July 20, 2017 L-2017-132 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn : Document Control Desk Washington , D. C. 20555-00001 Re: Turkey Point Unit 3 Docket No. 50-250 lnservice Inspection Program Owner's Activity Reports The purpose of this letter is to submit the Turkey Point Unit 3 Owner's Activity Reports . Attached please find in Attachment 1, Form OAR-1 , for the lnservice Inspections {ISi) and IWE inspection activities, and in Attachment 2, Form NIS-1 , the IWL inspection activities.
The Form OAR-1, Owner's Activity Report implements Code Case N-532-5.
Should there be any questions concerning this report, please contact Mr. Mitch Guth , Licensing Manager, at 305-246-6698.
Sincerely, llit#l-M Mitch Guth Licensing Manager Turkey Point Nuclear Plant SM Attachments cc: Regional Administrator, Region II , USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Power & Light Company 9760 S.W. 344"' Street Homestead , FL 33035
Attachment 1 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev . 0 EC-288647 Rev. 0 Page 1 of7 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ISl-PTN3-29 Plant: Turkey Point Nuclear Power Plant Unit 3 9760 SW 344th Street Homestead, Florida 33035 Commercial Service Date: December 14. 1972 Refueling Outage No. : PTN 3-29 Current Inspection Interval: ISi-Fifth IWE-Second Current Inspection Period: ISi Fifth Interval-First Period and IWE Second Interval - Third Period Edition and Addenda of Section XI applicable to the inspection plans: ISi Fifth lnterval-2007 Edition with Addenda through 2008 and IWE-2001 with Addenda through 2003.
Date and Revision of Inspection Plans: ISi Fifth Interval Effective-June 22, 2016 Rev. 1 and IWE Second Interval Effective April 5. 2016. Rev.1 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: ISi - ASME Section XI 2007 Edition through 2008 Addenda and IWE ASME Section XI 2001 Edition through the 2003 Addenda .
Code Cases Used: As Referenced in the ISi Program Plan and Schedule CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of PTN3-29 conform to the requirements of Section XI.
Signed .cK ,,...=:-<-";- ~...,,~J r.:-..v-&....
Owner or Owner's Designee, Title
,IZ t> <f/c..
Date ----'7::....<d; 7
~/'_.fZ,//
&. . . :'I;_;?_ _
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by the Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this in pe *on.
Attachment 1 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 EC-288647 Rev. 0 Page 2 of7 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number NONE NONE NONE L__ -
Attachment 1 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 EC-288647 Rev. 0 Page 3 of 7 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Item Description Date Repair/Replacement Code Class Description Of Work Completed Plan Number Pressurizer Replace 1 4/24/2017 RR40471736-01 Heater Sleeves Heaters Check Valve Replace 1 4/24/2017 RR40420522-01 3-875A Bolting Check Valve Replace 1 4/24/2017 RR40420521-01 3-875B Bolting Check Valve Replace 1 4/24/2017 RR40420520-01 3-875C Bolting Check Valve Replace 1 4/24/2017 RR40420519-01 3-875E Bolting Check Valve Replace 1 4/24/2017 RR40420518-01 3-876A Bolting Check Valve Replace 1 4/24/2017 RR40420517-04 3-876C Bolting Check Valve Replace 1 4/24/2017 RR40451984-01 3-312B Bolting Snubber Replace 1 04/07/2017 RR40441195-77 3-1093 Snubber
Attachment 1 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 EC-288647 Rev. 0 Page 4 of 7 FORM OAR 1 OWNER'S ACTIVITY REPORT Valve Replace Valve 2 08/05/2016 R R40354812-01 3-293C and piping Valve Replace Valve 2 08/05/2016 RR40354813-01 3-2930 and piping Flow Element Replace 2 11/29/2015 RR40354818-01 FE-3-940 Bolting Valve Replace 2 04/14/2017 RR40419620-01 MOV-3-862A Bolting Equipment Replace 2 Hatch 04/20/2017 RR40432229-05 Bolting 3S10 Snubber Replace 2 04/03/2017 RR40441195-24 3-1014 Snubber Snubbers Replace 2 3-1015,1016 03/31/2017 RR40441195-28 Snubbers
