L-2008-003, Inservice Inspection Report

From kanterella
Jump to navigation Jump to search
Inservice Inspection Report
ML080220439
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 01/10/2008
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2008-003
Download: ML080220439 (282)


Text

{{#Wiki_filter:JAN 1 0 2008 L-2008-003 FPL 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Unit 3 Docket No. 50-250 Inservice Inspection Report Attached are the Executive Summary and the following reports for Turkey Point Unit 3 in accordance with the provisions of the ASME Code, Section XI: Form NIS-1 Owners' Report for Inservice Inspections Form NIS-2 Owners' Report for Repairs or Replacements Summary of Inservice Inspection Examinations Summary of Inservice Inspection IWE Examinations Summary of Visual Examinations and Functional Testing of Snubbers Summary of System Pressure Testing Summary of Inservice Inspection IWL Examinations Should there be any questions concerning this report, please contact Paul Infanger at 305-246-6632. .William J erson, r. Vice President Turkey Point Nuclear Plant SM Attachments cc: Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant an FPL Group company

TURKEY POINT PLANT UNIT 3 2007 REFUELING OUTAGE INSERVICE INSPECTION REPORT Executive Summary This Inservice Inspection report is for the 2007 Turkey Point Unit 3 refueling outage. This was the first outage of the second period of the fourth 10-year interval. Inservice examinations consisted of augmented Feedwater ultrasonic examinations on the A, B and C Steam Generator Feedwater nozzles, adjacent piping, and fittings. Also examined were selected components from the Reactor Pressure Vessel, Reactor Coolant System, Chemical & Volume Control System, Residual Heat Removal System, Safety Injection System, Main Feedwater System, Main Steam System, "C" Reactor Coolant Pump, Steam Generator "A" & "C" Primary Side, Steam Generator "B" Secondary Side, Component Cooling Water System, Auxiliary Feedwater System and Intake Cooling Water System. The attached Inservice Inspection summary tables detail the examinations performed during the outage. The examinations credited to the Fourth Interval are detailed in Attachment 1 and Table 1. This outage completed the first period of the fourth 10-year interval. 'The NIS-2 forms document the repair and replacement activities that have taken place since the previous Unit 3 submittal, and those performed during the 2007 refueling outage. IWE examinations were performed on the containment liner this outage. This outage completed the first 10-year interval work. Preservice examinations were performed in areas of coating repairs to the containment metallic liner and moisture barrier seal. Details can be found in Attachment 2 for examination scope and results. Snubber visual examinations and functional tests were conducted in accordance with ASME Section XI and Turkey Point Plant Technical Specifications. Details of examination scope and results can be found in Attachment 3, Summary of Visual Examinationsand FunctionalTesting ofSnubbers. System pressure testing was conducted in accordance with the requirements of ASME Section XI and Turkey Point Technical Specifications. Details of test boundaries and results can be found in Attachment 4, Summary of System Pressure Testing The 3 5 th year Containment IWL examination was performed between 1/8/2007 to 3/27/2007. Details can be found in Attachment 5 for examination scope and results.

TURKEY POINT UNIT 3 2007 REFUELING OUTAGE

i FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS Page 1 of 5

1. Owner: Florida Power and Light Company 700 Universe Blvd.

Juno Beach, Florida 33408

2. Plant: Florida Power & Light Company Turkey Point Nuclear Power Plant 9760 SW 344 Street Florida City, Florida 33035
3. Plant Unit: 3 4. Owner Certificate of Authorization (if required): NLA
5. Commercial Service Date: December 14, 1972 6. National Board Number for Unit: N/A
7. Components Inspected:

Component or Manufacturer or Manufacturer or State or National Board Appurtenance Installer No. Province No. No. Reactor Pressure Babcock and N/A N-160 Vessel VseWicx610-0116 Wilcox Pressurizer Westinghouse 3T200 N/A N-720 Regenerative Heat N/A N/A Exchanger Westinghouse 3 E200 Reactor Coolant N/A N/A N/A System Bechtel Reactor Coolant 3-618J713 N/A N/A Pump C Westinghouse 2S76P499 Safety Injection Bechtel N/A N/A N/A System Residual Heat Removal Syst Bechtel N/A N/A N/A Removal System Steam Generator 16A-5885-1, 2 & 3 A, B and C Westinghouse FSGT-3001, 3002 & N/A N/A 3003 Main Steam Bechtel N/A N/A N/A System Main Feedwater Bechtel N/A N/A N/A System Auxiliary Bechtel N/A N/A N/A Feedwater Chemical and Bechtel N/A N/A N/A Volume Control Component Bechtel N/A N/A N/A Cooling Water Intake Cooling Bechtel N/A N/A N/A Water B

FORM NIS-1 Report Page 2 of 5 Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit: a Owner Certificate of Authorization (if required) N/.A Commercial Service Date: December 14. 1972 National Board Number for Unit: N/A

8. Examination Dates: from 4/11/2006to 10/15/2007
9. Inspection Period Identification: Second Period, from 02/22/2007 to 02/21/2011
10. Inspection Interval Identification: Fourth Interval, from 02/22/2004 to 02/21/2014
11. Applicable Edition of Section XI: 1998 Edition, 2000 Addenda, (I WE/IWL) 1992/1992 Addenda
12. Date/Revision of Inspection Plan: September 22, 2006 Rev. 1.
13. Abstract of examinations and test. Include a list of examinations and tests and a statement concerning status of work required for the inspection plan.

Inservice Examination of selected Class 1, 2 and 3 components and piping systems of Florida Power and Light's (FPL) Turkey Point Unit 3 were performed during the 2006 Refueling Outage. This cycle began on 4/11/2006 and ended 10/15/2007. This was the first outage of the second period of the fourth 10-year interval. The components and piping systems examined were selected in accordance with the Fourth Ten-Year Inservice Inspection Program. The inspection plans include an alternative to the examination and Pressure Test requirements of Table IWB-2500-1, Category B-F and B-J piping welds, as defined in American Society of Mechanical Engineers (ASME) Section XI 1998 Edition with Addenda through 2000. This alternative implements a risk informed inspection program for the examination selection for the Class 1, Category B-F and B-J piping welds in lieu of the requirements of Table IWB-2500-1. The alternative Plan allows examination selection for Unit 3 to be in accordance with "Florida Power & Light Turkey Point Unit 3 Risk-Informed Inservice Inspection Program." Manual ultrasonic, visual, magnetic particle and liquid penetrant non-destructive methods were used to examine components, piping, and their supports. FPL personnel supported by Washington Group International personnel performed the examinations. Details can be found in Attachment. 1 and Table 1, Turkey Point Unit 3 Inservice Inspection, for examination scope, results, and percentages completed. Snubber visual examinations and functional testing were conducted in accordance with ASME Section XI and Turkey Point Technical Specifications. Basic-PSA, Inc supplied examination and testing services. Details of examination scope and results can be found in Attachment 3 Summary of Visual Examinations and FunctionalTesting ofSnubbers.

FORM NIS-1 Report Page 3 of 5 Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit: 3 Owner Certificate of Authorization (if required) N/A Commercial Service Date : December 14, 1972 National Board Number for Unit: N/A FPL visual examiners conducted system pressure testing in accordance with the requirements of ASME Section XI and Turkey Point Technical Specifications. Details of test boundaries and results can be found in Attachment 4, Summary of System Pressure Testing. IWE examinations were performed on the containment liner, moisture barrier seal and penetrations this outage. This was the last outage of the third period of the First 10-year interval. Preservice examinations were performed in areas of coating repairs to the containment metallic liner and moisture barrier seal. Details of examination scope and results can be found in Attachment 2. The 3 5,h year Containment IWL examination was performed between 1/8/2007 to 3/27/2007. Details can be found in Attachment 5 for examination scope and results.

14. Abstract of Results of Examinations and Tests.

Refer to Attachment 1 for list of components and examination results during the Fall 2007 outage.

15. Abstract of Corrective Measures Tendon 35H39 Buttress #3 was observed to have approximately 4 ounces of water exiting from the grease cap bolt and 1 ounce in the grease cap. Engineering disposition: It has been determined that adequate grease coverage had been present and the entire anchorage components corrosion level criterion had been met. It is concluded that the detected condition had not created any adverse effect on the tendon. There was no ASME Section XI failure or reject.

Reference CR 2007-2213. Tendon 13H31 Buttress #3 was observed to havebutton heads missing from each end of the tendon. Engineering disposition: After prestress calculations, the actual predicted force at the end of containment life with 88 wires instead of 90 wires is 22% higher that the minimum required tendon force. This tendon is deemed acceptable. There was no ASME Section XI failure or reject. Reference CR 2007-2744. Tendon 51H35 Buttress #1 & #5 was observed to have a misalignment on the shim stack on both ends of the tendon Engineering disposition: This as-found condition does not deter the tendon from performing its design intent. For Buttress #1, the lift-off verification was performed and exceeded the acceptance criteria. The misalignment was corrected after the lift-off verification and the shim set was left in the proper alignment. For Buttress #5, during the physical inspection, the shim set moved back in alignment with no more overlapping. The lift-off verification was performed and met the acceptance criteria. There was no ASME Section XI failure or reject. Reference CR 2007-4660. Buttress #3 was observed to have three spalls on the face of buttress with exposed rebar. These areas of spalls are located in non-structural concrete cover. Engineering disposition: The

FORM NIS-1 Report Page4 of 5 Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit: 3 Owner Certificate of Authorization (if required) N/A Commercial Service Date: December'14 1972 National Board Number for Unit: N/A concrete cover does not perform a structural function. Its purpose is to protect the rebar from exposure to the outside environment elements. The corrosion observed on the exposed rebar was superficial without adverse effect on the design function of the rebar. The surrounding concrete was tapped by a hammer and no hollow sounds observed. As a corrective measure, the three subject areas were cleaned and coated with a protective coating. The spalled grout is non-structural, the rust on the exposed rebar is minor and the surrounding concrete is sound. Reference CR 2007-6493. Tendon 12V06 was observed to exceeds the force limitations of 70% G. U. T. S. (Guaranteed Ultimate Tensile Strength.). Engineering disposition: This tendon was scheduled for detensioning, wire removal and retensioning. With 89 effective wires, the contractor was directed to restore the tendon as close as possible to 70% G. U. T. S. There was no ASME Section XI failure or reject. Reference CR 2007-6493. Tendon 35H50 Buttress #3 and 51 H30 Buttress #1 was observed to have approximately I ounces of water exiting from the grease cap for tendon 35H50 and 6 ounces of water exiting from the grease cap fro tendon 51H30. Engineering disposition: It has been determined that adequate grease coverage had been present and the entire anchorage components corrosion level criterion had been met. It is concluded that the detected condition had not created any adverse effect on the tendon. There was no ASME Section XI failure or reject. Reference CR 2007-7005. Tendon 51 H02 Buttress I was observed to have pitting in excess of 1/8" deep on the tendon cap. Engineering disposition: The surface was cleaned and coated and the existing tendon cap was replaced. There was no ASME Section XI failure or reject. Reference CR 2007-7394. Tendon 64H62 Buttress #6 was observed to have an active grease leak and less than 1 ounces of water exiting from the grease cap. Engineering disposition: A new gasket was installed and water removed. The entire anchorage components corrosion level criterion had been met. It is concluded that the detected condition had not created any adverse effect on the tendon. There was no ASME Section X1 failure or reject. Reference CR 2007-8071. Tendon 61V25 exceeded 10% of the Net Duct Volume for the amount of grease replaced. Engineering disposition: A new gasket was installed and grease replaced. There was no ASME Section XI failure or reject. Reference CR 2007-8095.

FORM NIS-1 Report Page 5 of 5 Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit: 3 Owner Certificate of Authorization (if required) NIA Commercial Service Date: December 14. 1972 National Board Number for Unit: N/A We certify that a).the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI, and c) corrective measures taken conform to the rules of the ASME Code, Section XI. Certificate of Authorization No. N/A Expiration Date .t-! Date: 19/'-!" Signed: " (* By me1(_ - LLT-CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Florida, and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, CT have inspected the components described in this Owner's Report during the period during the period 4/11/2006 to 10/15/2007, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Report in accordance with the Inspection Plan and as required by the ASME Code, Section XI. By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Fc 4-Z7 (, C,1,7 -) Inspector's Signature National Board, State, Province, and Endorsements Date: /2 o7

TURKEY POINT UNIT 3 2007 REFUELING OUTAGE Abstract of Examinations and Tests Total Population and Percentages 4 th Interval - 2nd Period Table 1

Table I Turkey Point Unit 3 FOURTH INSPECTION INTERVAL - SECOND PERIOD - FIRST OUTAGE ABSTRACT OF EXAMINATION AND TESTS Total Total Total Total Examination Examinations Examinations Examinations Examinations Date for(%) Credited the to Remarks Category/Item Required for the Credited for the Credited (%) for Period the period Interval Interval B-A 5 0 0% 0% B 1.11 3 Deferral Permissible B11.21 1 Deferral Permissible B 1.30 1 Code Case N-623 Applied, Deferral Permissible B-B 5 0 0% 20% B2.11 2 B2.12 2 B2.40 1 B-D 24 2 40% 30% B3.90 6 Deferral Permissible B3.100 6 Deferral Permissible B3.120 6 B3.140 6 B-F RR will be being submitted to implement a risk informed program. The B-F examination category items are included in the Category R-A population. B-G-1 18 0 0% 0% Total includes Item B6.190, B6.190, B6.200 (only required if disassembled) B6.10 3 Deferral Permissible B6.30 3 Deferral Permissible B6.40 3 Deferral Permissible B6.50 6 Deferral Permissible B6.180 1 Deferral Permissible B6.190 1 Deferral Permissible B6.200 1 Deferral Permissible B-G-2 19 2 50% 58% B7.20 1 B7.30 6 B7.50 9

Total Total Total Total Examinations Examination Examinations Examinations Examinations exinatons Category/Item Required for the Credited for the Credited (%) for Date for the Interval Period the period Interval B7.70 3 B-J RR will be submitted to implement a risk informed program. The B-F examination category items are included in the Category R-A population. B-K 6 0 0% 16.6% B 10.10 2 Baseline performed on 6 new welds in the Ist period. B10.20 3 BI0.30 1 B-L-1 3 3 100% 100% B 12.10 3 Deferral Permissible B-L-2. 1 0 0% 0% B 12.20 1 Examination required only when disassembled B-M-2 3 1 33.3% 33.3.% B12.5 0 3B12.50 111 3maintenance. group requires valve in eachDeferral examination when disassembled for Permissible B-N-1 7 0 0% 33.3% Each item (7) must be examined each period 1313.10

  • 7 B-N-2 1 0 0% 0%

B 13.60 1 Deferral Permissible B-N-3 27 0 0% 0% B 13.70 27 Deferral Permissible B-0 3 3 100% 100% Baseline performed on 24 new welds in the 1St period. 25% will B-O3 3 100% 100%_b e performed in the next two periods. Deferral Permissible. B14.10 -3 0 0% 0% B-P System leakage tests are performed each outage (IWB-5220) in accordance with plant procedures. B-Q . Steam Generator tubing is examined in accordance with Plant Technical Specifications. 2

Total Total Total Total Examinations Examination Examinations Examinations Examinations exinatons Credited (%) to Remarks Category/Item Required for the Credited for the Credited (%) for Date for the Interval Period the period Interval C-A 7 0 0% 42.8% CI.10 4 C1.20 2 C1.30 I C-B 8 0 0% 25% C-B total does not include C2.33 items that are required each period C2.21 2 C2.22 2 C2.31 4 C2.33 6 0 0% 33.3% VT examinations required each period C-C 10 1 33.3% 36.3%

     ' C3.10           1 C3.20           9 C-F-I                  49                     9                 60%                    43%

C5.11 26 C5.21 12 C5.30 10 C5.41 I C-F-2 28 3 30% 46.4% Less than 28 welds would be required if 7.5% criteria is followed, FPL raised the total count to 28 per note 2. C5.51 25 C5.81 3 C-H System pressure tests are performed in accordance with plant procedures. Quantification of the number of tests is not practical. D-A 15 4 66.6% 53.3% DI.10 5

  • D13.20 10 D-B System pressure tests are performed in accordance with plant procedures. Quantification of the number of tests is not practical.

3

Total Total Total Total Examinations Examinations Examinations Examinations Examination Credited for the Credited (%) for Credited (%) to Remarks Category/Item Required for the Period the period Interval Interval 100% General Exam required each period. This completes the I" (IWE) E-A 246 82 100% 100% Interval for IWE RR 26, This completes the I" Interval for IWE. Examination of 8 (IWE) E-D 6 2 100% 100% of the total items required if made accessible. Deferral I permissible. (IWE) E-G 11 4100%! 100% RR 22, This completes the Ist Interval for IWE, deferral prisbe permissible. F-A 120 20 86.9% 48.3% FI.10 39 F1.20 33 F1.30 30 F1.40 18 R-A total does not include item R1.12. RR3 has been submitted to implement a risk informed inspection program for the Fourth R-A 34 5. 41.6% 44.1% Interval. The selections in program are based on the Risk Informed Program approval on November 30, 2000 for Third Interval. RI.1 1 34 R1.12 48 each outage Visual examination is performed each outage 4

TURKEY POINT UNIT 3 2007 REFUELING OUTAGE NIS-2

Abstract The attached NIS-2 reports detail the repair/replacement of Class 1, 2 and 3 piping and components for Florida Power and Light Company, Turkey Point Unit 3. These repairs or replacements were performed prior to and duringthe Fall 2007 refueling outage, between the dates of 4/11/2006 and October 15, 2007. Piping and components were inspected/tested in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, "Rules for Inservice Inspection of Nuclear Power Components," 1998 Edition up to and including the 2000 Addenda. 2

NIS-2 LOG Report No. Report Date> Work Order Number ANII Certifcto 07-001-3 9/13/2007 36016589-01 10/11/2007 07-002-3 9/13/2007 36003412-01 11/8/2007 07-003-3 9/13/2007 35018481-01. 10/25/2007 07-004-3 9/13/2007 35021139-01 11/l/2007 07-005-3 .9/13/2007 35031101-01 10/25/2007 07-006-3 9/14/2007 35029354-03 10/25/2007 07-007-3 2/23/2006 35029354-01 11/1/2007 07-008-3 9/14/2007 37008476-01 10/11/2007 07-009-3 9/15/2007 36025372-01 11/1/2007 07-010-3 10/4/2007 36017135-01 10/25/2007 07-011-3 10/4/2007 35021137-01 11/12007 07-012-3 10/4/2007 35019793-01 10/11/2007 07-013-3 10/2/2007 36006137-01 10/25/2007 07-014-3 10/2/2007 35019796-01 10/11/2007 07-015-3 10/2/2007 36005940-01 10/11/2007 07-016-3 10/2/2007 3708859-01 10/11/2007 07-017-3 10/2/2007 35019795-01 11/1/2007 07-018-3 10/4/2007 36026343-01 10/11/2007 07-019-3 10/5/2007 36026342-01 10/11/2007 07-020-3 10/6/2007 36019819-01 10/11/2007 07-021-3 10/5/2007 36019711-01 11/1/2007 07-022-3 10/6/2007 36007787-01 10/25/2007 07-023-3 10/5/2007 37001892-01 10/25/2007 3

07-024-3 10/5/2007 37001883-01 10/25/2007 07-025-3 10/5/2007 37020259-01 10/25/2007 07-026-3 10/15/2007 36019509-01 101/2/2007 07-027-3 10/15/2007 36019506-1 11/1/2007 07-028-3 10/15/2007 36019525-01 11/1/2007 07-029-3 10/15/2007 36018462-01 11/1/2007 07-030-3 10/15/2007 34020152-01 11/1/2007 07-031-3 10/15/2007 36018463-01 11/1/2007 07-032-3 10/15/2007 36014347-01 11/1/2007 07-033-3 10/15/2007 36011234-01 11/1/2007 07-034-3 10/25/2007 37019007-03 11/8/2007 07-035-3 10/25/2007 37014438-01 11/8/2007 07-036-3 10/25/2007 36019872-01 11/20/2007 07-037-3 10/29/2007 35010386-01 11/8/2007 07-038-3 10/29/2007 33022952-01 11/8/2007 07-039-3 10/29/2007 36009235-02 11/8/2007 07-040-3 10/25/2007 37020609-01 11/8/2007 07-041-3 10/29/2007 35010379-01 11/8/2007 07-042-3 11/14/2007 35030563-01 11/20/2007 4

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 9/ 13/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address Turkey Point Plant Unit 3 2, Plant Name WO#: 36016589- 01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Component Cooling Water -System #: 30 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A _.Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacennents 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed C(

ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No 3A CCW Pump N/A N/A N/A 3P211A N/A Corrected N

7. Description of Work:

Replace pump Inlet flange bolting

8. Tests Conducted: Hydrostatic: N/A Pneumatic NIA Nominal Operating Pressure N/A Other N/A Pressure - N/A psig Test Temperature N/A deg F 07-001-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date: N/A Signed Q.5i- - v\ G, . Date 'O IC _ Ownero-r Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of 3- Z4' -07 to /,-//*oT and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

  • _ _ _Commissions 14 6, -/

Inspecto's Signature National Board, State, Providence, and Endorsements Date __ _ 07-001-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1, Owner Florida Power and Light Co. Date 9113/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address Turkey Point Plant Unit 3

2. Plant Name WO#: 36003412-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Liqht Co. Type Code Symb ol Stamp N/A Name Authorization Nun nber N/A 9760 SW 344 Street Florida City, FL 33035 N/A Expiration Date Address
4. Identification of System: Component Cooling Water System #: 30 Quality GroulPc
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No 3A ICW Pump discharge check N/A D-5705 N/A 3-50-311 NfA Installed valveN 3A ICW Discharge Check Valve N/A D-3577 N/A 3-50-311 N/A Removed N
                                                             !j
7. Description of Work:

Replace Valve

8. Tests Conducted: - Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X .

Other VT-2 Pressure 17 psig Test Temperature 80 deg F 07-002-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Sinned I# oate , -o7 Owner or Owner's Designee, Title 0 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of I,?-- 2 1*--- to . I-0O2 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions 77ý,' C/ A/ lnspector's Signature National Board, State, Providence, and Endorsements Date A_ _ _ __0 07-002-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 9/113/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35018481- 01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Component Cooling Water System #. 3i0 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, ..N/A Addenda, N/A.Code Case (b) Applicable Edition of Section X1 Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components IASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No 3C ICW discharge check valve N/A D-3575 N/A 3-50-331 N/A Removed N 3C ICW Discharge Check Valve N/A D-4189 N/A - 3-50-331 N/A InstalledN
7. Description of Work:

Replace 3C ICW discharge check valve

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure Other N/A Pressure 14 psig Test Temperature 87 deg F 07-003-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed C Date -*C IOO* Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of____________ to /O-?.*-, 7 and state that to the best ofmy knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ___ ___ ___Commissions C, _ ___-

                        "       Inspectors Signature                                 National Board, State, Providence, and Endorsements Date       lo-07-003-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Florida Power and Light Co. Date 9/13/2007

1. Owner Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35021139-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Liaht Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: -CVCS Boron Addition and Recycle -System #. 46 Quality Group B
5. (a) Applicable Construction Code B31.1 . 19 55 Edition, NIA Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components N ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other ear Removed or Stamp Component Number Board Identification. Built, Installed Yes/No Boric Acid Storage Tank N/A N/A N/A T205A N/A Corrected N
7. Description of Work:

Replace handhole flange. bolting

8. Tests Conducted: Hydrostatic: NIA Pneumatic N/A *Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A *deg F 07-004-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp NIA Certificate of Authorization No. N/A Expiration Date: N/A Sioned r Date +/-490

                                         ) Owner or -Owners Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of           /z- Z--o 4-<         to    /,.-/ -02 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions L- CZ/I/2?

                        '"      Inspector's Signature                               National Board, State, Providence, and Endorsements Date 07-004-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Florida Power and Light Co. Date 9/13/2007

1. Owner Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 35031101-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Liaht Co. Type Code Symbol Stamp NA Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 N/A Address Expiration Date 4, Identification of System: Intake Cooling Water System #: 19 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components I ASME Corrected, Code
          .Nameof                         Name of Mfg     Mfg Serial National            Other                      Year       Removed or               Stamp Component                                        Number       Board         Identification                 Built         Installed           Yes/No 3B CCW Heat Exchanger                 NIA            N/A        N/A                3E207B                   N/A          Corrected N
7. Description of Work:
      - Replace two studs and two nuts on channel head      -
8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 07-005-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date: N/A Signed ner'sDate (e /07 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of 6.-t'Oý to la Z.'-o? and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions -7 , ,- .. Z Inspector's Signature National Board, State, Providence, and Endorsements' Date / o-t.4-07 07-005-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co, Date 9/ 14/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet I of 2 Address Turkey Point Plant Unit 3
2. Plant .... j . ...... .....

Name WO#-. 35029354 -03 CR#*. N/A 9760 SW 344 Street Florida City, FIL 33035 Address Repair Organization, P.O. No, Job No., etc.

3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Intake Cooling Water -System #: 19 Quality Group_ C 19 55 Edition, N/A Addenda, N/A Code Case
5. (a) Applicable Construction Code B31.1 (b) Applicable Edition of Section Xl Utilized for Repairs or Replace*ments 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components T ASME Corrected, Code Name of Name of Mfg Mfg Serial Ntional . Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No 3B ICW Pump Discharge elbow N/A N/A N/A Pipe Flange N/A Corrected IN
7. Description of Work:

Replace threaded on-flange

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 19 psig Test Temperature 85.7 deg F 07-006-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed Qs~ rv"\~ - Date Date toC (of & a-7

                                                                                                                                    ~'?
                                                                                       /

C Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, to /e-have 2t-?inspected the ccomponents described in this Owners Report during the period of 5-*/9-,04 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection-

                    '"/
                         ~z:< <~~s-Inspector's Signature Commissions 1" 4776,*,/*Zi)

National Board, State, Providence, and Endorsements Date 07-006-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl 1: Owner Florida Power and Light Co. Date 2123/2006 Name

                       '700 Universe Blvd. Juno Beach, FL 33408                         Sheet                I                of               2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35029354-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Liaht Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City. FL 33035 Expiration Date N/A Address
4. Identification of System: Intake Cooling Water .System #: 9 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No 38 ICW Pump N/A IST-1 N/A 3P9B N/A Installed Check Valve N/A D-4187 N/A 3-50-321 N/A Installed N
7. escription of Work:

Replace pump, expansion joint and check valve

8. Tests Conducted: Hydrostatic: NIA Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 19 psig Test Temperature 85.7 deg F 07-007-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp NIA Certificate of Authorization No. N/A Expiration Date: N/A Signed r\Ac,- Date ID kQ [07 Owner or Owners Designee, Title I" CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of 3- 5--i to //-1/-07 and state that to the best of my knowledge .and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. s'Commissions /25 #*77($1, C, l Z) Inspectors Signature National Board, State, Providence, and Endorsements Date 11-1_-__ _ _ 07-007-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner Florida Power and Light Co. Date 9/14/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address

2. Plant Turkey Point Plant Unit 3 Name WO#: 37008476-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No,, etc.
3. Work Performed by Florida Power and Liaht Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 N/A Address Expiration Date
4. Identification of System: Intake Cooling Water System #: 19 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda. N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, NIA Code Case
.6. Identification of Components Corrected or Removed and Installed Components ASME Corrected,.             Code Name of                       Name of Mfg        Mfg Serial National                 Other                     Year        Removed or              Stamp Component                                            Number      Board            Identification                 Built        Installed             Yes/No Basket strainer for A CCW               N/A               N/A        N/A                   BS-3-1402                N/A          Corrected                N

____________________I________ _____________ __ _______ ___N

7. Description of Work:

Replace cover nut and stud

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 07-008-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date: N/A Signed VN/\ (), Date I4 7

                                                                                      /

C 0wneO--wner 's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of I-Jartford, Connecticut, have inspected the components described in this Owners Report during the period of f-17-.0 7 to / 7 2*/4..-; and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions I=,- Inspector's Signature National Board, State, Providence, and Endorsements Date 07-008-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 9/15/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 36025372-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., et.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Component Cooling Water System #: 30 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No 3C CCw Heat Exchanger N/A N/A N/A 3E207C N/A Corrected
7. Description of Work:

Modify bolt hole from threaded to thru stud

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 07-009-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A r Signed 0,56 MrD ,1- Date j ( Owner or Owners Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have insoected the components described in this Owners Report during the period of I& -/- 0 6 to _ __- _____ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. g~u~ & fA~ ___Commissions A4 <1;77 d _ Inspector's Signature National Board, State, Providence, and Endorseme-nts Date t- -,o7 07-009-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 10/4/2007 Name 700 Universe Blvd.- Juno Beach, FL 33408 Sheet 1 of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 36017135-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job Noa,etc.
3. Work Performed by Florida Power and Liqht Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Component Cooling Water System #: 30 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section X1 Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No 3A CCW Heat Exchanger N/A N/A N/A 3E207A N/A Corrected
7. Description of Work:

Replace Two channel head bolts

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A. Pressure N/A psig Test Temperature N/A deg F 07-010-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed Date Ito10 -7 nr Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of 9-ZZ-i- o - to b-.--- 7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions _ ___C */

  • Inspe'tor's Signature National Board, State, Providence, and Endorsements Date /o7 2 07-010-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Florida Power and Light Co. Date 1014/2007

1. Owner Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet I of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 35021137- 01 CR#: NIA 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, PO. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 N/A Expiration Date Address
4. Identification of System: CVCS Boron Addition and Recycle System #: 46 Quality Group B 19 55 Edition, N/A Addenda, N/A Code Case
5. (a) Applicable Construction Code B31.1 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Boric Acid Storage Tank C N/A N/A N/A T205C N/A Corrected
7. Description of Work:

Replace bolting

8. Tests Conducted: Hydrostatic: N/A Pneumatic NIA, Nominal Operating Pressure N/A Other N/A Pressure NIA psig Test Temperature N/A- deg F 07-011-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks. MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code. Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed ýý,01- --'. oscI Mor'cd 1)

                                                                                                         -ae110 16(foll E)-1 Date L     Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of          7- /10- 04,           to         //-/-o D.7 c:5- )1-I. o7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall beliable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. __ __ _Commissions /21 4'L7 / C;, A/ Inspector's Signature National Board, State, Providence, and Endorsements Date //-/- - 07-0 11-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 10(4/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35019793-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Intake Cooling Water -System #: Ig Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N.A Addenda, N/A Code Case
*     (b) Applicable Edition of Section XI Utilized for Repairs or Replacements             19 98 Edition,    2000     Addenda,             N/A      Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME o Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Inlet Valve to Basket Strainer B N/A 733133D N/A 3-50-344 N/A Installed D-1-2 Inlet Valve N/A None N/A 3-50-344 N/A Removed N
7. Description of Work:

Replace Valve and bolting

8. Tests Conducted: Hydrostatic: Nominal Operating Pressure . X _

N/A Pneumatic N/A Other N/A Pressure 41 psig Test Temperature 78.8 deg F 07-012-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Daate: N/A U C), 5 r--- M0 Date , .. o I __ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of /Z o5 to /o11//-o0 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ________________' ______Commissions / V' 2

                                                                                                              'j,,71*ý         . _**

Inspector's Signature National Board, State, Providence, and Endorsements Date 0 07-012-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 10/2/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 36006137-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, PDO.No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Residual Heat Removal System #: 50_ Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Iso Valve at RHR Heat N/A N/A N/A 3-759A N/A Corrected Exchanger A discharge N
7. Description of Work:

Replace bolting material

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A. deg F 07-013-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp ' TypeCodeSymbl Stmp*N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed iE:- Date

  • Ol*_.9 0 Ovnelr-or Owner's Designee, Vitle CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of 6-4-, 7 to /' -a and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code, Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. _ __ _ _ _Commissions /C-AZ Inspectors Signature National Board, State, Providence, and Endorsements Date /6- Zof__07 07-013-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 10/2/2007 Name.

700 Universe Blvd. Juno Beach, FIL 33408 Sheet 1 of 2 Address Turkey Point Plant Unit 3

2. Plant Name WO#: 35019796-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp NIA Name Authorization Number N/A 9760 SW 344 Street Florida City, FIL 33035 Expiration Date N/A Address
4. Identification of System: Intake Cooling Water System #: 19 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Outlet Valve to Basket Strainer N/A 733133D N/A 3-50-329 N/A Installed D-1-3 N Outlet Valve N/A None N/A 3-50-329 N/A Removed N 7, Description of Work:

Replace valve and bolting

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other VT-2 Pressure 30 psig Test Temperature 90.4 deg F 07-014-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed D5~ M% '-- Date VD 'lOf - 0 Owner or Owner's Designee, Title I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of . ,/2- O 0-o5 to /0-/I-'. '2 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ___Commissions Inspector-s Signature Nationa Board, State, Providence, and Endorsements Date ___ ______ 07-014-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1, Owner Florida Power and Light Co. Date 10/2/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address Turkey Point Plant Unit 3

2. Plant Name WO#: 36005940-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power.and Light Co. Type Code Symbol Stamp N/A.

Name " Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 N/A Expiration Date Address

4. Identification of System: Residual Heat Removal _System #: 50 Qualityo Group B
5. (a) Applicable Construction Code 831.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Valve to RHR Heat Exchanger N/A N/A N/A 3-757B N/A' Corrected
                  *B inletN
7. Description of Work:

Replace body to bonnet bolting

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure* N/A Other N/A Pressure N/A psig Test Temperature N/A -deg F 07-015-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp TypeCodeSymol SampN/A Certificate of Authorization No. N/A Expiration Date: N/A 4: Date Signed

                                                                                                                   *(*    2..  .

O Owner or Owner's Designee, Titde CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of _ -z-o7 to /o-//io7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. __ _ _ _ _ _Commissions 1/2ý>4,7 A Inspector's Signature National Board, State, Providence, and Endorsements Date 07-015-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner Florida Power and Light Co. Date 10/2/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 37008859-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Liqht Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760.SW 344 Street Florida City, FL 33035 Address Expiration Date NIA
4. Identification of System: Intake Cooling Water System #: 19 Quality Group C
5. (a) Applicable Construction Code 1B31.11 19 55 Edition, N/A Addenda, NiA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No ICW Basket Strainer N/A N/A N/A BS-3-1402 N/A Corrected
.7. Description of Work:

Replace cover bolting

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 07-016-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section XI, Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed ), "i O->.6" e Date (,01 2- ) 7 U Owner or Owner's Designee, Titil CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commissi6n issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of "7--- o7 to /a-f/-o? and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions .7 Inspector's Signature National Board, State, Providence, and Endorsements Date ,-1 1-,2 07-016-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 101/2/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35019795- 01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No. Job No., etc.
3. Work Performed by -- Florida Power and Ught!.o. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Intake Cooling Water System #: __19 Quality Group C
5. (a) Applicable Construction Code B31.1t 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Inlet Valve to Basket Strainer N/A 733133D 3-50-324 N/A Installed D-1-1 N Inlet Valve N/A 61645 3-50-324 N/A Removed N
7. Description of Work:

Replace Valve and bolting

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other N/A Pressure 30 psig Test Temperature 90.4 deg F 07-017-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: NIA Signed 0 ~3 - I" (,- - Date ý (0 W Owner or Owner's Designee, Title '/ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of //-z -05<" to //7-- -o7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions _?ý_ / ,4 CA, ZJ Inspector's Signature National Board, State, Providence, and Endorsements Date /1-1-?__ 07-017-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner Florida Power and Light Co. Date 10/4/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 36026343-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Intake Cooling Water System #: 19 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1998 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Restricting Orifice for ICW to N/A N/A N/A RO-3-6691 N/A Corrected Lube water
7. Description of Work:

Replace bolting

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other NIA Pressure N/A psig Test Temperature N/A deg F 07-018-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration D*ate: N/A Signed 6 0'.6 f b- V0c

                                                                                  /

Date D L ) -7 () Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of 9__-_e_ _,07 to /O-//--2 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. __

  • Commissions / *72 .1 C. v 2)

Inspector's Signature National Board, State, Providence, and Endorsements 40_ _.7 Date 07-018-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner Florida Power and Light Co. Date. 10/5/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 36026342-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co, Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Intake Cooling Water System #: 19 - Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Restricting Orifice for ICW NANIA N/A RO-3-6690 N/A Corrected Lube water N

_____________________ _________ £ ______ I ____ t_______________ - _________________I

7. Description of Work:

Replace bolting material

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 07-019-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made-in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A-Signed i" .. ot I:.-- Date 1* O c07 J J Owner or Owner's Designee, Title

  • CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of f-. Z -e07 to /O;//- 7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions

                           -1    Inspector's Signature                              National Board, State, Providence, and Endorsements Date 07-019-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 10/6/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet I of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#/: 36019819-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Liqght Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Intake Cooling Water System #: ._99 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Nameof Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No ICW Pipe Flange N/A N/A N/A ICW Flange NIA Corrected IN
7. Description of Work:

Replace bolting

 .8. Tests Conducted:        Hydrostatic:        N/A                Pneumatic          N/A              Nominal Operating Pressure                  N/A Other               N/A            Pressure       N/A    pslg          Test Temperature            N/A        deg F 07-020-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed C-SE- Mý - Date IO()o 10 1 0" Q l Designee, Title orOwner's 0y wner or Owner's Designee, Title wner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of 7-/$,-O

                                                                        "         to    /o_-/y'-O 2 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code, Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection. _____ ___Commissions /1224t77 , ,C' l 2 Inspector's Signature National Board, State, Providence, and Endorsements Date ..... 07-020-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner Florida Power and Light Co. Date 10/5/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 36019711-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number . N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Main Feedwater System #: __74 Quality Group B
5. (a) Applicable Construction Code B31,1 _ 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, NIA Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No SIG A Main Feedwater Flow N/A N/A N/A FCV-3-478 N/A Corrected Control Valve N
7. Description of Work:

Replace one bonnet Stud

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure . N/A Other I N/A Pressure N/A psig Test Temperature N/A deg F 07-021-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Cý Signed Date ý01 2-7 d Owner or Owner's Designee, T-Ile CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of 9- Z?-o7 to //-/- 07 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions /e 2 I1,C, 5) Inspector's Signature National Board, State, Providence, and Endorsements Date /1-1-07 07-021-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Requiired by the Provisions of the ASME Code Section XI,

1. Owner Florida. Power and Light Co. Date .. 10/6/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet of 2 Address 3
2. Plant Tiirk~v Point Plont Plant Unit Turkev Point Name WO#.: 36007787- 01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No,, etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Component Cooling Water System #: 30 Quality Group C
5. (a) Applicable Construction Code .531.1 19 55 Edition, .N/A._ Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda,. N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Support on pipe to 3-721A N/A N/A N/A ES N/A Corrected Support on pipe to 3-721A N/A N/A N/A E6 N/A CorrectedN Support on pipe to 3-721A N/A N/A N/A E7 N/A Corrected N Supor o371 onpp / /A NAE / orce
7. Description of Work:

Reinstall supports ES, E6, and E7after corrosion removed from pipe

8. Tests Conducted: . Hydrostatic: N/A Pneumatic NIA Nominal Operating Pressure N/A Other VT-3 Pressure NIA psig Test Temperature N/A deg F 07-022-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration D*ate: N/A Signed C c2~- V~'A Date 1 o c' -" CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of /1o/-o7 to /a_ _ ____r-"__? and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. A~4 <~~*2c~xV~ Commissions A '972*,C* 1='Q)* National Board, State, Providence, and Endorsements Z Inspector's Signature Date 07-022-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 10/5/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 37001892-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and LiUht Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Containment Emergency Filters -System #: 56 Quality Group B
5. (a) Applicable Construction Code B31.1 1955 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Containment Emergency Filter N/A N/A N/A SV-3-2909 N/A Corrected C Solenoid Valve N
7. Description of Work:

Reweld canopy seal weld

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 07-023-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED INACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed V's 6 IM r'. V- Date -140 Owner or Owners Designee, Title-) CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSB of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of _ o7 to A'10- "-) and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection. _____ _________________Commissions C 4/ .Z Inspector's Signature National Board, State, Providence, and Endorsements Date 07-023-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner Florida Power and Light Co. Date 1015/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 37001883-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Lg9ht Co. Type Code Symbol Stamp N/A Name Authorization Number _ N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Containment Emergency Filters System #: 56 Quality Group B 5, (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, NIA Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Emergency Filter C Solenoid NIA N/A N/A SV-3-291 0 N/A Corrected Valve *IN
7. Description of Work:

Reweld canopy seal weld

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 07-024-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed M C-- 6,-- Date { 4O__ 0 Owner or Owner's Designee, Title - CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of 3-43-- -7 to /0O- Z -*. 7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. _______________Commissions - q- 177 Inspector's Signature National Board, State. Providence. and Endorsements Date ,/*ld, O /7 07-024-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi

1. Owner Florida Power and Light Co. Date 10/5/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2
  • Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 37020259-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name 9760 SW 344 Street Florida City, FL 33035 Authorization Number N/A Expiration Date N/A Address
4. Identification of System: CVCS Charging and Letdown System #: 47 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section X1 Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components Corrected, ASME Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Support for valve 3-293C N/A N/A NIA Mark No.1A NIA Corrected N

Support fo Valve 3-293C N/A N/A N/A Mark No. 1C N/A Corrected N

7. Description of Work:

Replace U-Bolt on Mark #1A and weld shim on Mark #1C

8. Tests Conducted: Hydrostatic: . N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 07-025-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed 6 0 5 C- vvý C)r- Date to 07 O Owner or Owner's Designee, Title / CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have insected the components described in this Owners Report during the period of 9-ZG -" 7 to /' -'4 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners' Report in accordance with the requirements of ASME Code, Section Xl. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions /2 f ,CAl77(* C A'/ Z Inspector's Signature National Board, State, Providence, and Endorsements Date /c._'& o7 07-025-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 10/15/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 36019509-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.

