P2 TWD 12 AV1 -0.31 TEC TEH 5 HOT 720UL 38 25 0.34 66 P 2 TWO 10 AV3 -0.11 TEC TEN 9 HOT 720UL 40 25 0.78 94 P2TWO 19 AV3 -0.11 TEC TER 9 HOT 72OUL 0.51 90 P2TWO 14 AV2 -0.04 TEC TEN 9 HOT 720VL 18 26 0.30 32 P2TWO 12 AV2 -0.09 TEC TEH 14 HOT 720UL 39 28 0.23 42 P2TWO 11 AV4 +0.00 TEC TEN 10 HOT 720UL 30 30 0.39 67 P2TWD 11 AV4 +0.09 TEC TEH 9 HOT 720UL 0.29 146 P2TWO 9 AV3 -0.11 TEC TEH 9 HOT 720UL 0.25 132 P 2 TWO 7 AV2 +0.18 TEC TEH 9 HOT 72OUL 0.29 38 P 2 TWO 9 AV1 -0.02 TEC TER 9 HOT 720UL 30 31 0.71 74 P2TWD 18 AV3 +0.02 TEC TEH 9 HOT 720UL 0.59 126 P2TWD 16 AV2 +0.09 TEC TER 9 HOT 720UL 0.57 72 P2TWD 15 AVI -0.35 TEC TEH 9 HOT 720UL 33 31 0.24 148 P 2 TWO 11 AV2 +0.00 TEC TEH 10 HOT 720UL 34 31 0.77 101 P2TWD 19 AV2 +0.00 TEC TER 9 HOT 720UL 42 31 0.51 44 P2TWD 14 AV3 -0.07 TEC TEH 9 HOT 720UL 33 32 0.29 55 P2TWO 13 AV4 +0.00 TEC TEN 10 HOT 720UL 0.44 128 P2TWDO18 AV2 +0.37 TEC TEN 10 HOT 720UL 43 33 0.41 44 P2TWO 12 AV3 -0.04 TEC TEH 9 HOT 720UL 35 35 0.50 71 P2TWDO14 AV3 +0.07 TEC TEH 11 HOT 720VL 43 35 0.28 69 P2TWO 9 AV3 +0.09 TEC TER 11 HOT 720UL 21 38 0.38 75 P2TWO 19 AV3 +0.00 TEC TEN 12 HOT 720UL 33 38 0.28 145 P 2 TWO 15 AV3 +0.00 TEC TEH 12 HOT 720UL 24 43 0.19 134 P2TWD 6 AV2 -0.24 TEC TEN 11 HOT 720UL 34 44 0.54 47 P2TWD 15 AV4 -0.07 *.TEC TEN 11 HOT 7200L 0.48 118 P2TWO 14 AV3 -0.02 TEC TEH 11 HOT 720UL 40 44 0.25 57 P2TWO 13 AV3 -0.09 TEC TEN 12 HOT 720UL 23 45 0.33 157 P 2 TWO 10 AV3 +0.33 TEC TEN 11 HOT 720UL 30 45 0.20 46 P2TWO 11 AV2 '+0.07 TEC TER 12 HOT 720UL 33 45 0.23 108 P2TWO 7 AV2 -0.29 TEC TEN 11 HOT 720UL 34 45 0.23 31 P2TWO 13 AV2 +0.02 TEC TEH 12 HOT 720UL 33 46 0.26 37 P2TWD 8 AV3 +0.00 TEC TEN 11 NOT 720UL 40 46 0.19 113 P2TWO 11 AV4 +0.05 TEC TEH 12 HOT 720UL 26 49 0.24 116 P2TWD 12 AV3 -0.07 TEC TEH 23 HOT 720UL

  • 35 49. 0.64 51 P 2 TWD 17 AV4 +0.02 TEC TEN 22 HOT 72OUL 35 51 0.39 135 P2 TWO 17 AV2 ,-'0.20 TEC TEH 23 HOT 720UL 34 52 0.26 144 P 2 TWO 12 AV3 +0.00 TEC TEN 23 NOT 720UL 35 .52 0.41 115 P 2 TWO 12 AV3 -0.15 TEC TER 22' HOT 720UL 45 52 0.17 92 P2TWD 8 AV4 +0.17 TEC TEN 23 HOT 720UL 35 54 0.45 50 P2TWD 13, AV2 -0.18 TEC TEH 22 HOT 720UL 0.25 58 P2TWD8 AV1 +0.07 TEC TEN 22 HOT 720UL