&1017 Snubber Replace 2 03/31/2017 RR40441195-29 3-1018 Snubber Snubber Replace 2 03/31/2017 RR40441195-30 3-1019 Snubber Snubber Replace 2 03/31/2017 RR40441195-31 3-1020 Snubber Snubber Replace 2 03/31/2017 RR40441195-33 3-1021 Snubber Snubbers Replace 2 3-1022 and 04/01/2017 RR40441195-38 Snubbers 3-1023
Attachment 1 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 EC-288647 Rev. 0 Page 5 of 7 FORM OAR-1 OWNER'S ACTIVITY REPORT Snubbers Replace 2 3-1024 and 04/01/2017 RR40441195-43 Snubbers 3-1025 Snubbers Replace 2 3-1026 and 03/31/2017 RR40441195-45 Snubbers 3-1027 Snubbers Replace 2 3-1028 and 04/03/2017 RR40441195-46 Snubbers 3-1029 Snubber Replace 2 04/01/2017 RR40441195-47 3-1030 Snubber Snubbers Replace 2 3-1078 and 04/06/2017 RR40441195-57 Snubbers 3-1079 Snubbers Replace 2 04/06/2017 RR40441195-62 3-1080 Snubber Snubbers Replace 2 3-1081 and 04/07/2017 RR40441195-67 Snubbers 3-1082 Snubber Replace 2 04/07/2017 RR40441195-72 3-1092 Snubber Valve Replace 2 04/21/2017 RR40423857-01 HCV-3-758 Bolting Safety Valve Replace Valve 2 4/24/2017 RR40524903-01 RV-3-1400 and Bolting Safety Valve Replace Valve 2 4/24/2017 RR40034136-01 RV-3-1403 and Bolting Safety Valve Replace Valve 2 4/24/2017 RR40034139-01 RV-3-1405 and Bolting
Attachment 1 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 EC-288647 Rev. 0 Page 6 of 7 FORM OAR-1 OWNER'S ACTIVITY REPORT Safety Valve Replace Valve 2 4/24/2017 RR40432330-01 RV-3-1413 and Bolting Support Replace 2 04/07/2017 R R40173816-04 3-ACH-24 baseplate Piping at Valve 3 Replace Piping 04/01/2017 RR40329690-03 3-711 B Remove and Support 3 replace to 05/26/2016 RR40192883-01 3-CCH-57 eliminate Gap Replace valve ,
Check Valve 3 expansion joint 10/14/2016 RR40356047-01 3-50-331 and bolting Relief Valve 3 Replace Piping 04/04/2017 RR40396627-03 RV-3-747B Replace valve, Check Valve 3 expansion joint 10/13/2016 RR40390273-01 3-50-311 and bolting Heat Exchanger Replace 3 06/28/2016 RR40418239-02 3E207A Bolting Support Weld attachment 3 06/25/2016 RR40420104-03 3-CCH -210 to support Basket Strainer 3 Add new va lves 01/19/2017 RR40440317-12 BS-3-1402 Basket Strainer 3 Add new valves 01/19/2017 RR40440317-17 BS-3-1403 Snubber Replace 3 03/28/2017 RR40441195-03 3-1000 Snubber
Attachment 1 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 EC-288647 Rev. 0 Page 7 of 7 FORM OAR -1 OWNER'S ACTIVITY REPORT Snubber Replace 3 03/28/2017 RR40441195-06 3-1001 Snubber Snubber Replace 3 03/28/2017 RR40441195-09 3-1002 Snubber Snubber Replace 3 03/28/2017 RR40441195-12 3-1003 Snubber Snubber Replace 3 04/05/2017 RR40441195-22 3-1013 Snubber Snubbers Replace 3 3-1099 and 03/29/2017 RR40441195-81 Snubbers 3-1100 Relief Valve 3 Replace Valve 4/16/2017 RR40471671-01 RV-3-1424 Check Valve Replace 3 10/19/2016 RR4037 4539-01 3-50-321 Valve Valve Replace 3 10/20/2016 RR40331354-01 3-7988 Bonnet Heat Exchanger Replace bolting 3 1/20/2017 RR40495800-01 3E207C on channel head
Attachment 2 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 EC-288647 Rev. 0 Page 1 of 64 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS Owner: Florida Power & Light Company, 700 Universe Blvd . Juno Beach , Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit: ~
Owner Certificate of Authorization (if required) N/A Commercial Service Date: December 14. 1972 National Board Number for Unit: N/A
- 1. Owner: Florida Power and Light Company 700 Universe Blvd.
Juno Beach, Florida 33408
- 2. Plant: Florida Power & Light Company Turkey Point Nuclear Power Plant 9760 SW 344 Street Florida City, Florida 33035
- 3. Plant Unit: 3 4. Owner Certificate of Authorization (if required): N/A
- 5. Commercial Service Date: 6. National Board Number for Unit:
December 14, 1972 N/A 7 c omponen ts Inspected :
Manufacturer State or Component or Manufacturer or Installer Province National Board No.
Appurtenance or Installer Serial No. No.
Tendons (See attached Report)
Containment Concrete Building (See attached Report)
- 8. Examination Dates: from 1/9/2017 to 4/6/2017
- 9. Inspection Period Identification: Third Period , from 9/9/2015 to 9/8/2018.