.3 Work Performed byY Florida Power and Liciht Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address

4. Identification of System: Reactor Coolant System #7 41 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section X1 Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Pressurizer Safety Valve NIA H51249- N/A RV-3-551A N/A Removed 1362 Pressurizer Safety Valve N/A H51249- N/A RV-3-551A N/A Installed N 1579
7. Description of Work:

Replace Valve with spare

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other VT-2 Pressure 2275 psig Test Temperature 539- deg F 07-026-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed __ Jn 4/"T DS ý qI Date , _ Ow'nerWOwner's Designee, TitleI V CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut have insoected the components described in this Owners Report during the period of I-/7-- 7 to _,_________ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ______________________________ Commissions / 4 .?? (- Cr4// Inspector's Signature National Board, State, Providence, and Endorsements Date //-1-o7 07-026-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 10/1512007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 36019516-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 N/A Expiration Date Address
4. Identification of System: Reactor Coolant System #: I Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Pressurizer Safety Valve N/A N69877- N/A RV-3-551 B N/A Removed 00-0005 N Pressurizer Safety Valve N/A N69877- N/A RV-3-551B N/A Installed N 00-0004
7. Description of Work:

Replace Valve with spare and replace bolting

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other VT-2 Pressure 2275 psig Test Temperature 539 deg F 07-027-3

Sheet 2 of 2 FORM NIS-2 (Back) 9; Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED. CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A . Expiration Date: N/A Signed C, ý_, ,ost5 M c, _ Date toll' to-) O Owneror Owners Designee, Title/ CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of /-/7-07_ to //-/-a0 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any Kind arising from or connected with this inspection. Commissions X? A ,, 'J ..... Inspector's Signature National Board, State, Providence, and Endorsements Date ///-1-02 07-027-3

FORM NISý2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner Florida Power and Light Co. Date 10/15/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 36019525-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Lig Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Reactor Coolant System #- 41 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Pressurizer Safety Valve N/A H51249- N/A RV-3-551C N/A Removed 1361 N Pressurizer Safety Valve N/A H51249- N/A RV-3-551C N/A Installed N 1581
7. Description of Work:

Replace valve with spare and replace bolting

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other VT-2 Pressure 2275 psig Test Temperature 539 deg F 07-028-3

Sheet 2 of 2 FORM NIS-2 (Back) .9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED. CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed 60L- 0 56ý ivý,Xt- Date 0 _llef07 Owner or Owner's Designee, Title / CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of /- /?"°' to 11-1-02 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. A~& 4%,*~ A4Commissions C Inspector's Signature National Board, State, Providence, and Endorsements Date 07-028"3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 10/15/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 36018462-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Main Steam -System #: 72 Quality. Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components F -ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Main Steam Safety Valve N/A BL-0395 N/A RV-3-1402 N/A Removed Main Steam Safety Valve N/A BL-0406 N/A RV-3-1402 N/A Installed N
7. Description of Work:

Replace Valve with Spare

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other VT-2 Pressure 975 psig Test Temperature 541 deg F 07-029-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp TypeCodeSymbl ____NIA Stmp Certificate of Authorization No. N/A Expiration Date: N/A Signed 4ý_: I/ Date 1 O(-.07 ( Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, [,ve inspected the components described in this Owners Report during the period of I 7- 36-c7 to 17--d and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

                          ~4                                                         Commissions            - C47-72 /1,   4      C2         -

Z Inspector's Signature National Board, State, Providence, and Endorsements Date //--07 07-029-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl Owner Florida Power and Light Co. Date 10/15/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet I 2of Address

2. Plant Turkey Point Plant Unit Name WO#: 34020152-01 CR#: NIA 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization. P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co._ Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Main Steam System #: 72 Quality Group B (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed YeslNo Main Steam Safety Valve N/A BL-0396 N/A RV-3-1407 N/A Removed Main Steam Safety Valve N/A BL-0400 N/A RV-3-1407 N/A Installed N

__________________________[ __________ .~ ~ _________________________I ___________________ ________

7. Description of Work:

Replace valve with spare valve

8. Tests Conducted: Hydrostatic: N/A. Pneumatic N/A Nominal Operating Pressure X Other VT-2 Pressure 975 psig Test Temperature 539 deg F 07-030-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed ~-~--~ L2$~ Date *_O - [0 - 0 Owner or Owner's Designee, Title 2 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of  ?- .o - -7 to I/-/_ - o__ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection. Commissions ,* '774 C, A', E)

                       /.-      Inspector's Signature                                National Board, State, Providence, and Endorsements Date 07-030-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl 1 Owner Florida Power and Light Co. Date 10/15/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address .2. Plant Turkey Point Plant Unit 3 Name WO#: 36018463-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.

3. Work Performed Ib~ Y Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Main Steam System #: 72 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Main Steam Safety Valve N/A BL-0394 N/A RV-3-1408 N/A Removed N

Main Steam Safety Valve N/A BL-0403 N/A RV-3-1408 N/A Installed N

7. Description of Work:

Replace valve with spare valve

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other VT-2 Pressure 975 psig Test Temperature 539 deg F 07-031-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed (K Dateo J) own'efor Owner's Designee,Tlitle CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of I 072 to 1 2 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. A -4._S .*

  • Commissions (,"' )'-Tc)

Inspector's Signature National Board, State, Providence, and Endorsements Date //-/- _ _ _ 07-031-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section X1 Florida Power and Light Co. Date 10/15/2007

1. Owner, Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of -2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 36014347-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date NIA Address
4. Identification of System: Main Steam System #: 72 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case
.    (b) Applicable Edition of Section XI Utilized for Repairs or Replacements            19 98 Edition,     2000      Addenda,            N/A     Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Main Steam Safety Valve N/A BL-0389 N/A RV-3-141 0 N/A Removed N

Main Steam Safety Valve N/A BL-0401 N/A RV-3-1410 N/A Installed N

7. Description of Work:

Replace valve with spare

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other VT-2 Pressure 975 psig Test Temperature 541 deg F 07-032-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration D*ate: N/A Signed 6-L , I- - - 0 sEMa I- - Date IVII.707 0 Owner or Owner's Designee, Title / CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of  ?-3ko.oo - to /4-0/o1 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XL. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. x~c~ ~ Inspector's Signature Commissions 17? National Board, State, Providence, and Endorsements Date 1/'/-07 07-032-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 10/15/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name .WO#: 36011234-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbcol Stamp N/A Name Authorization Nun*ber N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: CVCS Charging and Letdown -System #: 47 Quality Grou o B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Letdown Isolation Valve N/A N/A N/A CV-3-204 N/A Corrected N,
7. Description of Work:

Replace bonnet bolting

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure NIA psig Test Temperature N/A deg F 07-033-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Daate: N/A Signed Date I t. o 1 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inslected the components described in this Owners Report during the period of 9 - o6 7 to //-/

  • o and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section X1.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. S Commissions Al,_J Inspector's Signature National Board, State, Providence, and Endorsements Date 0 07-033-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 10/25/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1. of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 37019007-03 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Licht Co. Type Code Symbol Stamp N/A Name Authorization Number NWA 9760 SW 344 Street Florida City, FL 33035 N/A Address Expiration Date
4. Identification of System: Reactor Coolant System #: 41 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No B Hot Leg RTD N/A N6102 IN N/A TE-3-422B2 N/A Corrected

-7. Description of Work: Replace Thermowell

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other VT-2 .Pressure 2275 psig Test Temperature 539 deg F 07-034-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed r . .Da te Id-8 ;3_1 O Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of J-1artford, Connecticut, have inspected the components described in this Owners Report during the period of -.- 2 . to 9__.-0__ __2 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions 4 _i Inspector's Signature National Board, State, Providence, and Endorsements Date /4.. ~.- o2 07-034 FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner Florida Power and Light Co, Date 10/25/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address.
2. Plant Turkey Point Plant Unit 3 Name WO#: 37014438-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed Iby Florida Power and Liaht Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Reactor Coolant System #: 4I Quality Group A 19 55 Edition, N/A Addenda, N/A Code Case
5. (a) Applicable Construction Code B31.1 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No B Cold Leg Thermowell for RTD N/A N/A N/A . TE-3-420A N/A Corrected N

___ _ _____ __ {/A _ _ i ____ ____ ___ ____ ____ ____ ___ - __ ____ ____I._ _ _ _

7. Description of Work:

Replace thermowell

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other VT-2 Pressure 2275 psig Test Temperature 539 deg F 07-035-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed 6)-, O$~. ~fV\~- 6t~Date- o'7 0 Owner -or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Inspected the components described in this Owners Report during the period of -/9-,o to //-*,,-%7? and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ___________________Commissions _ ~ _ Inspector's Signature National Board, State, Providence, and Endorsements Date . _. 07-035-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner Florida Power and Light Co. Date 10/25/2007 Name .

700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Adlress Turkey Point Plant Unit 3

2. Plant Name WO#: 36019872-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by _Florida Power and Lignht o. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035.L N/A Expiration Date Address
4. Identification of System: Reactor Coolant -System #: 41 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A' Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No A Steam Generator N/A I N/A N/A 3E21 OA tN/A Corrected I ii
7. Description of Work:

Replace bolt at "A" hand-hole cover

8. Tests Conducted: Hydrostatic: N/A Pneumnatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A deg F 07-036-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No, NWA Expiration Date: N/A Signed _ _ Onrs _ineDate ITil Owner or Owner's Designee, Title I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of _ 1?-0Mo7 to ,,,//-__-0____2_ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions 4z _ e; Inspector's Signature National Board. State, Providence, and Endorsements Date 07-036-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner Florida Power and Light Co. Date 10/29/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address

2. Plant Turkey Point Plant Unit 3 Name WO#: 35010386-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performec bY Florida Power and Liaht Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: CVCS Charging and Letdown System # 47 Quality Group B
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built installed Yes/No Seal Water Outlet Isolation NIA N/A N/A 3-293A N(A Installed Valve N I .. ii. _
7. Description of Work:

Replace Valve by welding

8. Tests Conducted: Hydrostatic: N/A Pneumatic NIA Nominal Operating Pressure X Other VT-2 Pressure 2400 psig Test Temperature 119.5 deg F 07-037-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Riflnl*f Dae I i N/A Date 1118107 Sinn If O Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of ..-- '-0_ to /. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied,. concerning the examinations and corrective measures described In this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions 41774 1?4teCr,A / Z Inspector's Signature National Board, State, Providence, and Endorsements Date ,(/- i'ý02 07-037-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner Florida Power and Light Co. Date 10/29/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 2of Address Turkey Point Plant Unit 3
2. Plant Name WO#: 33022952-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co, Type Code Symbol Stamp. N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: CVCS Charging and Letdown System #: 47 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case 6, Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No RCP A Seal Water Check Valve N/A N/A N/A 3-298D N/A Corrected N
7. Description of Work:

Reweld canopy seal weld after overhaul

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure N/A Other N/A Pressure N/A psig Test Temperature N/A ' deg F 07-038-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed 6 (mVc? K J Date Date I! I I Is ~ La7

                                          )   Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, hIye Inspected the components described in this Owners Report during the period of              9-1 02'            to     4       -t and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ________________ Commissions "9' Inspector's Signature National Board. State, Providence, and Endorsements Date 07-038-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 10/29/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 36009235-02 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Flux Mapper -System #: 59 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Flux Mapper Seal Table Guide N/A N/A N/A D-3 N/A Corrected Tube N 7: Description of Work:

Replace fitting and seal weld

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other VT-2 Pressure ' 2275 psig Test Temperature 539 deg F 07-039-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed

                                                              *1 cs~        V~A.~q(                     Date             1       -

0 Owne- Owner's Designee, Titles CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have Ins ected the components described in this Owners Report during the period of _ -- /47-09 to 9/-9 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

                                               **_.* ____                             Commissions              477 L C AAZ_        _'

Inspector's Signature National Board, State, Providence, and Endorsements Date __... 07-039-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 10/25/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address Turkey Point Plant Unit 3
2. Plant Name WO#: 37020609-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Llaht Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 N/A Address Expiration Date
4. Identification of System: CVCS Charging and Letdown System #: 47 Quality Group A
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built. Installed Yes/No Bypass Isolation valve N/A N/A N/A 3-385 N/A Corrected I I,
7. Description of Work:
      - Replace valve bonnet
8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other VT-2 Pressure 2275 psig Test Temperature 539 deg F 07-040-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: N/A Signed mc, 6- Date IIX1 6 jy-rý S~T7 Date 6cL Ownerir Owner's Designee, Title e 0 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of 9-*'1- 07 to //---,o-,* and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. 44 ~Commissions 4 7 -4LC fx - Inspector's Signature National Board, State, Providence, and Endorsements Date /- g 9 07-040-3

FORM NIS-2'OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 10/29/2007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35010379-01 CR#: N/A 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbool Stamp N/A Name Authorization Nun *ber N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: CVCS Charging and Letdown System #: 47 Quality GroulP
5. (a) Applicable Construction Code B31 .1 19 55 Edition, N/A Addenda, NIA Code Case I (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Corrected, Code Name of Name of Mfg Mfg Serial National Other Year Removed or Stamp Component Number Board Identification Built Installed Yes/No Seal water injection filter N/A N/A N/A 3-293D N/A Installed isolation valve N
7. Description of Work:

Replace valve by welding

8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure X Other VT-2 Pressure 2400 psig Test Temperature 115 deg F 07-041-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date: NiA Signed __..___ Date ___ _____7 _ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of I-/co- 0:2 to // 7-o and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions .Ž 1

                                                                                                                  '   77   (         ,/

i Inspector's Signature National Board, State, Providence. and Endorsements Date 7/-01 07-041-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power and Light Co. Date 11/1412007 Name 700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2 Address
2. Plant Turkey Point Plant Unit 3 Name WO#: 35030563-01 CR#-. NIA 9760 SW 344 Street Florida City, FL 33035 Address Repair Organization, PKO. No, Job No., etc.
3. Work Performed by Florida Power and Light Co. Type Code Symbol Stamp N/A Name Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Intake Cooling Water System # I9 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, _ N/A .Addenda, ...... N/AC.._..Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 98 Edition, 2000 Addenda, N/A Code Case
6. Identification of Components Corrected or Removed and Installed Components ASME Name of Name of Mfg Mfg Serial National 1* Other Year.

Corrected, Removed or Code Stamp Component Number Board Identification Built Installed Yes/No 3C Intake Cooling Water Pump N/A IST-2 N/A 3P9C N/A Removed N 3C Intake Cooling Water Pump N/A IST-3 N/A 3P9C NIA Installed N

                                  ~.j~l          .~._                                  I.                                       _
7. Description of Work:

Replace Pump and expansion joint

8. Tests Conducted: Hydrostatic: N/A Pneumatic NIA Nominal Operating Pressure X Other N/A Pressure 16 psig Test Temperature 78 deg F 07-042-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl. Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Daate: N/A Sioned 05i-M (-V Date ,f /i' 0-) J (9 Owner or Owners Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by HSBCT of Hartford, Connecticut, have inspected the components described in this Owners Report during the period of // -/4- 04" to //- Z-* -0,ý: and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

                               , A.*--*"f*-.*          '*                            Commissions           ,,j .2az'-       c, AA-'J Inspector's Signature                              National Board, State, Providence, and Endorsements Date _       _-___        _      __0"7 07-042-3

TURKEY POINT UNIT 3 2007 REFUELING OUTAGE Summary of Inservice Inspection Examinations 4 th Interval - 2 nd Period Attachment 1 5

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 1 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) REACTOR PRESSURE VESSEL Zone # 3-001 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I O E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 038110 3-CRDM-64 (P6) B-0 C PT 3.3-006 X 9/12/2007 - PT Complete. No Recordable CRDM Housing Weld B14.10 Indications. ISO# 5613-M-4000 038170 3-CRDM-66 (F2) B-O C PT 3.3-005 X 9/12/2007 - PT Complete. No Recordable CRDM Housing Weld B14.10 Indications. ISO# 5613-M-4000 038230 3-CRDM-68 (B10) B-O C PT 3.3-004 X 9/12/2007 - PT Complete. No Recordable CRDM Housing Weld B14.10 Indications. ISO# 5613-M-4000 038700 3/4"-RC-1377-1 R-A C VT-2 4.2-002 X 10/11/2007 - VT-2 complete. No REACTOR HEAD TO RI.12 Recordable lndicaitons CONNECTION ISO# 5613-P-5074 SH. 1

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 2 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) STEAM GENERATOR A PRIMARY SIDE Zone # 3-003 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 039500 3-SGA-1-IRS B-D C VT-I Enhancee4.8-001 X 9/13/2007 - Enhanced Visual Complete. INLET NOZZLE INNER B3.140 No Recordable Indications. RADIUS SECTION ISO# 5613-M-4003 039600 3-SGA-O-IRS B-D C VT-1 Enhance(4.8-002 X 9/13/2007 - Enhanced Visual Complete. OUTLET NOZZLE INNER B3.140 No Recordable Indications. RADIUS SECTION ISO# 5613-M-4003

DATE:I 1/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 3 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) STEAM GENERATOR C PRIMARY SIDE Zone # 3-005 N I 0 ASME Status 0 N G T Sec X l R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 041300 3-SGC-I BOLTING B-G-2 C VT-I 4.1-008 .X 9/14/2007 - VT-I Complete. No Recordable STEAM GENERATOR B7.30 Indications. INLET MANWAY BOLTING ISO# 5613-M-4005 041400 3-SGC-O BOLTING B-G-2 C VT-1 4.1-007 X 9/14/2007 - VT-1 Complete. No Recordable STEAM GENERATOR B7.30 Indications. OUTLET MANWAY BOLTING ISO# 5613-M-4005

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] -- Unit 3 Page 4 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) REACTOR COOLANT SYSTEM LOOP A COLD LEG Zone # 3-009 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area CategI E 1 0 E Number Identification /ISO # Item No Method Data Sheet Number C G M R Remarks 045500 27.5"-RCS-1307-1 R-A C VT-2 4.2-003 X. 10/11/2007 - VT-2 complete. No 2" BRANCH RI.12 Recordable Indicaitons. CONNECTION ISO#5613-P-766-S SH. 1

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 5 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) REACTOR COOLANT SYSTEM LOOP B COLD LEG Zone# 3-012 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ.I E I O E Number Identification /ISO # Item No Method Data Sheet Number C G M R Remarks 048000 27.5"-RCS-1306-1 R-A C VT-2 4.2-004 X - 10/11/2007 - VT-2 complete. No 2" BRANCH RI.12 Recordable Indicaitons. CONNECTION ISO# 5613-P-766-S SH. 2 048500 27.5"-RCS-1306-13 R-A C UT 5.4-012 9/23/2007 - UT Complete. Root Geometry PIPE TO ELBOW RI.11 45S 2.25 AX X recorded. 100% Coverage from the Pipe side. Greater than 90% from the Elbow 45S 2.25 CIR X Side. UT 5.23-001 ISO#5613-P-766-S SH. 2 45L 1.0 AX X 45L 1.0 CIR X

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 6 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) REACTOR COOLANT SYSTEM LOOP C HOT LEG Zone# 3-014 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I O E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 050100 29"-RCS-1308-3 R-A C UT 5.4-013 - - - 9/23/2007 - UT Complete. Root Geometry PIPE TO ELBOW R1.11 45S 2.25 AX - - X recorded. 100% Coverage from the Pipe 45S 2.25 CIR X side. Greater than 90% from the Elbow Side. UT 5.23-002 ISO# 5613-P-766-S SH. 3 45L 1.0 AX X 451, 1 0 CIR X

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 7 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) REACTOR COOLANT SYSTEM LOOP C COLD LEG Zone# 3-015 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No j Method Data Sheet Number C G M R Remarks 050600 27.5"-RCS-1309-1 R-A C VT-2 4.2-005 X 10/11/2007 - VT-2 complete. No 2" BRANCH RI.12 Recordable Indicaitons. CONNECTION ISO#5613-P-766-S SH. 3

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 8 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) REACTOR COOLANT SYSTEM AUXILIARY SPRAY LINE Zone # 3-035 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ I E I 0 E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 114400 2"-RC-1310-2 R-A C VT-2 4.2-006 X - 10/11/2007 - VT-2 complete. No VALVE 3-313 TO PIPE RI.12 Recordable Indicaitons. ISO# 5613-P-661-S SH. 2 120900 2"-RC-1310-38 R-A C VT-2 4.3-006 . X 10/11/2007 - VT-2 complete. No REDUCER TO PIPE RI.12 Recordable Indicaitons. ISO#5613-P-661-S SH. 2

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] -- Unit 3 Page 9 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) RESIDUAL HEAT REMOVAL TO RC LOOP A COLD LEG Zone # 3-037 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I O E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 123500 10"-SI-1301-2 R-A C UT 5.4-002 9/11/2007 - UT Complete. No Recordable PIPE TO ELBOW R1I.I 45S 2.25 AX X Indications. 100% Coverage Achived from 45S 2.25 CIR X both sides. 60S 2.25 AX X ISO# 5613-P-585-S SH. 1 123600 10"-SI-1301-3 R-A C UT 5.4-002 9/11/2007 - UT Complete. No Recordable ELBOW TO PIPE RI.11 45S 2.25 AX X - _ _ Indications.. 100% Coverage Achived from 45S 2.25 CIR X both sides. 60S 2.25 AX X ISO# 5613-P-585-S SH. 1 126100 8"-RHR-1301-2 R-A C UT 5.4-001 9/11/2007 - UT Complete. No Recordable PIPE TO ELBOW R1.11 45S 2.25 AX X Indications. 100% Coverage Achived from 45S 2.25 C1R X both sides. 60S 2.25 AX X ISO# 5613-P-585-S SH. 1

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 10 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) HIGH HEAD SAFETY INJECTION LOOP B INSIDE CTMT Zone # 3-041 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Catego E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 140700 8051-R-528-01 F-A C VT-3 4.3-011 X 9/10/2007 - VT-3 Complete. No Recordable DOUBLE ACTING FI.10 Indications. RESTRAINT ISO# 5613-P-584-S SH. 1

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 11 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) HIGH HEAD SAFETY INJECTION LOOP C INSIDE CTMT Zone # 3-042 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I O E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 147700 2"-SI-1303-24 R-A C VT-2 4.2-007 X 10/11/2007 - VT-2 complete. No PIPE TO ELBOW RI.12 Recordable Indicaitons. ISO# 5613-P-648-S SH. I 147800 2"-SI-1303-25 R-A C VT-2 4.2-007 X 10/11/2007 - VT-2 complete. No ELBOW TO PIPE RI.12 Recordable Indicaitons. ISO#5613-P-648-S SH. 1 147900 2"-SI-1303-26 R-A C VT-2 4.2-007 X 10/11/2007 - VT-2 complete. No PIPE TO ELBOW R1.12 Recordable Indicaitons. ISO#5613-P-648-S SH. 1 148000 2"-SI-1303-27 R-A C VT-2 4.2-007 X 10/11/2007 - VT-2 complete. No ELBOW TO PIPE RI.12 Recordable Indicaitons. ISO#5613-P-648-S SH. 1 148100 2"-SI-1303-28 R-A C VT-2 4.2-007 X 10/11/2007 - VT-2 complete. No PIPE TO BRANCH RI.12 Recordable Indicaitons. CONNECTION ISO#5613-P-648-S SH. 1

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 12 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) HIGH HEAD SAFETY INJECTION LOOP A INSIDE CTMT Zone # 3-043 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 148900 8080-H-010-01 F-A C VT-3 4.3-015 X 9/11/2007 - VT-3 Complete. No Recordable DOUBLE ACTING F1.10 Indications. RESTRAINT ISO#5613-P-764-S SH. 2 151500 8080-H-010-12 F-A C VT-3 4.3-017 X 9/11/2007 - VT-3 Complete. No Recordable SINGLE ACTING F11.10 Indications. RESTRAINT ISO#5613-P-764-S SH. 2

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 13 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) CHEMICAL & VOLUME CONTROL TO RC LOOP C HOT LEG Zone # 3-045 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ.I E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 160300 PS-60 F-A C VT-3 4.3-007 X 9/8/2007 - VT-3 Complete. No Recordable DOUBLE ACTING F110 Indications. RESTRAINT ISO#5613-P-661-S SH. 1 161900 3-VCH-1 15 F-A A VT-3 4.3-009 X 9/8/2007 - VT-3 Complete. No Recordable DOUBLE ACTING Fl.10 Indications. RESTRAINT ISO#5613-P-661-S SH. 1 165400 3-VCH-132 F-A C VT-3 4.3-016 X 9/11/2007 - VT-3 Complete. No Recordable SINGLE ACTING FI10 Indications. RESTRAINT ISO#5613-P-661-S SH. 2

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] -- Unit 3 Page-14 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) CHEMICAL AND VOLUME CONTROL TO REGENERATIVE HX Zone # 3-047 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification I ISO #A Item No Method Data Sheet Number C G M R Remarks 172500 3-VCH-129 F-A C VT-3 4.3-008 X - - -'..9/8/2007 - VT-3 Complete. No Recordable SINGLEACTING FI

7. Indications.

RESTRAINT ISO# 5613-P-594-S SH. 1

DATE: 11/16/2007 TurkeyPoint Nuclear Plant [PTN] - Unit 3 Page 15 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1((4,2,1)) Completed Components (C, B, P, E, A, R) CHEMICAL & VOLUME CONTROL SEAL INJECTION LOOP A Zone # 3-050 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 181140 1"-CH-1351-1 R-A C VT-2 4.2-008 X - .. 10/11/2007 - VT-2 complete. No RCP 3P-200A TO PIPE RI.12 Recordable Indicaitons. ISO# 5613-P-5070 SH. 1 181148. 3/4"-CH-1357-2 R-A C VT-2 NDE 4.2 X 10/11/2007 - VT-2 complete. No 1" x 3/4" REDUCER TO RI.12 Recordable Indicaitons. PIPE ISO# 5613-P-5070 SH. 1 181190 1"-CH-1348-3 R-A C VT-2 4.2-008 X 10/11/2007- VT-2 complete. No REDUCER TO FLANGE RI.12 Recordable Indicaitons. ISO#5613-P-5070 SH. 1 181192 1"-CH-1354-1 R-A C VT-2 4.2-008 X 10/11/2007 - VT-2 complete. No FLANGE TO 1" x 3/4" RI.12 Recordable Indicaitons. REDUCER ISO#5613-P-5070 SH. 1

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page,16 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) CHEMICAL & VOLUME CONTROL SEAL INJECTION LOOP C Zone # 3-051 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification I ISO.# Item No Method Data Sheet Number C G M R Remarks 182800 1"-CH-1353-1 R-A C VT-2 4.2-009 X - 10/11/2007 - VT-2 complete. No RCP 3P-200C TO PIPE RI.12 Recordable Indicaitons. ISO#5613-P-5070 SH. 1 182809 3/4"-CH-1359-6 R-A C VT-2 4.2-009 X 10/11/2007 - VT-2 complete. No ELBOW TO PIPE Rl.12 Recordable Indicaitons. ISO#5613-P-5070 SH. 1 182820 I"-CH-1350-3 R-A C VT-2 NDE4.2 . .X 10/11/2007 - VT-2 complete. No REDUCER TO FLANGE RI.12 Recordable Indicaitons. ISO#5613-P-5070 SH. 1 182825 3/4"-CH-1356-5 R-A C VT-2 4.2-009 X 10/11/2007 - VT-2 complete. No PIPE TO ELBOW R1.12 Recordable Indicaitons. ISO#5613-P-5070 SH. 1 182836 3/4"-CH-1341A-2 R-A C VT-2 4.2-009 x - 10/11/2007 - VT-2 complete. No CONNECTION TO PIPE RI.12 Recordable Indicaitons. ISO#5613-P-5071 SH. 3 182838 3/4"-CH-1341B-1 R-A C VT-2 4.2-009 x 10/11/2007 - VT-2 complete. No FLANGE TO PIPE RI.12 Recordable Indicaitons. ISO# 5613-P-5071 SH. 3 182854 3/4"-CH-1344-5 R-A C VT-2 4.2-009 x 10/11/2007 - VT-2 complete. No VALVE 3-304L TO PIPE RI.12 Recordable Indicaitons. ISO#5613-P-5071 SH. 3

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] -- Unit 3 Page 17 REVISION: 0. Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C; B, P, E, A, R) CHEMICAL & VOLUME CONTROL SEAL INJECTION LOOP B Zone # 3-052 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification I ISO # It em No Method Data Sheet Number C G M R Remarks 185798 1"-CH-1352-1 . R-A C VT-2 4.2-010 X - 10/1.1/2007 - VT-2 complete. No RCP 3P-200B TO PIPE RI.12 Recordable Indicaitons. ISO#5613-P-5070 SH. 1 185805 3/4"-CH-1358-4 R-A C VT-2 4.2-010 X 10/11/2007 - VT-2 complete. No ELBOW TO PIPE RI.12 Recordable Indicaitons. ISO# 5613-P-5070 SH. 1 185819 1"-CH-1349-2 R-A C VT-2 4.2-010 X 10/11/2007 - VT-2 complete. No PIPE TO REDUCER RI.12 Recordable Indicaitons. ISO#5613-P-5070 SH. 1 185824 3/4"-CH-1355-3 R-A C VT-2 4.2-010 X 10/11/2007 - VT-2 complete. No PIPE TO ELBOW RI.12 Recordable Indicaitons. ISO#5613-P-5070 SH. 1

DATE: 11/16/2007 Turkey PointNuclear Plant [PTN] - Unit 3 Page 18 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) REACTOR COOLANT PUMP C Zone # 3-058 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 203100 3-RCP-C-A B-L-1 C VT-I 4.1-004 X 9/10/2007 - VT-I Complete. No Recordable PUMP CASING WELD A B12.10 Indications. ISO# 5613-M-4008 203200 3-RCP-C-B B-L-1 C VT-1 4.1-003 X 9/10/2007 - VT-1 Complete. No Recordable PUMP CASING WELD B B12.10 Indications. ISO# 5613-M-4008 203300 3-RCP-C-C B-L-l C VT-I 4.1-002 X 9/10/2007 - VT-I Complete. No Recordable PUMP CASING WELD C B12.10 Indications. ISO# 5613-M-4008

DATE:11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 .. Page 19 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) CHEMICAL & VOLUME CONTROL, REGENERATIVE HEAT EXCH Zone # 3-059 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 204100 RGX 3E200 C VT-2 4.2-011 X - - ' 9/3/200T-.VT-2 complete. No Recordable VISUAL FOR LEAKAGE VT-2 4.2-001 X Indications. Examination at.Shutdown. 10/11/2007 - VT-2 complete. No Recordable Indications. Examination at Start-up.. ISO# 5613-M-4009

DATE: 11/16/2007 ' Turkey Point NUclear Plant [PTN] - Unit 3 Page 20 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1))

                                              *Completed Components (C, B, P, E, A, R)

STEAM GENERATOR B SECONDARY SIDE Zone # 3-061 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ ' E I 0 E Number Identification /ISO # Item No Method Data Sheet Number C G M R Remarks 211600 3-SGB-SS A VT 4.4-001 X 9/25/2007 - Visual (Remote and Direct) and SECONDARY SIDE UT Thickness Complete. Slight undercut EXAMINATION was observed around the inside radius of the J-nozzle weld (Flow induced undercut). O 5Also erosion observed on the feedring where ISO# 561 3-M-4004 . .. the flow comes our of the J-nozzles.

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 21 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) RESIDUAL HEAT REMOVAL TO RESID.HEAT REMOVAL PUMP A Zone # 3-063 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I O E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 214900 SR-252. . F-A C VT-3 4:3-014 X - 8/31/2007 - VT-3 Complete. No Recordable SPRING HANGER, F1.20 Indications. ISO# 5613-P-600-S SH. 1 215000 14"-RHR-2301-9 C-F-I C PT 3.3-007 X 9/14/2007 - PT Complete. No Recordable PIPE TO ELBOW 'C5.1 I UT 5.4-006 Indications. 9/15/2007 - UT Complete. Root Geometry 45S 5.0 AX X recorded 360 degrees intermittent. 100% 45S 5.0 CIR X - Coverage Achieved. ISO#5613-P-600-S SH. 1 60S 5.0 AX X 70S 2.25 AX X 215050 14"-RHR-2301-9LDI C PT 3.3-007 X 9/14/2007 - PT Complete. No Recordable LONG SEAM UT 5,4-006 - - - Indications. DOWNSTREAM INSIDE 45S 5.0 AX X 9/15/2007 - UT Complete. No Recordable RADIUS 45S 5.0 CIR X Indications. ISO# 5613-P-600-S SH. 1 60S 5.0 AX X 70S 2.25 AX X 215100 14"-RHR-2301-9LDO C PT 3.3-007 X- 9/14/2007 - PT Complete. No Recordable LONG SEAM UT 5.4-006 - Indications. DOWNSTREAM OUTSIDE 45S 5.0 AX X 9/15/2007 - UT Complete. No Recordable RADIUS 45S 5.0 CIR X Indications. ISO# 5613-P-600-S SH. 1 60S 5.0 AX X 70S 2.25 AX X 215180 14"-RHR-2301-IOLUI C PT 3.3-007 X 9/14/2007 - PT Complete. No Recordable LONG SEAM UPSTREAM UT 5.4-005 Indications. INSIDE RADIUS 45S 5.0 AX X 9/15/2007 - UT Complete. No Recordable Indications. 45S 5.0 CIR X - - - ISO#5613-P-600-S SH. 1 60S 5.0 AX X X - - 70S 2.25 AX 215190 14"-RHR-2301-IOLUO C PT 3.3-007 X 9/14/2007 - PT Complete. No Recordable LONG SEAM UPSTREAM UT 5.4-005 _ . Indications. OUTSIDE RADIUS e v 9/15/2007 - UT Complete. No Recordable Indications. 45S 5.0 CIR X ISO#5613-P-600-S SH. 1 60S 5.0 AX X 70S 2.25 AX X 215200 14"-RHR-2301-10 C-F-I C PT 3.3-007 X 9/14/2007 - PT Complete. No Recordable ELBOW TO PIPE C5.11 UT 5.4-005 - - - Indications. 9/15/2007 - UT Complete. Root Geometry 45S 5.0 AX X recorded 360 degrees intermittent. 100% 45S 5.0 CIR X Coverage Achieved.. ISO# 5613-P-600-S SH. 1 60S 5.0 AX X 70S 2.25 AX X -

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 22 REVISION: 0 , Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P,-E, A, R) RESIDUAL HEAT REMOVAL TO RESID.HEAT REMOVAL PUMP A Zone # 3-063 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0. E Number Identification IISO #. Item No Method Data Sheet Number C G M R Remarks 215700 SR-251 F-A .A VT-3 4.3-023 X 9/11/2007 VT-3 Complete. No Recordable SPRING HANGER F1.20 Indications. The examination of SR-251 was required by site engineering per CR 2006-8621 for Cycle 22. ISO# 5613-P-600-S SH. 1 216500 14"-RHR-2301-18 C-F-I C PT 3.3-007 X -. - 9/14/2007 - PT Complete. No Recordable Indications. VALVE 3-752A TO PIPE C5.11 UT 5,4-009 9/15/2007 - UT Complete. Root Geometry 45S 2.25 CIR X -Recorded. 100% Coverage Achieved from 60S 2.25 AX - - X Pipe Side. ISO#5613-P-600-S SH. 1 70S 2.25 AX X 216520 14"-RHR-2301.-18LD C PT 3.3-008 X 9/14/2007 - PT Complete. No Recordable LONGITUDINAL SEAM UT 5.4-009 Indications. WELD DOWNSTREAM 45S 2.25 CIR X 9/15/2007 - UT Complete. No Recordable X Indications. 60S 2.25 AX ISO#5613-P-600-S SH. 1 70S 2.25 AX X X -9/14/2007- PT Complete. No Recordable 216580 14"-RHR-2301-19LU C PT 3.3-008 _ - Indications. LONGITUDINAL SEAM UT 5.4-010 X -9/15/2007 - UT Complete. No Recordable WELD UPSTREAM 45S 5.0 CIR Indications. 60S 5.0 AX ISO#5613-P-600-S SH. 1 X 9/14/2007 - PT Complete. No Recordable 216600 14"-RHR-2301-19 C-F-I C PT 3.3-007 Indications. PIPE TO TEE C5.11 UT 5.4-010 X9/15/2007 - UT Complete. Root Geometry 45S 5.0 CIR 60S 5.0 AX ISO#5613-P-600-S SH. 1 X 9/14/2007 - PT Complete. No Recordable 216620 14"-RHR-2301-19LD1 C PT 3.3-008 Indications. LONGITUDINAL SEAM UT 5.4-010 X -9/15/2007 - UT Complete. No Recordable WELD INSIDE OF TEE 45S 5.0 CIR X - Indications. 60S 5.0 AX ISO#5613-P-600-S SH. 1 X 9/14/2007 - PT Complete. No Recordable 216640 14"-RHR-2301-19LD2 C PT 3.3-008 Indications. LONGITUDINAL SEAM UT 5.4-010 9/15/2007 - UT Complete. No Recordable X Indications. WELD OUTSIDE OF TEE 45S 5.0 CIR 60S 5.0 AX X ISO#5613-P-600-S SH. 1

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] -- Unit 3 Page 23 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) RESIDUAL HEAT REMOVAL TO RESID.HEAT REMOVAL PUMP B Zone # 3-064 IN I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 217980 14"-RHR-2303-2LUI C SUR 3.3-009 X 9/14/2007 - PT Complete. No Recordable Longitudinal Seam Weld VOL 5.4-007 Indications. Upstream Inside o 45S 5.0 AX X 9/16/2007 - UT Complete. No Recordable Indications. 45S 5.0 CIR X ISO# 5613-P-600-S SH. 1 60S 5.0 AX X 70S 2.25 AX X 217990 14"-RHR-2303-2LU2 C PT 3.3-009 X 9/14/2007 - PT Complete. No Recordable. Longitudinal Seam Weld UT 5,4-007 Indications. Upstream Outside 9/16/2007 - UT Complete. No Recordable 45S 5.0 AX X Indications. 45S 5.0 CIR X ISO# 5613-P-600-S SH. 1 60S 5.0 AX X X 70S 2.25 AX 218000 14"-RHR-2303-2 X 9/14/2007 - PT Complete. No Recordable C-F-1 C PT 3.3-001 TEE TO PIPE C5.11 UT 5.4-007 Indications. 45S 5.0 AX X -9/16/2007 - UT Complete. Root Geometry Recorded. 100% Coverage Achieved. 45S 5.0 CIR X ISO# 5613-P-600-S SH. 1 60S 5.0 AX X 70S 2.25 AX 218020 14"-RHR-2303-2LD C PT 3.3-009 X 9/14/2007 - PT Complete. No Recordable LONGITUDINAL SEAM UT 5.4-007 Indications. WELD DOWNSTREAM 45S 5.0 AX X -9/16/2007 - UT Complete. No Recordable Indications. 45S 5.0 CIR X ISO# 5613-P-600-S SH. 1 60S 5.0 AX X 70S 2.25 AX X

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 24 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, PE, A, R) RESIDUAL HEAT REMOVAL FROM CONTAINMENT SUMP A Zone # 3-066 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 222080 14"-RHR-2305-3LU C PT 3.3-002 X -8/31/2007 - PT Complete. No Recordable LONGITUDINAL SEAM UT 5.4-011 Indications. WELD 45S 2.25 AX X -9/15/2007 - UT Complete. No Recordable Indications. 45S 2.25 CIR X ISO#5613-P-600-S SH. 2 60S 2.25 AX X 70S 2.25 AX X 8/31/2007 - PT Complete. No Recordable 222100 14"-RHR-2305-3 C-F-I C PT 3.3-002 PIPE TO VALVE C5.11 UT 5.4-011 Indications. MOV-3-860A 9/15/2007 - UT Complete. No Recordable 45S 2.25 AX X Indications. 45S 2.25 CIR X ISO#5613-P-600-S SH. 2 60S 2.25 AX X 70S 2.25 AX X 222860 14"-RHR-2305-IOLUI C PT 3.3-001 X 8/31/2007 - PT Complete. No Recordable LONG SEAM WELD UT 5.4-003 _ -Indications. INSIDE RADIUS OF 45S 2.25 CIR X -9/14/2007 - UT Complete. No Recordable ELBOW X Indications. 60S 2.25 AX ISO#5613-P-600-S SH. 2 70S 2.25 AX X 222880 14'-RHR-2305-IOLUO C PT 3.3-001 X 8/31/2007 - PT Complete. No Recordable LONG SEAM WELD UT 5.4-003 Indications. OUTSIDE RADIUS OF 45S 2.25 CIR X -- 9/14/2007 - UT Complete. No Recordable ELBOW X Indications. 60S 2.25 AX ISO# 5613-P-600-S SH. 2 70S 2.25 AX X 222900 14"-RHR-2305-10 C-F-I C PT 3.3-001 X 8/31/2007 - PT Complete. No Recordable ELBOW TO PIPE C5.11 UT 5.4-003 Indications. 45S 2.25 CIR X -9/14/2007 - UT Complete. Root Geometry recorded 360 degrees intermittent. 100% 60S 2.25 AX X Coverage Achieved. ISO# 5613-P7600-S SH. 2 70S 2.25 AX X 222920 14"-RHR-2305-1OLD C PT 3.3-001 X 8/31/2007 - PT Complete. No Recordable LONGITUDINAL SEAM UT 5.4-003 Indications. WELD DOWNSTREAM 45S 2.25 CIR X -9/14/2007 - UT Complete. No Recordable X Indications 60S 2.25 AX ISO# 5613-P-600-S SH. 2 70S 2.25 AX X 222980 14"-RHR-2305-1ILU C PT 3.3-001 X 8/31/2007 - PT Complete. No Recordable LONGITUDINAL SEAM UT 5.4-004 Indications. WELD UPSTREAM 45S 2.25 CIR X -9/14/2007 - UT Complete. No Recordable X Indications. 60S 2.25 AX ISO#5613-P-600-S SH. 2 70S 2.25 AX X 223000 14"-RHR-2305-11 C-F-I C PT 3.3-001 X 8/31/2007 - PT Complete. No Recordable PIPE TO VALVE C5.11 UT 5.4-004 Indications. MOV-3-861A 45S 2.25 CIR X -9/14/2007 - UT Complete. Root Geometry recorded 360 degrees intermittent. Limited 60S 2.25 AX -. X scan for .1"due to ID tag located at width ISO#5613-P-600-S SH. 2 70S 2.25 AX X .95" to 1.75" a dn length +/-.5".

