0 FPL.

JAN 16 2015 L-2015-012 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-00001 Re: Turkey Point Unit 4 Docket No. 50-251 Inservice Inspection Program Owner's Activity Report (OAR-i)

Attached find the Owner's Activity Report (Form OAR-i), for Turkey Point Unit 4 Fourth Inservice Inspection Interval, Third Period, Second Refueling Outage and Fifth Inservice Inspection Interval, First Period, First Outage (PTN 4-28). The Form OAR-i, Owner's Activity Report, implements Code Case N-532-4.

Should there be any questions concerning this report, please contact Robert J. Tomonto at 305-246-7327.

Very truly yours, Michael Kiley /( LCL-Vice President Turkey Point Nuclear Plant SM Attachment F04L~7 Forida Power & Light Company 9760 SW. 344"' Street Homestead, FL 33035

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ISI-PTN-4-2014 Plant: Turkey Point Nuclear Power Plant Unit 4 9760 SW 344th Street Homestead, Florida 33035 Commercial Service Date: September 7, 1973 Refueling Outage No.: PTN 4-28 Current Inspection Interval: ISI-Fifth IWE-Second Current Inspection Period: ISI Fourth Interval Extended-Third. Fifth Interval-First and IWE-Second Edition and Addenda of Section XI applicable to the inspection plans: ISI Fourth Interval Extended-1998 Edition with Addenda through 2000, ISI Fifth Interval-2007 Edition with Addenda through 2008 and IWE-2001 with Addenda through 2003.

Date and Revision of inspection plans: ISI Fourth Interval Extended-May 23, 2013 Rev.4. ISI Fifth Interval Effective-April 15, 2014 Rev.0 and IWE-March 3, 2009, Rev.0 Edition and Addenda of Section Xl applicable to repairs and replacements, if different than the inspection plan: ASME Section XI 1998 Edition through 2000 Addenda before 2/22/2014, ASME Section Xl 2007 Edition through 2008 Addenda after 2/21/2014.

Code Cases Used: N-460, N-526, N-532-4, N-533-1, N-566-2, N-586-1, N-616, N-623, N-624, N-658, N-686-1, N-729-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of PTN4-28 conform to the requirements of Section X1.

Signed -- <d .*),L, - 6-.-. . Date / -

Owner or Owner's Designee, Title /

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by HSB Global Standards of Hartford, CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury -- roperty damage or loss of any kind arising from or connected with this inspe tion.

_____ Commissions 46 14192 A4,Ab Q f inspector's Signatge National Board, State, Province and Endorsements Date F/4-14 2bI,,s/

FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE I ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number B-P/B15.10 4-875A RCS Check Valve Continued service for active leakage Body to Bonnet leakage at bolted bonnet joint 4-875A Borated water in contact with Continued service with degraded carbon steel bonnet bolting bolting due to borated water corrosion Evidence of Leakage at Bolted Joint B-P/B1 5.10 4-876E RCS Check Valve Continue Service with Change to Corrosion Resistant Bolting F-A/F1.30 Auxiliary Feedwater(AFW) Support Accept as-is bent Support Rod and 80117-H-324-01 Thread Engagement 4E202 Excess Letdown Heat Evidence of leakage at bolted joint.

B-P/B15.10 Exchanger, Evidence of Leakage at Clean dry boric acid and re-inspect Channel Head Bolted Joint

FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Date Repair/Replacement Description Of Work Completed Plan Number 1 RCS Check Valve 4-875A Replace Bolting 05/28/2014 RR40312542-11 Replace the RCS Check Bonnet and 1 CSChc Valve 4-875A Bnntad Body to Bonnet 10/19/2014 RR38004084-01 Bolting RCS Check Replace Valve 1 Valve and Section of 10/19/2014 RR40340662-04 4-387B Pipe RCS Support Modify Support 1N.S. 016 during Valve 10/19/2014 RR40340662-05 Replacement 1 RCS Check Replace Bonnet 10/19/2014 RR40331358-01 Valve 4-876E Bolting 2 CVCS Check Replace Valve 12/05/2013 RR40000702-03 Valve 4-352 and Piping Main Feedwater 2 Air-Actuated Replace Body to 10/19/2014 RR40258705-01 Check Valve Bonnet Bolting CV-4-2901 2 Main ReliefSteamRe Valve l c Valve Replace Vav 10/19/2014 RR40100621-01 2 Reief alve and bolting RV-4-1408 2 Main ReliefSteamRe Valve l c Valve Replace Vav 10/19/2014 RR40189536-01 RVand bolting RV-4-1 400

FORM OAR-I OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 2 Main ReliefSteamRe Valve l c Valve Replace Vav 10/19/2014 RR40117791-01 2 Reief alve and bolting RV-4-1413 Main Steam 2 ReliefRV-41412 Valve Replace Valve and bolting 10/19/2014 RR40117789-01 RV-4-1412 2 Equipment Hatch 4S10 Replace Bolt 10/16/2014 RR40213089-01 CCW Relief 3 Valve RV-4-1423 Replace Valve 10/10/2014 RR40117802-01 CCW Relief 3 Valve RV-4-1424 Replace Valve 10/10/2014 RR40117803-01 EDG Fuel Oil Replace Section Piping from of Piping 09/09/2013 RR40259428-02 4P241A Condensate Install 3 3 Storage Tank StrageT8n FukushimaFill Emergency 10/10/2014 RR40318922-06 Modification Condensate 3 Storage Tank Replace 10/10/2014 RR40318922-17 4T8 Manway Bolting 3 AFW Steam Replace Section 11/05/2013 RR40276916-01 Supply Piping of Piping 3 AFW Support Restore Support 10/18/2014 RR40340903-01 80117-H-324-03 to Design 3 ICW Check Replace Valve 11/01/2013 RR40216238-01 Valve 4-50-331 and Bolting

FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE CCW Heat 3 Exchanger Replace Bolting 08/07/2013 RR40259484-01 4E207C ICW Check Replace Valve 3 08/09/2013 RR40221488-01 Valve 4-50-321 and Bolting 3 1GW Check Replace Valve 09/18/2014 RR40243393-01 Valve 4-50-311 and Bolting 3 SFP Check Replace Body to 11/15/2013 RR40072531-01 Valve 4-819 Bonnet bolting CCW Heat 3 Exchanger Replace Bolting 06/28/2013 RR40250780-01 4E207A 3 ICW Pipe Flange Replace Bolting 10/08/2014 RR40171520-01 1,2 and 3 Various Systems Replace Nine 10/11/2014 RR40302388-01 Snubbers Snubbers