- 10. Inspection Interval Identification: Second Interval , from 9/9/2008 to 9/8/2018.
- 11. Applicable Edition of Section XI: 2001 Edition with 2003 Addenda
- 12. Date/Revision of Inspection Plan: IWL Second Interval Effective May 23 , 2016 Rev. 1
Attachment 2 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 EC-288647 Rev. 0 Page 2 of 64 FORM NIS-1 Report (continued)
Owner: Florida Power & Light Company, 700 Universe Blvd . Juno Beach , Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Flori da City, Florida 33035 Plant Unit: ~
Owner Certificate of Authorization (if required) N/A Commercial Service Date: December 14, 1972 National Board Number for Unit: NIA
- 13. Abstract of examinations and test. Include a list of examinations and tests and a statement concerning status of work required for the inspection plan.
IWL examinations were conducted in accordance with "The Concrete Containment lnservice Inspection Program for Turkey Point Unit 3 & 4". This program was written in accordance with ASME Section XI 2001 Edition with the 2003 Addenda and is subject to the limitations and modifications of 10 CFR 50.55a(b)(2) , 10 CFR 50.55a(g)(4) , and 10 CFR 50.55a(g)(6) . The requirements for the first inspection period as required by 10 CFR50.55a (g)(6) have been met as applicable to IWL, Program B of ASME Section XI. Precision Surveillance Corporation (PSC) supplied examination and testing services. See the attached report: Turkey Point Nuclear Plant- Unit 3 & 4, 45th Year Containment Tendon Surveillance for examination scope and results. This is the second ten-year interval for the IWE Program .
- 14. Abstract of Results of Examinations and Tests.
IWL Examinations Visual examinations were performed on the tendons and associated components , containment concrete and reinforcement steel. During the 45th year Containment tendon inspection , 3 tendons had loss of corrosion protection medium (grease) which exceeded the limit established in TS 4.6.1.6.1.e.2. AR2184466 identified tendons 12V22, 34V23, and 61V13 as having grease losses of 21 %, 17%, and 27%, respectively , compared to the allowed limit of 10% of the net tendon duct volume .
AR 2184991 identified a similar condition for tendons 12V11 , 56V28, and 61V20 which had grease losses of 34% , 27% , and 11 %, respectively.
- 15. Abstract of Corrective Measures Adequate grease volumes have been restored to the six tendons in accordance with approved vendor procedures and documented in Work Order 40448990. AR2184466-06 tracks inclusion of this condition in the final report
Attachment 2 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 EC-288647 Rev. 0 Page 3 of 64 FORM NIS-1 Report (continued)
Owner: Florida Power & Light Comp3ny, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit 3 Owner Certificate of Authorization (if requ ired) NIA Commercial Service Date : Decembe* 14. 1972 National Board Num ber for Unit: NIA We certify that a) the statements made in this repott are correct, b) the exam inations and tests meet the Inspection Plan as requ ired by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the AS ME Code, Section XL Certificate of A uthorization No. #//I Expiration Date - -- - - - - - -
CERTIFlCATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by the Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Report during the period of 1/9/2017 to 4/6/2017 , and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in th is Owner's Report in accordance with the Inspection Plan and as required by the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied , concerning the examination, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection .
Commission NfJ 11/,)9,:J. /!. I'/.! 6;4 CJBJ re National Board, State, ~rovince, and Endorsements
Attachment 2 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 EC-288647 Rev. 0 Page 4 of 64 FORM NIS-1 Report (continued)
Owner: Florida Power & Light Company, 700 Universe Blvd . Juno Beach , Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit: ~
Owner Certificate of Authorization (if required) N/A Commercial Service Date: December 14, 1972 National Board Number for Unit: NIA Attachment Final Report for the 45TH Year Tendon Surveillance at Turkey Point By PRECISION SURVEILLANCE COMPANY
Attachment 2 EC288647 Rev. 0 Eng ineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 5 of 64
~~G/
- i DOCUMENT NUMBER: REP-11 30-5 10 REVIS ION: 0 PAGE:
LANCE DOCUMENT TITLE :
PROJECT TITLE :