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] -- Unit 3 Page 25 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) SAFETY INJECTION SYSTEM OUTSIDE CONTAINMENT Zone # 3-090 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 274100 8"-SI-2308-19 C-F-I C PT 3.3-003 X 8/31/2007 - PT Complete. No Recordable ELBOW TO, C5.11 UT 5.4-008 Indications. PENETRATION P-Il 45S 2.25 AX X 9/15/2007- UT Complete. Root Geometry Recorded. 100% Coverage Achieved. 45S 2.25 CIR X - " ISO# 5613-P-601-S SH. 1 60S 2.25 AX X

DATE:Ill16/2007 * . -. .. Turkey Point Nuclear Plant [PTN] -- Unit 3 Page 26 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) HIGH HEAD SAFETY INJECTION OUTSIDE CONTAINMENT Zone # 3-095 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ " E I 0 E " Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 288604 8080-R-007-01 F-A C VT-3 4.3-001 X 8/31/2007 - VT-3 Complete. No Recordable DOUBLE ACTING F1.20 Indications. RESTRAINT ISO#5613-P-823-S SH. 2 288820 8080-H-004-01 F-A C VT-3 4.3-004 X 8/31/2007 - VT-3 Complete. No Recordable DOUBLE ACTING F1.20 Indications. RESTRAINT ISO#5613-P-823-S SH. 1 288865 8080-H-007-07 F-A C VT-3 4.3-002 X 8/31/2007 - VT-3 Complete. No Recordable DOUBLE ACTING F1.20 Indications. RESTRAINT ISO# 5613-P-823-S SH. 1 288868 8080-H-007-07 IA C-C C PT 3.3-010 X 8/31/2007 - VT-I Complete. No INTEGRAL C3.20 Recordable Indications. There is a 1/4" area ATTACHMENTS in the middle of the weld where there is no weld metal. The weld size was evaluated in a condition report CR 97-0160. ISO#5613-P-823-S SH. 1 288878 8080-H-007-10 F-A C VT-3 4.3-003 X 8/31/2007 - VT-3 Complete. No Recordable DOUBLE ACTING F1.20 Indications. RESTRAINT ISO#5613-P-823-S SH. 1 288896 8080-H-005-02 F-A C VT-3 4.3-005 X 8/31/2007 - VT-3 Complete. No Recordable DOUBLE ACTING F1l.20 Indications. RESTRAINT ISO# 5613-P-823-S SH. 1 288911 8080-H-005-01 F-A C VT-3 4.3-010 X 9/6/2007 - VT-3 Complete. No Recordable DOUBLE ACTING F1.20 Indications. RESTRAINT ISO#5613-P-823-S SH. 1

DATE:11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit3 Page 27 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E,.A, R) MAIN STEAM SYSTEM LOOP A OUTSIDE CONTAINMENT Zone# 3-100 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I O E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 301700 26"-MSA-2304-17-. . C-F-2 C MT 2.2-001 X 9/15/2007 - MT Complete. No Recordable PIPE TO VALVE C5.51 UT 5.2-001 Indications. POV-3-2604 45S 2.25 AX X - 9/16/2007 - UT Complete. No Recordable Indications. 100% coverage achieved from 45S 2.25 CIR X pipe side. No coverage from valve side. ISO# 56t3-P-654-S SH. 2 70S 2.25 AX X 301800 26"-MSA-2304-17LU C MT 2.2-001 X 9/15/2007 - MT Complete. No Recordable LONGITUDINAL SEAM UT 5.2-001 Indications. WELD UPSTREAM 45S 2.25 AX X - 9/16/2007 - UT Complete. No Recordable Indications. 45S 2.25 CIR X ISO# 5613-P-654-S SH. 2 70S 2.25 AX X

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] -- Unit 3 Page 28 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1))

                                               'Completed Components (C, B, P, E, A, R)

MAIN FEEDWATER SYSTEM LOOP A Zone# 3-109 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 330500

  • AUGMENTED EXAMINAT AUG A UT 5.16-001 - - 9/12/2007 - UT complete.. Previously FROM NOZZLE RAMP TO 60S 2.25 AX X X recorded root geometry and non-metallic I DIAMETER ON ELBOW* inclusions verified by 0 degree observed.

70S 2.25 AX X 60S 5:0 AX X ISO# 5613-P-651-S SH. 1 70S 5.0 AX X

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] -- Unit 3 Page 29 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) MAIN FEEDWATER SYSTEM LOOP B Zone# 3-110 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I o E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 330700 14"-FWB-2304-1 C-F-2 C MT 2.2-002 X 9/i 5/2007 - MT Complete. No Recordable VALVE CV-3-2901 TO C5.51 UT 5.2-002 Indications. PIPE 9/16/2007 - UT Complete. Geometry 45S 2.25 AX X Recorded 3.60 degrees intermittent. Greater 45S 2.25 CIR X than 90% coverage obtained. ISO#5613-P-817-S SH. 3 60S 2.25 AX X 70S 2.25 AX X 331100 14"-FWB-2304-3 C-F-2 C MT 2.2-002 X 9/1 5/2007 - MT Complete.. No Recordable PIPE TO ELBOW C5.51 UT 5.2-002 Indications.. 45S 2.25 AX X -9/16/2007 - UT Complete. Geometry Recorded 360 degrees intermittent. Backing 45S 2.25 CIR X Ring was also Recorded. 100% Coverage ISO#5613-P-817-S SH. 3 60S 2.25 AX X

                                                                                               -         Achieved.

70S 2.25 AX X 333800 AUGMENTED EXAMINAT AUG A UT 5.16-002 9/15/2007 - UT complete. Previously FROM NOZZLE RAMP TO 60S 2.25 AX X recorded root geometry and backing ring I DIAMETER ON ELBOW 70S 2.25 AX X -observed. X 60S 5.0 AX - X - ISO#5613-P-652-S SH. 1 70S 5.0 AX

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] -- Unit 3 Page 30 REVISION: 0, Inservice Inspection Results Summary Interval 4, Period 2, Outage.1 ((4,2,1)) Completed Components (C, B, P, E, A, R) MAIN FEEDWATER SYSTEM LOOP C Zone# 3-111 N I 0 ASME Status 0 N G T Sec Xl R S E H Summary Examination Area Categ I E I 0 E Number Identification I ISO # Item No Method Data Sheet Number C G M R .Remarks 338200 AUGMENTED EXAMINA'T AUG A UT 5.16-003 - 9/11/2007 - UT Complete. Previously FROM NOZZLE RAMP TO 60S 2.25 AX X X recorded root geometry, non-metallic I DIAMETER ON ELBOW 70S 2.25 AX X inclusions and backing ring observed. 60S 5.0 AX X ISO# 5613-P-178-S SH. 1 .70S 5.0 AX X

DATE: 11116/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 31 REVISION: 0. Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) COMPONENT COOLING WATER SYSTEM OUTSIDE CONTAINMENT Zone# 3-136 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification /ISO # Item No Method Data Sheet Number C G M R Remarks 356000 3-ACH-19 F-A C VT-3. 4.3-006 ",X - - 9/4/2007 - VT-3 Complete. No Recordable WELDED STANCHION F1.30 Indications. ISO#5613-P-618-S SH. 1 356010 3-ACH-19 IA D-A C VT-I 4.1-001 X 9/4/2007 - VT-I Complete. No Recordable INTEGRAL D1.20 Indications. ATTACHMENT ISO# 5613-P-618-S SH. 1

DATE:11/16/2007 Turkey Point Nuclear Plant [PTN] -- Unit 3 Page 32 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) COMPONENT COOLING WATER SYSTEM OUTSIDE CONTAINMENT Zone# 3-145 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ " E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 360400 MK-I 11 F-A C VT-3 4.3-018 . X 9/11/2007 - VT-3 Complete. No Recordable DOUBLE ACTING F1.30 Indications. RESTRAINT ISO# 5613-P-604-S SH. 6

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] -- Unit 3 Page 33 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage'l ((4,2,1)) Completed Components (C, B, P, E, A, R) COMPONENT COOLING WATER TO RESIDUAL HX B Zone# 3-146 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 361310 3-RHE-B-UPPER SUPPORI F-A C VT-3 4.3-012 X - 9/10/2007 VT-3 Complete. No Recordable HEAT EXCHANGER F1.40 Indications. UPPER SUPPORT ISO# 5613-M-4011 361320 3-RHE-B-UPPER SUPPORI D-A C VT-1 4.1-005 X 9/10/2007 - VT-1 Complete. No Recordable INTEGRAL D1.10 Indications. ATTACHMENT ISO# 5613-M-4011

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 34 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) COMPONENT COOLING WATER FROM NON-REGENERATIVE HX Zone# 3-161 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ _ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 370400 3-ACH-68 F-A C VT-3 4.3-013 X. 9/10/2007 - VT-3 Complete. No Recordable SINGLE ACTING FI.30 Indications. RESTRAINT ISO# 5613-P-622-S SH. 1 370450 3-ACH-68 IA D-A C VT-I 4.1-009 X 9/10/2007 - VT-I Complete. No Recordable INTEGRAL DI.20 Indications. ATTACHMENT ISO# 5613-P-622-S SH. 1

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] -- Unit 3 Page 35 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) AUXILIARY FEEDWATER PUMP SUCTION FROM COND.STG.TK. Zone# 3-164 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I O E Number . Identification IISO # Item No Method Data Sheet Number C G M R.: Remarks 376800 80117-H-340-06. F-A C VT-3 4.3-019 X. " 9/12/2007 - VT-3 Complete. No Recordable DOUBLE ACTING F1.30 Indications. RESTRAINT ISO#5610-P-818-S SH. 1 376850 80117-H-340-06 IA D-A C VT-I 4.1-006 X 9/12/2007 - VT-I.Complete. No INTEGRAL D1.20 Recordable Indications. ATTACHMENT ISO# 5610-P-818-S SH. 1 377060 Auxiliary Feedwater Pump 31F-A C VT-3 4.3-020 X - - . 9/12/2007 - VT-3 Complete. No Recordable PUMP SUPPORT F11.40 Indications. ISO#5610-P-818-S SH. 1

DATE: 11/16/2007 Turkey Point Nuclear Plant [PTN] - Unit 3 Page 36 REVISION: 0 Inservice Inspection Results Summary Interval 4, Period 2, Outage 1 ((4,2,1)) Completed Components (C, B, P, E, A, R) INTAKE & CHLOR.WATER FROM INTAKE COOLING WTR.PUMPS Zone# 3-167 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I O E Number Identification IISO #* Item No Method Data Sheet Number C G M R Remarks 377900 M-196-4 F-A C VT-3 4:3-022 X - *- - 9/12/2007 - VT-3 Complete. No Recordable SINGLE ACTING F1.30 Indications. RESTRAINT ISO#5613-P-606-S SH. 1 378110 ICW PUMP 3P9A F-A C VT-3 4.3-021 . X 9/12/2007 - VT-3 Complete. No Recordable PUMP SUPPORT F1.40 Indications. ISO# 5613-P-606-S SH. 2

TURKEY POINT UNIT 3 2007 REFUELING OUTAGE Summary of Inservice Inspection IWE Examinations Attachment 2 6

DATE: 11/20/2007 IWE Program-All Plants [IWE] - Unit 3 Page 1 REVISION: 0 Inservice Inspection Results Summary Interval 1, Period 3, Outage 2 ((1,3,2)) Completed Components (CBPROE) METALLIC CONTAINMENT LINER Zone #A 3-001 hIl I ' ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 400150 MOISTURE BARRIER E-D . 0 VT-3 4.7-001 X 9/5/07 - VT-3 of replaced sealant (condition LINER PLATE TO FLOOR E5.30 assessment) (MOISTURE BARRIER) ISO# 5610-C-i 65

DATE:11/20/2007* IWE Program-All Plants [IWE] -- Unit 3 Page 2 REVISION: 0 InserviceInspection Results Summary p.

                              ..                Interval 1, Period 3, Outage 2 ((1,3,2))

Completed Components (CBPROE) METALLIC CONTAINMENT LINER Zone # 3-002 NI 0 ASME Status 0 IN G T Sec Xl R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks

.400280   MOISTURE BARRIER        E-D     0  VT-3           4.7-002                   X      - - 9/5/07 - VT-3 of replaced sealant (condition LINER PLATE TO FLOOR E5.30                                                             assessment)

(MOISTURE BARRIER) ISO# 5610-C-165

DATE: 11/20/2007 IWE Program-All Plants [IWE] -- Unit 3 Page 3 REVISION: 0 Inservice Inspection Results Summary Interval 1, Period 3, Outage 2 ((1,3,2)) Completed Components (CBPROE) METALLIC CONTAINMENT LINER Zone # 3-003 N I 0 ASME Status 0 N G T Sec XI l R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 401250 MOISTURE BARRIER E-D 0 VT-3 4.7-003 X 9/5/07 - VT-3 of replaced sealant (condition LINER PLATE TO FLOOR E5.30 assessment) (MOISTURE BARRIER) ISO# 5610-C-165

DATE: 11/20/2007 IWE Program-All Plants [IWE] -- Unit 3 Page 4 REVISION: 0 Inservice Inspection Results Summary Interval 1, Period 3, Outage 2 ((1,3,2)) Completed Components (CBPROE) METALLIC CONTAINMENT LINER Zone # 3-004 N I 0 ASME Status 0 N G T Sec Xl R S E H Summary Examination Area Categ E I 0 E Number Identification I ISO# Item No Method Data Sheet Number C G M R Remarks 401400 MOISTURE BARRIER E-D 0 VT-3 4.7-004 X - 9/5/07 - VT-3 of replaced sealant (condition LINER PLATE TO FLOOR E5.30 assessment) (MOISTURE BARRIER) ISO# 5610-C-165

DATE: 11/20/2007 IWE Program-All Plants [IWE] -- Unit 3 Page 5 REVISION: 0 Inservice Inspection Results Summary Interval 1, Period 3, Outage 2 ((1,3,2)) Completed Components (CBPROE). METALLIC CONTAINMENT LINER Zone # 3-005 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 401510 MOISTURE BARRIER E-D 0 VT-3 4.7-005 X 9/5/07 - VT-3 of replaced sealant (condition LINER PLATE TO FLOOR E5.30 assessment) (MOISTURE BARRIER) ISO# 561 0-C-1 65

DATE: 11/20/2007 [WE Program-All Plants [IWE] -- Unit 3 Page 6 REVISION: 0 Inservice Inspection Results Summary Interval 1, Period 3, Outage 2 ((1,3,2)) Completed Components (CBPROE) METALLIC CONTAINMENT LINER Zone# 3-006 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ _ E I 0 E Number Identification IISO # Item No Method Data Sheet Number C G M R Remarks 401650 MOISTURE BARRIER E-D 0 VT-3 4.7-006 X - - 9/5/07 - VT-3 of replaced sealant (condition LINER PLATE TO FLOOR E5.30 assessment) (MOISTURE BARRIER) ISO# 5610-C-165

DATE: 11/20/2007 IWE Program-All Plants [IWE] -- Unit 3 Page 7 REVISION: 0' Inservice.Inspection Results Summary Interval 1, Period 3, Outage 2 ((1,3,2)) Completed Components (CBPROE) METALLIC CONTAINMENT LINER Zone# 3-016 N I1 0 ASME Status 0 N G T Sec Xl R S E H Summary Examination Area Categ E 0 E Number Identification I ISO # Item No Method Data Sheet Number C G M R ' Remarks 402682 PENETRATION 35 BOLTII' E-G C VT-l 4.7-009 " X - 9/18/07 - VT-l.Complete. Scaffold needed. BOLTING PENETRATION E8.10 for inspection. 35 ISO# 5610-C-170 402692 PENETRATION 36 (BOLTI] E-G C VT-1 4.7-009 X 9/18/07 - VT-1 Complete." Scaffold needed BOLTING E8.10 for inspection. Note: Two studs at the 12 (PENETRATION 36) o'clock position and two studs at the 6 o'clock do not require nuts on the liner plate ISO# 5610-C-170 side by design.

DATE: 11/20/2007 ]WE Program-All Plants [IWE] -- Unit 3 Page 8 REVISION: 0 Inservice Inspection Results Summary Interval 1, Period 3, Outage 2 ((1,3,2)) Completed Components (CBPROE) METALLIC CONTAINMENT LINER Zone# 3-018 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I O E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 402940 LINER PLATE E-A C GEN. 4.7-010 X - - , - .9/5/07 - General Visual Pre-repair. LINER PLATE (GENERAL EII.1 GEN. 4.7-011 X 9/24/07 - General Visual Post repair. VISUAL) ISO# 5610-C-165 402990 LINER PLATE E-A C VT-3 4.7-010 X " 9/5/07 - VT-3 Pre-repair. LINER PLATE (VISUAL) EI.12 VT-3 4.7-011 X 9/24/07 - VT-3 Post repair. ISO# 561 0-C-165

DATE: 11120/2007 IWE Program-All Plants [IWE] -- Unit 3 Page 9 REVISION: 0 Inservice Inspection Results Summary Interval 1, Period 3, Outage 2 ((1,3,2)) Completed Components (CBPROE) METALLIC CONTAINMENT LINER Zone # 3-020 N I 0 ASME Status 0 N G T Sec XI R S E H Summary Examination Area Categ E I O E Number Identification I ISO # Item No Method Data Sheet Number C G M R Remarks 403100 LINER PLATE E-A 0 GEN. 4.7-008 X - 9/18/07 - General Inspection of repaired SOUTH RECIRC SUMP ElI11 liner plate (coatings condition assessment) Area to be made inaccessible due to the sump modifications. iSO# 5610-C-150 403110 LINER PLATE E-A 0 GEN. 4.7-007 X - 9/7/07 - General Visual of repaired liner NORTH RECIRC SUMP EIll plate (coatings condition assessment) Area to be made inaccessible due to the sump modifications. ISO# 5610-C-150 403130 LINER PLATE E-A 0 VT-3 4.7-008 X - 9/18/07- VT-3 of repaired liner plate SOUTH RECIRC SUMP El.12 (coatings condition assessment) Area to be made inaccessible due to the sump modifications. ISO# 5610O-C-ISO0 403140 LINER PLATE E-A 0 VT-3 4.7-007 X 9/7/07 - VT-3 of repaired liner plate NORTH RECIRC SUMP E1.12 (coatings condition assessment) Area to be made inaccessible due to the sump modifications. ISO# S61 0-C-i 50

TURKEY POINT UNIT 3 2007 REFUELING OUTAGE Summary of Visual Examinations and Functional Testing of Snubbers Attachment 3 7

MECHANICAL SHOCK ARRESTOR FINAL REPORT TURKEY POINT UNIT 3 2007 CYLCE 23 REFUELING OUTAGE Commercial Service Date: December 14, 1972 Prepared by: Inservice Inspection Group Florida Power & Light Turkey Point Nuclear 9760 S.W. 344 St. Florida City, FL 33035 Originated by: Melba Uampbell Date

                     -I                                             Dt-0o7 Date Reviewed by:                      /RRicky        Spillman Approved by:                                Ed Lyons                 Date Word:ptmsfo2kvol.l/common/frp198

Mechanical shock arrestors (snubbers) were visually inspected/handstroked and functionally tested under purchase order #00081442 by Basic-PSA personnel in accordance with the following plant procedures: O-OSP-105.1 O-OSP-105.2 A technical specification visual inspection, ASME Section XI VT-3 and a hand stroking was performed at the following tag locations: 3-1001 3-1002 3-1004 3-1005 3-1006 3-1007 3-1008 3-1009 3-1011 3-1013 3-1015 3-1016 3-1017 3-1018 3-1019 3-1020 3-1021 3-1022 3-1023 3-1024 3-1026 3-1027 3-1028 3-1029 3-1094 3-1123 3-1124 3-1126 3-1127 3-1128 3-1129 3-113 3-1132 3-1133 3-1134 3-1135 A technical specification visual inspection, ASME Section XI VT-3, NO HAND STROKE., and a functional test was performed at the following tag locations: 3-1000 3-1003 3-1014 3-1025 3-1030 3-1075 3-1083 3-1102 3-1010 3-1012 3-1125 3-1131 Italics indicates SR Sample snubbers Bold indicates QR Sample snubbers Underline indicates previous rebuilds The following snubbers located in the Pressurizer Cubical are separate from the sample plan. These snubbers are tested for prevented maintenance. A technical specification visual inspection, ASME Section XI VT-3 and a hand stroke was performed at the following tag locations 3-1043, 3-1044, 3-1045, 3-1046, 3-1047, and 3-1050. Upon completion of the technical specification visual inspection and ASME Section XI VT-3 snubbers 3-1048, 3-1049, and 3-1060 were changed out with previously rebuilt and functionally tested snubbers. The removed snubbers were rebuilt and functionally tested and will be utilized as spares for future outages. Word:ptnsfo2/vol. 1/cornnion/frpl 98

TURKEY POINT NUCLEAR PLANT OUTAGE

SUMMARY

REPORT UNIT 3 C23 OUTAGE REPORT WO # 36019760-01 TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

. FUNCTIONAL TEST

SUMMARY

MENTS/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1000 18015 N/A 9/9/2007 PASS 09/09/07 PASS 12.875" PASS NO N/A Visual Inspection -SAT, "L"Dimension - FUNCTIONAL TEST PERFORMED? YES SAT. Snubber removed and transported to the test trailer for functional test. STATUS PASS (WA IF NOT PERFORMED) Functional test was SAT. Snubber to extension piece was torqued to 45 in lbs TENSION COMPRESSION CRITERIA using torque wrench M1010 (cal due date 2/20/08). Lubricated load pin and TEST 1 6.1 9.2 30.0 spherical bearings with neo-lube UTC TEST 2 7.8 10.2 30.0 24987-3. Re-installed snubber. As-left visual inspection - SAT. TEST 3 0.009 0.008 .02g's TEST 4 7.5 9.7 30.0 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED: 09/09/07 3-1001 27095 N/A 9/9/2007 PASS N/A 17.125' PASS YES PASS Visual Inspection -SAT, "L"Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS, N/A (N/A IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:.

TAG # SERIAL# REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1002 104 N/A 9/9/2007 PASS N/A 17.312" PASS YES PASS Visual Inspection -SAT, "'1 Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (WA IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1003 29625 N/A 9/10/2007 PASS 09/10/07 PASS 15.75" PASS NO N/A Visual Inspection -SAT, "U' Dimension - FUNCTIONAL TEST PERFORMED? YES SAT. Snubber removed and transported to the test trailer for functional test. STATUS PASS (N/A IF.NOT PERFORMED) Functional test was SAT. Lubricated load pin and spherical bearings with neo- TENSION COMPRESSION CRITERIA lube UTC # 24984-3. Snubber to Extension piece was torqued to 120 in. TEST 1 12.8 21.6 120.0 lbs. using torque wrench M1 008 (cal due TEST 2 24.6 36.7 120.0 date 3/1/08.). Reinstalled snubber. As-left visual inspection - SAT. TEST 3 0.004 0.004 .02g's TEST 4 39.3 49.1 120.0 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED: 09/11/07

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT SIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T. T

........ - .....= ......................................    .....................................................................
                                                                                                                             ,              ........ ............................ o .. ... .. .. .. . .. . . .. . .. ..... .

3-1004 101 N/A 9/9/2007 PASS N/A 17.375" PASS YES PASS Visual Inspection -SAT, L" Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (WA IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:. 3-1005 11931 N/A 915/2007 PASS N/A 26250' PASS YES PASS Visual Inspection -SAT, L' Dimension- FUNCTIONAL TEST PERFORMED? NO SAT, handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (WA IF NOT PERFORMED) UTC # 24984-3, lubricated load stud threads with N-5000-UTC # 24974-3. TENSION COMPRESSION CRITERIA Torqued load stud nuts to 150 ft. lbs. using torque wrench M999, cal due date TEST 1 11/25/07. TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

FUNCTIONAL S L DIMEN S HAND- S FUNCTIONAL TEST

SUMMARY

TAG # SERIAL # REPLACE- VISUAL S INSPECTION

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1006 6494 N/A 9/4/2007 PASS N/A 26.750" PASS YES PASS Visual Inspection -SAT, "U' Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (N/A IF NOT PERFORMED) UTC # 24984-3, lubricated load stud threads with N-5000-UTC # 24974-3. TENSION COMPRESSION CRITERIA Torqued load stud nuts to 150 ft. tbs. using torque wrench M999, cal due date TEST 1 11/25/07. TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1007 42387 N/A 9/4/2007 PASS N/A 26.750" PASS YES PASS Visual Inspection -SAT, 'L" Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS WA (WA IF NOT PERFORMED) UTC # 24984-3, lubricated load stud threads with N-5000-UTC # 24974-3. TENSION COMPRESSION CRITERIA Torqued load stud nuts to 150 ft. lbs. TEST 1 using torque wrench M999, cal due date 11/25/07. TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG# SERIAL# REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1008 8084 N/A 91312007 PASS N/A 27.50' PASS YES PASS Visual Inspection -SAT, 'L' Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (MIA IF NOT PERFORMED) UTC # 24984-3, lubricated load stud threads with N-5000-UTC # 24974-3. TENSION COMPRESSION CRITERIA Torqued load stud nuts to 150 ft. lbs. using torque wrench M999, cal due date TEST 1 11/25/07. TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1009 10542 N/A 9/5/2007 PASS N/A 26.750" PASS YES PASS Visual Inspection -SAT, "L"Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (NA IF NOT PERFORMED) UTC # 24984-3, lubricated load stud threads with N-5000-UTC # 24974-3. TENSION COMPRESSION CRITERIA Torqued load stud nuts to 150 ft. lbs. using torque wrench M999, cal due date TEST 1 11/25/07. TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL# REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1010 6530 N/A 914/2007 PASS 09104107 PASS 26.125" PASS NO N/A Visual Inspection -SAT, 'L2Dimension FUNCTIONAL TEST PERFORMED? YES acceptable. Snubber removed and transported to the test trailer for STATUS PASS (N/A IF NOT PERFORMED) functional teSt. Snubber functional test was SAT and re-greased. Lubricated TENSION COMPRESSION CRITERIA load pin and spherical bearings with neo- T lube UTO # 24984-3. Re-installed TEST 1 183.6 132.8 1000.0 snubber, Torqued load studs to 150 ft TEST 2 209.3 .158.0 1000.0 lbs using torque wrench M999 (cal due date 11/25/07). As-left visual TEST 3 0.005 0.004 .02g's inspection - SAT. TEST 4 229.7 154.8 1000.0 TEST SAMPLE? YES SAMPLE CLASS OR DATE REINSTALLED: 09/08/07 3-1011 12376 N/A 9/3/2007 PASS N/A 20.125" PASS YES PASS Visual Inspection -SAT, "L" Dimension- FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neocube STATUS WA (N/A IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T

     . . .I                                 S
              ............................... .       S   5 S ... ..
                                                  . ........          ..    .    . * . .   . . ..... ... .. ......      I... ..
                                                                                                                    .. ...      ..  ... ... . I .................... ............ .  .. .  ..

3-1012 8086 N/A 9/3/2007 PASS 09/03/07 PASS 27.0" PASS NO N/A Visual Inspection -SAT, "L Dimension - FUNCTIONAL TEST PERFORMED? YES SAT, Functional test -SAT. Snubber was internally inspected, the results STATUS PASS (N/A IF NOT PERFORMED) indicated it needed to be re-greased and capstan spring replaced. As left TENSION COMPRESSION CRITERIA functionally test-SAT. Reinstalled Snubber lubricated load studs and TEST 1 47.1 112.4 1000.0 spherical bearing with N-5000-UTC # TEST 2 84.8 147.2 1000.0 24974-3. Torqued load stud nuts to 150 ft. lbs. Using torque wrench M999, cal TEST 3 0.005 0.007 .02g's due date 11/25/07. As left visual inspection was SAT. TEST 4 123.2 114.3 1000.0 TEST SAMPLE? YES SAMPLE CLASS OR DATE REINSTALLED: 09/08/07 3-1013 33624 N/A 9/9/2007 PASS N/A 10.375" PASS YES PASS Visual Inspection -SAT, "L" Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (WA IF NOT PERFORMED) UTC # 449261-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1014 1722 N/A 9/11/2007 PASS 09/11/07 PASS 8.750' PASS NO NWA Visual Inspection -SAT, 'L" Dimension - FUNCTIONAL TEST PERFORMED? YES SAT. Snubber was removed and transported to the test trailer for STATUS PASS (WA IF NOT PERFORMED) functional test. Functional test was SAT. Reinstalled Snubber lubricated TENSION COMPRESSION CRITERIA load pin and spherical bearings with neo-lube UTC # 24984-3. As-left visual TEST 1 2.3 4.2 13.0 inspection was SAT. TEST 2 2.3 5.4 13.0 TEST 3 0.011 0.015 .02g's TEST 4 2.4 4.8 13.0 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED: 09/11/07 3-1015 18009 N/A 9/10/2007 PASS N/A 11.875' PASS YES PASS Visual Inspection -SAT, 'L" Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke- SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (WA IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1016 18012 N/A 9/10/2007 PASS N/A 12.00 PASS YES PASS Visual Inspection -SAT, "L. Dimension ~ FUNCTIONALTEST PERFORMED? NO SAT, Handstrolke - SAT. Lubricated load pin and spherical bearingwith neo-lube STATUS N/A (WA IF NOT PERFORMED) UTC #24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1017 18003 N/A 9/10/2007 PASS N/A 13.750" PASS YES PASS Visual Inspection -SAT, "L' Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke- SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (N/A IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T

 - ..-.................................................................................................-S-     .  .. . .  .. . . S. S
                                                                                                                                    ..S . -. . - I ..- . S .55 ..
                                                                                                                                                         .         .~SS
                                                                                                                                                                      . .S* I ..SS~SS-
                                                                                                                                                                                  . .   *S-
                                                                                                                                                                                         . . SS~S
                                                                                                                                                                                              . I .... ...

3-1018 18013 N/A 9/1012007 PASS N/A 13.50" PASS YES PASS Visual Inspection -SAT, "L' Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-Iube STATUS N/A (WA IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1019 17425 N/A 9/11/2007 PASS N/A 17.375" PASS YES PASS Visual Inspection -SAT, '1 Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (N/A IF NOT PERFORMED) UTC # 449261-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1020 103 N/A 9/11/2007 PASS N/A 17.062' PASS YES PASS Visual Inspection -SAT,"L" Dimension - FUNCTIONAL TEST PERFORMED? NO. SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (NA IF NOT PERFORMED) UTC # 449261-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1021 16725 N/A 9/11/2007 PASS N/A 8.250' PASS YES PASS Visual Inspection -SAT, "L"Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (WA IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L-DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE - A A  ? A T T T T ................ ....................... "..............................7......11.......... " .""................'.................."..........I. ""..!. 3-1022 18006 N/A 9/11/2007 PASS N/A 13.375 PASS YES PASS Visual Inspection -SAT, " Dimension- FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (N/A IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1023 23273 N/A 9/11/2007 PASS N/A 12.875" PASS YES PASS Visual Inspection -SAT, 'L" Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (N/A IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL# REPLACE-: VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T n

..    -   -De.
          .    . i. .   . .  . . .   . . .  . . . I ... ..
                                                             ,.  ...... i..
                                                                          .o... ...                     ... I ...  ..                                         i 3-1024   17427    N/A      9/11/2007 PASS              N/A      16.625      PASS     YES PASS Visual Inspection -SAT, "L"Dimension -         FUNCTIONAL TEST PERFORMED?                      NO SAT, Handstroke - SAT. Lubricated load pin and spherlcal bearing with neo-lube         STATUS N/A                  (N/A IF NOT PERFORMED)

UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED; 3-1025 100 N/A 9/11/2007 PASS 09/11/07 PASS 16.750' PASS NO N/A Visual Inspection -SAT, 'L" Dimension - FUNCTIONAL TEST PERFORMED? YES SAT. Snubber removed from extension piece and transported to the test trailer STATUS PASS (NWAIF NOT PERFORMED) for functional test. Functional test was SAT. Torqued snubber to transition TENSION COMPRESSION CRITERIA tube using torque wrench M1010 to 120 in lbs (cal due date 2120/08). TEST 1 14.7 10.2 120.0 Lubricated load pin and spherical TEST 2 17.9 19.7 120.0 bearings with neo-lube UTC 24984-3. Re-installed snubber and performed as- TEST 3 0.007 0.003 .02g's left visual inspection - SAT. TEST 4 14.9 21.0 120.0 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED: 09/11/07

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND. S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1026 12394 N/A 9/12/2007 PASS NO 19.0 PASS YES PASS Visual Inspection -SAT, 'L' Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS NO (WA IF NOT PERFORMED) UTC #24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1027 16237 N/A 9/12J2007 PASS NO 21.0" - PASS YES PASS Visual Inspection -SAT, 'L" Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS NO (NWA IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1028 11135 N/A 9/1112007 PASS NO 19.75" PASS YES PASS Visual Inspection -SAT, "L" Dimension - FUNCTIONAL TEST PERFORMED?. NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS NO (N/A IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1029 11330 N/A 9/11/2007 PASS NO 21.625 PASS YES PASS Visual Inspection -SAT, "'L"Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS NO (WAIF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S. FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1030 11121 N/A 9/11/2007 PASS 09/11/07 PASS 21.125 PASS NO N/A Visual Inspection -SAT, "L" Dimension - FUNCTIONAL TEST PERFORMED? YES SAT. Snubber removed from extension piece and transported to the test trailer STATUS PASS (WA IF NOT PERFORMED) for functional test. Functional test was SAT. Torqued snubber to transition TENSION COMPRESSION CRITERIA tube using torque wrench M631 to 37 in lbs (cal due date 2/24108). Lubricated TEST 1 35.2 22.4 300.0 load pin and spherical bearings with neo- TEST 2 44.6 34.9 300.0 lube UTC 24984-3. Re-installed snubber and performed as-left visual inspection - TEST 3 0.007 0.008 .02g's SAT. TEST 4 28.7 41.8 300.0 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED: 09/12/07 3-1043 17900 N/A 9/6/2007 PASS N/A 22.062" PASS YES PASS Visual Inspection -SAT, "L" Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (N/A IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1044 11125 N/A 9/6/2007 PASS N/A 21.562' PASS YES PASS Visual Inspection -SAT, "L" Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (NIA IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1045 17189 N/A 9/6/2007 PASS N/A 21.50" PASS YES PASS Visual Inspection -SAT, "L" Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (NIAIF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL# REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1046 17903 N/A 9/6/2007 PASS N/A 20.75" PASS YES PASS Visual Inspection -SAT, "L Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (N/A IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1047 17906 N/A 91612007 PASS N/A 20.938" PASS YES PASS Visual Inspection -SAT, "L" Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (N/A IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1048 16238 3932 916/2007 PASS 09108107 PASS 191/2" PASS YES PASS Visual Inspection -SAT, "LVDimension - FUNCTIONAL TEST PERFORMED? YES SAT, Handstroke - SAT. Snubber SN 16238 was removed and replaced with STATUS PASS (N/A IF NOT PERFORMED) tested spare SN 3932 as a scheduled swap out Extension piece was torqued TENSION COMPRESSION CRITERIA to 37 ft. lbs using torque wrench M631, cal due date 2124/08; Lubricated load pin TEST 1 12.1 33.1 300.0 and spherical bearing with neo-lube UTC

                                                                         #24984-3. SN 16238 was torn down, re-built, functionally tested and will be       TEST 3    0.009       0.005          .02g's stored as a spare.

