fEB O7 2019 L-2019-018 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk

  • Washington, D. C. 20555-00001 Re: Turkey Point Unit 3 Docket No. 50-250 lnservice Inspection Program Owner's Activity Report (OAR-1) .

Attached find the Owner's Activity Report (Form OAR-1), for Turkey Point Unit 3 Fifth lnservice Inspection Interval, Second Period, (PTN 3-30). The Form OAR-1, Owner's Activity Report, implements Code Case N-532-4.

Should there be any questions concerning this report, please contact Mr. Robert J. Hess, Licensing Manager, at 305-246-4112.

Licensing Manager Turkey Point Nuclear Plant SM Attachment cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Power & Light Company 9760 S.W. 344tt' Street Homestead, FL 33035

Attachment 1 Engineering Evaluation: PTN-ENG-SESJ-18-018 Rev. 0 EC-292353 Rev. 0 Page 1 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ISi PTN3-30 2018 Plant: Turkey Point Nuclear Power Plant Unit 3 9760 SW 344th Street Homestead, Florida 33035 Commercial Service Date: December 14, 1972- Refueling Outage No.: PTN 3-30 Current Inspection Interval: ISi-Fifth IWE-Third Current Inspection Period: ISi-Second Period and !WE-First Period Edition and Addenda of Section XI applicable to the inspection plans: ISi Fifth lnterval-2007 Edition through the 2008 Addend and IWE Third lnterval-2007 Edition through the 2008 Addenda.

Date and Revision of Inspection Plans: ISi Fifth Interval Effective-June 22, 2016 Rev. 1 and IWE Third Interval Effective July 15, 2018, Rev.a Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: Same Code Cases Used: As Referenced in the ISi Program Plan and Schedule CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of PTN3-30 conform to the requirements of Section XI.

Signed _ _ _ _ _B_r_u:ui,_' __________ Date

__b_UIU'v 2/6/19 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by the Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items .described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing *this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind ar" ing

  • n cted with this inspection.

't--==~~~~~~~~~~--- Commissions _____N__B__1. . . 4.__2__9___2___R ......,....1___G

__,....N 3 _ _ _ __

A.....9_8......

Inspector's Signa re National Board, State, Province, and Endorsements J 1 9_ _

Date -~tJ..2........,h~D"-"7-+-/.=-,;,=..10(......

Attachment 1 Engineering Evaluation: PTN-ENG-SESJ-18-018 Rev. 0 EC-292353 Rev. 0 Page 2 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1

-- ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number NONE NONE NONE

Attachment 1 Engineering Evaluation: PTN-ENG-SESJ-18-018 Rev. 0 EC-292353 Rev. 0 Page 3 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class Description Of Work Completed Plan Number Replace struts and RHR pipe support return 2 10/15/18 RR40528572-01 3-ACH-24 support to design configuration Replace CCWpiping and support upstream of CCW pipe and 3 valve 3-711 B 4/18/18 RR40560071-01 support replacement due to corrosion and through wall leak