FINAL REPORT FOR THE 45"' YEAR TENDON SURVEILLANCE AT TURKEY POINT 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 ENG INEERI NG REPORT DOCUMENT COVER SHEET DOCUMENT TITLE: Fi nal Report for the 45TH Year Tendon Surveillance at Turkey Point PSC ENGINEERING AND CLIENT REVIEW NAME ELECTRONIC SIGNATURE DATE PREPARED BY: David Maldonado (]/) ( /f.1~ /// 06/19/17 v
VERIFED BY: Nicholas Darlage
/\J/ !/~ (,/
06/19/17 APPROVED BY: Paul Smith £ c. ,L.,/ 06/19/17 CLIENT APPROVAL: See acceptance form dated 06/16/20 17 signed by Steve Bergeson
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. O Page 6 of 64
~
DOCUMENT NUMBER: REP-11 30-5 10 REVISION : 0 PAGE :
- ii
~~LANCE DOCUMENT TITLE:
PROJECT TITLE :
FINAL REPORT FOR THE 45th YEAR TE NDON SURV EILLANC E AT TURKEY POINT 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE : 06/19/17 RECORD OF REVISIONS REV.NO. DATE DESCRIPTION 0 06/19/17 ORIGINAL ISSUE
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 7 of 64 DOC UMENT NUMBER: _R_E_P_-1_1_30_-5_1_0 _ _ _ _ _ __ _ _ _ _ _ REVISION: 0 PAGE: ii i DOCUMENT TITLE: FINAL RE PORT FOR THE 45th YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45rH YR U3 & U4 TENDON SURVEI LLAN CE AT T URKEY POINT DATE : 06/19/17 ABSTRACT The purpose of this report is to present the results of the Turkey Point Nuclear Plant, 45th Year In-Service Inspection on the Unit 3 and Unit 4 containment structures' post-tensioning system . The results of this investigation are discussed in detail in the body of this report and are summarized in order of presentation below:
);;> Summary of Find ings:
- 1. SECTION 3.0 - SHEATHING FILLER ANALYSIS (SQ 7.0)
Water-soluble ion concentrations, moisture contents , and Neutralization (Base) Numbers of the tested sheathing fil ler samples were with in acceptable limits for all inspected tendons , per IWL-3221.4 .
- 2. SECTION 4.1 - GREASE CAP REMOVAL (SQ 6.0)
Acceptable grease coatings were found on all tendon ends inspected , and no unusual conditions were reported at any tendon end .
- 3. SECTION 4.2 - FREE WATER INSPECTION (SQ 6.1)
The presence of free water was observed at Unit 3 tendons 12V1 1 (6 oz .) 12V22 (4 oz.). Water Notification Letters were submitted to Turkey Point Engineering in response to each occurrence.
All other inspected tendon ends were found with no evidence of free water and are acceptable per IWL-3221 .3(e) .
- 4. SECTION 4.3 - ANCHORAGE INSPECTION (BUTTONHEAD COUNT) (SQ 8.0)
The gallery end of Unit 3 vertical tendon 12V01 was found with one (1) protruding buttonhead not previously reported . Non-conformance report (NCR) FN1130-001 was written by PSC Quality Control personnel , and Turkey Point Engineering was notified .
The buttress 5 end of Unit 4 hoop tendon 15H12 was found to have one (1 ) missing wire not previously reported. Non-conformance report (NCR) FN1130-009 was written by PSC Quality Control personnel ,
and Turkey Point Engineering was notified .
All other buttonheads at all inspected tendon ends were found in acceptable condition , per IWL-3221 .3(c).
- 5. SECTION 4.4 - ANCHORAGE INSPECTION (CORROSION LEVELS I CRACKS) (SQ 8.0)
No anchorage component cracks were observed on any inspected tendon end , and all inspected tendon anchorage components were found with acceptable corrosion levels, per IWL-3221 .3(a) and IWL-3221 .3(b) respectively .
- 6. SECTION 4.5 - BEARING PLATE CONCRETE INSPECTION (SQ 8.3)
All cracks observed with in the 24" perimeter of the concrete surrounding each inspected bearing plate were less than 0.01 O" in width , and are acceptable per IWL-3221.3(d).
- 7. SECTION 5.0- HYDRAULIC JACK CALIBRATIONS Two hydraulic jacks, 9191 and 9194 , are undergoing maintenance and have not completed the post-job calibration . The pre-job and post-job comparisons for these jacks are pending and will be included in the next revision of this report.
The remaining hydraulic jacks used for tendon lift-offs were calibrated before and after the surveillance period , and were found to be within the acceptable variation of +/-1.5%.
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 8 of 64 DOCUMENT NUMBER: -'-R=E"-P--'
'-13
' -'0'-
-5'"""'1-'-0_ _ _ _ _ __ _ _ _ _ _ REVISION : 0 PAGE : iv DOCUMENT TITLE: FINAL REPORT FOR THE 451" YEAR TENDON SURVEILLANCE AT TUR KEY POINT PROJECT T ITLE : 45TH Y R U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE : 06/19/17
- 8. SECTION 6.0 - TENDON LIFT-OFF FORCES (SQ 9.0)
The average value of all tendon lift-off forces for a given tendon group exceeded the minimum required prestress value for their respective tendon group, per IWL-3221 .1(a) .