TEST 4 27.5 40.8 300.0 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 09/06/07 3-1049 11461 3919 9/612007 PASS 09/08/07 PASS 201/2" PASS YES PASS Visual Inspection -SAT, "L"Dimension - FUNCTIONAL TEST PERFORMED? YES SAT, Handstroke - SAT. Snubber SN 11461 was removed and replaced with STATUS PASS (NIA IF NOT PERFORMED) tested spare SN 3919 as a scheduled swap out Extension piece was torqued TENSI ON COMPRESSION CRITERIA to 37 ft. lbs using torque wrench M631, cal due date 2/24/08. Lubricated load TEST 1 23.3 18.6 300.0 pins and spherical bearings with neo-TEST 2 29.9 30.4 300.0 lube UTC # 24984-3. SN 11461 was tom down, re-built, functionally tested TEST 3 0.008 0.009 .02g's and will be stored as a spare. TEST 4 27.4 34.4 300.0 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 09/06107

TAG # SERIAL# REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT SIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1050 11446 N/A 9/6/2007 PASS N/A 22.250" PASS YES PASS Visual Inspection -SAT, "L" Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (WA IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST I TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1060 19728 27092 91612007 PASS 09/03/07 PASS 18 1/4" PASS YES PASS Visual Inspection -SAT, "V"Dimension - FUNCTIONAL TEST PERFORMED? YES SAT, Handstroke - SAT. Snubber SN 19728 was removed and replaced with STATUS PASS (WA IF NOT PERFORMED) tested spare SN 27092 as a scheduled swap out Extension piece was torqued TENSIION COMPRESSION CRITERIA to 120 in. lbs using torque wrench M1005, cal due date 10/28/07. TEST 1 10.3 18.7 120.0 Lubricated load pin and spherical TEST 2 14.3 19.5 120.0 bearing with neo-lube UTC # 24984-3. SN 19728 was tom down, re-built, TEST 3 0.005 0.004 .02g's functionally tested and will be stored as a spare. TEST 4 12.3 20.5 120.0 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 09/06107

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE - A DATE A A  ? A T T T T 3-1075 18072 N/A 9/1012007 PASS 09/10/07 PASS 8.687" PASS NO N/A Visual Inspection -SAT, "L' Dimension - FUNCTIONAL TEST PERFORMED? YES SAT. Snubber removed and transported to the test trailer for functional test. STATUS PASS (WA IF NOT PERFORMED) Functional test was SAT. Lubricated load pin and spherical bearings with neo- TENSION COMPRESSION CRITERIA lube UTC # 24984-3. Re-installed snubber, as-left visual inspection was. TEST 1 2.1 42 13.0 SAT. -- v-cery Aa TEST 3 0.008 0.008 .02g's TEST 4 2.6 4.5 13.0 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED: 09/10/07 3-1083 11925 N/A 9/13/2007 PASS 09/13/07 PASS 25.50' PASS NO N/A Visual Inspection -SAT, 'LV Dimension - FUNCTIONAL TEST PERFORMED? YES SAT. Snubber removed and transported to the test trailer for functional test STATUS PASS (N/A IF NOT PERFORMED) Functional test was SAT. Lubricated load pin and spherical bearings with neo- TENSION COMPRESSION CRITERIA lube UTC # 24984-3. Re-installed snubber, as-left visual inspection was TEST 1 78.6 230.0 1000.0 SAT. TEST 2 105.3 256.6 1000.0 TEST 3 0.004 0.004 .02g's TEST 4 96.8 236.9 1000.0 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED: 09/13107

TAG# SERIAL# REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENTSJN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1094 27081 N/A 9/10/2007 PASS N/A 15.125' PASS YES PASS Visual Inspection -SAT, "L"Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (N/A IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1102 29451 N/A 9/10/2607 PASS 09/10107 PASS 11.125" PASS NO N/A Visual Inspection -SAT, "L" Dimension FUNCTIONAL TEST PERFORMED? YES acceptable. Snubber removed and transported to the test trailer for STATUS PASS (N/A IF NOT PERFORMED) functional test. Functional test was SAT. Lubricated load pin and spherical TENSION COMPRESSION CRITERIA bearings with neo-lube UTC # 24984-3. Re-installed snubber, as-left visual TEST 1 1.6 5.0 7.0 inspection was SAT. TEST 2 3.5 ..5.3 7.0 TEST 3 0.008 0.009 .02g's TEST 4 3.6 5.0 7.0 TEST SAMPLE? YES SAMPLE CLASS SR DATE REINSTALLED- 09/10/07

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1123 6484 N/A 9/8(2007 PASS N/A 27.75' PASS YES PASS Visual Inspection -SAT, "L"Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-Iube STATUS N/A (N/A IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1124 12991 N/A , 9/8/2007 PASS N/A 27.75' PASS YES PASS Visual Inspection -SAT, "LDimension - FUNCTIONAL TEST PERFORMED? NO

  • SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (NfA !F NOT PERFORMED)

UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT SIN INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1125 12986 N/A 917/2007 PASS 09/11/07 PASS 26.625' PASS NO N/A Visual Inspection -SAT. "L" Dimension - FUNCTIONAL TEST PERFORMED? YES SAT. Snubber removed from extension piece and transported to the test trailer STATUS PASS (WA IF NOT PERFORMED) for functional test. Functional test was SAT. Torqued snubber to transition TENSION COMPRESSION CRITERIA tube using torque wrench M876 to 150 ft lbs (cal due date 3/2108). Lubricated TEST 1 83.6 177.6 1000.0 load pin and spherical bearings with neo- TEST 2 139.7 221.1 1000.0 lube UTC 24987-3. Re-installed snubber and performed as-left visual inspection - TEST 3 0.003 0.006 .02g's SAT. TEST 4 127.4 245.8 1000.0 TEST SAMPLE? YES SAMPLE CLASS OR DATE REINSTALLED: 09/12/07 3-1126 12989 N/A' 917/2007 PASS N/A 26.937' PASS YES PASS Visual Inspection -SAT, "L"Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with N-5000 STATUS N/A (WA IF NOT PERFORMED) UTC # 24974-3:. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S LDIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1127 *12990 N/A 9/8/2007 PASS N/A 27.25' PASS YES PASS Visual Inspection -SAT, "L'Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated Ioad pin and spherical bearing with N-5000 STATUS N/A (NA IF NOT PERFORMED) UTC # 24974-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1128 12985 N/A 9/4/2007 PASS N/A 27.0' PASS YES PASS Visual Inspection -SAT, "L" Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke- SAT. Deviation report #TP3-07-001 was generated due STATUS N/A (NIA IF NOT PERFORMED) to heavy corrosion inside the support structure. CR 2007-26873 had TENSION COMPRESSION CRITERIA previously been generated by Eng to address this concern. Lubricated load TEST 1 pin and spherical bearing with neolube TEST 2 UTC # 24984-3. TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:.

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1129 12987 N/A 9/4/2007 PASS N/A 26.0" PASS YES PASS Visual Inspection -SAT, "LVDimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N//A (N/A IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1130 17840 N/A. 9/4/2007 PASS 09/08/07 PASS 19.75" PASS YES PASS Visual Inspection -SAT, "L" Dimension - FUNCTIONAL TEST PERFORiMED? YES SAT, Handstroke - SAT. The snubber was removed, transported to the test STATUS PASS (N/A IF NOT PERFORMED) trailer for a functional test (SAT) for information because the companion TENSION CiOMPRESSION CRITERIA snubber tag 3-1131 failed the functional test. The snubber was re-installed and TEST 1 78.9 110.3 300.0 the load pins and spherical bearings TEST 2 78.9 112.1 300.0 were lubricated with neo-lube UTC # 24984-3 The transition tube bolting was TEST 3 0.007 0.006 .02g's torqued to 37 ft. lbs using torque wrench M635 (cal due date 12/6/07). Re- TEST 4 62.2 81.6 300.0 Installed and performed as-left visual inspection-SAT. TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 09/09/07

TAG # SERIAL # REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1131 17837 16231 9/7/2007 PASS 09/08/07 FAIL 19.875' PASS NO N/A Visual Inspection -VT-3 (IWF) inspection FUNCTIONAL TESTPERFORMED? YES UNSAT (pipe spring movement of 7/16"), "L" Dimension -SAT. The STATUS FAIL (NWA IF NOT PERFORMED) snubber was removed , transported to the test trailer for a functional test TENSION COMPRESSION CRITERIA (UNSAT) .The snubber was replaced TEST 1 1097.3 1167.4 300.0 with a tested spare. TEST 2 1097.3 1167.4 300.0 TEST 3 0.004 0.020 .02g's TEST 4 1524.5 1308.4 300.0 TEST SAMPLE? YES SAMPLE CLASS OR DATE REINSTALLED: N/A 3-1131 16231 N/A 9/13f2007 PASS 09/09/07 PASS 19.625" PASS NO N/A This S/N 16231 was a replacement for FUNCTIONAL TEST PERFORMED? YES S/N 17837 a OR sample which failed the functional test. The Snubber was STATUS PASS (N/A IF NOT PERFORMED) torqued to transition tube using torque wrench M635 (cal due date 12/6/07). An TENS ION COMPRESSION CRITERIA as left functional test was performed after re-greasing-SAT. One load pin was TEST 1 29.2 36.5 300.0 damaged during removal and was 300.0 TEST 2 40.2 53.1 replaced .Load pins and spherical bearings were lubricated with neo-lube TEST 3 0.005 0.003 .02g's UTC # 24984-3. Installed the snubber and performed an as- left visual TEST 4 27.5 47.6 300.0 inspection-SAT. TEST SAMPLE? NO SAMPLE CLASS N/A, ' DATE REINSTALLED:. 09/13/07

TAG# SERIAL# REPLACE- VISUAL S FUNCTIONAL S L DIMEN S HAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENTS/N INSPECT T INSPECT T T STROKE T DATE A DATE A A,  ? A T T T T 3-1132 17838 N/A 9/812007 PASS N/A 19.125" PASS YES PASS Visual Inspection -SAT, "1 Dimension- FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated ilod pin and spherical bearing with neo-lube STATUS N/A (N/A IF NOT PERFORMED) UTC #24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1133 13695 N/A

  • 9/8/2007 PASS N/A 19.625" PASS YES PASS Visual Inspection -SAT, 'L" Dimension - FUNCTIONAL TEST PERFORMED?. NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (N/A IF NOT PERFORMED)

UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

TAG# SERIAL# REPLACE- VISUAL S FUNCTIONAL S L DIMEN S KAND- S INSPECTION

SUMMARY

FUNCTIONAL TEST

SUMMARY

MENT S/N INSPECT T INSPECT T T STROKE T DATE A DATE A A  ? A T T T T 3-1134 17836 N/A 9/8/2007 PASS N/A 19.125, PASS YES PASS Visual Inspection -SAT, "L"Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neoiube STATUS N/A (N/A IF NOT PERFORMED) UTO # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED: 3-1135 17839 N/A 9/8/2007 PASS N/A 19.250" PASS YES PASS Visual Inspection -SAT, "L"Dimension - FUNCTIONAL TEST PERFORMED? NO SAT, Handstroke - SAT. Lubricated load pin and spherical bearing with neo-lube STATUS N/A (N/A IF NOT PERFORMED) UTC # 24984-3. TENSION COMPRESSION CRITERIA TEST 1 TEST 2 TEST 3 TEST 4 TEST SAMPLE? NO SAMPLE CLASS N/A DATE REINSTALLED:

BASIC-PSAI !.NP. F-I.NAL REPORT Florida Power & Light Turkey Point Nuclear Plant Unit # 3 Client's P.O. # 00081442 Rel. 009 BPI Job # FN2492 Florida Power & Light Turkey Point Nuclear Plant Unit # 3 Snubber Functional Testing & Overhauls Fall 2007 PREPARED BY: DATE: ! -ý-,07 REVIEWED BY: DATE: /6~9 ~- 1

CERTIFICATE OF COMPLIANCE Testing and Overhaul activities described in this Final Report were Conducted in accordance with the Project Plan PP-07-005 And the applicable requirements of Florida Power & Light Purchase Order # 00081442 Rel. 009

                                             /o1030.o7 Ma ager o*f Quality Assurance                Date 2

CERTIFICATE OF COMPLIANCE VT-3 inspection activities described in this Final Report were conducted in accordance with the Project Plan PP-07-005 and the applicable requirements of Florida Power & Light Purchase Order # 00081442 Rel. 009 anader of Quality Assurance

          .. ......... dr .............

Date 3

ABSTRACT To satisfy the requirements of ASME Section Xl and Turkey Point Power Plant Unit # 3 Technical Specifications, functional testing of Basic- PSA, Inc. snubbers were performed during Turkey Point Power Plant's Unit # 3 Fall 2007 Outage. Functional tests and failure analysis were accomplished only on those snubbers designated by the Site Representative. Functional testing using Basic-PSA, Inc. (BPI) on-site mobile test equipment confirmed the-required operational parameters. All activities performed by Basic-PSA, Inc. at Turkey Point Power Plant were performed by qualified and certified Individuals using calibrated tools, instruments and equipment 4

INTRODUCTION Florida Power & Light, Turkey Point Nuclear Power Plant Unit # 3 was shut down for a scheduled outage in September, 2007. During this Outage, functional testing activities were performed by Basic-PSA, Inc. personnel in accordance with the BPI Project Plan, PP-07-005 which implemented the requirements of Turkey Point Nuclear Plant Technical Specifications and ASME Section Xl. This report summarizes the on-site activities performed by Basic-PSA, Inc. All original data regarding functional tests and failure analysis were presented to the customer's representative prior to the conclusion of the on-site activities; these documents (which are incorporated by reference), the Project Plan, the Snubber Test Reports and this summary report comprise the BPI Final Report. Personnel performing testing activities are qualified and certified in accordance with the BPI QA manual. A copy of all personnel certifications is provided in the Project Plan. Basic-PSA Test equipment and tools used at Turkey Point Nuclear Plant were calibrated and traceable to NIST. A copy of all calibration certificates for equipment provided by Basic-PSA, Inc. is included in the Project Plan. 5

SCOPE OF-SERVICES The original scope for testing consisted of fifty-seven (57) snubbers. These snubbers were identified by the customer as needing to be tested. Those with a degraded condition were disassembled, re-greased, rebuilt and then as-left tested. 6

FUNCTIONAL TESTING Of the fifty-seven (57) snubbers at Turkey Point Unit # 3 tested, fifty-seven (57) were Basic-PSA, Inc. mechanical snubbers.. TEST RESULTS Tacq Number Exam Number Serial Number. Mfq./Cap. Results 3-1000 001-TP3-07-1 000 18015 . PSA-1.. AF SAT 3-1001 002-TP3-07-1 001 27095 PSA-3 HS SAT 3-1002 003-TP3-07-1002 104 PSA-3 HS SAT 3-1003 004-TP3-07-1003 29625 PSA-3 AF SAT 3-1004 005-TP3-07-1004 101 PSA-3 HS SAT 3-1005 006-TP3-07-1i005 11931 PSA-35 HS SAT 3-1006 007-TP3-07-1006 6494 PSA-35 HS SAT 3-1007 008-TP3-07-1007 42387 PSA-35 HS SAT 3-1008 009-TP3-07-1008 8084 PSA-35 HS SAT 3-1009 010-TP3-07-1009 . 10542 PSA-35 HS SAT 3-1010. 011-TP3-07-1010 6530 PSA-35 AF SAT AL SAT 3-1011 012-TP3-07-1011 12376 PSA-10 HS SAT 3-1012 013-TP3-07-1012 8086 PSA-35 AF SAT AL SAT 3-1013- 014-TP3-07-1013 33624 PSA-1/4 HS SAT 3-1014 015-TP3-07-1014 1722 PSA-1/2 AF SAT 3-1015 016-TP3-07-1015 18009 PSA-1 HS SAT 3-1016 017-TP3-07-1016 18012 PSA-1 HS SAT 3-1017 018-TP3-07-1017 18003 PSA-1 HS"SAT 3-1018. 019-TP3-07-1018 18013 PSA-1 HSSAT 3-1019 020-TP3-07-1019 17425 PSA-3 HS SAT 3-1020 021-TP3-07-1020 103 PSA-3 HS SAT 3-1021 022-TP3-07-1021 16725 PSA-1/2 HS SAT 3-1022 023-TP3-07-1022 18006- PSA-1 HS SAT 3-1023 024-TP3-07-1023 23273. PSA-1 HS SAT 3-1024 025-TP3-07-1024 17427 PSA-3 HS SAT 3-1025 026-TP3-07-1025 100 PSA-3 AF SAT 3-1026 027-TP3-07-1026 - 12394 PSA-1 0 HS SAT 7

Tagq Number Exam Number Serial Number Mft./Cap. Results 3-1027 028-TP3-07-1027 16237 PSA-10 HS SAT 3-1028 029-TP3-07-1028 11135 PSA-1 0 HS SAT 3-1029 030-TP3-07-1029 11330 PSA-10 HS SAT 3-1030.- 031-TP3-07-1030 11121 PSA-1 0

  • AF SAT 3-1043 032-TP3-07-1043 17900 PSA-10 HS SAT 3-1044 033-TP3-07-1044 11125 PSA-10 HS SAT 3-1045 034-TP3-07-1045 17189 PSA-10 HS SAT 3-1046 035-TP3-07-1046 17903 PSA-I 0 HS SAT 3-1047 036-TP3-07-1047 17906 PSA-10 HS SAT 3-1048 037-TP3-07-1048 16238 PSA-1 0 HS SAT 3-1049 038-TP3-07-1049 11461 PSA-10 HS SAT 3-1050 039-TP3-07-1050 11446 PSA-10 HS SAT 3-1060 040-TP3-07-1060 19728 PSA-3 HS SAT 3-1075 041-TP3-07-1075 18072 PSA-1/2 AF SAT 3-1083 042-TP3-07-1083 11925 PSA-35 AF SAT 3-1094 043-TP3-07-1094 27081 PSA-3 HS SAT 3-1102 044-TP3-07-1102 29451 PSA-1/4 AF SAT 3-1123 045-TP3-07-1123 6484 PSA-35 HS SAT 3-1124 046-TP3-07-1124 12991 PSA-35 HS SAT 3-1125 047-TP3-07-1125 12986 PSA-35 AF SAT 3-1126 048-TP3-07-1126 12989 PSA-35 HS SAT 3-1127 049-TP3-07-1127 12990 PSA-35 HS SAT 3-1128 050-TP3-07-1128 12985 PSA-35 HS SAT 3-1129 051-TP3-07-1129 12987 PSA-35 HS SAT 3-1130 052-TP3-07-1130 17840 PSA-10 AF SAT 3-1131 053-TP3-07-1131 17837 PSA-1O0 AF UNSAT 3-1132 054-TP3-07-1132 17838 PSA-10. HS SAT 3-1133 055-TP3-07-1 133 13695 PSA-10 HS SAT 3-1134 056-TP3-07-1134 17836 PSA-10 HS SAT 3-1135 057-TP3-07-1135 17839 PSA-1 0 HS SAT 8

SPARE SNUBBERS Seven (7) snubbers were chosen by FP&L representative to be functionally tested to used as spares-or placed in dry storage.- - Exam Number Serial Mfcq./Cap: Result Location Number TP-07-3-001 3932 PSA-10 SAT TAG# 3-1048 TP-07-3-002 3919 PSA-10 SAT TAG# 3-1049 TP-07-3-003 27092 PSA-3 SAT TAG# 3-1060 TP-07-3-004 16238 PSA-10 SAT Dry Storage TP-07-3-005 11461 PSA-10 SAT Dry Storage TP-07-3-006 19728 PSA-3 SAT Dry Storage TP-07-3-007 16231 PSA-1 0 SAT TAG# 3-1131 9

In summary, sixty-seven (67) visual tests were preformed. Forty-four (44) of -these were hand strokes, thirteen (13) were as found test, and ten (10) were as left tests. Of the ten (10) as left test seven (7) were spares. NOTE: -All of the above had an initial VT-3 performed. 10

TURKEY POINT UNIT 3 2007 REFUELING OUTAGE Summary of System Pressure Testing Attachment 4 8

TURKEY POINT UNIT 3 CYCLE 23 SYSTEM PRESSURE TESTING FINAL REPORT Owner: Florida Power and Light Company 700 Universe Blvd. Juno Beach, Florida, 33408 Plant: Florida Power and Light Company Turkey Point Nuclear Power Plant Unit 3 9760 SW 34 4th St. Florida City, Florida, 33035 Commercial Service Date: December 14, 1972 Cycle 23 Service Dates: April 10, 2006 to October 16, 2007 Refueling Outage Dates: September 3, 2007 to October 16, 2007 Prepared By:_ Date: 1 /- " Reviewed By: 1,21 Date: Approved By: Date:  ?-7 Page 1 of 6

Abstract This report details the pressure testing of selected ASME Class 1, 2 and 3 piping and components of Florida Power and Light Company's Unit 3 at the Turkey Point Nuclear Power Station. These tests were performed during Unit 3 cycle

23. The refueling outage occurred between the dates of September 3, 2007 and October 16, 2007. The complete cycle 23 was from April 10, 2006 to October 16, 2007, This pressure testing is being reported following the first outage of the second period for fourth ten-year interval for Turkey Point Unit 3.

Piping and components were selected and tested in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code "Rules for Inservice Inspection of Nuclear Power Components", 1998 Edition, 2000 addenda with specific relief as granted in accordance with 10CFR 50.55a. Procedures The following Florida Power and Light (FPL) procedures and documents have been implemented to provide instructional guidance for the performance of the required ASME XI pressure testing and subsequent inspections. 0-ADM-523 ASME Section XI Pressure Tests for Quality Group A, B, C Systems/Components. 3-OSP-041.25 RCS Overpressure Leak Testing 3-OSP-045.1 ASME Section Xi Quality Group A Bolting Examination 3-OSP-045.2 ASME Section XI Quality Group B Bolting Examination 3-OSP-041.2 Reactor Coolant System Visual Leak Inspection and Leak Evaluation. NDE-4.2 Visual Examination VT-2 Conducted During System Pressure Tests. System Summary The following safety related Class 1, 2, and 3 systems, or sections thereof were pressure tested in accordance with the requirements of the 1998 Edition, 2000 addenda ASME Section XI Code. System Name System Number Intake Cooling Water 19 Component Cooling Water 30 Spent Fuel Pool Cooling 33 Reactor Coolant 41 Chemical and Volume Control 47 Residual Heat Removal 50 Safety Injection 62 Safety Injection Accumulators 64 Containment Spray 68 Main Steam 72 Feedwater 74 Auxiliary Feedwater 75 Page 2 of 6

Acronyms: ADM: Administrative AFW: Auxiliary Feedwater ASME: American Society of Mechanical.Engineers CSS: Containment Spray System CST: Condensate Storage Tank CCW: Component Cooling Water CVCS: Chemical Volume Control System ECC: Emergency Containment Cooler FW: Feedwater HX: Heat Exchanger ICW: Intake Cooling Water MS: Main Steam NDE: Nondestructive Examination PWO: Plant Work Order PZR: Pressurizer RCP: Reactor Coolant Pump RCS: Reactor Coolant System RHR: Residual Heat Removal RO: Restricting Orifice

  • RV: Relief Valve RX: Reactor SFPC: Spent Fuel Pool Cooling SI: Safety Injection SIA: Safety Injection Accumulators SG: Steam Generator XJ: Expansion Joint.

WO: Work Order Page 3 of 6

Test Packaqe Development: The specific pressure test boundaries were selected after review of the applicable plant operating diagram/code boundary drawings. The piping systems were broken into sub systems. The sub-systems were selected based on Technical Specifications operability requirements, acceptable isolation points and availability of test connections and vent valves. The sub-systems were then assigned test package numbers, which could be tested in entirety, or based on availability could be broken down further into numerous tests within the specific sub-system. The pressure test package numbers contain six (6) segments of Information, Sample: 04-CCW-30110 -L-01 1 2 3456

1. Unit Number (00) common to both units 3 and 4. (03) Unit 3 specific and (04) Unit 4 specific.

2: System abbreviation

3. System number [First (2) digits].
4. Sub-system number [(2) or (3) digits].
5. Type of test (H) Hydrostatic, (P) Pneumatic, (L) Leakage
6. Number of test performed within the specific sub-system.

Page 4 of 6

PRESSURE TESTS THAT WERE PERFORMED DURING CYCLE 23 INTAKE COOLING WATER SYSTEM (19) 03-ICW-19157-L-01 Test Date: 9/17/2007 This test performed due to the replacement of valve 3-50-324 per WO#35019795-01. There was no leakage observed. 03-ICW-19158-L-01 Test Date: 9/17/2007 This test performed due to the replacement of valve 3-50-329 per WO#35019796-01. There was no leakage observed. 03-ICW-19159-L-01 Test Date: 9/27/2007 This test performed due to the replacement of valve 3-50-344 per WO#35019793-01. There was no leakage observed. 03-ICW-19160-L-01 Test Date: 5/21/2006 This test performed due to the replacement of 3B ICW pump, check valve and down steam flange per WO#35029354-01 and WO#35029354-03. There was no leakage observed. 03-ICW-19163-L-01 Test Date: 7/7/2006 This test performed due to the replacement of valve 3-50-331 per WO#35018481-01. There was no leakage observed. 03-ICW-19167-L-01 Test Date: 2/22/2007 This test performed due to the replacement of 3C Intake Cooling Water Pump per WO#35030563-01. There was no leakage observed. 03-ICW-19169-L-01 Test Date: 2/9/2007 This test performed due to the replacement of valve 3-50-311 per WO#36003412-01. There was no leakage observed. Page 5 of 6.

REACTOR COOLANT SYSTEM (41) 03-RCS-4101-L-03 Test Date: 10/11/2007 This test involved the leakage test of the Reactor Coolant System piping inside containment following the Unit 3 Cycle 23 Refueling Outage. This leakage test also addressed the following replacements: Component Work Order # Description RV-3-551A 36019509-01 Remove, install spare RV-3-551 B 36019516-01 Remove, install spare RV-3-551C 36019525-01 Remove, install spare TE-3-422B2 37019007-03 Replace Thermowell TE-3-420A 37014438-01 Replace Thermowell D-3 36009235-01 Replace fitting at seal table 3-385 37020609-01 Replace valve bonnet No leakage was observed during this test. CHEMICAL AND VOLUME CONTROL SYSTEM (47) 03-CVCS-4793-L-01 Test Date: 10/25/2007 This test was performed due to the replacement of valve 3-293D per WO#35010379-01. There was no leakage observed. 03-CVCS-4794-L-01 Test Date: 10/11/2007 This test was performed due to the replacement of valve 3-293A per WO#335010386-01. There was no leakage observed. MAIN STEAM SYSTEM (072) 03-MS-7233-L-01 Test Date: 10/11/2007 This test was performed due to the replacement of valve RV-3-1407 per WO#34020152-01. There was no leakage observed. 03-MS-7239-L-01 Test Date: 10/11/2007 This test was performed due to the replacement of valve RV-3-141 0 per WO#36014347-01. There was no leakage observed. 03-MS-7240-L-01 Test Date: 10/11/2007 This test was performed due to the replacement of valve RV-3-1402 per WO#36018462-01. There was no leakage observed. 03-MS-7241 -L-01 Test Date: 10/11/2007 This test was performed due to the replacement of valve RV-3-1408 per WO#36018463-01. There was no leakage observed. BOLTED JOINT EXAMINATIONS The bolted joint examinations were performed in accordance with 3-OSP-045.1 for ASME Class 1. The inspections for class 1 components consisted of all insulated bolted connections that require inspection. The insulation was removed for inspection. There was no identified bolted joint leakage discovered during this inspection cycle. Page 6 of 6

TURKEY POINT UNIT 3 2007 REFUELING OUTAGE Summary of Inservice Inspection IWL Examinations Attachment 5 9

PTN/PSC-TP-N981-508 Final Report For The 35"' Year Containment IWL Inspection 3 5f ' Year Tendon Surveillance At Turkey Point Section 1 thru 13 . . I ; L

    'Woo no-21101va I!

[ Psc0 v L

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: i Y DOCUMENT TITLE: FINAL REPORT FOR TI- IE 35Tm YEAR CONTAINMENT IWL INSPECTION PROJECT TITLEz 35- YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 FPL DOCUMENT COVER SHEET Document No: PTN/PSC-TP-N98i-508

Title:

FINAL REPORT FOR THE 35 TH YEAR CONTAINMENT IWL INSPECTION 0 Submittal Issue CEC 0&5/2507 BAG 05125107 MA-- le, Date Chkd Date Appr Date No. Description By __PSC SIGN OFF FPL SIGN OFF REVISIONS N."

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: ii DOCUMENT TITLE: FINAL REPORT FOR THE 35TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: W" YEAR TENDON SURVEILLANCE AT TURKEY POINT 35 DATE: 05/25107 FPL ABSTRACT The purpose of this report is to present the results of the 2007 35th Year Containment IWL Inspection of the Florida Power &Light Turkey Point Units 3 and 4 Containment Structure post tensioning systems. The results of this investigation are discussed in detail in the body of this report and are summarized as follows: I. The sheathing filler (grease) samples were tested and found to have acceptable levels of water-soluble ions, (Chlorides, Nitrates, and Sulfides). One tendon end sample had a moisture content above the limits. However, upon engineering review of the VT-1 inspection and comparison of previous inspections, the condition is not indicative of the tendons condition or capacity for performing as designed and is deemed acceptable. All neutralization numbers were above the IWL requirement of 0.0 mg KOH/g value and acceptable. No visible breakdown of the grease was noted either by color or consistency for all grease samples tested.

2. Seven of the tendon ends inspected exhibited water, 0 to 12 ounces, during removal of the grease cap, detensioning or around the tendon anchorage. Upon water sample testing and the engineering evaluation, these conditions have been deemed acceptable
3. Acceptable corrosion levels were found on all tendon ends and no cracks were found on any anchorage components. Cracks in the concrete surrounding the bearing plates were within allowable tolerance of
        < 0.010"
4. Additional missing buttonheads were found on five of the inspected surveillance tendon ends and no protruding wires were detected.
5. The IWL baseline concrete examination for Units 3 and 4 was completed on 8/16/01 during the 30d Year Containment Tendon Surveillance. The subsequent required examination of the containment concrete has been performed during this 35" Year period. All of the additional indications detected since the baseline inspection have been evaluated and deemed acceptable. The indications do not constitute abnormal degradation of the containment structure and there is no structural concern associated with these indications.
6. The hydraulic jacks used for liftoffs, detensioning and retensioning tendons were calibrated and found to be within an acceptable range of +/- 1.5%.
7. The tendon liftoffs were found to be within the acceptable limits in all cases.
8. All sample wires tested were found to be acceptable for diameter, yield strength, ultimate strength and elongation.
9. The detensioned tendons were retensioned with acceptable elongations and acceptable force levels.
10. All tendons were resealed and regreased to acceptable levels inaccordance with SQ1 2.1 of the PSC Surveillance Procedure, which is included in Appendix H.
11. A comparison of "As-found"force levels to the original force levels was made in.an effort to detect any evidence of system degradation. The amount of force loss since the original installation is comparable to the losses of other plants of this age and does not show any evidence of system degradation.

Based on the data gathered during the 2007 35th Year Containment IWL Inspection and reported herein, the conclusion is reached that no abnormal degradation of the Post Tensioning System has occurred at the Florida Power &Light Turkey Point Units 3 and 4 Containment Structures.

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: i ui DOCUMENT TITLE: FINAL REPORT FOR THE 3er YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 5TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125/07 PPL TABLE OF CONTENTS SECTION TITLE PAGE

    --                                   COVER SHEET                                        i
    --                                     ABSTRACT                                         ii TABLE OF CONTENTS                                     iii
    --                                   LIST OF TABLES                                   iv-v 1.0                                 -INTRODUCTION                                       1 2.0                          SURVEILLANCE PROCEDURES                                    6 3.0                                SHEATHING FILLER                                     7 4.0                           ANCHORAGE COMPONENTS                                      15 5.0               GENERAL EXTERIOR CONCRETE INSPECTION                                 46 6.0                         HYDRAULIC JACK CALIBRATIONS                                 47 7.0                  TENDON LIFTOFFS AND DETENSIONING                                  48 8.0                         WIRE INSPECTION AND TESTING                                 53 9.0                  TENDON RETENSIONING AND RESEALING                                  55 10.0               COMPARISON WITH ORIGINAL INSTALLATION                                68 11.0                         STRESSING TREND ANALYSIS                                   70

12.0 CONCLUSION

76

13.0 REFERENCES

78 APPENDICES [ TITLE NO. OF PAGES A SURVEILLANCE DATA SHEETS 961 B LABORATORY ANALYSIS OF SHEATHING FILLER 43 C NON-CONFORMANCE REPORTS 15 D FPL CONDITION REPORTS 393 E FIELD CHANGE REQUESTS 12 F PROJECT CORRESPONDENCE 34 G JACK CALIBRATIONS 48 H PROCEDURE 350 I CALIBRATION OF GAUGES 30

DOCUMENT NUMBER: PTNIPS -TP-N9815O DOCUMENT TITLE: PROJECT TITLE: 35eMYEAR TENDON SURVEILLANCE AT TURKEY POINT REVISION: 0 PAGE: iv FINAL REPORT FOR THE 35TH YEAR CONTAINMENT IWL INSPECTION DATE: 05/25/07

  • L LIST OF TABLES TABLE I :UNIT 3 - SCOPE OF WORK ........ ......................... ............. ............ ................ 2 TABLE 2: UNIT 3 - SCOPE OF WORK- ADDITIONAL WORK ....................................................................... 3 TABLE 3: UNIT 4 - SCOPE OF WORK ....................................................... ............. 4 TABLE 4: UNIT 4 - SCOPE OF WORK - ADDITIONAL WORK ........................................................................ 5 TABLE 5: UNIT 3 VERTICALS - LABORATORY ANALYSIS OF SHEATHING FILLER .................................. 8 TABLE 6: UNIT 3 HOOPS - LABORATORY ANALYSIS OF SHEATHING FILLER ........................................ 9 TABLE 7: UNIT 3 DOMES - LABORATORY ANALYSIS OF SHEATHING FILLER ......................... 10 TABLE 8: UNIT 3 ADDITIONAL WORK - LABORATORY ANALYSIS OF SHEATHING FILLER............... 11 TABLE 9: UNIT 4 VERTICALS- LABORATORY ANALYSIS OF SHEATHING FILLER .................................. 12 TABLE 10: UNIT 4 HOOPS - LABORATORY ANALYSIS OF SHEATHING FILLER ................... 13 TABLE 11 : UNIT 4 DOMES - LABORATORY ANALYSIS OF SHEATHING FILLER ....................................... 14 TABLE 12: UNIT 4 ADDITIONAL WORK- LABORATORY ANALYSIS OF SHEATHING FILLER ................. 14 TABLE 13: UNIT 3 VERTICALS - SQ6.0 - GREASE CAP REMOVAL........................................................... 15 TABLE 14: UNIT 3 HOOPS - SQ6.0 - GREASE CAP REMOVAL .................................................................. 16 TABLE 15: UNIT 3 DOMES - SQ6.0 - GREASE CAP REMOVAL ................................................. :............... :....... 17 TABLE 16: UNIT 3 ADDITIONAL WORK - SQ6.0 - GREASE CAP REMOVAL .............................................. 18 TABLE 17: UNIT 4 VERTICALS - S06.0 - GREASE CAP REMOVAL ............................ 19 TABLE 18: UNIT 4 HOOPS - SQ6.0 - GREASE CAP REMOVAL ................................................................... 20 TABLE 19: UNIT 4 DOMES - SQ6.0 - GREASE CAP REMOVAL .................................................................... 21 TABLE 20: UNIT 4 ADDITIONAL WORK - SQ6.0 - GREASE CAP REMOVAL............................................. 22 TABLE 21: UNIT 3 VERTICALS/HOOPS - SQ6.1 - INSPECT FOR WATER .................................................. 23 TABLE 22: UNIT 3 DOMES/ADDITIONAL WORK- SQ6.1 - INSPECT FOR WATER .................................... 24 TABLE 23: UNIT 4 VERTICALS/HOOPS - SQ6.1 - INSPECT FOR WATER .................................................. 25 TABLE 24: UNIT 4 DOMES/ADDITIONAL WORK- SQ6.1 - INSPECT FOR WATER .................................... 26 TABLE 25: UNIT 3 VERTICALS - SQ8.0 - ANCHORAGE CORROSION CONDITON .................. 28 TABLE 26: UNIT 3 HOOPS - SQ8.0 - ANCHORAGE CORROSION CONDITON ............................................ 29 TABLE 27: UNIT 3 DOMES - SQ8.0 - ANCHORAGE CORROSION CONDITON ............................................ 30 TABLE 28: UNIT 4 VERTICALS - SQ8.0 -ANCHORAGE CORROSION CONDITON..................... 31 TABLE 29: UNIT 4 HOOPS - SQ8.0 - ANCHORAGE CORROSION CONDITON ........................................... 32 TABLE 30: UNIT 4 DOMES - SQ8.0 - ANCHORAGE CORROSION CONDITON ..................... 33 TABLE 31: UNIT 3 VERTICALS - SQ8.0- BUTTONHEAD COUNT ................................................................. 34 TABLE 32: UNIT 3 HOOPS - SQS.0 - BUTTONHEAD COUNT ................................. 35 TABLE 33: UNIT 3 DOMES - SQ8.0 - BUTTONHEAD COUNT ................. ................ 36 TABLE 34: UNIT 4 VERTICALS - SQ8.0 - BUTTONHEAD COUNT .............................. 37 TABLE 35: UNIT 4 HOOPS - SQ8.0 - BUTTONHEAD COUNT ........................................................................ 38 TABLE 36: UNIT 4 DOMES - SQ8.0 - BUTTONHEAD COUNT ............................................. ................. 39

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 RiSION: 0 PAGE: v DOCUMENT TITLE: FINAL REPORT FOR THE 35TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 5 TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 FPL TABLE 37: UNIT 3 VERTICALS - SQ8.3 - CONCRETE INSPECTION ............................ 40 TABLE 38: UNIT 3 HOOPS - SQ8.3 - CONCRETE INSPECTION .................................................................. 41 TABLE 39: UNIT 3 DOMES - SQ8.3 - CONCRETE INSPECTION .................................... 42 TABLE 40: UNIT 4 VERTICALS - SQ8.3 - CONCRETE INSPECTION ................................... ............................ 43 TABLE 41: UNIT 4 HOOPS - SQ8.3 - CONCRETE INSPECTION .................................................................... 44 TABLE 42: UNIT 4 DOMES - SQ8.3 - CONCRETE INSPECTION .................................... 45 TABLE 43: HYDRAULIC JACK CALIBRATIONS ................................. ............... ........................................... 47 TABLE 44: UNIT 3 - SQ9.0 - MONITORING TENDON FORCE ..................................................................... 49 TABLE 45: UNIT 4 VERTICALS- SQ9.0 - MONITORING TENDON FORCE ................................................... 50 TABLE 46: UNIT 4 HOOPS- SQ9.0 - MONITORING TENDON FORCE ........................... 51 TABLE 47: UNIT 4 DOMES- SQ9.0 - MONITORING TENDON FORCE .......................................................... 52 TABLE 48: UNIT 3 - SQ1 0.2 & SQ10.3 -VISUAL INSPECTION AND TENSILE TESTING OF WIRE ........... 53 TABLE 49: UNIT 4 - SQ1 0.2 & SQ10.3 - VISUAL INSPECTION AND TENSILE TESTING OF WIRE ........... 54 TABLE 50: UNIT 3 & 4 - SQ1 1.0 - TENDON RETENSIONING....................................................................... 56 TABLE 51: UNIT 3 VERTICALS - SQ12.1 - GREASE LOSS VS. GREASE REPLACEMENT ........................ 61 TABLE 52: UNIT 3 HOOPS - SQ12.1 - GREASE LOSS VS. GREASE REPLACEMENT ............... 62 TABLE 53: UNIT 3 DOMES - SQ 12.1 - GREASE LOSS VS. GREASE REPLACEMENT .............................. 63 TABLE 54: UNIT 3 ADDITIONAL WORK- SQ12.1 -GREASE LOSS VS. GREASE REPLACEMENT .......... 64 TABLE 55: UNIT 4 VERTICALS - SQ12.1 - GREASE LOSS VS. GREASE REPLACEMENT ................. 65 TABLE 56: UNIT 4 HOOPS - SQ1 2.1 - GREASE LOSS VS. GREASE REPLACEMENT ........................ 66 TABLE 57: UNIT 4 DOMES - SQ12.1 - GREASE LOSS VS. GREASE REPLACEMENT ............... 67 TABLE 58: COMPARISON WITH ORIGINAL UNIT 4 INSTALLATION DATA ................................................. I....69 TABLE 59: COMPARISON WITH UNIT 3 RVCH INSTALLATION DATA .............................................................. 69 TABLE 60: COMPARISON WITH UNIT 4 RVCH INSTALLATION DATA ........................................................... 69 TABLE 61: UNIT 4 VERTICALS- REGRESSION ANALYSIS - INPUT DATA ............................. 70 TABLE 62: UNIT 4 VERTICALS- REGRESSION ANALYSIS - OUTPUT DATA .............................................. 71 TABLE 63: UNIT 4 HOOPS- REGRESSION ANALYSIS - INPUT DATA .......................... 72 TABLE 64: UNIT 4 HOOPS- REGRESSION ANALYSIS - OUTPUT DATA ....................................................... 73 TABLE 65: UNIT 4 DOMES- REGRESSION ANALYSIS - INPUT DATA ................................ 74 TABLE 66: UNIT 4 DOMES- REGRESSION ANALYSIS - OUTPUT DATA ........................................................ 75

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 1 oDOCUMENT TITLE: FINAL REPORT FOR THE 3WH 5 YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 356" YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 " PL

1.0 INTRODUCTION

This report details the 35U" Year Containment IWL Inspection of the Florida Power &Light Turkey Point Units 3 and 4 containment structures. The Containment Structure surveillance program is a systematic means of assessing the quality and structural performance of the post tensioning system and exterior concrete surface. The tendon surveillance program consists of a periodic inspection of the condition of a selected group of tendons on one Unit while a visual inspection is performed on the other. This program provides confidence inthe condition and functional capability of the system, and an opportunity for timely corrective measures ifadverse conditions are detected. Physical tendon surveillance consists of: sheathing filler inspection and testing, anchorage inspection, force monitoring, inspection and tensile test of removed wire samples (for detensioned tendons), retensioning of detensioned tendons and replacement of sheathing filler after completion of all inspections. The Turkey Point Units 3 &4 Is currently committed to meet the requirements of the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section XI, 1992 Edition with 1992 Addenda, Sub-Section IWL "Requirements for Class CC Concrete Components of Light-Water Cooled Plants". Portions of the containment buildings at the Turkey Point Units 3 &4 were affected by the Reactor Vessel Closure Head (RVCH) project. The above mentioned edition of the code does not require any additional tendon inspection due to RVCH project. However, as a conservative measure additional tendons were inspected during the 35th Year IWL inspection period. The additional tendons were selected based on Sections IWL 2521.2 of the ASME Boiler &Pressure Vessel Code, Section XA, 2001 Edition with 2002 Addenda. This program is also subject to the limitations and modifications of 10 CFR 50.55a(b)(2), 10 CFR 50.55a(g)(4), and 10 CFR 50.55a(g)(6). The 3 5 th Year tendon surveillance at the Turkey Point Nuclear Plant began on January 8, 2007 and ended on March 27, 2007. This surveillance period consisted of a Visual Inspection on Unit 3 and a Physical Inspection on Unit 4. The Turkey Point Technical Specifications, PSC Surveillance Procedures, the Code of Federal Regulations 10 CFR 50.55a and ASME Section XI, Sub-Section IWL, define the specific requirements for selection of the inspection tendons as well as specific requirements and acceptance criteria for the performance of the inspection. A copy of the PSC Surveillance Procedures is included In Appendix H of this Surveillance Report. The tendon selection for the Original Surveillance, Augmented Surveillance due to the RVHC Project and Condition Report items required per Calculation PTN-BFSC-01-2007 are listed inthe following Tables I thru 4. Hydraulic Rams are used to check the force on each tendon selected for Physical Inspection.

