    • F=PL.

February 15, 2021 L-2021-042 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-00001 Re: Turkey Point Unit 4 Docket No. 50-251 lnservice Inspection Program Owner's Activity Report (OAR-1)

Attached find the Owner's Activity Report (Form OAR-1), for Turkey Point Unit 4(PTN 4-32),

Fifth lnservice Inspection Interval-Second, and IWE Third Interval-First. The Form OAR-1, Owner's Activity Report, implements Code Case N-532-4.

Should there be any questions concerning this report, please contact Mr. Robert J. Hess, Licensing Manager, at 305-246-4112.

Sincerely, I~

~Hess Licensing Manager Turkey Point Nuclear Plant Attachment cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Power & Light Company 9760 S.W. 3441" Street Homestead, FL 33035

Enclosure Page 1 of 3 FORM OAR-1 OWNERS ACTIVITY REPORT Report Number: ISI-PTN-4-2020 Plant: Turkey Point Nuclear Power Plant Unit 4 9760 SW 344th Street Homestead, Florida 33035 Commercial Service Date: September 7, 1973 Refueling Outage No.: PTN 4-32 Current Inspection Interval: ISI-Fifth and IWE-Third Current Inspection Period: ISI Fifth Interval-Second and IWE Third Interval -First Edition and Addenda of Section XI applicable to the inspection plans: ISI Fifth Interval-2007 Edition through the 2008 Addenda and IWE Third Interval-2007 Edition through the 2008 Addenda Date and Revision of inspection plans: ISI Fifth Interval Effective-January 7, 2020 Rev.2 and IWE-July 15, 2018 Rev.0 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: ASME Section XI 2007 Edition through 2008 Addenda, Code Cases Used: N-532-5 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of PTN4-32 conform to the requirements of Section XI.

Signed _______________________________________________ Date ________________

Owner or Owners Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by the Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report.

Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

___________________________ Commissions __________________________________

Inspectors Signature National Board Number and Endorsement Date _________________________

Enclosure Page 2 of 3 FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number None None None

Enclosure Page 3 of 3 FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Item Description Date Repair/Replacement Code Class Description Of Work Completed Plan Number Component Install PM Cap on A 3 Cooling Water CCW supply pipe due 10/20/20 RR40676550-09 Pipe to wall loss Component Install PM Cap on B 3 Cooling Water CCW return pipe due 10/30/20 RR40676550-03 Pipe to wall loss Component Install PM Cap on A 3 Cooling Water CCW return pipe due 10/20/20 RR40676550-02 Pipe to wall loss Component Install PM Cap on B 3 Cooling Water CCW supply pipe due 10/30/20 RR40676550-01 Pipe to wall loss Replace Containment Containment 2 Spray CS Elbow with 10/22/20 RR40735938-01 Spray Elbow SS due to corrosion Component Weld Repair Pin Hole 3 Cooling Water Leak on B CCW PM 11/6/20 RR40676550-15 Pipe Cap Welding Support for Containment Replacement of 2 Penetration P- 11/2/20 RR40747435-03 Penetration P-48B 48B Insulator 1 Valve 4-312A Replace valve 4-312A 10/19/20 RR40656497-01