Unit 4 vertical tendon 34V05 had a lift-off value less than its pred icted lift-off value . After removal of the test wire and during retensioning , the tendon was restored to an acceptable force level.
All other tendons had an average lift-off force greater than its predicted lift-off value.
- 9. SECTION 7.0 - COMPARISON WITH ORIGINAL INST. DATA AND PREV. LOCK-OFFS In examining the average group percentage loss from the installation lock-off force values to the as-found lift-off force values during the 45th year surveillance , no abnormal losses were observed .
- 10. SECTION 8.0 - TENDON WIRE VISUAL INSPECTION & TENSILE TESTING (SQ 10.2 /SQ 10.3)
All wire samples, selected for testing per IWL-2523.1 , had acceptable corrosion level of 1 and were free of physical damage. All tendon wires removed and tested were found to have diameter values within the acceptable range and acceptably high yield stress and ultimate tensile strength.
- 11. SECTION 9.2 / 9.3 - TENDON RETENSIONING (FORCE and ELONGATION) (SQ 11 .0)
All detensioned tendons were retensioned to acceptable lock-off forces, per IWL-2523.3.
- 12. SECTION 9.4- TENDON RETENSIONING (BUTTONHEADS and WIRES) (SQ 11.0)
No broken, protruding , or detached buttonheads were recorded for any tendon due to restressing activities ,
and the anchorage condition at each tendon end was acceptable per IWL-3221 .3.
- 13. SECTION 10.1 / 10.2 - TENDON RESEALING (SQ 12.0 I SQ 12.1)
All tendon grease caps were properly installed to their respective tendon ends .
Three (3) Unit 3 scope tendons-12V11 (NCR-FN1130-007) , 12V22 (NCR-FN1130-002) , and 34V23 (NCR-FN1130-003) , three (3) Unit 3 gasket repair tendons-56V28 (NCR-FN1130-005) , 61V13 (NCR-FN1130-004), and 61V20 (NCR-FN1130-006), and two (2) Unit 4 gasket repair tendons-23V06 (NCR-FN1130-011 )
and 56V02 (NCR-FN 1130-010)-had a difference of the grease replaced , versus the grease lost, greater than 10% of the net duct volume for each respective tendon. The indicated Nonconformance Reports were written in response to each occurrence, and the conditions were evaluated by FPL Engineering .
All other tendon caps were refilled to acceptable levels, per IWL-3221.4 .
- 14. SECTION 11 .0-EXTERIOR CONCRETE SURFACE EXAMINATION (SQ 8.4)
The noted observations of the containment concrete General Visual Examination, including small bug holes, form grout patches , rust stains from embed rails, and shrinkage cracks, were recorded as "RI" (recordable indications) and "10" (information only) items. The condition of the exterior concrete surface was evaluated by FPL Engineering , per IWL-3211.
~ Abstract Summary:
In summary, the Final Report for the 45th Year Tendon Surveillance at Turkey Point Nuclear Plant has concluded that the functional integrity of the selected post-tensioning system has met all the applicable code requirements, unless noted otherwise with non-conformance items, which are recorded , identified, and presented within this document and attached appendices, as required .
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 9 of 64 DOCUMENT NUMBER: REP-1130-510
~~~~~~~~~~~~~~~
REVISION : 0 PAGE: v DOCUMENT TITLE: FINAL REPORT FOR TH E 45"' YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE: 45rH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 TABLE OF CONTENTS ENGINEERING REPORT DOCUMENT COVER SHEET RECORD OF REVISIONS ii ABSTRACT iii TABLE OF CONTENTS v
1.0 INTRODUCTION
1 Table 1-1 : Turkey Point Unit 3 - 45TH Year Surveillance Scope 2 Table 1-2: Turkey Point Unit 3 - 45rn Year Surveillance Gasket Repair Scope 3 Table 1-3: Turkey Point Unit 4 - 45TH Year Surveillance Scope 4 Table 1-4: Turkey Point Unit 4 - 45TH Year Surveillance Gasket Repair Scope 5 2.0 SURVEILLANCE PROCEDURES 6 3.0 SHEATHING FILLER ANALYSIS 7 Table 3-1 : Sheathing Filler Analysis - Unit 3 All Tendons 8 Table 3-2: Sheathing Filler Analysis - Unit 4 Dome & Hoop Scope Tendons 9 Table 3-3: Sheathing Filler Analysis - Unit 4 Vertical Scope Tendons 10 4.0 VISUAL INSPECTIONS 11 Table 4-1 : SQ 6.0 - Grease Cap