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 PREVISION:. 0 PAGE: 2 DOCUMENT TITLE: FINA.L REPORT FOR-THE 3H YEAR CONTAINMENT IWALINS DAPECTION 707 PROJECT TITLE: 35" YEAR TENDON SURVEILLANCE AT. TURKEY POINT DATE: 05/25/07 FPL TABLE I . UNIT,3 - SCOPE OF WORK 12V06 D&G 010 0 0 ebb1 0 AUGMENTED RVCH SCOPE IM2_ D & G... .0 * *ORIGINAL SCOPE, CO .MMON 45V02 D&G .ORIGINAL'SCOPE 45V11i~il D;i&:G i* 0iORIGINAL SCOPE 45V28 D&G 0ORIGINAL SCOPE 56V2*2 &. G.. : QA.D .0 .D * * *() AU.MENTED

                                                                                                                   ..            RVCH SCOPE
      ...: , .......: : .....   *:             ..          .U                                  ..                     ME.      .

61VOl D &G

  • AUGMENTED RVCH SCOPE 130110 BT. :.1
  • 4 INACCESSIBLE, ORIGINAL SCOPE REPLACEMENT FOR 13H10 PER 13H31 BT. 1 & 3 0IWL-2521.1(b)
 .35H39                             3&5            *
  • ORIGINAL SCOPE
10BT.

51H03 BT. 1 &5 ORIGINAL SCOPE 51H18. BT .: *i .5.] p 4

  • 4 ORIGINAL SCOPE, COMMON INACCESSIBLE, AUGMENTED RVCH 51H33. BT. 1&.5 *9 SCOPE REPLACEMENT FOR 51 H33 PER.
  ..... H35
  • BT &. . 0W I L-2521.1 (b) 62H5S BT. 2 & 6
  • AUGMENTED RVCH SCOPE BT.4&6. .64175 *.ORIGINAL.SCOPE REPLACEMENT FOR 2D40 PER 20116 BT. 1 &4 0 0 0RELIEF REQUEST NO. 21 REPLACEMENT FOR 2D40 PER
   ........... ..             .         &4             0                                                          RELIEF REQUEST NO. 21 2D40                         BT. 1             *INACCESSIBLE,                                                                 ORIGINAL SCOPE
    .3D081                    BT. 4 &61             0
  • 0 a ORIGINAL SCOPE, COMMON..

3D51 BT. 1 & 2 0 0 ORIGINAL SCOPE

     ");*3D52 =.BT.                ".I &*2          *       *ORIGINAL                                                        SCOPE
                                    ., ....             T                           L LEGEND SQ 6.0- GREASE CAP REMOVAL                  .                  SQ 9.0 - MONITOR TENDON FORCE SQ 6.1 -    INSPECTION FOR WATER                               SQ 10.2 - TENDON WIRE INSPECTION SQ 7.0 -    AQUIRE GREASE SAMPLES                              SQ 10.3 - TESTING TENDON WIRES SQ 8.0 -    ANCHORAGE INSPECTION.                              SQ 11.0 - RETENSION TENDONS SQ 8.3 -    CONCRETE INSPECTION                          . SQ 12.1 - GREASE REPLACEMENT NOTES:

(1) - DENOTES TENDONS WHICH WERE SINGLE END STRESSED FROM DOME END ONLY. PHYSICAL INSPECTIONS WERE ONLY REQUIRED TO BE PERFORMED ON THE END OF TENDONS WHICH WERE STRESSED.

DOCUMENT.NUMBER: PTN/PSCGTP-N981-508 REVISION: 0 "PAGE: 3 DOCUMENT TITLE:_ FINAL REPORT FOR THE 35TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125/07 FFIL TABLE 2: UNIT 3 - SCOPE OF WORK -ADDITIONAL WORK 12V03 GALLERY

  • 0
  • AUG. CR SCOPE, GASKET REPAIR
  .....      GALLER.~Y*                                                                      ,AUG.CR SCOPE, GASKET REPAIR 12V14      GALLERY                      .                                             *o  AUG. CR SCOPE, GASKET REPAIR

'::.34VI3 GALLERY .. " AUG. CR SCOPE, GASKET REPAIR 56V19 GALLERY o AUG. CR SCOPE, GASKET REPAIR

  .56.20... .GA(3LLER4Y.*                                                                   AUG. CR SCOPE, GASKET REPAIR 56V25      GALLERY           o          0
  • AUG. CR SCOPE, GASKET REPAIR
46V2- GLLERY . AUG. CR SCOPE, GASKET REPAIR 56V30 GALLERY *
  • 0 AUG. CR SCOPE, GASKET REPAIR 6V03 :GALLERY -. . AUG. CR SCOPE, GASKET REPAIR 61V. 7 GALLERY o 0 o AUG. CR SCOPE, GASKET REPAIR 61V07 GALLERY 4
  • o AUG. CR SCOPE, GASKET REPAIR 6iV22 GALLERY .. AUG. CR SCOPE, GASKET REPAIR 61V22 GALLERY *
  • e AUG. CR SCOPE, GASKET REPAIR 61V30 GALLERY o
  • 0 AUG. CR SCOPE, GASKET REPAIR
ý:35H.5          3T. 3     :o                " :    . o 0                                   AUG. CR SCOPE, GASKET REPAIR 35H51        BT. 3           *
  • AUG. CR SCOPE, ALLTHREAD REPAIR 3552 -BT.3.: o o AUG. CR SCOPE, ALLTHREAD REPAIR 51H02 BT, 1 *
  • 0
  • 0
  • AUG. CR SCOPE, CAN REPLACEMENT 5iH301 BT.* 1 * * *
  • AUG. CR SCOPE, GASKET REPAIR 51H31 BT. 1 o
  • AUG. CR SCOPE, ALLTHREAD REPAIR 5!H63: !BTI.I . .. AUG. CR SCOPE, ALLTHREAD REPAIR 64H62 BT. 6 * * *
  • o AUG. CR SCOPE, GASKET REPAIR D " -BT."3 ' . " AUG. CR SCOPE, GASKET REPAIR 2D08 BT.3 . 0 o AUG. CR SCOPE, GASKET REPAIR
2D :BT.3' -e. * *. AUG. CR SCOPE, GASKET REPAIR 2D21. BT. 4-3 *
  • AUG. CR SCOPE, PLUG REPAIR
2D22 .. : BT.3 ' o AUG. CR SCOPE, GASKET REPAIR 2D49 BT. 6 * * . AUG. CR SCOPE, GASKETREPAIR LEGEND SQ 6.0 - GREASE CAP REMOVAL SQ 9.0 - MONITOR TENDON FORCE SQ 6.1 - INSPECTION FOR WATER S 10.2 -TENDON WIRE INSPECTION SQ 7.0 - AQUIRE GREASE SAMPLES SQ 10.3 - TESTING TENDON WIRES SQ 8.0 - ANCHORAGE INSPECTION SQ 11.0 - RETENSION TENDONS SQ 8.3 - CONCRETE INSPECTION SQ 12.1 - GREASE REPLACEMENT

DOCUMENT NUMBER: PTN(PSC-TP-N981-508

  • REVISION: 0 PAGE: 4 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 TK YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35T YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 FpL TABLE 3: UNIT 4 - SCOPE OF WORK 12vo3 I D&G 1 0 0I1@ 0 k"I ok')I *t'I e'Ik111oJAUGMENTED RVCH SCOPE
  ....4....... . i D. & G '.                            :      .         (     -ORIGINAL                            SCOPE, ADDITIONAL:.

GASKET REPAIR PERFORMED 34V23 D&G * * * * * *1 0(0) 00) *(1) o ORIGINAL SCOPE 45V110 D&*"G 6. * * . *

  • oRiGINAL SCOPE, COMMON 45V23 D&G 0 0 0 0 *
  • 1 ORIGINAL SCOPE 56V2 D;,G:- * , . * ,(U AUGMENTED RVCH SCOPE 56V30 D&G * * *
  • 00) AUGMENTED RVCH SCOPE 13H7 BT.&3. 0 S 0 S
  • 0 ORIGINAL SCOPE 35H25 BT. 3 0 0 0 INACCESSIBLE, ORIGINAL SCOPE REPLACEMENT FOR 34H25 PER
  ..... .....       ..   . .       .                         "       .       I                               IWL-2521.1(b) 42H16            BT. 2 & 4               o     0
  • INACCESSIBLE, ORIGINAL SCOPE 1 . . INACCESSIBLE, ORIGINAL SCO 4REPLACEMENT FOR 42H16 PER 42H31 ST. 2 & 4 S 0 5 0 IWL-2521.1(b)
                                                   '3"T.2&           "                                       REPLACEMENT FOR 42HI9 PER m_*2.
          *2:                      .. * . ý         l   4       *0                           IIWL-2521.1(b) 51H40            BT. 1 &5
  • 0 0 0 0 AUGMENTED RVCH SCOPE, 6:q.2H33.*j::.% T.2&
  • 0 0. o o 0 * *AUGMENTEDRVCI-SCOPE 62H34 BT. 2 & 6 0 0
  • 0 AUGMENTED RVCH SCOPE
   ......              T. 2......& 6 .                                    0 "                                ORIGINAL SCOPE, COMMON REPLACEMENT FOR 2D34 PER 2D07           BT. 2 & 6
  • 5 6 5RELIEF REQUEST NO. 21 P0% m: 2 6REPLACEMENT FOR 2D34 PER
    .2D8            .26              .'                    "                6                               RELIEF REQUEST NO. 21 2D34               BT. 2               0      0
  • INACCESSIBLE, ORIGINAL SCOPE
     .3D20...:     BT              6.              41    w. o*           :                           *ORIGINAL      SCOPE, COMMON 3D25           BT. 3 & 6               0      0     0      0       6                                     ORIGINAL SCOPE 3                         *
  • 0BT.3& o 0 . -. ORIGINAL SCOPE LEGEND SQ 6,0 - GREASE CAP REMOVAL SQ 9.0 - MONITOR TENDON FORCE SQ 6.1 - INSPECTION FOR WATER SQ 10.2 - TENDON WIRE INSPECTION SQ 7.0 - AQUIRE GREASE SAMPLES SQ 10.3 - TESTING TENDON WIRES SQ 8.0- ANCHORAGE INSPECTION SQ 11.0 - RETENSION TENDONS SQ 8.3 - CONCRETE INSPECTION SQ 12.1 - GREASE REPLACEMENT NOTES:

(1) - DENOTES TENDONS WHICH WERE SINGLE END STRESSED FROM DOME END ONLY. PHYSICAL INSPECTIONS WERE ONLY REQUIRED TO BE PERFORMED ON THE END OF TENDONS WHICH WERE STRESSED

        "DOCUMENTNUMBER: ,               UPTN/PSC-TP-N981-508                             REVISION:  0     PAGE:    5 DOCUMENTTITlLE:           :FINAL REPORT FOR THE 35TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE;. -          3!ý' YEAR TENDON SURVEILLANCE AT TURKEY POINT                     DATE:   05125/07       1=PL_

TABLE 4-: UNIT SCOPE OF WORK - ADDITIONAL WORK 12V19 , D &G * *AUG. CR SCOPE. GASKET REPAIR 511 5 .... . ... . .. .. .AUG..CR SCOPE, GASKEr..EPAIR ID28 BT. 4 *

  • AUG. CR SCOPE, ALLTHREAD REPAIR
         ...... 3..... "                                                                     AUG. SCOPE, ALLTHREA   .REPAIR LEGEND SQ 6,0  -  GREASE CAP REMOVAL                                       SQ 9.0 - MONITOR TENDON FORCE SQ 6.1  -  INSPECTION FOR WATER                                     SQ 10.2 -TENDON WIRE INSPECTION SQ 7.0  -  AQUIRE GREASE SAMPLES                                    SQ 10.3- TESTING TENDON WIRES SQ 8.0  -  ANCHORAGE INSPECTION                                     SQ 11.0- RETENSION TENDONS SQ 8.3  -  CONCRETE INSPECTION                                      SQ 12.1 - GREASE REPLACEMENT Upper Support Frames are assembled and then lifted to the top of the Containment Dome to support the crews and equipment performing inspection activities.

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 6 DOCUMENT TITLE: FINAL REPORT FOR THE 36- YEAR CONTAINMENT IWL INSPECTION I . PROJ ECT TITLE: 35TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 FPL 2.0 SURVEILLANCE PROCEDURES Appendix H of this Surveillance Report contains the detailed procedures for conducting the tendon surveillance. The surveillance consists of the following steps: 2.1 Visual examination of sheathing filler grease. 2.2 Analytical testing of sheathing filler grease samples. 2.3 Inspection of the anchorage assembly of each of the surveillance tendon ends for deleterious conditions such as corrosion, cracks, broken or missing wires or buttonheads. 2.4 Inspection of concrete surrounding the bearing plate. 2.5 Inspection of the tendon anchorage grease caps for all of the assessable ends, 2.6 General exterior concrete inspection. 2.7 Measurement of the liftoff force for each physical surveillance tendon. 2.8 Removal of one wire from surveillance tendons, which are detensioned for examination and testing. 2.9 Retensioning of detensioned tendons and measuring the corresponding tendon elongation. 2.10 Visual inspection for corrosion, pitting, or any significant physical change of the removed wires. 2.11 Testing of wires removed from tendons for yield strength, ultimate strength, and percentage elongation at failure. 2.12 Resealing tendon caps and replacement of lost sheathing filler into the tendon ductand cap. 2.13 Evaluation of test and inspection results to assess the general condition of the post tensioning system. The Hoop and Dome Tendons are accessed from hanging work platforms.

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 7 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5T' YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35 YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125107 FPL 3.0 SHEATHING FILLER ANALYSIS 3.1 A sample of sheathing filler (grease) was removed from each end of the surveillance tendons. Chemical tests were performed on each sample by Suburban Laboratories, Inc., and the results are presented in Appendix B and are summarized in Tables 5 thru 12. In Tables 5 thru 12, "N/A" indicates that samples were not taken and/or required for testing. 3.2 The maximum acceptable limits are: 10 percent by weight for water content and 10 parts per million for water-soluble chlorides, nitrates and sulfides. All samples that have been tested met the acceptance criteria as stated above except U3-2D16/BTI. 3.2.1 The test results for U3-2D16/BT1 were acceptable for water-soluble chlorides, nitrates and sulfides. The moisture content detected in sample I of the subject tendon was 39%. Due to the results of sample 1, sample 2 was sent for testing to verify the results. The results from the second sample tested determined the moisture content as 14%. The VT-1 inspection has been reviewed and all other inspection criteria were acceptable. There was no evidence of free water during the inspection, the grease did not shown any evidence of moisture or degradation and no corrosion was present. After the visual inspection was completed of the tendon by the IWL Level II Inspectors, the new gasket, tendon cap hardware and grease was installed. The disparity between the two samples regarding moisture content and the review of the VT-1 inspection data sheets allows us to conclude the grease results, regarding moisture, are not indicative of the actual tendon condition. In comparison to surveillance results industry wide, we have not experienced any sample results with this large percentage of moisture content, even with the presence of free water in large quantities (several gallons). Based on the above stated discussion and comparison to previous worse case situation, there is no operability concern associated with the reported condition. 3.3 The sample testing report also includes the neutralization number of each grease sample. This test is generally performed by grease manufacturers on new batches of the product and is a method of determining the overbase additives in the grease. Degradation of the sheathing filler will yield a change in the acidity of the filler material as well as an increase in the ion content. The required neutralization number for the mixture of grease at Turkey Point Nuclear Pant is >0.0 mg KOH/g. This requirement was achieved by all samples tested to date. 3.4 No detrimental condition was noted on any grease samples, and no visible breakdown of the grease by either color or consistency was noted on any of the tendons tested.

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 8 DOCUMENT TITLE: FINAL REPORT FOR THE 35TMYEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35 TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125107 pmL TABLE 5: UNIT 3 VERTICALS - LABORATORY ANALYSIS OF SHEATHING FILLER UUMh 57.7 12V06 <0.50 GALLERY: 0.50i~): <0.*

o50 <0.10 DOME <0.50 <0,50 <0.50 0.35 67.0 12V22 ERY 5 50 0.58 .54.3_:.

DOME 0.50 <0.50 <0.50 1.5 12.2 GALRY 05 <.0<0.5 0..A27 ,3.47 DOME <0.50 <0.50 <0.50 0.78 4.08 45Vl I GALLERY 0.50  :. 0.50 0.50 0.58 5.31 DOME <0.50 <0.50 <0.50 1.7 46.0 45V28 GLLEY <05 <0.50. 0.0.86 52.3. DOME <0.50 <0.50 <0.50 0.19 52.6 5WV22 . 0 GALLERY.. -0.5 0.50 5 <0.50 .0.15 55.8 DOME <0.50 <0,50 <0.50 0.11 54.5 61"VOl .. I. .. ' : . I - . I . ' ' " GALLER

                                     <0.5<0.5                      <0.5           <010             64.2 ACCEPTANCE LIMITS TEST                                    LIMITS WATER SOLUBLE CHLORIDE                       LESS THAN 10.OPPM WATER SOLUBLE NITRATES                       LESS THAN 10.OPPM WATER SOLUBLE SULFIDES                       LESS THAN 10.OPPM WATER CONTENT                                LESS THAN 10% DRY WEIGHT NEUTRALIZATION NO.                          GREATER THAN 0.0 mg KOH/g

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 - PAGE: 9FILLER DOCUMENT TITLE: FINAL REPORT FOR THE 35TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: "W3T'YEAR TENDON SURVEILLANCE'AT TURKEY POINT D)ATE: 05/25107 iIl[*l-p TABLE 6 : UNIT 3 HOOPS - LABORATORY ANALYSIS OF SHEATHING FILLER BT. 1 <0.50 <0.5c <0.50, 0.57 13H1 0 N/A6 "N/A :NA BT. 1 <0.50 <0.50 <0.50 0.68 7.40 13H31 BT 3- 0.50 <0.50 <0.50 0.84.. 8.13. BT. 3 0.50 <0.50 <0.50 8.10 5.78 35H39 ':i!BT.5  : .' '* 50

<,  : .: ;<050 :, :,* 0.5 ,' 0 3  : .:: : 66 '

BT. 1 0.50 <0.50 <0.50 0.34 6.63 51H03 BT.!; 5<.00.0 0.50 0. 29 :6.4 BT. 1 0.50 <0.50 <0.50 0.15 54.8 51H18 B  :.50.50 <0.50 <0.50 %0.86 7.34 BT. 1 <0.50 <0.50 <0.50 0.17 42.2 51H33 4 "BT.5 0.50 7 <0.50 050. 098 40.6 BT. 1 <0.50 <0.50 <0.50 0.15 54.4 51H35 BT. 5 <0.50 <0.50 <0t.500.357 BT. 2 <0.50 <0,50 <0.50 <0.10" 47.8 62HS5 B.T.6 <ýý::0.50 <0.50 <0.50 0.635 BT. 4 <0.50 <0.50 <0.50 0.39 7.98 64H75 BT.6 0.50. <050 <0.50 .0.44 618 AC CEPTANCE LIMITS TEST LIMITS WATER SOLUBLE CHLORIDE LESS THAN 10.OPPM WATER SOLUBLE NITRATES LESS THAN 10.OPPM WATER SOLUBLE SULFIDES LESS THAN 10,0PPM WATER CONTENT LESS THAN 10% DRY WEIGHT NEUTRALIZATION NO. GREATER THAN 0.0 mg KOH/g

DOCUMENT NUMBER: DOCUMENT TITLE: PROJECT TITLE: PTNIPSC-TP-N981-508 REVISION: FINAL REPORT FOR THE 35 TWYEAR CONTAINMENT IWL INSPECTION 35WYEAR TENDON SURVEILLANCE AT TURKEY POINT

                                                                                   *. 0 DATE:

PAGE: 10' 05/25/07 0ipL TABLE 7: UNIT 3 DOMES - LABORATORY ANALYSIS OF SHEATHING FILLER NEAR BT.1 0.50 <0.50 <0.50 39.0/14.0 5.20 /4.53 2016 NEAR BTA <0.50 <50.50 ;0.,49 NEAR BT.1 <0.50 <0.50 <0.50. 0.78 2.21 2D17 NEAR BT. 0.5 <0.50 05 ..4070 NEAR BT. 1 0.50 <0.50 <0.50 0.59 11.2 200 NEA..RBTA-.4 /ANA N/A N/A NEAR BT.4 <0.50 <0.50 <0.50 0.53 41.6 3008 NEARBT. <-0.50- <0." 50 <050 0. 50 5.45. NEAR BT.1 0.50 <0.50 <0.50 0.44 8.33 3051

                                <0.5                        <0.50.          0.43           .6.04.

NEAR BT.1 1.0 <0.50 <0.50. 0.39 7.03 NEARB. 0.50 <0.50 .0.50-  : 0.39 5

                                                                                             .97
                                         *CEPTANCE LIMITS TEST                                LIMITS WATER SOLUBLE CHLORIDE                LESS THAN 10.OPPM WATER SOLUBLE NITRATES                LESS THAN 10.OPPM WATER SOLUBLE SULFIDES                LESS THAN 10.OPPM WATER CONTENT                         LESS THAN 10% DRY WEIGHT NEUTRALIZATION NO.                    GREATER THAN 0.0 mg KOH/g After the grease cap is removed, samples of grease are taken for all tendons requiring a visual or physical inspection.

IN

DOCUMENT.NUMBER: PTNJPSC-TP-N981-508 REVISION: 0 PAGE: 11 " DOCUMENT TITLE: FINAL REPORT FOR THE 35T YEAR CONTAINMENT IWL INSPECTION ER ENO ""35M PRJETTILE S~EILAC SURVEILLANCE A TURKEY POINT ".. AT TREYPIN AT: DATE: 01517 05/25/07. PL1. PROJECT TITLE:,YEARENDON TAn

  • C
  • lil jr%=F-V-O:ulql liIT
                       -am A rll'rlt#KlAI       1AWNr2If I A E2^0 ArtDV        A M

AK 10l f%0 bLIU14 L

                                                                                                          ~rU 1

Ll U n Elf A coI I ZVU3 GALLERY NIA N/A N/A NfA N/A 12V05 N/AN/A !GALLERY

                                                                          '::N/A          .           N/A        ::    N/A 12V14            GALLERY                    N/A             N/A             NIA               N/A              N/A 34V13             GALLERY                    N/A             N/A             N/A               NIA         "N/A 56V1 9            GALLERY                    N/A             N/A             NIA               N/A              N/A 66V20             GALLERY                    N/A             N/A             NIA               N/A              N/A 56V26             GALLERY                    N/A             N/A             N/A               N/A              N/A 56V29             GALLERY                    N/A             N/A             N/A               N/A             N/A 56V30             GALLERY                    N/A             N/A             N/A               N/A              N/A 61V03             GLEY                       N/A             N/WA            N/A               N/A              N/A 61V07             GALLERY                    N/A             N/A             N/A               N/A              N/A 61V09         :.:.'GALLERY:::::              N/A             N/A             N/A               N/A              N/A 61V22             GALLERY                    N/A             N/A             NIA               N/A              N/A 61V25             GALLERY                    N/A             N/A             N/A               N/A              N/A 61V30             GALLERY                    N/A             N/A             N/A               N/A              N/A 36H60                ST: 3                   0..50           N/A             N/A                3.4            7.011 35H61                17. 3                   N/A             N/A             N/A               NIA              N/A 36H62                83N/NN/A                                                  /AN/A.                           N/

51H02 BT. 1 <0.50 <0.50 <0.50 0.97 5.96 51H30 :T . 5,<0.50 . <*0.50  :<0.50 95.7 4.49 51H431 BT.1I NIA N/A N/A N/A N/A 51H63 BT.t N/A N/A N/A N/A N/A 64H62 BT. 6 <0.50 <0.50 <0.50 4.7 39.8 1010 BT.3 N/A N/A N/A N/A N/A 2D08 BT. 3 N/A N/A N/A N/A NIA 2009 T. .::N/A N/A ":N/A N/A NIA 2D21 BT. 4-3 N/A N/A N/A N/A NIA 2D22 BT.3  :.:...NIA i::. NIA N/A N/A N/A 2049 BT. 6 N/A N/A N/A N/A N/A ACCEPTANCE LIMITS TEST L LIMITS WATER SOLUBLE CHLORIDE LESS THAN 10.OPPM WATER SOLUBLE NITRATES LESS THAN 10.0PPM WATER SOLUBLE SULFIDES LESS THAN 10.0PPM

                     *WATER CONTENT                                    LESS THAN 10% DRY WEIGHT NEUTRALIZATION NO.                               GREATER THAN 0.0 mg KOH/g

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 12 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5T. YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35M YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125/07 TABLE 9: UNIT 4 VERTICALS- LABORATORY ANALYSIS OF SHEATHING FILLER UUM-12V03 GALLERY ... o0.50 <0.50 ý<0.50 :1.2 39.4 DOME <0.50 <0.50 <0.50 0.97 4.96 34V02 L.LERY *0.50. *0.50 0 . 0.50 0.43 %2.42 DOME <0.50 <0.50 <0.50 7.8 2.17 34V23 GALLERY . .50.. <0.50 <0.50 5.9 1.81 DOME <0.50 <0.50 <0.50 1.3 62.3 45V10 GALLERY <0.0.<.0 050 3.8 .34.0 45V 23 DOME

              .-, ,....-.:.,......      <0.50           <0.50          <0.50            1.2          14.6 GALLERY                .050.            *0.:50        <0.50          .0.58          5.94, DOME                  <0.50           <0.50          <0.50           0.17          52.7 56V20 GALLERY                <0.50            <0.50         <0.50           0.27          <0.50 DOME                  <0.50            <0.50         <0.50            11           20.0 56V30 GALERY
                                        <0.0               0.5         <050            0.29          211.4 ACCEPTANCE LIMITS TEST                                   LIMITS WATER SOLUBLE CHLORIDE                            LESS THAN 10.OPPM WATER SOLUBLE NITRATES                           LESS THAN 10.OPPM*

WATER SOLUBLE SULFIDES LESS THAN 10.OPPM WATER CONTENT LESS THAN 10% DRY WEIGHT NEUTRALIZATION NO. GREATER THAN 0.0 mg KOH/g Two samples from each tendon end are placed in 1-quart metallic canisters to be stored, then sent to the laboratory for testing.

DOCUMENT NUMBFW PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 13 DOCUMENT TITLE: FINAL RE ORT FOR THE W" YEAR CONTAINMENT IWIL INSPECTION IRA PROJECTTITLE: WH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125107 r-Fn-TABLE 10: UNIT 4 HOOPS - LABORATORY ANALYSIS OF SHEATHING FILLER BT. I <0.50 <0.50 <0.50 0.37 8.00 13H70 BT. ';3 .0.38.

                                                                                                  !6.14 :*~:
                                 <0.50               <0.50     <0.50 BT. 3            <0.50         <0.50           <0.50              0.62            8.01 35H25          BT.5              NIANA                         NNIA":!1          N/A                     .N BT. 3            <0.50         <0.50           <0.50              0.78            4.35 3SH34         BT.. 5            0.5          <0.:0...6.81                                 ...

BT. 2 <0.50 <0.50 <0.50 0.86 4.88 M1T4 <0.50 <0.50 <0..50 . 0.64 " 4.26... BT. 2 <0.50 <0.50 <0.50 0.48 7.13 42H19

4. 40.5*. 0 . 0.50 <0.50 4.6 9.66 BT. 2 <0.50 <0.50 <0.50 0.88 6.75 42H31 BT.4 <0.50 .<050 <0.50 :0.48 11.8 BT, 2 0.50 <0.50 <0.50 0.83 4.82 42H32 4BT.4. O.50 ." 0.50 i.: <0.50 0.64 ":6.12 BT. 1 <0.50 <0,50 <0.50 0.50 6.93 51 H40 B. 5. <0.50 <0.50 <:.,5o ';:0.68 42.4 BT. 2 <0.50 <0.50 <0.50 0.39 41.7 62H33BT. 6  : <0.50 <0.50  :--:<0.50 0.39 44.9 BT. 2 <0.50 <0.50 <0,50 0,20 54.8 62H34 6 6BT.
                                 <0.50          <0.50            0.50         .0.24         .      52.8 BT. 2            <0.50          <0.50          <0.50              0.25             45.2 BT. 6            <0.50          <0.-.50            50< "1         0.     *18       12.0 ACCEPTANCE LIMITS TEST                                  LIMITS WATER SOLUBLE CHLORIDE                  LESS THAN 10.OPPM WATER SOLUBLE NITRATES                  LESS THAN 10.OPPM WATER SOLUBLE SULFIDES                  LESS THAN 10.OPPM WATER CONTENT                           LESS THAN 10% DRY WEIGHT NEUTRALIZATION NO.                      GREATER THAN 0.0 mg KOH/g

I 1 DOCUMENT TITLE: DOCUMENT NUMBER: PTN/PSC-TP-N9g1-508 FINAL REPORT FOR THE 3 5 TC YEAR CONTAINMENT REVISION: IWL INSPECTION 0 PAGE: 14 PROJECTTITLE: 35C YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125107 FML TABLE 11: UNIT 4 DOMES - LABORATORY ANALYSIS OF SHEATHING FILLER NEAR BT.2 <0.50 <0.50 <0.50 0.34 5.47 2D07 <0.50, NERBT.6, <0.50:' .0.49 NEAR BT.2 <0.50 <0.50 <0.50 0.33 4.09 2D08 N.EA<050. ýc.*'4.46 <050 <050 0. 29 :. ' NEAR BT.2 <0.50 <0.50 <0.50 0.60 6.36 2D34 NEAR BT.5 N/A N/A -NIA N/A -. N/A NEAR BT.3 <0.50 <0.50 <0.50 0.74 47.0 3D20 NERT. T6 <NA

                                      -0.50             <0.500.         .50:        .:0.30               .57,.3 NEAR BT.3           <0.50             <0.50        <0.50               1.1              354 3D)25      3NEARBT6:           <0.50             <0.50        <0.          .        1.0.19         4.35.

NEAR BT.3 <0.50 <0.50 <0.50 0.27 5.75 3D31 NEAR BT. I <0 505 0.50 ;0o.50 0.19 5.26 TABLE 12: UNIT 4 ADDITIONAL WORK - LABORATORY ANALYSIS OF SHEATHING FILLER N/A N/A N/A 12V19

                  .GALLERY:..                                                                            :4.78 BT. 1             0.50             <0.50         <0.50             0.78               3.77 51H01 5.:           <06.50           <5                 .BT.         0.88              f5.6.-

1028 BT.4 NIA N/A NIA N/A N/A 33w BD N3A N/A N/ /A N/A ACCEPTANCE LIMITS TEST LIMITS WATER SOLUBLE CHLORIDE LESS THAN 10.OPPM WATER SOLUBLE NITRATES LESS THAN 10.OPPM WATER SOLUBLE SULFIDES . LESS THAN 10.OPPM WATER CONTENT LESS THAN 10% DRY WEIGHT NEUTRALIZATION NO. GREATER THAN 0.0 mg KOH/g

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 15 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 5 TP YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125/07 FPL 4.0 ANCHORAGE COMPONENTS In the following discussion, all procedures referred to are included in Appendix H of this report and all data sheets are included in Appendix A. 4.1 SQ6.0 - GREASE CAP REMOVAL 4.1.1 Inspection of the anchorage components began by removing the grease cap (PSC Procedure SQ 6.0). Complete grease coating (100%) was found on 112 out of the 117 tendon ends in-which their cap was removed either for physical inspection, visual inspection or gasket repair. Tendons U3-45V02/Dome, U3-45V11/Dome, U3-51H331BT1, U3-51H35/BT5 and U4-34V23/Dome had coatings ranging from 50% to 100%. It has been determined per the inspection that the all of the anchorage components corrosion level criteria have been met. The percentage of grease coverage was recorded on Data Sheet SQ 6.0 with the results tabulated in Tables 13 thru 20. In Tables 13 thru 20, "NIA" indicates the cap was not removed and/or not existent. TABLE 13: UNIT 3 VERTICALS - S06.0 - GREASE CAP REMOVAL DOME 100 100 100 100 100 12V06 GALLERY. 100 100 100 DOME 100 100 100 100 100 12V22

                      %:GALLERY.             100     .             10.A00                  ..           100               100 DOME               800(1)                 100                100               100               100 45V02                               7 GALLERY               100. ..  ............                    100.N               A      .A.100 DOME               80 0)                  100               8501)              100               100 45VDOME                              100                   100                100               100                100 GALLERY               100                   100                100               100                100 56V2 DOME ALLRY10010 100                   100 10 100 N00A 100                100 100 DOME                100                   100                100               100                100 GALLEY               100                   100                                  N0A 10                 100:

(1) No corrosion present L

       .DOCUMENT NUMBER:    PTN/PSC-TP-N981-508                            REVISION:     0    PAGE:     16 DOCUMENT TITLE:     FINAL REPORT FOR THE W" 35     YEAR CONTAINMENT IWL INSPECTION' PROJECT TITLE:      35TH YEAR TENDON SURVEILLANCE AT TURKEY POINT               DATE:     05/25/07 TABLE 14: UNIT 3 HOOPS - SQ6.0 - GREASE CAP REMOVAL 13HIO          BT. 1           100            100                100               100                   100 BT3100.100                         0       "      10*/A:'                                NI0  ::

ST. 3 100 100 100 100 100 BT. 100 100 100 100 100 BT. 1 100 100 100 100 100 51H03 AT. 100 10 10 10010 BT.5 100 100 100 100 100 SIH18 BT.5 10(0: 100 100. 100 100 ST. 1 010 100 100 010 100 51H33 BT.:5 100 100 100 100 100 ST.T1 100 100 100 100 100 51 H35 1 1 ST. 5o 0_ to) 5 jdto( BT. 2 100 100 100 100 100 62H55 813.6: 100 100 100 100.100 81.4 100 100 100 100 100 64H75

8. 6.. 10.0 1:00.10.1 ..

(1) - NO CORROSION PRESENT

DOCUMENT NUMBER: DOCUMENT TITLE: PROJECT TITLE: PTN/PSC-TP-N981-508 FINAL REPORT FOR THE 3 5 TW YEAR TENDON SURVEILLANCE AT TURKEY POINT REVISION: 3 5 TH YEAR CONTAINMENT IWL INSPECTION 0 DATE: PAGE: 17 05/25/07 0 ,PL TABLE 15: UNIT 3 DOMES - SQ6.0 - GREASE CAP REMOVAL NEAR BT.1 100 100 100 100 100 2D16 NA RJBT.4- .100. "100. I i 100' 100 -100:.. NEAR BT.1 100 100 100 100 100 NEAR BT.1 100 100 100. 100 100 NEAR BT.4 100 100 100 100 100 21040 NEAR.BTA. NA NA N.A. N/A N/A NEAR BT.1 100 100 100 100 100 3D08 NEARBT.6. .10. 00 . .. 1 100 NEAR BT.1 100 100 100 100 100 31051 NEAR BT . 100 100 100 100 100

           .NEA BT.                               100                                                     ý100101010 NER.:.            100             00                 01-0             10010 Before the Grease Cap is removed, a plastic bag is taped to the concrete in order to catch any grease that might fall during removal.
     "DOCUMENT NUMBER: PTN/PSC-TP-N981-508                                                   REVISION:    0    PAGE:    18
  • DOCUMENT TITLE: .. FINAL REPORT FOR THE 35T YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35TMYEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 III,
          .TABLE 16: UNIT 3 ADDITIONAL WORK - SQ6.0 - GREASE CAP REMOVAL 12V03         GALLERY                       100             100                     100              100                   100 12V05         GALLERY1:.                      0100                                  100              100                  100 12V14         GALLERY                       100             100                     100              100                   100 34VI3         GALLERY                       100             100                .00                   100                   100 56V19          GALLERY                      100              100                   100                100                  100 56V20          GALLERY                      1404100                     %           100.100o100 56V25          GALLERY                      100              100                    100               100                  100 56V29          GALLERY                   .10001001                                   001               0.0100 56V2           GALLERY
                ..                            1.0              0.0                                     100.100 56V30          GALLERY                       100             100                    100               100                  100 61V 03     I!:.G    ~iE      Y::. :"'::.,          100 "."     .i:::".: .100. :i:-100'    :   "-. / :i   0 i  -*     '  .::    0 ""-.!

61V07 GALLERY 100 100 100 100 100 61V .9 . ...... l 100 100 100 100 61V22 GALLERY 100 100 100 100 100 61V25 GALLERY 0 100 100 100 100 61V30 GALLERY 100 100 100 100 100 35H50 :BT3. 00 .100 100 100 1100 35H51 BT. 3 N/A N/A N/A N/A N/A 35H52 .. ,1BT:3 N/A N/A N/A N/A N/A 51H02 BT. 1 100 100 100 100 100 51H30 :B-. 100. 100 100 100 100 51H31 BT.1 N/A N/A N/A N/A N/A 51H63 .B . . N/A N/A N/A N/A NIA 64H62 BT.6 100 100 100 100 100 1010 BT.3 .00 100 100 100. 100 2D08 BT. 3 100 100 100 100 100 2D09 '  :"1BT.3 100. 100 "100 100 100 2D21 BT. 4-3 N/A N/A N/A N/A N/A 2D22 SBT.3. 100 100 100 100 100 2D49 BT.6 100 100 100 100" 100 L

DOCUMENT NUMBER: PTNJPSC-TP-N981-508

  • REVISION7* PAGE: 19 DOCUMENT TITLE: FINAL REPORT FOR THE 3 51H YEAR CONTAINMENT IWL INSPECTION .

PROJECT TITLE: 3 5 Th YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE:-05/25/07 PL-TABLE 17: UNIT 4 VERTICALS - SQ6.0 - GREAS'ECAP REMOVAL-----,

             'DOME                   100           100              -'in                 100                   100 12V03                                                             :100    .

GALLERY.,. *100 . .100. 100 100 DOME 100 100 100 100 100 34V 02 1'00 :  : 10 GALLERY .. ..10. -.. 100 . - 100 100 ... .100 DOME 5_01) 100 100 100 100 34V23 GLER1010101010 DOME 100 100 100 100 100 45 wV 10* L *R *

  • 1:00~ : : !*i '100 :i * :*
  • i 1 *00 ,* :*: ::i100o * ; :1 : 100 - / i 45VI3 DOME 100 100 100 100 100
             -GALLERY              ý100.            10010                                100D10 DOME                  100            100             100                   100                  100 45V23                                                                                   10010
.GALLERY,ý 101010 DOME RY 100 100 100 100 100 1oo0.o 100 56V30
            -GALLERY.:         :..100               1.00            100                   10                   100 (1)- NO CORROSION PRESENT When the Grease Cap is removed, the amount of grease coverage on all the anchorage components is documented.

DOCUMENT NUMBER. PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 20. 1 DOCUMENT TITLE: FINAL REPORT FOR THE 35H YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35H YEAR TENDON SURVEILLANCEAT TURKEY POINT DATE: 05/25/07 L TABLE 18: UNIT 4 HOOPS - SQ6.0 - GREASE CAP REMOVAL BT. I 100 100 100 100 100 13H70  :::1.00 . BT. 3 :100 100. BT. 3 100 100 100 100 - 100 35H25 _ T.5 . . NA

                                   .       N/A                    N/A                N/A.N/A BT. 3               100                 100         100                100                   100 35H34 BT.5100100                                 10                :10010 BT. 2               100                 100         100                100                   100 42H16 BT.4                10          .1    00            100         ... 100.*100 BT. 2               100                 100         100                100                   100 42H19                                              "10010 l:BT1*00                        10.100 BT. 2               100                 100         100                100                   100 42H31
             .BTý .:              10010010                                           1.00               ý100.