.39 54 0.45 79 P 2 TWO 13 AV3 -0.13 TEC TEH 22 HOT 720UL 0.31 108 P 2 TWO 9 AV4 -0.09 TEC TEN 22 HOT 720UL 33 55 0.35 115 P2TWD 10 AV3 -0.18 TEC TEN 24 NOT 720UL 39 55 0.47 45 P2TWO 13 AV2 +0.00 TEC TEN 22 HOT 720UL 36 56 0.26 50 P 2 TWO 12 AV3 +0.11 TEC TEH 25 HOT 720UL 24 57 0.41 53 P2 TWO 18: AV2 +0.00 TEC TEN 25 HOT 720UL 26 58 0.42 61 P2TWO 18 AV3 -0.13 TEC TEN 25 HOT 720UL 24 59 0.26 94 P2TWD 8 AV3 -0.18 TEC TEN 24 HOT 72OUL 0.43 28 P2TWD 12 AV2 -0.04 TEC TEN 24 HOT 7200UL 0.43 124 P 2 TWO 12 AV1 +0.00 TEC TEN 24 HOT 7200L 28 60 0.29 85 P2TWD 13 AV2 -0.22 TEC TEN 25 HOT 720UL 30 60 0.21 38 P2TWO 10 AV2 -0.04 TEC TEN 25 NOT 72OUL 43 60 0.11 268 P2TWD 5 AV2 +0.07 TEC TEN 25 MOT 72OUL 30 61 0.30 50 P2TWO 13 AV4 +0.13 TEC TEN 25 HOT 720UL 38 61 0.38 143 P2TWD 17 AV2 +0.04 TEC TEH 25 HOT 720UL 21 62 0.33 31 P2TWO 10 AV1 -0.07 TEC TEH 24 HOT 720UL 0.25 48 P2TWD 7 AV2 -0.09 TEC TEH 24 HOT 720UL 25 62 0.70 94 P2TWS 17 AV3 +0.02 TEC TEN 24 NOT 7200L 0.61 49 P2TWO 16 AV2 -0.11 TEC TEN 24 HOT 720UL 24 63 0.48 58 P 2TWD 19 AV2 +0.04 TEC TER 25 HOT 720UL 38 63 0.45 38 P2TWO 18 AV2 +0.17 TEC TEH 25 HOT 720UL 38 65 0.73 110 P2TWO 18 AV2 +0.07 TEC TEN' 24 HOT 720UL 0.42 132 P 2 TWO 12 AV3 a0.02 TEC TEH 24 HOT 720UL 38 66 0.32 96 P2TWO 14 AV3 +0.07 TEC TEH 25 HOT 720UL Total Tubes : 52 Total Records: 67

. I PTP - Preventative Tube Plug TWO - Through Wall Depth WAR - Wear A

ATTACHMENT 4 continued

.T~brkey Point Unit 3: S/G C Total Tubes with Bobbin 20-39% TWO.

ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL I LEG PROBE 37 2e 0.65 77 P 2 TWO 23 AV4 +0.00 TEC TER 10 HOT 720UL 33 31 0.59 104 P 2 TWO 22 AV3 -0.02 TEC TEH 10 HOT 720UL 34 31 1.10 102 P 2 TWO 24 AV3 -0.02 TEC TER 9 HOT 720UL 33 32 0.53 123 P 2 TWD 20 AV3 +0.22 TEC TER 10 HOT 720UL 35 36 0.57 54 P 2 TWO 24 AV2 +0.11 TEC TER 12 HOT 720UL 0.46 146 P 2 TWO 21 AV3 -0.07 TEC TEN 12 HOT 720UL 21 38 0.52 78 P 2 TWO 23 AV2 +0.00 TEC TER 12 HOT 720UL 34 41 0.97 94 P 2 TWO 23 AV1 +0.04 TEC TEN 11 HOT 720UL 1.01 96 P 2 TWO 23 AV2 -0.18 TEC TER 11 HOT 720UL 0.99 97 P 2 TWO 23 AV3 -0.09 TEC TEN 11 HOT 720UL 0.95 108 P 2 TWO 22 AV4 +0.02 TEC TEN 11 HOT 7200L 33 43 0.91 71 P 2 TWD 32 AV3 -0.33 TEC TEN 12 HOT 720UL 0.60 94 P 2 TWD 25 AV2 +0.20 TEC TEN 12 HOT 720UL 30 45 0.41 105 P 2 TWO 20 AV3 -0.02 TEC TEN 12 HOT 720UL 28 48 1.18 97 P 2 TWO 33 AV2 +0.18 TEC TER 23 HOT 720UL 40 55 0.58 64 P 2 TWO 23 AV3 +0.09 TEC TEN 23 HOT 720UL 26 58 0.92 93 P 2 TWO 29 AV2 +0.13 TEC TER 25 HO 720UL 0.54 86 P 2 TWO 21 AVI +0.00 TEC TEN 25 HOT 720UL 30 61 0.81 118 P 2 TWO 27 AV2 +0.00 TEC TEN 25 HOT 720UL 24 63 0.69 96 P 2 TWO 25 AV3 -0.02 TEC TER 25 HOT 720UL 38 65 0.93 86 P 2 TWO 21 AV4 -0.04 TEC TER 24 HOT 720UL 38 71 0.73 126 P 2 TWO 26 AV3 -0.02 TEC TEN 31 HOT 720UL Total Tubes  : 16 Total Records: 22 Turkey Point Unit 3: S/G C Total Tubes with Bobbin 40-100% TWO, PIT and VOL.

ROW COL VOLTS DEG CHN INO %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL I LEG PROBE


_- s. .-..... . - --- __ - ------

Total Tubes' : 0 Total Records: 0 Turkey Point Unit 3: S/G C Total Tubes with Bobbin PTP.

,ROW COL VOLTS DEG CHN IOD %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL f LEG PROBE Total Tubes  : 0 Total Records: 0 Turkey Point Unit 3: S/G C Total Tubes with RPC 1-19% TWO.

ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL I LEG PROBE

_ __ _ .--- ._ . . . .s..-

32 19 0.11 134 P 5 WAR 5 03H -0.60 03H 03H 969101 68 HOT 720PP 42 63 0.10 0 P 5 WAR 5 TSC 40.73 TSC TSC 969101 14 COLD 720PP Total Tubes  : 2 Total Records: 2 Turkey Point Unit 3: S/I C Total Tubes with RPC 20-39% TWO.

ROW COL VOLTS DEG CNN IND %TW LOCATION EXT EXT UT5L 1 PSIL 2 CAL I LEG PROBE Total Tubes  : 0 Total Records: 0 PSP - Preventative Tube Plug TWO - Through Wall Depth WAR - Wear