Removal - Unit 3 Scope Tendons 12 Table 4-2 : SQ 6.0 - Grease Cap Removal - Unit 3 Gasket Repair Tendons 13 Table 4-3: SQ 6.0 - Grease Cap Removal - Unit 4 Dome & Hoop Scope Tendons 14 Table 4-4 : SQ 6.0 - Grease Cap Removal - Unit 4 Vertical Scope Tendons 15 Table 4-5 : SQ6.0 - Grease Cap Removal - Unit 4 Gasket Repair Tendons 15 Table 4-6 : SQ 6.1 - Inspection for Water - Unit 3 Scope Tendons 17 Table 4-7: SQ6.1 - Inspection for Water - Unit 3 Gasket Repair Tendons 17 Table 4-8: SQ 6.1 - Inspection for Water- Unit 4 Scope Tendons 18 Table 4-9 : SQ 6.1 - Inspection for Water - Unit 4 Gasket Repair Tendons 18 Table 4-10: SQ 8.0- Buttonhead Count- Unit 3 All Tendons 20 Table 4-11: SQ 8.0 - Buttonhead Count - Unit 4 Dome & Hoop Scope Tendons 21 Table 4-12: SQ 8.0- Buttonhead Count- Unit 4 Vertical Scope Tendons 22 Table 4-13 : SQ 8.0 -Anchorage Corrosion Condition - Unit 3 Scope Tendons 23 Table 4-14: SQ 8.0 -Anchorage Corrosion Condition - Unit 4 Dome & Hoop Scope Tendons 24 Table 4-15: SQ 8.0 - Anchorage Corrosion Condition - Unit 4 Vertical Scope Tendons 25 Table 4-16 : SQ 8.3 - Concrete Inspection - Unit 3 Scope Tendons 27 Table 4-17: SQ 8.3 - Concrete Inspection - Unit 4 Dome & Hoop Scope Tendons 28 Table 4-18 : SQ 8.3 - Concrete Inspection - Unit 4 Vertical Scope Tendons 29 5.0 HYDRAULIC JACK CALIBRATIONS 30 Table 5-1: Hydraulic Jack Calibrations 30 6.0 MONITOR TENDON FORCE 31 Table 6-1 : SQ 9.0 - Monitoring Tendon Force - Unit 3 Scope Tendons 32 Table 6-2 : SQ 9.0 - Monitoring Tendon Force - Unit 4 Dome Scope Tendons 32 Table 6-3 : SQ 9.0 - Monitoring Tendon Force - Unit 4 Hoop & Vertical Scope Tendons 33 7.0 COMPARISON WITH ORIGINAL INSTALLATION DATA 34 Table 7-1 : Comparison with Installation Data - Unit 3 Original Installation Tendons 34
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 10 of 64 DOCUMENT NUMBER: _R_E_P-_ 1_13_0_-5_10_ _ __ _ _ _ _ _ __ REVI SI ON : 0 PAGE: vi DOCUMENT TITLE : FINAL REPORT FOR THE 45 1" YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE : 06/19/17 Table 7-2 : Comparison with Installation Data - Unit 4 Original Installation Tendons 35 Table 7-3 : Comparison with Installation Data - Unit 4 RVCH Tendons 35 8.0 TENDON WIRE VISUAL INSPECTION AND TENSILE TESTING 36 Table 8-1 : SQ 10.2 & SQ 10.3 - Visual Inspection & Tensile Testing of Wire - Unit 3 37 Table 8-2: SQ 10.2 & SQ 10.3 - Visual Inspection & Tensile Testing of Wire - Unit 4 37 9.0 TENDON RETENSIONING 38 Table 9-1: SQ 11.0 - Tendon Restressing - Unit 3 RVCH 39 Table 9-2 : SQ 11 .0 - Tendon Restressing - Unit 4 Original Installation & RVCH Tendons 39 10.0 TENDON RESEALING 45 Table 10-1 : SQ 12.1 - Grease Loss vs . Grease Replacement- Unit 3 Scope Tendons 46 Table 10-2: SQ 12.1 - Grease Loss vs . Grease Replacement - Unit 3 Gasket Repair Tendons 47 Table 10-3: SQ 12.1 - Grease Loss vs . Grease Replacement - Unit 4 Dome & Hoop Scope Tendons 48 Table 10-4: SQ 12.1 - Grease Loss vs . Grease Replacement - Unit 4 Vertical Scope Tendons 49 Table 10-5: SQ 12.1 - Grease Loss vs . Grease Replacement - Unit 4 Gasket Repair Tendons 50 11.0 EXTERIOR CONCRETE SURFACE EXAMINATION 51
12.0 CONCLUSION
52 APPENDICES NO. OF PAGES Appendix A: Survellance Data Sheets 556 Appendix B: Laboratory Analysis of Sheathing Filler 75 Appendix C: Wire Sample Analysis 7 Appendix D: Jack Calibrations 26 Appendix E: PSC Surveillance Procedures 220 Appendix F: Daily Gauge Calibration Records 19 Appendix G: Correspondence Appendix H: Non-Conformance Reports 43 Appendix I: Field Change Requests 12 Appendix J: General Exterior Concrete Exam 79 Appendix K: Water Notification Letters 6