BT. 2 100 100 100 100 100 42H32 -BT..4 100..1*100 . 00 00 100 BT. 1 100 100 100 100 100 51 H40 514 100 100 1:00 ;100 1o00 BT. 2 100 100 100 100 100 62H33*" . T...

                ..........    .*100                   100                            100 .0            .100 BT. 2               100                 100          100               100                   100 62H 34    .:.                   ...               "            ' :      I ...      .       .             ":      ..

BT..6 1'00 100 10 10 100 BT. 2 100 100 100 100 100 62H82 BT,6A 10100 .100. l0 100

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 21 A L DOCUMENT TITLE: FINAL REPORT FOR THE 35 W" YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 PPL TABLE 19: UNIT 4 DOMES - SQ6.0 - GREASE CAP REMOVAL 2D08G NEAR BT.2 100 100 100. 100 100 NEAR BT.2 100 100 100 100 100 3D529 3 D...5 .... .......

                                  ..i./ . :10.
                                             . .  "i..." ..."-       . . . . . ."..10.0.0.

NEAR BT.2 100 100 100, 100 100 3D31 213 4* **,NEAR  ;, **BT.3 *. * . 100 NEARBT,3 100

                                                 . R. ..5:_ý./A:100
                                                                 .N :. . . .100 100              NA 100
                                                                                    .. . .. .., . NI
                                                                                                        . .. . . .100 100 100 NI 100 NEAR NEAR BT.3 BT.                -   100 100                  100 100              100 100                  100 100                100 100 U    -

After initial inspections are completed and samples collected, the anchorage components are cleaned with solvent so a full VT-1 inspection can be performed.

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 22

  • DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 TP YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 5 TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 PPL TABLE 20: UNIT 4 ADDITIONAL WORK - SQ6.O - GREASE CAP REMOVAL DOME 100 100 100 100 100 12V1 9
                .:GALLERY               100            .100                       100                 '1100 DOME                 N/A            N/A                        N/A                 N/A                N/A 34vo2            ALL0ERY      .  .100                           .,.              01 BT. 1               100             100                       1100                100                100 51 H01                  . . .      .:           *     " 0 0'  ...   .i.I .' I'.

BT.5100100100100 100 1D28 BT. 4 N/A N/A N/A NIA N/A 3D30 *BT.3 N/ NA. N/A .N/A N/A. 4.2 SQ6.1 - INSPECT FOR WATER 4.2.1 Water Inspections were recorded on Data Sheet SQ 6.1 and are summarized in Tables 21 thru 24. In

           *Tables 21 thru 24, "N/A" indicates the cap was not removed.

4.2.2 Water was detected on a combined seven tendon ends between Units 3 & 4. A complete visual inspection was performed on the subject tendon ends and it was determined per the inspection that adequate grease coverage was present, and all of the anchorage components corrosion level criteria have been met. Grease samples were collected and tested for the subject tendon ends as required by PSC Procedure SQ7.2 and all test criteria were met. 4.2.3 The water samples collected have been evaluated for pH value as required by IWL-2525.2(b). The laboratory analysis of the water samples was performed per PSC Procedure SQ6.2. A Condition Report was generated for each subject tendon listed below and the full evaluation is included in this report in Appendix D. The pH for all subject water samples were >7.0 and are deemed acceptable. If the pH value is above 7.0 the water is non-acidic. Hence, the water sample results indicate the water is not conducive to aggressive corrosion. Therefore, it is concluded that the detected condition on all subject tendons has notcreated any adverse effect on the tendons. 4.2.3.1 The inspection for water on the Unit 3 tendons detected four tendons with water. The subject tendons for Unit 3 are 35H39/BT3 (Ref. CR2007-2213), 35H50/BT3 (Ref. CR2007-7005), 51H30/BT1 (Ref. CR2007-7005) and 64H62/BT6 (Ref. CR2007-8071) 4.2.3.2 The inspection for water on the Unit 4 tendons detected three tendons with water. The subject tendons for Unit 4 are 45V1 0/Gallery (Ref. CR2007-2213), 12V19/Gallery (Ref. CR2007-4658) and 51 H01/BT5 (Ref. CR2007-6494)

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 'PAGE: 23_ DOCUMENT TITLE: FINAL REPORT FOR THE 35 TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35WmYEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 FPL TABLE 21: UNIT 3 VERTICALSIHOOPS - SQ6.1 - INSPECT FOR WATER DOME 0 BT. 1 0 12V06 0 :::

iii:o 13H10 G.,ALLERY FBT: -3 DOME 0 BT. 1 0 12V22 GLE .. 13H131 DOME 0 BT. 3 5 oz 1 )

45V02 35H39 GALLERY0 BT.5 0 DOME 0 BT. 1 0 45V11I 51 H03 ......

"BT5 ~

DOME 0 BT. 1 0 45V28 GALLERY... 51 HI38  :.ii:i.i* i5 ";...!.: "*..':.0  :;:: DOME 0 BT, 1 0 56V22 51H33 GALLERY0. 6BT. 0 DOME 0 BT, 1 0 61V0l 51 H35 GALLERY* :0 BT. 2 0 62HS5 BT. *0 BT. 4 0 64H75 8T:6 0. (1) - ACCEPTABLE PER CR2007-2213 EVALUATION

0 DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 24 DOCUMENT TITLE: FINAL REPORT FOR TI4E 35T" YEAR CONTAINMENT IWL INSPECTION JRVFILLANCF AT TUJRKEY POINT DATE: 05/25/07 *IPL PROJECT TITLE: 35 TK YEAR TENDON SU RVEILLANCE AT TURKEY POINT TABLE 22: UNIT 3 DOMESIADDITIONAL WORK- SQ6.1 - INSPECT FOR WATER NEAR BT.1 0 12V03 GALLERY 0 2D16  : ;::: ,.

                                  *!:i:0
NEAR T.4:: 12V05 GA RY 0 NEAR BT.1 0 12V14 GALLERY 0
           -:NEAR SL4.             .0                            34V13               GALLERY.              ;0, NEAR BT.1              0                            56V19               GALLERY                 0 2D40 NEAR"BT,.4::,:        NIA                           56V20               GALLERY                 0 NEAR BTA               0                            56V25               GALLERY                 0 3D08                                 0.

NEAR BT. 56V29 GALLERy 0 NEAR BT.1 0 56V30 GALLERY 3051 NEAýR, T.20 61Vo3  :-::ý.GALLERY :0 NEAR BT.1 0 61V07 GALLERY 0 3D52 NEAR.BT.2 0: 61VO9  :::..GALLERY 0 61V22 GALLERY 0 61V25 GALLERY 0 61V30 GALLERY 0 35H50 BT13,ioz~' 35H51 BT. 3 .0 35H52 BT. 3: 0 51H02 BT.1 0 51H30 :BT. 1 6oz(.. 51H31 BT. 1 0 51H63 . I. 0 64H62 BT. 6 1 oz (2) 1D10 BT..3 0 2D08 BT, 3 0 2D09 BT. 3 0 2021 BT. 4-3 0 (1) ACCEPTABLE PER CR2007-7005 EVALUATION 2D22 BT.3 0 (2) ACCEPTABLE PER CR2007-8071 EVALUATION 2D49 BT. 6 0

DOCUMENT NUMBER: ý PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 25 Adp%,ý DOCUMENT TITLE: YEAR CONTAINMENT IWL INSPECTION FINAL REPORT FOR THE 3!5ýH PROJECT TITLE: W" YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 TARI F 2~* UNIT A VFRTI~AI ~IHOOP~ - ~ORA - INSPECT FOR WATER TABLE 23: UNIT 4 VERTICALSIHOOPS - SQ6 I - INSPECT FOR WATER DOME 0 BT. 1 0 12V03 i:::::0 ' 13H70 GALLERY. 0.. DOME 0 BT. 3 0 34V02 35H425 GALLE 0 DOME 0 BT. 3 0 34V23 35H34 . T...0 BT.2 0 DOME 0 45V1 0 GALLER 12 oz. BT. 2 0 42H161 DOME 00 DOME 45V23 BT. BT.42 00 42H19 DOME 0 BT. 2 0 56V20 GALLERY 0 BT. . 0 42H31 DOME 0 BT. 2 BT.4 0 56V30 GALLERY,,0 51 H4 0 . - ,. . . . -. . . . . . -. . . . BT. 2 0 62H33 BT. 0 BT . 0. 62H434 BT.6 0 BT. 2 0 62H82 0: BT. BP (1) ACCEPTABLE PER CR2007-2213 EVALUATION

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 26 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 m YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35.. YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 FPL

      .. TABLE 24:UNIT4A DOMFSIADDI1TioNAL WORK - $06.1 - INSPECT FOR WATER TXBLE 14: UNIT-4 DOMESIADDITI ONAL WORK - S06 I - INSPECT FOR WATER NEAR BT.2                 0                                          DOME                    0 2D07                                                              12V1 9 NEAR BT. 4                                                     GALLERY                'Ioz.

N/A 2008 NEAR BT.2 0 34V02 DOME NEAR 13T.6.: ..:0.. GLLE4R~Y N/A NEAR BT.2 0 BT. 1 0 2D34 51H01 NEA BT.5 NA BT.5 <oz~ NEAR BT.3 0 ID28 BT, 4 0 3D20 NEAR. BT.6 . 3D30B . NEAR BT.3 - 0 3D25

            ý.:NEAR BT.6:-

NEAR 67.3 0 3D31 NEAR BT.6. 110 (1) ACCEPTABLE PER CR2007-4658 EVALUATION (21 ACCPETABLE PER CR200O7-6494 EVALUATION1 During all phases of the can removal and inspections, the presence of water is noted and quantified.

                                                                                                          /

I

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 27 DOCUMENT TITLE: FINAL.REPORT FOR THE 35- YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35W"YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125/07 pp,= 4.3 SQ8.0 - ANCHORAGE CORROSION CONDITON 4.3.1 The anchorage components (anchorhead, buttonheads, shims and bearing plate) were inspected for corrosion level and cracks per PSC Procedure SQ 8.0. The results were recorded on Data Sheet SQ 8.0 and are summarized in Tables 25 thru 30. In Table 25 thru 30, "N/A" indicates no inspection was performed. 4.3.2 The corrosion level for all of the inspected buttonheads was either: A-Excellent Condition: Bright, uniformly colored wire; no foreign matter, visible rust orpitting. No cleaning for inspection is required. Two heavy passes with 100 grit sandpaperto bright metal. Or B-Good Condition: Partialloss of color; little foreign matterand a small quantity of light rust may be present; no pitting. The oxide coat will be more discernable when viewed parallelto the length of the wire. Rag, wipe cleaning may be requiredfor inspection. Five heavy passes with 100 grit sandpaper to bright metal. 4.3.2.1 The corrosion level for all of the inspected anchorheads, shims and bearing plates were either Level 1 - "No visible oxidation" Or Level 2- "Metalreddish brown color, no pitting." on all inspected tendons ends except two., No evidence of cracking was observed on any of the anchorage components. 4.3.2.2 The bearing plates on U3-51H02/BT1 and U4-51H01/BT5 were detected with Level 5 corrosion. The revealed corrosion is outside of the gasket seating area. These two tendons ends were evaluated deemed acceptable per CR2007-7394 and CR2007-6494, respectively. All of the Condition Reports are included in Appendix D of this report. The condition on tendon 1-3-511-12/13T1 was identified (left) and repaired 0..(right) in accordance with appropriate procedures and evaluations.

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0, PAGE: 28 DOCUMENT TITLE: FINAL REPORT FOR THE M' YEAR CONTAINMENT IWL INSP ECT16N PROJECT TITLE: WT" YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: . 05/25/07 FPL TABLE 25: UNIT 3 VERTICALS - SQs.0 - ANCHORAGE CORROSION CONDITON DOME TW173 A 1, NONE 1, NONE 2, NONE 12V06 GALLERY

,,, q_

TW18:~i 6'I!* .A 1, NONE 1, NONE 1, NONE DOME TP1093 A 1, NONE 1, NONE 2, NONE 12V22

          .GALLERY                     .      I71         A.   .         1, NONE                   NEA               1 NONE DOME                        TP1 134          A              2, NONE               2, NONE             .2, NONE 45V02 GAýLLERY.                       P0              A.             1, NONE                   NA2,                  NONE DOME                        TP1110           A              2, NONE                2,NONE               2, NONE 45V11 GALLERY.                       TP10*0*          A              1 NONE                 1, NONE.:            1, NONE.

DOME TP14 A 2, NONE 2, NONE 2, NONE 45V28 GALLER .. P3 :A ý.2, NONE NIA :1, NONE DOME TW177 A 2, NONE 1, NONE 2, NONE 56V22 -

           .GALLERY                iT         9."         A               1, NONE             :N/A                    1,NONE DOME                        TW201            A               1, NONE               1, NONE              2, NONE 61VOl GALLýERY                        T16             A               1, NONE                  NIA               1, NONE INDICATES CORROSION LEVEL                                      11 NONE-l----              INDICATES # OF CRACKS 1 - No visible oxidation.

2 - Metal reddish brown color, no pitting. 3 - Pitting: 0.000" < 0.003" 4 - 0.003" < Pitting < 0.006" 5 - 0.006" <Pitting < 0.010"

                                             "*'*         i*JInspection                      and pictureofResults CORROION NSPETIONcorrosion                                        inspection CORROION NSPETIONon                                        U3-12V22/Dome la(9.1.1) Butionheads                  Level:   A (1 (9. 1.1) Anchorhead                 Level:         (     (10. 1 & 10.2) Cracks    E]'YesrI"       IQNo (9.1.1) Shims                       Level:        r2)    (10.1 & 10.2) Cracks, 0 Yes r            INo A     [3 N/A (9.1.1) Bearing Plale                Level:   2.    '     (10.1 & 10.2) Cracks 0] Yes I'
  • No 0 N/A 01)_ Corrosion Level of E, requires an NCR. ()- Corrosion Levels of 3.4. or 5. requires an NCR.

43)- Compose a sketch of the cracks on Sketch Sheet 8.0 and initiate an NCR.

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: -29 DOCUMENT TITLE: FINAL REPORT FOR THE 35e YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 357" YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 .IL TABLE 26: UNIT 3 HOOPS - SQ8.0 - ANCHORAGE CORROSION CONDITON IIS. 1 INI/ A 2, NONE 1, NONE 1, NONE 13H10 BT. 3  ::N/A NIA N/A. BT. 1 TP276 A 2, NONE 1, NONE 1, NONE 1131-131 BT. 3 P3 A. I",NONE " I, NONE 1 NONE BT. 3 TP1589 A 2, NONE 2, NONE 1, NONE 35H39 - BT..:01 A2, NONE 2, NONE 2, NONE BT. 1" TP1123 A 2, NONE 1, NONE 1, NONE 51 H03

                       .       "T.q TP1157.::":.".      A               2, NONE              2, NONE        : .: 2, NONE BT. I             TP1911              A               2, NONE               2, NONE             1, NONE B        .        TP917              A               2 NONE .             2, NONE O                I, NONE BT. 1             TP49               A               1, NONE               1, NONE             1, NONE 61 H33                                                                             .....
                                                    .TP122 A              :1, NONE               2,:NONE         :1,NONE BT. 1             TP48               A               1, NONE           .1,NONE                 1,NONE 51H35 BT.               TP124              A               1, NONE               1, NONE             1, NONE BT. 2             TP127              A                INONE                1,NONE              1,NONE 6 2H 5 5     ::: ý:: -     ::           t "-    .                                             . ..
                 ....              T..                A           'I,     NONE              1,NONE              I, NONE BT. 4             TP898              B               2, NONE               2, NONE             1, NONE 64H75.
                         .      I. PT. 3.:.           A               2, NONE      .:2,        NONE             1, NONE 35H50*           BT. 3             TP623              A               2, NONE               2, NONE             2, NONE 51H02*          BT.i             TP1331*.:           A    .       .2, NONE                 2, NONE            -5,NONE (')

51H30* BT. I TP259 A 1, NONE 1, NONE 1, NONE 64H62* S'T: .6 TP815 -.A A. .::2,NONE . 2, NONE 1, NONE

  • THESE TENDONS WERE PART OF THE ADDITIONAL WORK SCOPE.

(1) ACCEPTABLE PER REFERENCE CR2007-7394 EVALUATION

                                                        .. 1, NONE-c--       .

INDICATES CORROSION LEVEL INDICATES # OF CRACKS I - No visible oxidation. 2 - Metal reddish brown color, no pitting. 3 - Pitting: 0.000" : 0.003" 4 - 0.003" < Pitting < 0.006", 5 - 0.006" < Pitting < 0.010"

DOCUMENT NUMBER: PTNIPSC-TP-N981-608 REVISION: 0 PAGE: 30 DOCUMENT TITLE: FINAL REPORT FOR THE WH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/2.5/07 FPL TABLE 27: UNIT 3 DOMES - SQ8.0 - ANCHORAGE CORROSION CONDITON NEAR BT.1 TP2789 A 2, NONE 1, NONE 1, NONE 2D16 .A N.EAR BT4.4 1P932: 2,.NONE ',2, NONE :1,:NONE NEAR BT.1 TF1446 A 2, NONE 1, NONE 1, NONE 2D17 NEAR BT*E4 ý:TP265 A 2, NONE  :.2, NONE . NONE NEAR BT.1 TP730 A 2, NONE 2, NONE 1, NONE 2D40 . NEAR. BT.4ý NIA N/A -N/A N/AN/ NEAR BT.4 TP701 A 2, NONE 2, NONE 1, NONE 3D08 :NEARBT.6 TP14.. A 2NONE 1, NONE 1,NONE NEAR BTA1 TP1275 A 2, NONE 2, NONE 1, NONE 3D61 NEA1B*""2 " P*%419 A 2, NONE 1, NONE :, NONE NEAR BT.1 TP1380 B 2, NONE 2, NONE 2, NONE 3D52 NEAR BT.2 TF234.:: A 2, NONE, 2, NONE i, NONE 1, NO NE - *-- - -- - - INDICATES CORROSION LEVEL INDICATES # OF CRACKS 1 - No visible oxidation. 2 - Metal reddish brown color, no pitting. 3 - Pitting: 0.000'5*0.003" 4 - 0.003" < Pitting < 0.006" 5 - 0.006" < Pitting < 0.010" CORROSION INSPECTION (9,1.1) Buttonheads (9.1.1)Anchorhead Level: Level: A 2-. it

                                         '2     (10.1 & 10.2) Cracks        -]Yesrl       [ No I

1 (9.1,1) Shims Level: 7 *0) (10.1 & 10.2) Cracks QYes 3 9 No (9.1.1) Bearing Plate Level: f "' (10.1 & 10.2) Cracks [Yes '*' 1 No

        -Corroson Level oWE.

reaquiresan NCR. (11- Corrosion Levels of 3.4. or 5. reqtires an NCR. (- Compose asketd" of the cracks on Sketch Sheet 8.0 and initllat an NCR. Inspection Results I' and picture of corrosion inspection on U3-3D51/BT.1

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 31 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35Th YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125/07 P .PL TABLE 28: UNIT 4 VERTICALS - SQ8.0 - ANCHORAGE CORROSION CONDITON A 1, NONE 1, NONE 1, NONE S12V03 GALLERY  ::"::P A ý.2,NONE. -2, NONE_ 1.ý,NONE DOME TP2839 B 2, NONE 2, NONE 2, NONE 12V19 . .

                                                                                               .~              NE.
2,N 0,OE .1,NNNONE -:.

GALLERY.ý T P2428. pA.% 2 NONE DOME TP3278. A 2, NONE 1, NONE 1, NONE 34V02 GALLERY .TP2370... B2,NONE1, NONE 1, NONE DOME TP1961 A 2, NONE 2, NONE 2,NONE 34V23

.GALLERY, TP2 A 1ý,NONE 1, NONE .1%,.NONE DOME TP2058 A 1, NONE 1, NONE 2, NONE 45VI0
GALLERY TP2543. A " -2, NONE 1, NONE -:A, NONE.

DOME TP2968 B 2, NONE 2, NONE 2, NONE 46V23

GALLERY'.: TP2690' -B 2, NONE .2, NONE 1, NONE DOME TD85 A 1, NONE 1, NONE 1, NONE 66V20 G .ALLERY.:.TP2468 :A 2, NONE 1, NONE 1, NONE DOME TD112 A 1,NONE 1, NONE 1, NONE 56V30
GALLERY TP240 A 2 NONE 1, NONE : , NONE INDICATES CORROSION LEVEL - 1 NONE-*---- INDICATES # OF CRACKS 1 - No visible oxidation.

2 - Metal reddish brown color, no pitting. 3 - Pitting: 0.000" < 0.003" 4 - 0.003" < Pitting <0.006" 5 - 0.006" < Pitting < 0.010" ht nspection Results CORReOSION INSPECTION and picture of (9.1.1) BUilDnhearls .Level: is**corrosion inspection (9.1.1) Anchorhead Level: 3-** (io., & on U4-45V23/DOME o 0 f (9.1.1) Shims Level: .3 e (10.1 &10.2) Cracks e " Wo 0W (9.1.1) Bearing Plate Level: 21I= (10,1 &110.2) Cracks [*Yes*13 J~

  • WA il- Corroslio Level df. requiresa an NCR. 42)-Corrosion Levels of 3,4, or 5. requires an NCR.

I"*-Comnpose a=sketch of the crach on Sketch Sheet 8.0 and nirtilae an NCR.I

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: . 0 PAGE: 32 DOCUMENT TITLE: FINAL REPORT FOR THE 35T' YEAR CONTAINMENT IWL INSPECTION PROJECT.TITLE: 35 YEAR TENDON SURVEILLANCE AT TURKEY POINT. DATE: 05/25107 F1pL TABLE 29: UNIT 4 HOOPS - SQ8.0 -ANCHORAGE CORROSION CONDITON BT. 1 TP3177 A 2, NONE 1, NONE 1, NONE 13H70 13T. 3 003228 B1 .2, NONE 2,NONE 1, NONE 3526 35H25 .... BT. 3..... TP3048 A 2, NONE ' 2, NONE 2, NONE BT. 5 .. NIA NIWA.ý N/A. NWA NkA BT. 3 TP488 A 2, NONE 1, NONE 1, NONE 3SH34 BT.5 TP2854 A ..... 2, NONE 2, NONE 1, NONE. BT. 2 TP2652 A 2, NONE 2, NONE 1, NONE

             ..... BT. 4         TP28.77            A2,                      NONE      -2,NONE                 2, NONE BT, 2          TP2506            A                    2, NONE           2, NONE              1,NONE 42H19 BT.-4      .TP1918               A                    2, NONE           1, NONE             1, NONE BT, 2          TP2689            A                     2,,NONE          2, NONE             1, NONE 42H31 BT."4          TP3616.::         A                     2, NONE          1, NONE             1, NONE BT. 2          TP2653            A                     2, NONE          2, NONE             1 NONE 42H32 BT44           TP2884            A              ;.2,      NONE         .1, NONE             1, NONE BT. 1          TP2795            B                     2, NONE          1, NONE             1, NONE 51H01I BT. 5          TP1426            A                    A, NONE           1, NONE            6, NONE(I)

BT. 1 TD58 A 1, NONE 1, NONE 1, NONE 51 H40 BT. 5 T:7:T " A INONE "1, NONE  :.:I1,NONE.... BT. 2 TD97 A 1, NONE 1, NONE 1, NONE 62H33 BT. 6 TD7I 7 .. A . '1,OE1NNNONE 1, BT. 2 TD98 A 1, NONE 1, NONE . , NONE 62H34 2BT6 TD5" A . 1, NONE 1, NONE 1, NONE BT. 2 TP340 A 1, NONE 1, NONE 1,NONE 62H82 BT~q8 TP2218 A2, NONE 2, NONE 1, NONE (1) ACCPETABLE PER CR2007-6494 EVALUATION INDICATES CORROSION LEVEL 1' INDICATES # OF CRACKS 1 - No visible oxidation. 2 - Metal reddish brown color, no pitting. 3 - Pitting: 0.000" < 0.003" 4 - 0.003" < Pitting < 0.006" 5 - 0.006" < Pitting <0.010".

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 33 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 TH YEAR CONTAINMENT-IWL INSPECTION PROJECT TITLE: 357" YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125107. IFPL TABLE 30: UNIT 4 DOMES - SQ8.0 - ANCHORAGE CORROSION CONDITON NL*1,"  :$ .z TP325 A 2, NONE 1, NONE 1, NONE 2.D07 NEAR.BT.6 . TP'2392 i*iii:l::!::::B .2, NONE 2,NONE :2,NONE: NEAR BT.2 TP1909 A 2, NONE 1, NONE 1,NONE 21308 NERA BT.6. TP531 A 2 NONE. :1,N NONE..- :2,NONE":'.- NEAR BT.2 TP1879 A 2, NONE 2, NONE 1, NONE 2D34 NEAR BT,:..5 N/A %N/A :N/A -N/A NIA NEAR BT.3 TP403 A 2, NONE 1, NONE 1, NONE 3D20

             ýNEAR BT,6::         P02267:               A             ý2, NONE           1,NONE                1,NONE.

NEAR BT.3  :'-, TP2124

                                    .-. : .. .. .       A               2, NONE %--. 1, NONE               1, NONE 3 D 256 .       :;::!-,:*.'
             .NEAR BT.6            TP.331..             A               2, NONE         2, NONE                1, NONE NEAR BT.3           TP1719                A               2, NONE          1, NONE               1, NONE 3D31
            !NEAR BT.6       .P309                      A               2, NONE    "     1, NONE               1, NONE 1 1 NONE INDICATES CORROSION LEVEL                                                         INDICATES # OF CRACKS 1 - No visible oxidation.

2 - Metal reddish brown color, no pitting. 3 - Pitting: 0.000" < 0.003" 4 - 0.003" < Pitting < 0.006" 5 - 0.006" < Pitting < 0.010" Inspection Results and picture of corrosion inspection on U4-2D34/BT.2 (9.1.1) Buttonheads Level: A ' (9.1.1) Anchorhead Level: *. { (10.1 & 10.2)Cracks []Yes""' *No 0 N/A (9.1.1) Shims Level: , ( (10.1 & 10.2) Cracks 5Yes *NoZ 0 NIA (9.1.1) Bearing Plate Level: ) (' (10.1 & 10.2) Cracks [l Yes 13) . No Ell NfA N/A I"-LCorrosion Level of E. requires an NCR. 42)_ Corrosion Levels of 3. 4, or 5, requires an NCR. f3)- Compose a sketch of the cracks on Sketch Sheet 8.0 and initiate an NCR.

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 34 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 TW YEAR CONTAINMENT IVML INSPECTION PROJECT TITLE: 356T YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 FPL 4.4 SQ8.0 - BUTTONHEAD COUNT 4.4.1 The inspection for protruding and missing buttonheads was performed and documented per PSC procedure SQ 8.0. The buttonheads were inspected for their physical condition. This inspection is performed to acquire information on the function of the tendon, since the original installation or previous surveillance. A missing and/or protruding buttonhead decreases the amount of effective wires in the tendon. All conditions for buttonheads and wires, whether missing or defective, have been documented. The results of these inspections are recorded on Data SheetSQ 8.0, and are summarized in Tables 31 thru 36. In Tables 31 thru 36, "NIA" indicates no inspection was performed. 4.4.2 No protruding buttonheads were detected on any of the inspected tendon ends. The inspection of U3-13H31 detected a missing buttonhead on both ends of the tendon. In accordance with Turkey Point Technical Requirements (Reference 13.7), this type of condition must be evaluated by the FPL condition reporting process. Condition report CR2007-2744 was generated to evaluate the subject condition and deemed acceptable. Two tendon ends on Unit 3, 12V22/Gallery and 45VI 1/Gallery and three tendon ends on Unit 4, 12V03IGallery, 56V20/Gallery and 42H31/BT2 were detected with one missing buttonhead. One missing buttonhead per tendon is acceptable per the inspection criteria stated in Reference 13.7. TABLE 31: UNIT 3 VERTICALS - SQ8.0 - BUTTONHEAD COUNT UUMI- U U U U U 9U 12V06 .... ..... 1!i 89 DOME

  • 0 0 0 0 0 0 0 90 90 GALR 0 10 89. 8 DOME 0 0 0 0 0 0 0 g 90 46V02 GALLERY 0 vo2: 0 0 go DOME 0 0 0 0 0 0 0 90 90 46V11I GALLERY 0 0 0'0 1 0 1 0 89 89 DOME 0 0 0 0 0 0 0 9 90 4DV28

_GALLERY 0 0 0 0 0 0 0 90 90 DOME 0 0 0 0 0 0 0 90 90 56V22 GALER 0..0.00 .00. 90.+ 90 DOME 0 0 01 3~ 0 3. 0 87 87 61 VOl. (1) DOCUMENTED AND ACCEPTED DURING PAST INSPECTIONS

DOCUMENT NUMBER: .PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 35 DOCUMENT TITLE: FINAL REPORT FOR THE 3 51H YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE:. 3 5 THYEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 r-pL TABLE 32: UNIT 3 HOOPS - SQ8.0 - BUTTONHEAD COUNT BT. I 0 0 0 0 0 0 0 90 90 I 13HI0

                                        ýN/A     ýN/A NINA         N/AA      N/A. N/              A N/A           NI/A:

BT. 1 0 0 0 1 (1) 0 1) 0 89 89 13H31 3B 3 0 0:::0 io"

  • 0 :*: 0*89 89 BT. 3 0 0 0 0 0 0 0 90 90 35H39
                   -BT5                  0,:       0     0           0          0       0       0        900 BT. 1                0         0     0           0          0       0       0        90            90 51 H03 BT:5.                0         o0     0.         0.         0 . 0         0         90.          90 BT. 1                0         0     0           0          0       0       0         90           90 51H18                      ...       0..o       0                0          0   . 0       0                      90 BT. 1                0         0     0           0          0       0       0         90           90 51H33 BT.0                 0    0           0.         0       00-0                           9 5 1H35          BT. 1 5HB.5B    .. 1..-
                . II... ....
                                       . 0 0
                                             . . ...0 0

0 0 0 0:

                                                                          .. , 0..

0 0 0 0 0 90

                                                                                                         .9 9O
. ;90o -

BT. 2 0 0 0 0 0 1 1 90 89 62H65 0 o., 0 0 0 1o 190 :89 BT. 4 0 0 0 0 0 0 0 90 90 64H75 .- 0 "0 o 0 0 0 0 80 90 35H50* BT, 3 0 0 0 0 0 0 0 90 90 51 H02* BT.. 0 00 .0 00 0 -:9 9 51H30* BT. 1 0 0 0 0 0 0 0 90 90 64H62* B6 0 0 0 0 0 0, 90,

  • THESE TENDONS WERE PART OF THE ADDITIONAL WORK SCOPE.

(1) ACCEPTABLE PER CR2007-2744 EVALUATION

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 36. DOCUMENT TITLE: FINAL REPORT FOR THE 35T" YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35W YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 iPL

                  -TARLE1:               IIIJIT -qflAmFR    - iqo o - RLITTONNEAD COUINT NEAR BT.I               0           0       0         0        0       0         0      90           90 2D16                                                                     0*:    05                90
                                                                                                                 !:*90
              ýNEAR BT.4.                                                                      0 NEARBT.1                0           0       0         0        0       0         0      90           90 2D17 NEARBT.4,.          .0-          .0.        0         0        0       0         0      9...g        90 NEAR BT.1               0           0       0         0        0       0         0      90           90 20 40      . . .           I           I--

NEAR BT. NA NA NA.  :,N/A.. N/A N/A. N/A N/A NIA NEAR BT.4 0 0 0 2(1) 0 2(l) 0 88 88 3 D 08 ý: NEAR.BT.6.:. .0: . .:0 :.': 0 2 ," . . 2 ." .) .0 88  : 8.8. NEAR BT.A 0 0 0 0 0 0 0 90 90 3D51 NEARBT.2 0 0 0 0 0 0 0 90  : .90 NEAR BTA 0 0 0 0 0 0 0 90 90 3D52 NEAR BT.2 0. 0t :0 0,.ýo 0 - 0 0 90 90 (1) DOCUMENTED AND ACCEPTED DURING PAST INSPECTIONS ttand; Buttc

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 37 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125/07 TABLE 34: UNIT 4 VERTICALS - SQ8.0 - BUTTONHEAD COUNT DOME U U U 1 12V03 U 0 S0 GALLERY I 89. 88 DOME 0 0 0 0 0* 0 0 90 90 12V19 GALLERY. 0 0 0 0 0 0 0 90 90 DOME 0 0 0 0 0 0 0 90 90 34V02

         ..GALLERY:*       0ý      0      0           0       0     00             :,90           9 DOME          0       0      0           0       0     1        1       90           89 34V23 GALLERY,      ..o    .0...               :..::0       "0                  9.0          89 DOME          0       0      0           0       0     0        0       90           90 45V10
GALLERY.:. 0 :0. .'..0 0 0 0 0 90 890 DOME 0 0 0 0 0 0 0 90 90 45V23 GLEY0 :0 0  :.0 0 0 90 90 DOME 0 0 0 0 0 0 0 90 90 56V20 GALELERY 0ýý 0 0 0 .1 0 89 :89 DOME 0 0 0 0 0 0 0 90 90 56V30 S ALLERY 0 0 0 :0 0 P0 -90 90

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 38 DOCUMENT TITLE: FINAL REPORT FOR THE 35 TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: . 35 YEAR TENDON SURVEILLANCE AT TURKEYPOINT DATE: 05/25/07 I llL TABLE 35: UNIT 4 HOOPS - SQ8.0 - BUTTONHEAD COUNT BT. 1 0 0 0 . 0 0 1 :1 90 89 13H70 I IT. 0. 0 0 0.1 BT.3.ý 90::: BT. 3 0 0 0 0 0 0 0 90 90 35H25 3T..5 . NA " N/A N/A.1NA N/A 'NA :NA N/A NIA BT.3 0 0 0 0 0 0 0 90 90 35H34 BT. 2 0 0 0 0 0 0 0 90 90 0 0 0.. 0 0. 0 90 90. T.. BT. 2 0 0 0 0 0 0 0 90 90 42H199  :* :.. . BT.:4 0. 1 0.:. ..  : 0, 0 0 .:o0 90 '90 BT. 2 0 0 0 1 0 1 0 89 89 42H31 BT,4 0 0 0 0. 0 0 90 90 BT. 2 0 0 0 0 *0 0 0 90 90 42H32 BT.1 0 0 0 0 0 0 0 90 90 BT, 1 0 0 0 0 0 0 0 90 90 51HOI i ý;.,  %  :- . B . 0 . 0- 0 0 0 0 0 90 . 90 BT. 1 0 0 0 0 0 0 0 90 90 51 H40 BT.5 . 0:. .. : 0... 0. .0 0 0

                                                                                         ,90              . 90 BT. 2           0           0         0           0        0         0        0      90            90 62H33                                                                                       0                   9 BT..        0                     0          0,                                 .90 ST. 2            0          0         0           0       0          1        1      90           89 62H34 BT6      0          0         0.          0.       0.:,o1                    90           89 ST. 2            0          0         0           0        0         0        0      90            90 62H82 BT.6                       0                     0        0         0        0      900

DOCUMENT NUMBER: DOCUMENT.TITLE: PROJECT TITLE: PTNIPSC-TP-N981-508

  • FINAL REPORT FOR THE 3 51H 3 5 THYEAR REVISION:

CONTAINMENT IWL INSPECTION YEAR TENDON SURVEILLANCE AT TURKEY POINT 0 DATE: PAGE: 39 05/25/07 0s TABLE 36: UNIT 4 DOMES - SQ8.0 I - BUTTONHEAD COUNTIII NEAR BT.2 0 0 0 0 0 0 90 90 2D0o7 0o- 0i~ 0 NERB.6 0 NEAR BT.2 20 108 ...... ý - .: ."  ::0 . . .0 . : ..0  : :0 . " 1.. . 0 : . . .0 . 0. : . . 90

                                                                                                              . ..        90 NEAR BT.6;              0        0      0            0           0             .0%090                            90 NEARBT.2               0        0       0           0           0              0           0        90          90 N.:ýEARBT5 S.N/A      N/        NA      N/A                     N/A            N/A      .- N/A       N/A         N/A NEAR BT.3              0        0       0           0           0              0           0        90          90 3D20 NEAR BT.6              0ý       0ý    :0                    !............0                 0      '90         :ý90 NEAR BT.3              0        0       0           0           0              0           0        90          90 3D5 NEAR BT.6             0               .0            0.                         0         .0         90          90.

NEAR BT.3 0 0 0 0 0 1 1 90 89 3031 NEAR BT,6 0 0 0 0 .0 1. %1 b-90. 89

DOCUMENT.NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 40

  • DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 TWYEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 5 TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 PPL 4.5 SQ8.3 - CONCRETE INSPECTION 4:5.1 A VT-lC Detailed inspection in accordance with the ISI/IWL-PTN-3/4, "ASME Section XI, Sub-Section IWL, Concrete Containment Inservice Inspection Program" and PSC Procedure SQ8.3 was performed on the 24" around the bearingplate. This detailed inspection is performed in order to detect any cracks in the concrete >0.010" In width. The results were recorded on Data Sheet SO 8.3 and summarized In Tables 37 thru 42. In these tables, "N/A" indicates that an inspection was not performed. None of the inspected tendon ends exhibited concrete cracks exceeding 0.010" around any bearing plate Inspected.

TARLF* 37" IMIT 3 VI=RTICAIR SOR.3 - CONCIRETE ISETO TABLE 37: UNIT 3 VERTICALS - S08 3 - CONCRETE INSPECTION ULME NUNLtIUUNU 0 0 12V06 NONE FOUND 0. 0 0 DOME NONE FOUND 0 0 0 12V22

ýGALLERY. NONE.FOUND .N. 0 . 0 .. .. 0 DOME NONE FOUND 0 0 0 450 .GALLERY: NONE FOUND. 0 00 DOME PC13 0 0 0 45V11 GALLERY; NONE"FOUND 0 0 0 DOME PC13 0 0 0 45V28 GALLERY . ýNONEFOUD. 0 DOME NONE FOUND 0 0 0 56V22 GALLERY. NONE FOUND. 0
-":_ 0::. 0.

DOME NONE FOUND 0 0 0 61,VOl GALLERY NOEFUD00.0

DOCUMENT TITLE: DOCUMENT NUMBER: PTN/PSC-TP-N981-508 FINAL REPORT FOR THE 351H YEAR CONTAINMENT REVISION: 0 IWL INSPECTION PAGE: _ 41 PROJECT TITLE: 35TMYEAR TENDON SURVEILLANCE AT TURKEY POINT " DATE: .05/25./07 *DI

               ,TABLE 38: UNIT 3 HOOPS - SQ8.3 - CONCRETE INSPECTION BT. I            NONE FOUND              U           u                0 13H10 N/A            N/A ST. 1            NONEFOUND               00                           0 13H31 BT.3I
  • NONE FOUND 0 0. 0 BT.3 NONEFOUND 0 0 0 35H39 B5 NEFOUN 000 BT. 1 NONEFOUND 0 0 0 51H03 BT. I NONEFOUND 0 0 0 51 HI 8 .BT. 1 NONE FOUND 5BT.5 :;:. NONEFOUND . 00 0 0 0

BT. 1 NONEFOUND 0 0 0 51 H33

BT.5NONEFOUND 0 0 0 BT. 2 PC11II .:i 0 0 . 0 BT. 4 NONEFOUND 0 0 0 64H75 "BT.6... OE ND 0 0 0" 35H50" BT, NONE FOUND 0 0 0 51H02* T... NONE FOUND 0  :.0 0 51H30" BT. 4 NONE FOUND 0 0 0
%J3B.' 6 NONE FOUND 0. 0.

64H62" .6 ,NNFUD00%

  • These tendons were part of the additional work scope.