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 11 of 64 DOCUMENT NUMBER: REP-1130-510 REVI SION: 0 PAGE: vii DOCUMENT TITLE : FI NAL REPORT FOR THE 45'" YEAR TENDON SURVE ILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 REFERENCES Ref. 1 10 CFR 50.55a , Codes and Standards Ref. 2 NRC Regulatory Guide 1.35.1, Determining Prestressing Forces for Inspection of Prestressed Concrete Containments Ref. 3 ASME Boiler and Pressure Vessel Code,Section XI , Div. 1, Subsection IWL, 2001 Edition with 2003 Addenda Ref. 4 Turkey Point Units 3 & 4 Updated Final Safety Analysis Report (UFSAR), latest revision Ref. 5 Turkey Point Technical Specifications Ref. 6 Turkey Point Program Procedure 12-ISl/IWL-PTN-3/4, Interval 2 Concrete Containment lnservice Inspection Program Ref. 7 PSC Surveillance Procedures: Florida Power & Light Company Turkey Point Nuclear Plant - Unit 3 & Unit 4 45th Year Containment Building Tendon Surveillance - Precision Surveillance Corporation In-service Inspection Tendon Surveillance Program , Rev. 1 Ref. 8 CAL-1130-500 , CAL-1130-501 - Tendon Selection for the 45th Year Tendon Surveillance at Turkey Point, Revision 0 Ref. 9 PTN/PSC-REP-1130-501 Tendon Selection and Predicted Forces, Revision 0 Ref. 10 PTN/PSC-REP-1130-502 45th Yr Technical Requirements , Revision 0 Ref. 11 PTN/PSC-REP-1130-503 Miscellaneous Engineering Evaluation , Revision 0 Ref. 12 PTN/PSC-REP-1130-505 Tendon Walk Down Results , Revision 0 Ref. 13 PTN/PSC-REP-1130-506 Unit 4 FCR Predicted Forces Summary, Revision 0 Ref. 14 REP-1130-300 Comparative Analysis Of Methods Used To Calculate Predicted Forces, Revision 1
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. O Page 12 of 64 DOCUM ENT NUMBER: REP-1130-510
~~~~~~~~~~~~~~~~
REVISION: 0 PAGE:
DOCUMENT TITLE : FINAL REPORT FOR THE 45"' YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE 45TH YR U3 & U4 TENDON SURVEILLAN CE AT TU RKEY POINT DATE: 06/19/17
1.0 INTRODUCTION
This report details the 45th Year Turkey Point Nuclear Plant Unit 3 & 4 conta inment structure post tensioning systems IWL Tendon Surveillance. The surveillance program is a systematic means of assessing the quality and structural performance of the post-tension ing system.
1.1 The tendon surveillance program consists of a periodic inspection of the physical condition of a selected group of tendons . This program provides confidence in the condition and functional capability of the system , and an opportunity for timely corrective measures if adverse conditions are detected . The 45th Year Tendon Surveillance at the Turkey Point began on January 9, 2017, and on-site inspection was completed on April 6, 2017.
1.2 This surveillance period consisted of a visual inspection at Unit 3 and a physical inspection at Unit 4 of the conta inment buildings' post-tensioning system.
1.2.1 A visual tendon surveillance consists of sheathing filler inspection and testing , inspection for free water, anchorage inspection , concrete inspection around tendon bearing plates , and replacement of grease caps and grease after completion of all inspections.
1.2.2 A physical tendon surveillance consists of a visual inspection , plus force monitoring and inspection ,
as well as tensile testing , of removed wire samples.
1.3 The following documents define the specific requirements for selection of the inspection tendons, as well as the specific requ irements and acceptance criteria for the performance of inspected tendons for the 45th Year Tendon Surveillance at Turkey Point:
)> ASME Boiler and Pressure Vessel Code ,Section XI, Div. 1, Subsection IWL, 2001 Edition with 2003 Addenda
)> Code of Federal Regulations 10 CFR 50.55a
)> Turkey Point Technical Specifications
)> Turkey Point Program Procedure 12-ISl/IWL-PTN-3/4, Interval 2 Concrete Containment lnservice Inspection Program
)> PSC Surveillance Procedu res: Florida Power & Light Company Turkey Point Nuclear Plant - Unit 3
& Unit 4 45th Year Containment Building Tendon Surveillance - Precision Surveillance Corporation In-service Inspection Tendon Surveillance Program, Rev. 1 1.4 Sixteen (16) tendons were selected for the Unit 3 visual surveillance. Among the group of selected tendons , two (2) hoop tendons and two (2) vertical tendons had been affected by the RVCH repair and replacement activities, and were inspected in accordance with Table IWL-2521-2. The remaining twelve (12) tendons were selected in accordance with Section IWL-2521 and Table IWL-2521-1 of Ref. 3.