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0! PAGE: 42 DOCUMENT TITLE: FINAL REPORT FOR THE 35 TH YEAR CONTAINMENT IWL INSPECTION . PROJECT TITLE: 3 5 THYEAR TENDON SURVEILLANCE AT TURKEY POINT DATE:* 05125/07 FpI TABLE 39: UNIT 3 DOMES - SQ8.3 - CONCRETE INSPECTION NEAR BT.1 u u u PC13 2D16 0 NEAR BT .. NONE FOUND 0 0 NEARBT.4 PCII3.0 !0 0 NEAR BT.1 NONE FOUND 0 0 0 21140 NEAR BT4 - A NN/A .A :A N. NEAR BT.4 PC16 0 0 0 3D08 NEAR BT.1 NOEF13UN 0 0 0 NEAR BT,1 NONEFOUND 0 0 0 3D51 NEAR BT2.2 :PC13 0 00 NEAR BT.1 NONEFOUND 0 0 0 3D52 NEAR BT.2. NONE FOUND - 0 0 0

.DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 43 l* DOCUMENT TITLE: FINAL REPORT FOR THE 357TMYEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35 TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 III-TABLE 40: UNIT 4 VERTICALS - SQS,3 - CONCRETE INSPECTION UuMt NUNtz -ruuN'u 0 0 0 12V03 GALER *i0 *

  • 0 a
NONEE FOUND DOME NONE FOUND 0 0 0 12V19 GLLERY NoNEFOUND 0 0o . 0 DOME NONE FOUND 0 0 0 34V02 GALERy NONE FOUND 0 0-0 DOME NONE FOUND 0 0 0 34V2 GALERY NO.NEF.OUND .0 DOME NONE FOUND 0 0 0 45VI0 GALLERY ýNONE FOUND .00 0 DOME NONE FOUND 0 0 0 45V23 GALLERY. NONE FOUND 0 0 0 DOME NONE FOUND 0 0 0 56V20
.GALLERY,ý. :N.ONE fOUND 0o 0.

DOME NONE FOUND 0 0 0 56V30 G-.ýALLERY NONE FOUND 000

DOCUMENT TITLE: FINAL REPORT FOR THE 35T"YEAR CONTAINEN IWNPETO PROJECT TITLE:* 35T"YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125/107 TABLE 41: UNIT 4 HOOPS - S08.3 - CONCRETE INSPECTION NONE FUUNU U U 131H70 BT. 3 0 NONE FOUND BT. 3 NONEFOUND 0 0 0 351-26 ... BT.5 NIA N/A N/A: WA BT. 3 NONEFOUND 0 0 0 BT.2 NONEFOUND 0 0 0 42H16 BT.4 NNEFOUND.00 BT. 2 PC3 0 0 0 42H1- BT4

  • NONEFOUND: .'0 -0.

42H19 .... BT. 2 NONEFOUND 0 0 0 NoNEouNDE NBTO4F .::. 0 42 32 421-131 .:B.4:.*.:....: BT. 2 NON NONE FOUND 0. . .. 0 0

                    .B..               NONE FOUND                0,"                      0  :0 BT. 2              NONE FOUND                 0                       0                0
,.NONE FOUND 00 BT. 1 NONEFOUND 0 0 51H440 BT."5  ::: NONEFOUND  :.0 00 621H433 BT. 2 BT.6 NONEFOUND
                                     .NoNEFOUND           :

0 0

                                                                                        ..0:

0

0 621-33 BT. 2 NONEFOUND 0 0 0 BT.6 NONE FOUND 0....

621-182 BT. 2 NONEFOUND 0 0 0 BT.6 NONEFOUND 0 0 0 (1) The crack noted on the data sheet is In a grout patch and does not fall under the inspection requirements.

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 45 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 5 TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125/07 PFL TARIF d2~ UNIT A DOMFR - RDR ~ - CONI~RETF INSPF(~TIflN TABLE 42: UNIT 4 DOMES - Sf3R 3 - CONCRETE INSPECTION IN~P-. U I . u u P025 2D07 0* -: . 0..-

                                                                            ' .0 NEAR BT.2           NONE FOUND                  0                  0             0
NEAR BT.6.:: PC25 0. .0 0ý NEAR BT.2 PC25 0 0 0 NEAR BT.3 NONE FOUND .0 300 NEAR PN/A00 N/A6 ... .. ... 0 .*0...

NEAR BT.3 NONE.FOUND 0 0 0 3ER0256 :PQ50

           *NEAR BT.6           NONEFOUND                   0                  0             0 NEAR BT.3               PC25                    0                  0             0 3D31 NEARB.                  P025                    00

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 46 DOCUMENT TITLE: FINAL REPORT FOR THE 35TM YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 5 TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125107 PPL 5.0 GENERAL EXTERIOR CONCRETE INSPECTION The examination of containment concrete is scheduled in accordance with 10 CFR 50.55a(g)(6)(i)(B)(2). The first examination must be performed prior to September 10, 2001. The date of the first examination of concrete must be used to determine the 5-year schedule for subsequent examinations subject to the provisions of IWL-241 0(c), i.e. subsequent examinations shall commence not more than one year prior to the specified dates and shall be completed not more than one year after such dates. The date of the first examination shall be the date the Responsible Engineer approves the last VT-3C examination record sheet, 5.1 The baseline concrete examination for Units 3 and 4 was completed on 8/16/01 during the 30dh Year Containment Tendon Surveillance. The subsequent examination of the containment concrete has been performed during this 356 Year Containment inspection period for Units 3 and 4. This VT-3C examination was performed on the entire containment building of Unit 3 and 4 inorder to identify any new or propagating areas of distress or degradation incomparison to the baseline inspection performed during the 30&h Year Inspection Period. Additional indications were detected during this inspection period and are listed below. All of the additional indications have been evaluated and do not constitute abnormal degradation of the containment structure and there is no structural concern associated with these indications. This inspection was completed in accordance with PSC Procedure SQ8.4 and FPL-ENG-IWL 2.0. All of the corresponding data sheets are including inAppendix A of this report. 5.2 Additional Indications for' Unit 3. 5.2.1 On the containment wall surface between Buttress I and 6 there are approximately 40 unrecorded un-grouted form tie holes between pour level 7 and 10. This detected condition is a result of the recent RVCH project. As a result of the IWL Baseline General Exterior inspection un-grouted form tie holes were deemed acceptable. Therefore, the subject indication is acceptable upon this review. 5.2.2 The inspection of the face of Buttress 3 revealed three spalls on the face of the buttress. The areas of these spalls detected are located in non-structural concrete cover. A VT-I C inspection was performed as required at each location and detected a piece of exposed rebar at each location. The subject conditions have been evaluated in CR2007-6413 and deemed acceptable. The exposed sections of rebar have been properly coated as stated in CR2007-6413. 5.2.3 Multiple leaking caps (1D28, I D15, 2D54, 1D14, 1D08, 3D03, 42H33 and 35H55) were detected between Buttress 4 and 6. These tendon ends are inaccessible due to the steam safety release and no repairs were performed. The grease leakage is minor, and based on past experience there will be no significant adverse effect on tendon hardware and wires, due to the leaking grease. 5.2.4 Tendon 51 H02/BT1 was detected with excessive corrosion and pitting. Subsequently, a visual inspection and cap replacement was performed on this tendon end. The subject condition was evaluated and deemed acceptable per CR2007-7394. 5.3 Additional Indications for Unit 4. 5.3.1 Approximate 25' south of Buttress 2/740 on the east side of the containments dome surface grease/oil was seeping out of the non-structural lean concrete that covers the top vertical tendon caps. The lean concrete inthis area was removed in order to determine the source of the grease/oil leak and make the appropriate repairs. The subject condition was evaluated and deemed acceptable per CR2007-4658. 5.3.2 On the containment wall surface between Buttress 1 and 6 there are approximately 100 previously unrecorded grouted form tie holes. This detected condition is a result of the recent RVCH project. As a result of the IWL Baseline General Exterior inspection grouted form tie holes were deemed acceptable. Therefore, the subject indication is acceptable upon this review. 5.3.3 Multiple leaking caps (1D28, 1D22, 35H45 to lower levels, 51 H77, 51H64, 51 H56, 51 H54, 51 H33 and multiple below 51 H33) were detected between Buttress 4 and 6. These tendon ends are inaccessible due to the steam safety release and no repairs were performed. The grease leakage Is minor, and based on past experience there will be no significant adverse effect on tendon hardware and wires, due to the leaking grease.

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 47-DOCUMENT TITLE: FINAL REPORT FOR THE 35 THYEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35e YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 FPL 5.3.4 There were several areas where the non-structural comers of buttresses had spalled since the baseline inspection. Many of the spalls consequently exposed the rebar. A detailed inspection and sounding of the buttresses has been performed during this current 3 5th Year Tendon Surveillance. Additional loose areas of the buttress corners, as well as the originally detected areas, have been sounded and/or removed and repaired as deemed necessary by engineering. A detailed summary of the inspections and repairs are included in the evaluation of this condition in CR2007-9034. 6.0 HYDRAULIC JACK CALIBRATIONS 6.1 Precision Surveillance Corporation has developed a program for calibrating hydraulic jacks utilizing regression analysis (PSC Procedure QA 12.8.G-W). This is a process where a straight line is mathematically best fit to a set of data points (in this case, force versus gauge pressure). This results in a linear equation which relates the ram area (slope) and constant (y-intercept) for each jack calibration, allowing the conversion of pressure to force and vice versa. Completed calibrations for all of the hydraulic jacks used are contained in Appendix E and are summarized in Table 43. 6.2 A before and after comparison of the stressing jacks' ram areas revealed that none of the hydraulic jacks' calibrations varied by more than 0.90%, indicating that they were in a properly calibrated status. Acceptable variation is 1.5% 6.3 The wire-testing ram, I.D.#7702, was also found within the acceptable variation. 6.4 Note that the force exerted by a jack can be calculated as follows: Force = Area x Pressure + Constant (F) (in2) (KSI) (K) TABLE 43: HYDRAULIC JACK CALIBRATIONS 9191 11/30/06 120.717 -4.047 853.044 04126/07 120.338 -9.018 845.382 7100 +0.898 9192 11/30/06 120.326 -4.875 849.433 04126/07 120.633 -4.678 851.816 7100 -0281 9193 11/30/06 120.870 -3.007 1205.693 04126/07 119.682 -0.106 1196.714 10000 +0.746 9194 11/30106 120.832 -3.075 1205.245 04127/07 121.314 -9,315 1203825 10000 +0.118 9305 12/24/06 103.495 -1.553 996.656 04/27/07 103,778 -2.181 998.758 9645 -0,211 7702 0323107 1.587 0.103 13.593 05/08/07 1.590 0.146 13.661 8500 -0.503

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 48 DOCUMENT TITLE:. FINAL REPORT FOR THE 35 TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125/07 FPL. 7.0 TENDON LIFTOFFS 7.1 MONITOR TENDON FORCES 7.1.1 A liftoff is defined as the force required to lift the anchor head off the shim stack and is representative of the force in that tendon. A liftoff is performed on each physical surveillance tendon to monitor the force exerted by the tendon onto the structure. PSC Procedure SQ 9.0 in Appendix H details the steps taken to perform a liftoff. The results were documented on Data Sheet SQ 9.0 and are summarized in Tables 44 thru 47. In Tables 44 thru 47, "N/A" indicates that a physical inspection was not performed. 7.1.1.1 It should be noted that performing a liftoff has only a localized effect on a tendon; therefore, it is acceptable to use the same jack for both ends of a tendon by executing the liftoff on separate occasions. 7.1.2 The tendons, which are included in the Augmented. RVCH Scope, did not have their lift-off forces normalized. The effects of elastic shortening due to the sequence of the original tendon stressing and the secondary effects of tendons stressed in other directions is considered negligible due to the large amount of time between the two stressing periods and the small percentage of containment area that has been effected. 7.1.3 All of the tendon liftoffs were found to be above the minimum design and above 95% Predicted Force as required by IWL-3221.1. The liftoff requirement stated in IWL is: Tendon forces are acceptable if: (a) The average of all measured tendon forces, including those measured in IWL-3221.1 (b)(2), for each type of tendon is equal to or greater than the minimum required prestress specified at the anchorage for that type of tendon; (b) The measured force in each individual tendon is not less than 95% of the predicted force unless the following conditions are satisfied: (1) the measured force in not more than one tendon is between 90% and 95% of the predicted force; (2) The measured forces in two tendons located adjacent to the tendon in IWL-3221.1 (b)(.1) are not less than 95% of the predicted forces; and. (3) The measured forces in all the remaining sample tendons are not less than 95% of the predicted force. 7.1.3.1 The average tendon force in Unit 4 for each group and their respective minimum design are: Vertical Tendon: Group Average = 632.43 Kips Minimum Design = 522 Kips Hoop Tendon: Group Average = 571.77 Kips Minimum Design = 491.6 Kips Dome Tendon: Group Average = 612.46 Kips Minimum Design = 531 Kips 7.1.3.1.1 As depicted above, all group averages are above the required group minimum and are therefore acceptable. S7.1.3.2 All surveillance tendons physically inspected were found :to have forces greater than 95% of the predicted force. 7.1.4 Upon completion of the liftoff, a visual verification is.performed to identify any changes in the condition of the tendon end. No additional or broken wires were noted during or after liftoffs.

DOCUMENT NUMBER: PTN/PSC-TP-N981.-508 REVISION: 0 PAGE: 49 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 5W"YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 - . FPL TABLE 44: UNIT 3 - SQ9.0 - MONITORING TENDON FORCE DOME (25 9U I 91W4 I1eb.b 12V06 730.35 I N/A 1 730.35 I 607.7 I 577.3 I 546.9 I YES GALLERY 1 1.75 90 9305 733.95 DOME 3.25 90 :9194 739'63 ý56V22 739.63.:. NA :739.63 607.7 577.3 546.9. YES:. GLERY: N/A N/ NA NA DOME 8.0 87 9194 690.5 61 VOl 690.5 NtA 690.5 587.42 558.05 528.68 YES GALLERY N/A N/A N/A N/A BT.1 32 906 19.895 51H35 .. ...I....1597.32 N/A 597.32 584.2 53. 508 YE 75..3.625 90 .9194 60.1 BT.2 2.25 90 9192 630.44YE 62H55 619.38 N/A 619.38 564.2 536.0 507.8 YE BT.6 1.75 90 9194 608.33 Before a Liftoff is performed, the shim stack is secured so that the shims do not shift once the load from the tendon is released during testing.

L DOCUMENT NUMBER: DOCUMENT TITLE: PTN/PSC-TP-N981-508. FINAL REPORT FOR THE 356H.YEAR CONTAINMENT IWL INSPECTION REVISION: 0 PAGE: 50 PROJECT TITLE: 3 5 TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 P ,, TABLE 45: UNIT 4 VERTICALS- SQ9.0 - MONITORING TENDON FORCE DOME 4.25 90 9191 718.23 12V03 GALLERY N/A 718.23 NIA 718.23 607.4 , 577.1 546.7 YES 89 N/A N/A

DOME 3.25. 90 913 63397.

-34V02 626.17. :.988 .618.65 580B.2ý 551.2 5:,22.1 YES GALLERY 2.70 "o90 9305 618.38.:. DOME 5.0 90 9193 667.01 34V23 667.01 .941 627.65 580.2 551.2 522.1 YES GALLERY 2.0 90 N/A N/A 45VI 0 ::*;Do

          .ýDOMEE:;* :,:;:.

2.0 :i: *::*.90.... :.:*.9193

                                                   ...:!!*:*i:632.35 23 :     624.67::                        5:                          2 4510 .62.6                                                          956      597.18. 580.1       65.1         522.1    YES
        -GALLERY       .2.0:          9          9305     .617.0     .               .

DOME 2.0 90 9193 631.95 45V23 611.87 .97 593.51 580.1 551.1 522.1 YES GALLERY 2.0 90 9305 591.8 DOME4.0 90 193 71.5.76. 56V20: :715.76 :N/A .715.76 607A4 577.1 546.7;: .YES. GALLERY 2.0 89 IA :N/A DOME 4.0 90 9191 671.16 56V30 671.16 N/A 671.16 614.3 583.5 552.8 YES GALLERY N/A N/A N/A N/A shim stack secure, the hydraulic ram is coupled the tendonis for Once thetoinspection Liftoff testing. complete and the

DOCUMENT NUMBER:. PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 51 DOCUMENT TITLE: FINAL REPORT FOR THE 35TMYEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 FPL TABLE 46: UNIT 4 HOOPS- SQ9.0 - MONITORING TENDON FORCE t:51 . I .5,1 lz 13H70 587.75 0.963 1 566.0 527.9 501.5 475.1 YES BT. 3 2.75 90 9193 588.85 WB.3 . 2.25.. 9.0 9193 559.8 3SH34 .558.82 0.986: .545.08: 527.9 501.5 451 YES BT5 2.75:1 19 578 BT. 2 2.5 89 9191 558.89 42H431 552.71 1.02 563.76 522.0 495.9 469.8 YES BT. 4 2.5 90 9193 546.46 B.2 1.75 90: 919 546.01

42H32.>.1 540.43 10 5524 279 0.5 75.1 YES:

BT.

                        . 3.0      90        9193 ý.534.86 51 H40      BT                .2         0       99       1.0      606.06      1.0    606.06      573.0     544.4       515.7     YES ST. 5           2.875      90        9193   600.53 BT. 2            2.25    .90         9191     930 621433    T.Q6            2.       90.       9193   :603.76    59.2       NA       984          3I      544         517       YE BT. 2            2.75      90        9191    632.92 62H34                                                              623.37      N/A   .623.37      573.0     544.4       515.7     YES ST. 6             2.5      90        9193    613.83 8T       2        90       .9191   '618.85 6H26191                                                       097      598.73. 527:9'            501.71    .:YIES-ST6    2,5       90        913     61947-           ýI
     -~       ~
              -               -                   -                                The Liftoff testing is performed using feeler gauges, which I-indicate the pressure at which the load on the tendon is                k transferred from the shim stack to the hydraulic ram.

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 52 " DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 T" YEAR CONTAINMENT IWL INSPECTION DATE: 05/25/07 qqlw PROJECT TITLE: 35 TM YEAR TENDON SURVEILLANCE AT TURKEY POINT TABLE 47: UNIT 4 DOMES- SQ9.O - MONITORING-TENDON-FOReE--- NEAR BT'2 2.25 90 9191 646.61 2008 633.64 1.027 650.74 538.9 512.0 485.0 YES NEAR BT.6 2.75 90 9193 620.68

  • NEAR BT.3 . 0 90. 9193 623.09.

31D20 619.06. .989. 6112.25 :538.9 512.0- .485..0 YES. NEAR.BTA.6 . 90: .. 9193.. 615.04. NEAR BT.3 2.0 ý90 9193 592.07 3025 593.68 0.97 576.06 538.9 512.0 485.0 YES NEAR BT.6 2.25 90 9193 595.69 NEAR BT.3 :9193 598.92 603.25.. .

                                       *90                                                                                       1512.0       485.0 30331                                                                                        0.97.       585.15.      538.9                              YES NEAR 13T.6     2.2,5.     .9.0                 :607.58

... . - " - I - i iii I I - I - I - I M On each end, three sets of pressures are averaged to find the force on that tendon end. Both ends are then averaged and normalized to determine if the tendon is at an acceptable force level according to the predicted. forces. (9.7.2) Tendon End Liftoff maximum Force 713 , kips Pressure 611 I.-1 psi (Tendon End Maximum Force shall not exceed 743 kips for a 90 wire tendon, 8.25 (PLL) 1S8. 0i( kips (95%PLL) S14.0 kips (90%PLL) . kips qq*A.JL. psi .60 p. Psi .,q00-.'s psi (9.8.5.3) ACTUAL LIFTOFF: (psi) (9.8.5.4) Circle Stack #1 - 1 510 , Stack #2 - I

1. Actual I S18O 2 Sj So 2 SIC. 2 6jr.

3 SS , 4 0- 3 4o Actual Average _______-_ FORCE (opposite end) ,qj.(p kips FORCE (this end) 6,5 kip-THIS TENDON - This is the Liftoff ACTUAL AVERAGE LIFTOFF FORCE &4 kips X Norm. Factor = data for tendon TENDON NORMALIZED LIFTOFF FORCE (*o. -74 kips U4-2D08/BT.6 (9.8.6) Acceptable (95%PLL or greater) 4 or NO L I

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 53 DOCUMENT TITLE: FINAL REPORT FOR THE 35ýH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35ým YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 FFL 8.0 WIRE INSPECTION AND TESTING 8.1 A tendon of each type was completely detensioned. A single wire was removed from each detensioned tendon for inspection and testing. Each removed wire was examined over its entire length for corrosion and mechanical damage. Each sample was tested for yield strength, ultimate tensile strength and elongation. PSC Procedures SQ 10.2 and SQ 10.3 outline the details involved with the wire removal and testing. All data was recorded on Data Sheets SQ 10.2 and SQ 10.3 and the results summarized in Tables 48 and 49. 8.2 On Unit 3 for the RVCH Augmented Scope, one tendon from the vertical group and one tendon from the horizontal group was scheduled to be detensioned and have a test wire removed for visual inspection and tensile testing. Only RVCH tendons were physically inspected on Unit 3. On Unit 4 for the Original Scope, one tendon from the vertical group, one tendon from the horizontal group and one tendon from the dome group was scheduled~to be detensioned and have a test wire removed for visual inspection and tensile testing. On Unit 4 for the RVCH Augmented Scope, one tendon from the vertical group and one tendon from the horizontal group was scheduled to be detensioned and have a test wire removed for visual inspection and tensile testing. 8.3 All wire diameters were within the acceptance criteria of 0.250 + 0.002". The corrosion level for all of the test wires were either: A-Excellent Condition: Bright, uniformly colored wire; no foreign matter, visible rust or pitting. No cleaning for inspection is required. Two heavy passes with 100 grit sandpaper to bright metal Or B-Good Condition: Partial loss of color; little foreign matter and a small quantity of light rust may be present; no pitting. The oxide coat will be more discemable when viewed parallel to the length of the wire. Rag, wipe cleaning may be required for inspection. Five heavy passes with 100 grit sandpaper to bright metal. The Ultimate Strength of the wires tested exceeded the minimum strength criteria of 240,000 psi on all. samples. The percent elongation exceeded the required minimum of 4.0% on all samples tested. The recorded elongation on the samples varied from 4.2% to 5.6%. TABLE 48: UNIT 3 - SQ10.2 & SQ10.3 - VISUAL. INSPECTION AND TENSILE TESTING OF WIRE A 10-19 0.25 230.983 265.251 +4.6 YES 12V06 2 :B 180 -89 0.25 230.336 YES 3 150 -159 0.25. 228.720 263.634 +4.2 YES 1.. -W..10-19 0.5 4197 284.848 +5.1

                                                                                               't5            E 62H55          2                       70-79       0.25       246.500       285.294      +5.6         YES 3             A        120-129"0.25            :241,974       285.294      +53         YES

DOCUMENT NUMBER: PTN/PSC-TP-N981-508. REVISION: 0 PAGE: 54 DOCUMENT TITLE:. FINAL REPORT FOR THE 3 5TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35 TN YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 "PL TABLE 49: UNIT 4- SQ10.2 & SQ1 0.3 - VISUAL INSPECTION AND TENSILE TESTING OF WIRE

                                .A          10-19       0.249     229.947     258.955      +5.0         YES 12V03           2                                    0.250     223.870     257.492                  "YES A

0.250 259.432 +4.6 YES 3 150-159 221.931 I  ; B 1019 0.250 0.226.048 220.638 +4.4 YE 34V23 2 B 80-89 0.250 221.931 262.664 +5.1 YES 3 150-159- 0.250,:: 222.577 260.07 +5 YES. iA 10-19 0,250 227.750' 265.897 +4.3 YES 133H70 2:. . A. 60-69 0.2,50 226.457 264.281 +4.7 YES 3 A 120 - 129 0.250 229.043 266.544 +4,8 YES A *10-19 0.250 238.095 28 95.6 YES 62H34 2 A 70-79 0250 241,328 284.324 +5. YES A .3120-.129 0.249 239.399 287.638. +5.6 YES 1 A 10-19 0.249 226.361 262.215 +5.1 YES 3D31 .2 ,A 60-69 0.249 229.621 : 264.822 +5.1 YES 3 " " A 120.- 129 0.249 227.665 263.518 +5.1 YES Once the selected tendon Is detensioned, a wire is located at both o ends and removed for inspection and Stensile testing." q

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 55 DOCUMENT TITLE: FINAL REPORT FOR THE 35H YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 5 TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 PPL 9.0 TENDON RETENSIONING AND RESEALING 9.1 TENDON RETENSIONING 9.1.1 The tendons that were detensioned for wire removal were retensioned per PSC Procedure SQ 11.0 in order to restore them to acceptable working force. The results of the retensioning process were recorded on PSC Data Sheet SQ 11.0 and the results summarized in Table 50. On Table 50, "N/A" indicates restressing occurred from the opposite end. 9.1.2 All new elongations were compared to original elongations and found to be acceptable (within + 10%). A force versus elongation graph of each retensioning is plotted to verify that the elongation is linear and that no distortions of the tendon elongation are evident through bind or friction points. All plots trended similar to original installation and were acceptable. 9.1.3 All tendons were retensioned to acceptable force limits greater than as found, except U3-12V06. Tendon U3-12V06 had an As-Found Lift-Off values that exceeded the required Predicted force by 19.5%. PSC Procedure SQ1 1.0 states: The force being restored shall be held to a tolerance of plus 6% and minus 0% of the liftoff observed during the Monitoring of Tendon Force or to a value equal to but not in excess of 6% greater than the Predicted Lower Limit (PLL) of the Predicted forces shown in the Table of Procedure SQ9.1, whichever is greater, but NOT TO EXCEED 70% of tendon GUTS for the amount of effective wires in the tendon. Ifthis cannot be accomplished, the Owner shall be notified. The contractor was directed by the FPL Designated Engineer to restore the tendon as close as possible to 70% of G.U.T.S. (Guaranteed Ultimate Tensile Strength) without exceeding 70% of G.U.T.S. The final Lock-Off value was 69.28% of G.U.T.S. This condition is documented and deemed acceptable in CR2007-6493. All tendons were locked off below the maximum of 70% G.U.T.S. Afer the test wire is removed, i:iii the hydraulic ram Is coupled back onto the tendon. Then the tendon is retensioned to an appropriate force.

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 56 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 Th YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35W YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 FL,- TABLE 50: UNIT 3 & 4 - SQ11.0 - TENDON RETENSIONING u 9194 726.75 9194 725,13 3 112Vo6 11.75 11.5 I -2.12 730.35 726.43 I -0.54 I YES(') G 3.5 9305 733.95 9305 727.74 2ý

  • 4.65.9192 630.44 ,- .. 9192 664.5 62H55 9.0:9.05 .55 619.38 ' 653.53 1 BT..-9194 608.33 9194 .. :642.57 D 11.5 9191 718.23 9191 721.46 4 12V03 10.5 11.5 9.50 718.23 721.46 +0.45 YES G N/A N/A NIA N/A N/A 1.8 9193,.- 667.01 9193 684.33 4"34V21 10.8.:8 800 .:... 667.01"684.33'-2...YE G. N/A . N/A :::N/A. . ,N/A...NA BT.I NIA ) 9191 586.66 9191 620.86 4 13H70 8.5 9.2 8.24 587.75 612.91 +4.28 YES BT. 3 9.2 9193 588.85 9193 604.96 BT24.4 ý9191 632.92 911 650.23 423 .0.990 0.0 623.37 . 64.31 +ý3.38 YES B4ý.6 9193 613.83 6 9193 638.40 BT.3 4.9 9193 598.92 9193 616.65 4 3D31 90 9.0 00 603.25 614.12 +1.80 YES BT 6 4.1 9191 607.58 9191 611.60 (1) ACCEPTABLE PER CR2007-6493 EVALUATION (2) TENDON WAS RETENSIONED FROM BT3 SIDE. OSF COULD NOT BE ACHIEVED DUE TO THREAD CAPACITY OF THE ANCHORHEAD ON BT1,

I DOCUMENT NUMBER: PTN/PSC-TP-N981-508 " REVISION: 0 PAGE: 57 DOCUMENT TITLE: FINAL REPORT FOR THE 3 51H YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 5 1H YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107_ ELONGATION FOR U3-12V06 RVCHSCOPETIIENDON

              ~L ..! . -..l.. ... . 4L..L...L
  • I.'.

12

           .....     .+3
                     .*L
                         '171
                             'L.'        *!_I.:.I                _J               J     I     _    -I       J 1-.

7 1-I-I-__ I II

  • I II
                                                                                                                                                                                .1                   -.I-I- -,-T   t 1-            -J- L -J- L-
                                                                                                                                                                                                                                   -I- L -I- Ld J
                                                                                  ..             .    .       .                 .           i     I       I      I
                                                                                                                                                                                                            - -T " -" i-i-1or
                                                                                                                                                                                                            -T 10   -1"              o--35th Year                                                 --

35 h Yea Original FiR-I - I -I -I!4 L J-. LW

                                                                                                                                                                      -i- T -I-
                                                                                                                                                                            - T 7" T
                                                                                                                                                                                                                                       - ri -j- r -
         +71 -.       -r        T r i mr -1 "1 "-.                                       ..        .             - I-             -       7- T -i-                  -                          -
                        *       --*-- --              ..                             .-            -             4----,.-4-4--+-*                                4 --- +                -"+--,                                    --j* '-- :              :-i                      -

LI .. 1". I

                                      ';I.*1            1:t .      '1     : I      .'
                                                                                   '1    . I    i            I     I     - L.           .. I ...I .. I          j[ I.        ...iir I           IT"1 i IiJ  i         I  . ..       iI L Ji i.

_j_ I i L i_ IL ii Ii

                           ' 7        * .G-r;* a-I- - t m "i~l
                                    ;r,7"*.

r"7-- ---- * -I---I T - 4t T ," -- - T-- T - "I- --I- - -

                                                                                                                                              ..        ...-                                            1..I..           ...      . i- I"-I               I-r -      r--r 1"                       I      I                 . 7...    'II .                           Ir       1*                            - I                                            T                          -- t                                  I 6      - - L j    -,L            L j         L             I              I                         I                                                               L                      -        -        -         -
                                                                                                                                                                                                                                    - -              - L Lr-r
                                                                                                                                                                                                                                                                   -I-L--.-

F

                                                                                                                                                                                                                                                                               -I-I.
                                     ;ri ;
                                    .I           I                                                           1-                       -                    -T.T                                                                                                                            _

_ L _,1 . I IL _ L 7 4 1"t*L/L t :1 "1 , i *li" I i _ I II I L I I, I iI ji I~ .- 1- . ýj. 1 1 - -~~

                   ...T      r.i-.
                               -1        .7-r.G                  --         .- 7i-T              I    i"        I t -rI-.I       -      I
                                                                                                                                               -r I        I

_- i-I Tr--I- -I

                                                                                                                                                                                                    - T--I-r"3 I       I I I rt       L-r-         -r-i-r                                S .
          " 1T:FIJI.             -         iL" 1*                   .2 -1                          -               ii- .-.     -           J-i-      .- I-             -         L".4"--.              T -i T -1                    W...L         11                   . i       "7 "
         -21         -LL
                       "         "l r,'i~.T"f..r* I"              " ip*,      I,     I -,TT-I-TlI       II                             .      I.             ...          tI -'-LI...      i T-            I I--T I      I -L I ....       /' - !-      -I - r -       -I        LI Lrm7r"       .

2 . -1 . 7- 717 1 - "- -i- L " "r -L -

                     .LI       :-I*--LL-LI i       '..*-
                                                              --  .a-              i                    I    I-         - *.-,.*J,,J L_               -
                                                                                                                                                        -I-It--
                                                                                                                                                             -__TLL__                              --- L-J         .L-,---                   --- L        --            -      -. I.,,

0 0 100 200 300 400 500 600 700 800 900 FORCE (kips) ELONGATION FOR U3-62H55 RVCH SCOPETfNDON 10

                             -..          D -_CLI--:                      Z                        :          D                                                                                     Z          C:5: c:                                                     c-J:: r- Z 9                                -1.            ..-~,-p---~mrl-r                               -                        i                             --E -__,_- A-                                       ,                            _-                -                 .          -

S -o--35th Year -a--Original  : r, 8

                                                                       ----                 --     -          -----               -          - -             -- - - -, --                        - - ---- c 2 --                    -                ,-
  "" 7
                  'a'-r-h-rT-r     j-n,-" i r                --1."

lG--

                                                                    -           rn-r*-r-L .                       L       -r "-I -":-I'-r                        -r - -                        -._*        l - '- -- 1 "-r           - --            -         G !-  L J-'r - -           -
  • S6

_

  • _ _j - __t- -.-- ----- - , _ -+ -- -. _ * .. a. .- a- -

5 4

_:**r_* :1=* c: D c:) _ -:*D:c_ 'c :_r-3_c_ 3 '-I :0C-  :*_*: :_ ::! *_*:3: 1: :,:_:7C::

2 1

                          "3"C3-C-~:1                       T "            -         T-                   -- 4i*** -u3     4 "3                *2            C           -
  • C - 7r- - ]--4 1r--_7 I-
  • 0 0 10o 200 300 400 500 600 700 800 900 FORCE (ldps)

DOCUMENT NUMBER: DOCUMENT TITLE: PROJECT TITLE: PTN/PSC-TP-N981-508 FINAL REPORT FOR THE 3 5 7HYEAR TENDON SURVEILLANCE AT TURKEY POINT 3 5 TM YEAR CONTAINMENT IWL INSPECTION REVISION: 0 DATE: PAGE: 05/25107 58 0ipL ELONGATION FOR U4-12V03 RVCH SCOPE TNDON 12 * ...- . v-T--.*-j--*i - i 1 1 1 iiiiliiii l

                                                                                                                                                                  -I-             ,-T-1 L,                ,         LL'I LJ -                      - -. t                -' " - -" -

J-..J- L .J- LJ- -- -- O-i-gina -i-T- - - T-I- I- -T I- - r-i r - 1L iL

                            ---           35th Year                              G-O                    gial lo  -                                                                                                                                                                                       I . I .l .
                                                                                                                                                                                               -          i,-.L _t              i.L               L_-

Ii~i 111111 Ii I I- IT -LJ-L,- I.T T .A, " r* 17.- i -I 7 ,- :1 " I 1 I I I I I -t -I-T-i-T- ST. - -T I -r-i- r-,-

                                                                                   .1                                                                                                                                         -, -    r   -t-     r    -
                        ýl           L-- i L           iý         .      ,                                                                                                              -,              .. i'..,_               _, _LA _, _L                 _LJ , _LLA... _,

z -. 7r-, LI 71i LI 1 - .4-,i-- 1-. -,- I -,-I ,-T .T, .--I- T l-I- - ',. ,1i -.. . L.4. .. . I .r .L-, ,- L-._ .L

                                      *Ii                           i.I        iIi                                                                      I,              i1,i             I          it            t   h     u               ii1                        ii L j.                  Fr-rh%7 L-, --*r7iI, T I
                                         -rT                        i         -         .         I    1i     I--r-                                                       -i-i1-
                                                                                                                                                                          -         -Tii Lt o4-                                                                                                                        -   A        l                                                                                        jL       J-                  -L -
                                                                 - I        I4
             'I, iTF.
                   ":L 1r " .                                                                                               -   T                                                                   Ti _1        Tn_            _Ii           i
                                      -I-H.7÷.-.I-A-7 ("1.2    7r]i "                                             ~I        1- ~                                              t-- TT
                                                                                             -I--I         -- I- 4--

2 i4.~-.i. + I44~.4~ Li~l~i- +/- iii' I -I'I I I I iI 1 liii 1 F1 -F - F 1 FT - -,i T 1 T - - T.-i-iT -i-. r-r r r r -i-0J L - . i1 if r - - T -i i - L.-

                                                                              -I-I-
                                                                                                                            ..     .... L-J               -_I. .. I... L .. . =.                ...J._L... L-.4..

I_

                                                                                                                                                                                                                                     .-1.

L.. j A.-. t L -I- ýA-

                                                                                              ~.                                                                                                                                                           1-1--j--j-0                         100                      200                            300                            400                                500                             600                           700                          800                        900 FORCE (kips)

ELONGATION FOR U3-62-34 RVCH SCOPETENDON 10 I ,LI.* U- .... i--*...L... LiU... . ... ..U... ... I..L...i .. i...L.i.. * ......t..J...I l.....-.* , I- i--i--H

                                        ..-..                     H-i-H--..........                                                    -...                      --.. i---i-    ...---                                                                           "-- ---'          -

9 35th Year Original -r -*- - - .- --- 8-1r F F - "1- -rr- - F T-r l-F- 1F -i-- 1 FirF--- 1 -i 7 6 ..- .-i - i--L -fH *i -- -- H--H-H---. -- i - - if-- - i -- -. i-i if ruiH i----f -- i -- -- iIi 5 -'Ii-i r IHi-n -- i-- 0 I*___)__ I -I c.. . D11..... 11 ~.L I...... ..... 1 U F1 I . 1 . U..... F ..FC ....F .F - ......... i .4- .L* .. ..

                                                                                                                                                                                                                               ......                               U.....-
                         .4c              L4II-li.--

DIi C4 I. . IL .U.- 4.U.. 4 3

                - L *-I--c        -                            ......E..IL..-                          I      . I _                  -.            ....               ..        LI) . ....                                                                          .

Z - :- C 3Z.4 2 H -i . - i-_-

                                        ,i.                               ~                                                                                                  -C-I-i-              -I-I-       .4~i--i~l-                   iU.4i.L.4..4...

__________ h-i-i- -i-i--i--H-i--i-i-' I

  • I I
  • I l
  • t r t
  • 1 I I I I l I 1 I i . , i¸ ,,, . . . . . . . . . . .
        --- - - - - -                                   I I              II                 -         -

0 I - I :A I I II 1 j , , . i . . . . . . . . . . . i . . . . i* 0 100 200 300 400 5oo 600 700 800 900 FORCE (kips)

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 59 DOCUMENT TITLE: FINAL REPORT FOR THE 35TH YEAR CONTAINMENT IWL INSPECTION PROJECT.TITLE: 3 5 TW YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 lpPL ELONGATION FOR U4-13H70 ORIGINAL SCOPEITENDON 10 ____-r-r nr '-- n-r- -r-r, n 1-- I wr" r-a -0 35th Year Original - -- ----- ---

          -i -1I::-n      :    -                                      r1-f~rr
                                                                                            ~             r-lr, 24....                    -

r"-r 4u---4.F4 r--1rc-.---i 4, U

                                         .I . . .            . I                                   I .        . .           .       I       t I          , I
                                      -A~- -1        - I~ -l -    -1r1r-                            -      nr'-      -i-i-           *~*Pfl 1~r CI   6
                                      - L4           - -. 4 -     ~            L -.1 -     I-.

F--I -F--i

                                                                                                                                     ~
                                                                                                                                     - -i - F"1 I.~4 -

F- i

                                                                                                    -r-              el*.*-,
                                                                                                                                     -     iF--i                 F-X,,-                                                                          5-r1 I,-           111                        -r 5

z F- I

                                       .4L4LS~

F--I-h-i,-r

                                                     -4 I. F:-F--1h     4..4. r'1.L4.L4.                -C -I               -I              1

_4_.2--4 "-

                                                                                                                                                                                         . . 11i2"f-2 U4...... ... .. 4.........I...                                        -                         -

4

             -     I-         I- .    -         1-1r-I-.           1-F-.--
                                                                    ,                       -I--     -r-i-r                          i                 -       -      -        -            F-           ]          --        i--i--I--                                      I   -                                                                                               C       - .                C                  2:                 2:c : H :l:32                E 0                   1            D::c                                     D L..         I.        I      -l--..I-..4--

{ -4 .--. f-4--. 4 -A f4 .... 2-. 4 1,I. 3

                                                                                                                                                                                                                                                 = :'Z : ~: :                              :  c3_t-:

4~I~4~ c~ --I c -I z cf:-1-l-

                                                                                                                                                                                                                                                     -------- -j-r  -------      .--ra-i-i--I-2                                                                 -         .. 4 -.                  4242
                                      ~I~4~I                                                     ~I~4~I.4-                                                       1'        -4                                         E 2L I"2-.l.

tr?2-n- .2 i .:_=._ j :c:zc ci c 1I c- ' 02- 800. 900....4 0 100 200 300 400 500 600 70 FORCE (kips) ELONGATION FOR U4-34V23 ORIGINAL SCOPE TENDON 12

                             ... .....- JI J..L ..- -- 1---r--r-               ...    ~... --- ..1.L----I...             ...Tif-1 .                                                                                                                -       1-L              L       -    I"           r    -I-
                                                                                                                                                                           --t,       J. .2
                                                                                                                                                                                            ,2 t,*               3- -- rr-fl-                                                                      I L.I1 I          I I
                                                                                                                                                                                                            -    T "i"T--

10 -o- 35th Year --o- L 1 L J.. Original I & I i i I i - I,

  • ii"1
                                        *___"    ___1 I    _____

li.,ii'..-]- _____"t ___ Iui,*:,: Ti.::+ ___t ________ * .2.. 4. 4 .. .i. T-I---- .. lAo,.L

                                                                                                                                                                                                                                               -        -- -.                  -     -L :I-- L 1.
£                                                                                                                                                                            -I-           - -

J L L LJ J _ _ I _ _I I. I L 1 I_ J ,- -L -1 L J L- nL -J-L 8- - - r - - n'i..r1 i r 17 1 ._- _ , - I -- 77,l.*F .rrr ,- 1- -- .1 7- -- I_ -- T --- Tt-I-T- --- r-l-l_. _ - -L_ L _ .K L J -

             .'j -'L      J 11- It            I'.,j       LILk J                   IIýJ -I-Iý I-J -I-_                    __J              -I-.L_                                     -     ...                _lJ L I&     J.. _J I_.~l.                                       ... .....

z " I I Ij I I I mI 2 III fI I 2 I I I 03 [+J:.' J _ 1F*L 1 I IFLI IF- "1_I -. II 2F I_,. t+,,*- I IJ2 .. - - I- - -. tI --1 f * - . ..-I J ---- I _ -iI7 I I - - -r__L I

                                                                                                                                                                                                                                                                                              ._L t IiI                                     l I-         Ir       - - Ir i                    T-
                                                                                              . .--                          #               -#Ti- I-             [
i. ' - F q- ri - i _ - II 4 _.11 -

n, j.. L nLJ- r -r i-. 7-ir- -i -I- -*- -I- -T -- f-I--I- - T -I- T-T -I- T-I- - -i- r -- I-r- r-i-4.4 Ik.- 4 - - +...4.. , ,. 1-. 1 ..- -, - 2

                                                                                                                                                                                               ~

7:1

                             -i
                        -i- .;     2*

A_ I I- "i - , l I. - 1j fJl-1 2

                                                                                          -l-         ..-

I IJI4I

                                                                                                               .1
                                                                                                               -I -

f I- '- T T T T-I-L--] II . 1

                                                                                                                                                                            -I Ci .4I.T-T--I - T.[

T

                                                                                                                                                                                                                 -T '- - T 1

I-,4M

                                                                                                                                                                                                                                                  .I..
                                                                                                                                                                                                                                                   -I-r t       .- i- Ir -             rl    ---

L r* -i-2~~ 21 - - - - 1 1- 12{

                                                            -i~                      A22                                                                                                                                                                                             If         I.--f 0

0, 100 200 300 400 500 600 700 800 900 FORCE (kips)

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 60 DOCUMENT TITLE:, FINAL REPORT FOR THE 35T YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 5T7 YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 FPL ELONGATION FOR U4-3D31 ORIGINAL SCOPE TENDON I 1! .... .. ,

   .v Li~i~I      L iL                                  L        iLi_

E1LL LJL]ýLJ. -r DLLJ.

                                                                                                                                                                                     -J-r D   -t - - - L  - _.-r L.--_

9

                                                 -          na     r----    r----      r-a-II-I              n     a---                   7 -c
                                                                                                                                       ------              II---

I

              ':l        -                   n35th Year                    --a--Original                        [           'r-r--r-a-8      "n     .. . "

r-rTI r - - .. "F

                                                                  .... -   -r ...     .              ..               * -            r--i - r    " "n -          r n    - r     - -     i-    nrr - -    -     r---

tirfrZa-. -- 1r1-rI-h-1 --IaI-I

                                                                                                                                                                                        -- C        D       E      _

7 . L. . . . ....... . . p 6 z . r-- -- r D:-

                                             -. Li I-
                                                         -'      -L  L_
                                                                  -r-I-I        -       Li3L.

i- *-ra A- f-r-a-r- E EI t* D~ i-r r - - r--- r--i-- r--_- 5 n-i-r - -"-1---- n-i-n r - r -- - LiL--j--I-1.ir". I r" J--L 4 - - - I-_ - -L -a - z "4 ,- L* -- aE7- a-3 -a p-

                                                                       -           -Lr    ---      --
                                                                                         -- a-a---a-.
                                                                                                             -I---- ---
                                                                                                             -a-a--a4 a-
                                                                                                                                      -- I               - r----
                                                                                                                                                  -L"---L-
A --r - - a--a1--a--a-L
                                                                                                                                                                                                   ".Zp-4.

0-mx 3

.--* a--

E  :*Ha4-4 -I. -- -a-I-p- - - -- i'-I--I-I--a4-i'- t.- -aa-II I- ...

                                                                                                               -n r--i-----         r-      r--

1~--aF-- 4 -n-r -i--I ... -a-I- - -I--L-a--r----r-- r-i-r-,------- J- L Z-fl-- L -nia 1 .

                                                                                                                                                                                                       -Ip- ý- I I.
                                                                                                                                                                                                      .IiL "Ir F         .n3ci i         L          Dai cI'1                   rc1:Ev LL ,            iiLi i                i                                 --                      c-2             ý.l-r -I      - .---             aF---'-- :E              -                                                    :c2-aD-               D- c D-                     Da        J. -. 4UJ.

Da

                                  -~LJ-200-3.LL J

00-4*0 LL J 0 500 L 600iJIJLA 700L4-1. 009 00 10 0 - 0o 1 00 200 300 400 Soo 600 700 800 900 0 FORCE (kips)

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 61 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 Tm YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3WH 5 YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125/07 FPL 9.2 TENDON CAP RESEALING AND GREASING 9.2.1 After completion of all inspections, the anchorage components were hand coated with cold grease to ensure complete coverage. The caps were reinstalled with new gaskets, and the necessary amount of sheathing filler (grease) was added. Results of the grease replacement were recorded on Data Sheet SQ 12.1 and are summarized in Tables 51 thru 57. 9.2.1.1 All of the Original Scope and RVCH Augmented Scope surveillance tendons were refilled within the acceptable limits as stated in the procedure SQ12.1. 9.2.1.2 Tendon U3-61 V25 of the CR Scope of work exceeded the acceptable limits for grease replacement. CR2007-8095 was issued to evaluate this condition. During the grease replacement, 33,5 gallons of grease was installed on the subject tendon. CR2006-9308 and the current IWL Inspection have documented the amount of grease removed/lost as 20 gallons. The absolute difference of the amount of grease removed and amount of grease replaced equals 15.16%. As statedabove, the absolute difference between the amount of grease removed/lost and the amount of grease replaced in the subject tendon exceeds 10% of the net duct volume. This condition is documented and deemed acceptable per CR2007-8095. TABLE 51: UNIT 3 VFRTICAl -q O12_ - .RF:AqF= LOSI VS0 G;REAqF1 RF:Pl ArMrMI:NT DOME 1.0 8.4 12V06 20,5 20.79 0.29 88.32 0.32 YES GALLERY 19.5 12.39 DOME 1.5 .4.86 12V22 00.86: `: .. 0.96,.. 89.15::" YES:. GALLERY 2 .58 DOME 1.0 0 45V02 42.5 43.25 0.75 88.67 0.84 YES GALLERY 41.5 43.25 DOME 1.0.0 45V281 51.5 58.64 . 88.58 4.67. YES GALLER3Y.- 50.5. 64. . .. DOME - 1.5 5.75 45V28 4.0 5.75 1.75 88.81 1.97 YES GALLERY 2.5 0 DOME .5 , 3.98 56V22

  • GA;LL*ERY...: 1.*:*:

0 .:/ ' 2.5

                                              ...        *;,* :::ii       3.98. 1..-

1 88 16 i;:;~*ii::~)i YES.. DOME 1.0 6.19 61VO1 4.0 6.19 2.19 88.74 246 YES GALLERY 3.0 0

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 62 DOCUMENT TITLE: FINAL REPORT FOR THE 35TMYEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 357H YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125107 FPL TABLE 52: UNIT 3 HOOPS - SQ12.1 - GREASE LOSS VS. GREASE REPLACEMENT BT. i 3.0 3.09 13H10 3.0 3.09 0.09 73.59 0.12 YES BT, 3 N/A N/A BT. 1 20 . v2 2K .1 13H31 .. . ...... 3....:.. ... . 4 0.:..9YES_ BT. 3 1.5 1.77 35H39 3.0 3.54 0.54 73.28 0.73 YES BT. 5 1.5 1.77 BT1 3.5&5 51H03 .. 5.0.55.05 73.32.. ý0.72 YES BT. 1 2.0 2.21 51H18 3.5 4.42 0.92 73.66 1.24 YES BT. 6 1.5 2.21 BT. I 1:I .2.21 51H33 2.5 3.8 148 7.6 2.01 YES.: BT. 6: .15 . - 17 BT. 1 2 3.98 51H35 3.0 5.30 2.30 73.42 3.13 YES BT. 5 1 1.32 62H55 3.0.. 3.98.. 0.98.: 73.56 1.30 YES 64H75 . 4.5 5.30 0,80 73.25 1.09 YES BT. 6 3.0 . 3.09

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 63 Aorib ,, DOCUMENT TITLE: FINAL REPORT FOR THE 35 TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 5 TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 TABLE 53: UNIT 3 DOMES - SQ02.1 - GREASE LOSS VS. GREASE REPLACEMENT NEAR BT,1 1.5 1.77 2D16 3.0 3.54 0.54 65.24 0.82 YES NEAR BT.4 1.5 1.77 NEAR IT1 . 2.21 2D17  :.O 5.30 0.30-65.67 0.45 YES. NEAR BT.1 3.0 3.09 NEAR BT.1 3.0 3.09 2D40 3.0 3.09 0.09 64.96 0.13 YES NEAR BT.4 0.0- 0.0 3D08 . NEAR*.i,.

         .-   BT.4;-: . 2..0        *       .:     2:"i!0i 21 : .:
                                                 . :.':::     !.: 3.:
98. 0.48i. ",61.11 -. 78 Y.i ES ."i
NEAR BT. 1. 1:77 NEAR BT.1 2.0 2.21 3D51 4-0 4.42 0.42 60.01 0.69 YES NEAR BT.2 2.0 2.21 NEARWB. 1.5:177 3D52 30 354 0.54 59.30 0.91 YES NEAR BT.2 1.5 .77 Depending on the amount of grease loss during the inspection, grease can be replaced by pouring it back into the grease cap.

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 64 DOCUMENT TITLE: PROJECT TITLE: FINAL REPORT FOR THE 35T' YEAR CONTAINMENT IWL INSPECTION 3 5 TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 0 FPL TABLE 54: UNIT 3 ADDITIONAL WORK - SQ12.1 - GREASE LOSS VS. GREASE REPLACEMENT 12V05 OP ý 1.0 .1.0 :0.88 0.88 -0.12 1 88.94 A-.13 1 ] YES 12V14 TOP 1.0 1.0 0.88 0.88 -0.12 88.63 -0.13 YES 34V13 GALL*E*Ry 510-5 .51.0  ::49.56 1 49.56 -. 44 :89.63 -2.72 -YES 56V19 TOP 2.0 2.0 2.65 2.65 0.65 89.08 0.72 YES 56V20 tOP 1.0 1.0 1.77 1.77 0.77 89.08 0.86 YES 56V25 GALLERY 37.0 37.0 38.94 38.94 1.94 88.94 1.05 YES 56V29 TP 1.0- 1:.0 221 2.21 121 89.08 1.36 YES 56V30 TOP 1.0 1.0 1.77 1.77 0.77 89.01 0.86. YES 61V03 TOPIF I.. .0  : 1.0 1.77 1.77 077 :88.74 0.86 YES 61V07 TOP 1.0 1.0 1.32 1.32 0.32 89.01 0.35 YES 61V09 TOp 1.0 1.0 1.77 177

1. 0.77 88,94 0.86 YES TOP 0 3.98 61V22 .12.0 4.86 -7.14 88.91 -8.03 YES GALLERY 12.0 0.88 61V25 ..
          .GLLR.,                  20.0              *.20.0         33.51    33.51      13.5        89.2        15.16         YES(1) 61V30               TOP              1.0                 1.0           1.32    1,32       0.32       88.63        0.36        YES 35H50                T.13           1                  1.13            1.32    1.32        .19       73.32        0,26    'YES 35H51             BT. 3 (2'         N/A                 N/A            N/A      N/A        N/A         N/A        N/A          N/A 35H52                          .N/A:                    N/A            N/A      N/A        N/A         N/A      :N/A           N/A 51H02              BT. 1            1.13               1.13            3.54    3.54       2.41        73.38.      3.29        YES 51H30               87.*1.*.. .*.1.3        .          1.13            1.32    1.32        .19       73.52        0.26       -YES 51H31             BT. 1 2)          N/A                 N/A            N/A      N/A        N/A         NIA        N/A          N/A 2

51H63 -BT-.1  ::N/A N/A N/A NIA N/A N/A N/A N/A 64H62 8T. 6 2,0 2.0 2.21 2.21 .21 73.45 0.28 YES ID10 0.75..:

                                 .:BT.3               0.75            0.88    0.88       0.13       62.34        0.20        YES 2D08              BT. 3            0.75               0.76            0.88    0.88       0.13       68.11        0.19        YES 2D09              BT. 3.            1.0               "1.0           1.062   1,082       .062       61.81         .10        YES 2D21            BT. 4-3 (a         N/A                 N/A            N/A      N/A        N/A         N/A        N/A          N/A 2D22          .     ..              1.0                              1.062   1.062       .062       68.11        0.09        YES 2D49              1T. 6            0.75               0.75            0.88    0.88       0    .13   60.65         .21        YES Ik) Mý,,,      IP.IA:'Lr-r   ,-"UU-OUO i         :VP.LU       IIUN (2). ALL-THREAD REPLACEMENT ONLY. THE TENDON CAP WAS NOT REMOVED.

DOCUMENT NUMBER: PTNtPSC-TP-N981-508 REVISION: 0 PAGE: 65 DOCUMENT TITLE: FINAL REPORT FOR THE 35TMYEAR CONTAINMENT IWLINSPECTION 35 TH YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 r-1"L PROJECTTITLE: TABLE 55: UNIT 4 VERTICALS - SQ12.1 - GREASE LOSS VS. GREASE REPLACEMENT DOME 2.0 0 12V03 29.0 35.25 86.25 88.81 +7.03 YES GALLERY 27.0 35.25 DOME 0- ES . 0.75E54.75: 0. 34V02 :4.0 GALLERY 52.0 5 5 DOME 1.5 0 34V23 39.5 44.4 4.9 89.05 +5.5 YES GALLERY 38,0 44A4 DOMEý 2, 0': 45V1 0 42 42.8  ::.0,8 89.32 +0.89 YES GALLERY 40 + 42.8: DOME 1.5 0 45V23 57.5 64.87 7.37 89.43 +8.24 YES GALLERY 58.0 64.87 DOME, 2.0-. 108 56V20 10.2 0.82 822 +9 YES GALLERY, '. 8,0 0 DOME 2.0 0 56V30 33.0 40.48 7.48 89.77 +833 YES GALLERY 31.0 40.48 12V1901 ) 495 55864 6.14 869.60 +7.96 YES GALILERY: 48.0

55-64
+:ýt (1) ADDITIONAL WORK SCOPE

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 . REVISION: 0 PAGE: 66 ,*'*1, DOCUMENT TITLE: FINAL REPORT FOR THE35WH YEAR CONTAINMENT IWL INSPECTION PRJCTTTL: 35HYEAR TENDON SURVEILL .ANCEAT TURKEY POINT DATE: 05125/07 FlL_ TABLE 56: UNIT 4 HOOPS - SQ12.1 - GREASE LOSS VS. GREASE REPLACEMENT BT. I 2.0 2.21 13H70 5.0 5.75 +0.75 73.01 +1.02 I YES BT. 3 3.0 3.54 BT. 3 3.0 3.98. 35H25 . ..3T.5.........".....

....."...0'3.98 0.98 73.32 +1.33* .YES BT. 3 2 2.21 35H34 3.5 3.98 +0.48 73.32 +0.65 YES BT. 5 1.5 1.77 BT, 2 .1.5 22 42H16 .+01 . 5.75 +1.75 73.45 2.38 . YES BT.4 2.5 ':3.54 BT. 2 1.5 1.77 42H19 3.5 3.98 +0.48 73.14 +0.65 YES BT. 4 2.0 2.21 BT.2 1517 42H31 5 3.98
                                                                                           ..    +0.48      73.35      +0.65             YES B 4 ..             2.                                   :2.21 BT. 2               1.5                                      1.77 42H32                                            3.5                                      3,98    +0.48      73.38      +0.65              YES BT. 4              2.0                                       2.21 5H..0024.93, +4.93      73.59     +: 6.69             YES +..

T.. 5 "8.5 24.93. BT. 1 2.0 2.21 51H40 4.0 4.42 +0.42 73.01 +0.57 YES BT. 5 2.0 2.21 BT 62 BT. . 2. 2.0 .1 2.21

                     .,.....:                                                ..   ...                 2                    57.     :.:.... S BT. 2               2.0                                      2.21 62H34                                            4.0                                      4.42     +0.42     73.28      +0.57               YES BT. 6               2.0                                      2.21 BT7.2               2.0                                      2.21 62H82                                            40.                                      442      +0.42     73.45       +057               YES 7.6               2Z.:221

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 67 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 5 TW YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125107 PPL TABLE 57: UNIT 4 DOMES - SQ12.1 - GREASE LOSi*3REASE REPLACEMENT NEAR BT.2 2.0 2.21 2D07 3.5 3.98 +0.48 61.41 +0.78 YES NEAR BT.6 1.5 1.77 NEAR BT.2  : .0 0 . 5 . 2.2

                                                      -0.58.
                                                        -           4.86          0.4     "61.70                 .YES NEAR BT.6           25                         26 NEAR BT.2           2.0                        2.21 2D34                                         2.0                     2.21        +0.21       68.73      +0.30      YES NEAR BT.5            0                            0
NEAR BT. :2.526 3D20 5 . 4.86
                                                                      ..              . 67.63       0.053     YES NEAR BT      :6     2.                  .   . 22...

NEAR BT.3 7.0 0 3D25 16.0 21.56 5.56 70.28 7.9 YES NEAR BT.6 9,0 21.56 NEAR BT.3 .. *2 0 3D31 345 3572 1 YES NEART6 14:5 35.72 1 If a large amount of grease is lost during the inspection, then grease must be replaced by pressure pumping-itWback-into the tendon duct.

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 68 DOCUMENT TITLE FINAL REPORT FOR THE 3ý'H YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35"' YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 FPL 10.0 COMPARISON WITH ORIGINAL INSTALLATION DATA A comparison of the liftoff forces from this surveillance to the original installation lock-off forces for the tendons physically inspected on Unit 4 is made in an effort to detect any evidence of system degradation. The lock-off forces are compared in order to detect any abnormal force loss that would possibly indicate an underestimation of the creep, shrinkage and/or elastic shortening effects in the Containment Building. This comparison is summarized in Tables 58 thru 60. 10.1 The losses for the Unit 4 Original Scope tendon groups are reported as: 18.3% for the verticals, 26.42% for the hoop tendons and 21.33% for the dome tendons. These losses appear to be as expected when comparing to other containments of this style and age. Based upon this data PSC concludes that the results do not indicate any degradation of the post tensioning system. 10.2 Turkey Point Units 3 & 4 is currently committed to meet the requirements of the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section XI, 1992 Edition with 1992 Addenda, Sub-Section IWL "Requirements for Class CC Concrete Components of Light-Water Cooled Plantse. Portions of the containment buildings at the Turkey Point Units 3 & 4 were affected by the Reactor Vessel Closure Head (RVCH) project. The above mentioned edition of the code does not require any additional tendon inspection due to the RVCH project. However, as a conservative measure additional tendons have been inspected during this 3 5 th Year inspection period. The additional tendons were selected based on Sections IWL 2521.2 of the ASME Boiler & Pressure Vessel Code, Section XI, 2001 Edition with 2002 Addenda. 10.2.1 In addition to the random containment tendons, five tendons were selected from the RVCH Project Scope for Unit 3 and six tendons from the RVCH Project Scope for Unit 4. Their losses are as follows: Unit 3 Verticals - 4.4%, Unit 3 Hoops - 3.45%, Unit 4 Verticals - 6.2% and Unit 4 Hoops - 3.6%. Typical losses from the original installation of the tendons at this plant (first surveillance) were :15%. This reduction in loss is due to the elimination of a majority of the concrete creep, shrinkage and relaxation in the wire for the portion of the tendons not completely replaced. Losses in these tendons should continue to be low and they will remain well above minimum requirements, thus indicating there is no further degradation of the post-tensidning system

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 69 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35T YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25107 FPL TABILE 58: COMPARISON WITH ORIGINAL UNIT 4 INSTALLATION DATA N TAkE 58: COMPARISON WITH ORIGINAL UNIT 4 INSTALLAT16 (OZ.Of oz'o. I f I 2 .9O% 34V231 667.01 1i06.099... 774 19.9% 18.1% 45V10 780 624.67 155.33

                                                                                       =;*20.9%

4MV3 774, .1162.13 13170 774 587.75 186.25 24.1% 335H7 77 - 58.82 2H18.18 42H31 777 552.71 224.29 28.9% 26.4% 42H432-* -7.7.7:504265 30.4%k 62H82 780 619.16 160.84 20.6% 2008 78 633.641463.3618% 3D20 786 619.06 166.94 21.2% 21.3% 3D5-. F :774: 3'2. 593.88. 180.12 ýM23.3% 3031 774 60325 170,75 22.1% TABLE 59: COMPARISON WITH UNIT 3 RVCH INSTALLATION DATA 12V6 748.6 730.35 18.25 2.4%

2!:*i  : i2;::*;
                                 .iii~iit,~i/i !i:? :73 .63 :':; ": 18.57: ;* :: - :2:4% ,::::                   4.4%

61VOl 753.5 690.5 63.00 8.4%

_H35 . 625.15 -. 597.32 27.83 4.5%

62H55 634.44 619.38 15.06 2.4% TABLE 60: COMPARISON WITH UNIT 4 RVCH INSTALLATION DATA 12V3 749.87 718.23 31.64 "4.2% ,

       !!v:i~( ::~ii*
*! 7,;4:i 7.97 +:: :':+

715.76 . : K.:3 ,21 : 4+:

                                                                                              .3% ` : : '        6.2%

56V30 756.36 680.01 76.35 10.1% 51H0'.. 634.46 606.06 28.40 .4.5% 62H33 631.99 598.42 33.57 5.3% 3,6% -62H 34 629.21 623.37 5.84 0.9%

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 . REVISION:. 0 PAGE: 70 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 TH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 5 T YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125107 FPL 11.0 STRESSING TREND ANALYSIS 11.1 A regression analysis was conducted on each of the tendon groups for Unit 4 Original Surveillance Scope. The graphs are shown on the following pages, along with the input data for force and age (time since stressed). 11.1.1 The analysis determined the vertical, hoop and dome tendons remaining above the minimum requirements well beyond the next surveillance period as well as beyond 60 years. The Forecasted Value at 60 years is +14.5% above.the design minimum for the verticals, +13.5% above the design minimum for the hoops and +11.8% above the design minimum for the dome tendons. TABLE 61: UNIT 4 VERTICALS- REGRESSION ANALYSIS - INPUT DATA 56V29 1.68 638.1 0.518794 45V10 21.01 606.6 3.044999

    *12V29      . 2.22   . 664.     . 0.797607               12V25.       .     '-21.03           .         .604.8:       .            3.045W5 34V29           3.57        660.6         1.272566               45V28                   24.91                    606.6                  3.215269 56V29            3.57       87.7.         1.272...                   V14:*               24.91..:        ....         219              .3.215269, 12V29           4.12         711          1.415853                23V2                      25                     617.4                 3.218876 34V29            6.2        681.ý3        1.824549               4:V.4                      25                     613.8                  3.218876 56V29            6.2        667.8         1.824549               23V23                   25.01                     637.2                  3219276
                                                                      .45V8                   25.01                    -626.4.ý               ý3.219276 34V29           10.55       684.3         2.356126               34V23                   34.82                    627.65                 3.550192 56V:;

29:!ii 'I 0*o* '!5i -{* **,2.356126..... 669*.6:!::.0 4*V.' 35.07 597.18 3.557346 12V29 .11.1 673.2 2.406945 45V23 35.08 593.51 3.557631 34V2. 35.64 61&865 3.573469 12V27 20.91 595.8 3.040228 61V12 20.92 1 625.5 3.040706

                                                                         . . . ... .I" . ... . . ... . . . .. . .1"   . . ... . ... . .-I" . . . . . . . . ... ..

12V28, 21.01 6077fi  ::3.044999.:

               .1.

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0 PAGE: 71DATA DOCUMENT TITLE: FINAL REPORT FOR THE W"T YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: W5TYEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 i11 TABLE 62: UNIT 4 VERTICALS. REGRESSIO ANALYSIS - OUTPUT DAT Intercept 698.0872 3 671 658 522

  • Sigma 22Z75535 5  :::: t :':0659 69 t 649 64 t ,522.

Count 28 10 642 634 522 T-Valu

  • 1..056 1.5 632 .%..624 522 Mean Ln(t) 2.510046 20 625 617 522

_Vu76Ln(t)0.-.:.%:, .914371 25 619 610 522 30 615 605 522 __._:.____-  : . -:.35 611 600 522 40 608 596 522

                                                                         .. 45                          605             593                522 50                          602             589                522

____________ 55600 58652 60 598 584 522 Turkey Point2007 Tendon Surveillance Regression Analysis for U4-Vertical Tendons 750

                                                  --                              7    .      -      -

700 i-i X"

i. ¸. . . . . . , i L
                                                  .                I
                                                                                 ":"" T........i....
                                                                                     *1i I                     i                *Forecast Value il.(¢:.:'
                  .7ý'7 -. 7 7                                                                                            - --  --- Lowar Bound Design Minimum r --                 .--
                                                                                                                           .... X Test Data Points    7 ---

650 , xI kýt x 600 T- 7.

T
                                                                 .1  -- -   ----      I--.--             -----------

4L

                                                                                                                                     ------ý1------

t L 550 7ýý7.- -ý7

       ---- --------- -ý7-Q 1                                                 '-'..

0 10 20 30 40 50 60 70 Years

POETTAITEF AW' MYEATENO SUfAP.RVEFRINC ATTURKEY P INT U DATA:0/50 TABLE 63: UNIT 4 HOOPS- REGRESSION ANAL*SIS - INPUT D 511H50 1.37 632.7 0.314811 35H41 20.73 540.9 3.031582

  *13115               1.52        630             0.41871'    35H42                20.73  .         551.7. . 3.031582 64H70               3.15       616.5           1.147402     35H38                20.74            534.6    3.032064 131138              3.27    .. 647.1            01.18479         35139           20.74           581       3.032064 42H57               3.48       646.2           1.247032     51H1O                20.88            605.7    3.038792 42H            ,. 5.78       6.4       . ,1.754404.       42H83                20.93   .
                                                                                                    .634.5    3.041114 64H70               5,78       631.8           1.754404     35H79                24.58            599.4    3.201933
                                                                         .3.20274.

62138 6.2) 642.6 1616 62H82 : .. 24,6 .'..61747.4 42H180 10,13 642.6 2.315501 51 H42 24.71 583.2 3.207208 4 1.3. 2.316488 . .13137 24.72 Z600.3 3.2070613 62H38 10.47 617.4 2.348514 13H32 24.73 613.8 3.208017 53H55 20.6 563,4 3.02629.1. 511H19 24.87 612.9 3.213662 62H82 20.61 604.8 3.025776 35H20 24.88 584.1 3,214064 13118 2.72 5742 31031099 62H54 24.91 582.3 3.215269 13H49 20.72 591.3 3.031099 42H30 25.05 587.7 3.220874 13110 2.72 588..6 3..031099 13H70 . 34.65 566 3.545298 13H51 20.72 598.5 3.031099 62H82 34.67 598.73 3.545875 13H53 20.72 564.3 3.031099 35H34 34.8 3549617

                                                                                                                .545.08 131-54            20.72       573.3            3.031099     42H31                35.12           563.76    3,558771
.:!!.!*tH.4e ";:20.72 5..59..8.  :.. * . ...

I 3.031099

                                                                '42H32              !35.12          -551.24    3.558771 51 H48            20.72       559.8           3.031099      421132               35.12           551.24    3.558771

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISRGESO: 0 .- PAGE:O73UP DOCUMENT TITLE: FINAL REPORT FOR THE 357HYEAR CONTAINMENT IWL INSPECTION i PROJECT TITLE: "35THYEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07_ II*L TABLE ý64: UNIT 4 HOOPS- REGRESSION ANALYSIS - OUTPUT DATA

          ... m.                                       6..4..9...                                                     624                            613.491.6 Count                                          42                                10                         605                           598                   491.6 WT-viue,                            1683852                               15                         595                           588                   491.6 Mean Ln(t)                                  2.666335                               20                         587                           580                   491.6 arLt)0,822964                                                         25                         581                           573                  :491.6 30                         576                           568                   491.6
                                                                                   .        35                        :572                           563                   491k6 40                         569                           558                   491.6 S45 "                       56                            8555                  491.6 50                          563                           551                   491.6
                                                                                                  -5                   50                            58491.6 60                         558                           545                   491.6 Turkey Point2007 Tendon Surveillance Regression Analysis for U4-Hoop Tendons 73 o       ~
                                             . : I'"    - --      "-      I    '     -      "         I                              .--

r ----- j I: '.: 7 7i 68 - I -"**

           -*I*: :! * = - -',
                                  - -'i* r'*.:.*.*
! .:T  ::I
                                                                      ':].       .     -       .
                                                                                              -I.
                                                                       - . .-I . .".- . . . .*.4, ..
                                                                                                     * -ii
                                                                                                     ---. - .       . . -. - .*        . .    ." 1      -   Forecast esg      value u      TI -    *i
                                                                                                                                  ..         -.         -A-&Lower s' 'U:

Bound , "- r-- ------ ---- -- ----------- --.--- --.. es.gnM.nimu. r -- 7 --- -. ... 7-A - - - - --.... - - -.... ....-- - - -. - X est DateP oints.- 63(

             .L.:.'T X:_ 7 * ,.::-         *-."":::,-:~~
                                              ** - --       -.. ": .*.                " .. . ..J ,. - .                      . A - -~~~    ---.----       . .Z" --.
                                                                                                                                                                 ... - -... - -I-          .    .....

a --

                               * . -.j*: :
                                               ~~~~~~~~~~~~

0~ * * * : **=*.

                                                                                                      ,--------- --- I. .. . .L,
                                                                                                                                                                  ~~
                                                                                                                                                                   -"' ~~~~
                            *       '  '      . . .-                                   7-.   - -..-     - -.- - -'-,- - -:':-:--              -      - -
- r:7::' .. . 4: - -"-- - -.- _ '

0 " ' . ;,,* '"*; : ." * .: . . . . . . . , , **1-,7 53( 480 p-nv .1~1 0 10 20 30 40 50 60 70 Years

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 74 0 DOCUMENT TITLE: FINAL REPORT FOR THE 35 rH YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 35 HT YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 Ipm TABLE 65: UNIT 4 DOMES- REGRESSION ANALYSIS - INPUT DATA 2D2A 1:.32 69.7 .7U.ft63z2 2.L24U 20.Z7.t 57.6 3.0 2D28 1.32 659.7 0.277632 2D240 3.2. 20.67

                                                                             .. 7    ....

597.6

                                                                                            ' . *Q .   *M 3.028683
                                                                                                            .3.028683 1D28          3.21       683.1         1.166271              1D38             20.7            615.6           3.030134 3028           3.21      66::3::.      . .

1.166271 24.62 6093 3.203559 2014 3.24 658.8 1.175573 3D49 24.62 622.8 3.203559 2D3 .81. 68.8 1.759581 :1D3 .2.64 ,580.5 3247 1D28 5.84 694.8 1.764731 3D20 24.66 619.2 3.205182 328 5.84 653.4 1.7647731 22 .24.7 682.2 3.206803 21D3 10.17 613.8 2.319442 3D25 34.7 576.06 3.54674 132 8 10.2 6 8 2.322388 3D31 34.7.7 . 585.15 :3.54674 3D28 10.2 621.9 2.322388 3020 34.73 61225 3.547604 D4 20.6. 566.1. "3027715 28. 34.76 650.74 3.54467,-

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 75 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5TMYEAR CONTAINMENT IWL INSPECTION PROJECT TITLE:. 3 5 T' YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05125/07 FpL TABLE 66: UNIT 4 DOMES- REGRESSION ANALYSIS - OUTPUT DATA

                .       e:
                       .Sl                       -20.5315 ::':::::         1                679               655                531 Intercept                         678.5597                  3                656               641                531 i gai.:                          2892199                   5                646             "634                 531.

Count 26 10 631 622 531 T-466e1.10821 623 V13 531 Mean Ln(t) 2.382738 20 617 606 531 Var Ln(t) 1.14481 , 25 - .612 600 531 30 609 595 531

..:.35. 606 :591 531 40 603 588 531
45. 600 584 531 50 598 581 531 55 596 579 531 60 594 576 531 Turkey Point 2007 Tendon Surveillance Regression Analysis for U4-Dome Tendons
              ......              .. 7-' -,:7.7- " ---      -- --- 7 1---"----...               .. . -- "I-- - - -

700 70 - -- ---- - 1: * ----- - , -- '... --------- 680 -- 0-Forecast Value 680 6.-0*--Design Minimum 640 . ." - ": . ' "_ " t X T e st D ata P oints 6201___

  -    -0        .       ..                                                                                   ..
        ".I ::*     ""   .flfl*                             '*-  <             X      *  *   '  -*-   - *,         '  *    "         -

5601 560 Aq 77*

           " .       7" 7 --- . - ..7--. - - - - - - - - -                        - -                                                   i-540 . .. .. . . . .. ... . ., . . .                         .. .     . ,..      . ., ,

520 0 10 20 30 40 50 60 70 Years

DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 76 DOCUMENT TITLE: FINAL REPORT FOR THE 3 5 THYEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 " YEAR TENDON SURVEILLANCE AT TURKEY POINT W DATE: 05/25/07

12.0 CONCLUSION

A review of this surveillance was conducted per IWL-3220 Unbonded Post-Tensioning Systems and is outlined below: IWL-3221 Acceptance by Examination

    -IWL-3221.1 Tendon Force. Tendon forces are acceptable if:

(a) The average of all measured tendon forces, including those measured in IWL-3221.1(b)(2), for each type of tendon is equal to or greater than the minimum required prestress specified at the anchorage for that type of tendon; Results: The average tendon force for each type of tendon measuredthis inspection period was above the minimum design. The averagepercent above the minimum design for tendon group is as follows: Verticals, +21.2%, Hoops, +16.3% and Dome, +15.3% (b) The measured force in each individual tendon is not less than 95% of the predicted force unless the following conditions are satisfied: (1) The measured force in not more than one tendon is between 90% and 95% of the predicted force; (2) The measured forces in two tendons located adjacent to the tendon in IWL-3221.1 (b)(1) are not tess than 95% of the predicted forces; and (3) The measured forces in all the remaining sample tendons are not less than 95% of the predicted force. Results: All surveillancetendons physically inspectedthis inspection periodwere found to have forces greaterthan 95% of the correspondingpredicted force. IWL-3221.2 Tendon Wire or Strand Samples. The condition of wire or strand samples is acceptable If: (a) samples are free of physical damage; Results: All of the tendon wire test samples were free ofphysical damage. (b) sample ultimate tensile strength and elongation are not less than minimum specified values. Results: All of the tendon wire test samples were found to be acceptable for diameter(0.250

                                +/-0.002), ultimate tensile strength (>240ksi) and elongation(>4%).

IWL-3221.3 Tendon Anchorage Areas. The condition of tendon anchorage areas is acceptable if: (a) there is no evidence of cracking in anchor heads, shims, or bearing plates; Results: Detailedinspectionsdid not reveal any cracks in the anchoragecomponents for any inspected tendon end. (b) there is no evidence of active corrosion; Results: Detailed inspectidnsdid no-t reveal ahk active,corrosion on the anchoragecomponents for any inspected tendon end except U3-51HO2/BT1. The subject condition was evaluated and accepted per CR2007-7394. The condition report evaluation is included in Appendix.

DOCUMENT NUMBER: PTNIPSC-TP-N981-508 REVISION: 0. PAGE: 77 DOCUMENT TITLE: FINAL REPORT FOR THE 35 TH YEAR CONTAINMENT rWL INSPECTION PROJECT TITLE: 35T YEAR TENDON SURVEILLANCE AT TURKEY POINT DATE: 05/25/07 .i L (c) broken or unseatedwires, broken strands, and detached buttonheads were documented and accepted during a preservice examination or during a previous in-service examination; Results: Detailedinspection did not detect any unseated wires for any of the inspected tendons. A detachedbuttonhead was detected on both ends of U3-13H31. The detected condition was evaluatedand acceptedper CR2007-2744. Three tendon ends on Unit 4, 12V03/Gallery, 56V20/Gallety and 42H31/BT2 were detected with one missing buttonhead. In accordancewith the acceptance criterastated in PTNIPSC-TP-N981-502,Technical Requirements for the 3e'Year ContainmentIWL Inspection for Turkey Point Units 3 &4, this condition is deemed acceptable. (d) cracks in the concrete adjacent to the bearing plates do not exceed 0.01 in. inwidth. Results: No cracks observed were greaterthan 0.010" on any of the concrete 240 aroundthe bearingplates of the inspected tendons. IWL-3221.4 Corrosion Protection Medium. Corrosion protection medium is acceptable when the reserve alkalinity, water content and soluble ion concentrations of all samples are within the limits specified inTable IWL-2525-1. Results: The sheathingfiller (grease)samples were tested and found to have acceptable levels of water-solubleions, (Chlorides,Nitrates, and Sulfides). One tendon end sample hada moisture content above the limits. However, upon engineeringreview of the VT-1 inspection andcomparison of previous inspections, the condition is not indicativeof the tendons condition or capacity for performing as designed and is deemed acceptable. All neutralizationnumbers were above the IWL requirementof 0.0 mg KOHIg value and acceptable. No visible breakdown of the grease was noted eitherby coloror consistency for all grease samples tested. IWL-3222 Acceptance by Evaluation. Items with examination results that do not meet the acceptance standards of IWL-3221 shall be evaluated as required by IWL-330. Results: All conditions that did not meet the correspondinginspection criteria were documented, evaluated anddeemed acceptable via the FPL Condition Report process. All of the condition reportsgeneratedduring this inspection period areincluded in Appendix D of this report. Based upon the evaluation of the In-Service Inspection results for the 35th Year Containment IWL Inspection of the Florida Power &Light Turkey Point Units 3 and 4 Containment Structures, reported herein, PSC concludes that the containment structures have experienced no abnormal degradation of the post-tensioning system. The containment post-tensioning systems are performing in accordance with the design requirements and are expected to continue to do so for the life of both units.

- DOCUMENT NUMBER: PTN/PSC-TP-N981-508 REVISION: 0 PAGE: 78 DOCUMENT TITLE: FINAL REPORT FOR THE 35T" YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 56H YEAR TENDON SURVEILLANCE AT-TURKEY POINT DATE: 05/25f07

13.0 REFERENCES

13.1 " Turkey Point Units 3 & 4 Updated Final Safety Analysis Report (UFSAR), latest revision. 13.2 ASME Section XI, 1992 Edition with 1992 Addenda. 13.3 - Code of Federal Regulation 10 CFR 50.55a. 13.4- ISi/IWL-PTN-3/4, "ASME Section XI, Sub-Section IWL, Concrete Containment Inservice Inspection

              -Program!',  latest revision. ..

13.5- - PTN/PSC-TP-N981-500, Scope of Work for the Wh 35 Year Containment Tendon Surveillance. 13.6 PTN/PSC-TP-N981-501, Tendon Selection, Normalization and Lift-Off Criteria for The 35 th Year Containment Tendon Surveillance. 13.7 PTN/PSC-TP-N981-502, Technical Requirements for the 3 5th Year Containment IWL Inspection for Turkey Point Units 3 & 4. 13.8 TP 06-041, 35th Year Containment Concrete and Tendon In-Service Inspection Temporary Procedure. 13.9 PTNIPSC-TP-N981-504, Engineering Evaluation for the 35e Year Containment IWL Inspection. 13.10 PTN/PSC-TP-N981-505, Evaluation of Miscellaneous Items for the 35th Year Containment IWL Inspection. 13.11 Turkey Point Technical Specifications}}