1.5 Sixteen (16) tendons were selected for the Unit 4 physical surveillance . Among the group of selected tendons, two (2) hoop tendons and two (2) vertical tendons had been affected by the RVCH repair and replacement activities, and were inspected in accordance with Table IWL-2521-2. The remaining twelve (12) tendons were selected in accordance with Section IWL-2521 and Table IWL-2521 -1 of Ref. 3.
1.5.1 Unit 4 hoop tendons 13H12, 15H34 , and 62H22 were determined to be inaccessible at one or both tendon ends. Per Ref. 3, a visual inspection was performed at the accessible tendon end (s) , and alternate tendons were selected . Tendons 13H16, 15H35, and 62H28 were selected as alternates for 13H12, 15H34, and 62H22, respectively . Therefore , a total of nineteen (19) tendons were inspected on Unit 4.
1.6 Eleven (11) tendons on Unit 3 and sixteen (16) on Unit 4 were selected by the plant for gasket repair, due to observable grease leaking at grease cap .
1.6.1 A protruding wire was observed at the gallery end of Unit 3 vertical tendon 12V01 . Under the direction of the plant, a grease sample was collected for testing (Ref. 7, SQ 7.0) and an inspection of the anchorage components was conducted (Ref. 7, SQ 8.0) . All other gasket repair tendons were inspected based on the criteria in Table 1-2 and Table 1-4.
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. O Page 13 of 64 DOCUMENT NUMBER: _R_E_P_-1_1_30_-_51_0_ _ _ _ _ _ _ _ _ _ _ _ REVISION : O PAGE: 2 DOCUMENT TITLE FINAL REPORT FOR THE 45 1' YEAR TENDON SURVE ILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TEN DON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 VISUAL PHYSICAL TENDON END 0 .,.... 0 0 <') 0 N M ~
0 c:i c:i N N u:i u:i ,..: cxi cxi en .,.... .,.... .,.... .,.... .,.... COMMENTS 0 0 0 0 0 0 0 0 0 0 0 CJ) CJ) CJ) CJ) CJ) CJ) CJ) CJ) CJ) CJ) CJ) 1D52 NW&NE x x x x x x x 2D02 S&E x x x x x x x 2D13 NE&SW x x x x x x x 3D08 NW&SW x x x x x x x COMMO N 13H11 BT 1 & BT 3 x x x x x x x 15H18 BT 1 & BT 5 x x x x x x x COMMON (SAME AS 51H18) 42H10 BT 2 & BT 4 x x x x x x x 62H44 BT 2 & BT6 x x x x x x x x x x x RVCH - DETENSION 62H57 BT 2 & BT6 x x x x x x x x RVCH 62H83 BT 2 & BT6 x x x x x x x 64H72 BT 4 & BT6 x x x x x x x 12V11 D&G x x x x x x x x x x x RVCH - DETENSION 12V14 D&G x x x x x x x x RVCH 12V22 D&G x x x x x x x COMMON 34V23 D&G x x x x x x x 45V01 D&G x x x x x x x NOMENCLATURE D = Dome; G = Gallery; BT= Buttress; N = North End ; S = South End ; E = East End ; W =West End LEGEND SQ 6.0 - GREASE CAP REMOVAL SQ 9.0 - MON ITOR TENDON FORCE (IWL Item L2 .10)
SQ 6.1 - IN SPECTION FOR WATER (IWL Item L2 .50) SQ 10.2 - TENDON WIRE INSPECTION (IWL Item L2 .20)
SQ 7.0 - SHEATING FILLER ANALYSIS (IWL Item L2.40) SQ 10.3 -TESTING TENDON WIRE (IWL Item L2 .20)
SQ 8.0 -ANCHORAGE IN SPECTION (IWL Item L2 .30) SQ 11 .0 - RETENSION TENDONS SQ 8.3 - BEARING PLATE CONCRETE (IWL Item L2 .30) SQ 12.0 - GREASE CAP REPLACEMENT INSPECTION SQ 12.1 - GREASE REPLACEMENT
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 14 of 64 DOCUMENT NUMBER: _R_E_P_-1_1_30 _ -_
51_0_ _ _ __ _ __ _ _ _ _ REVISION : 0 PAGE: 3 DOCUMENT TITLE: FINAL REPORT FOR THE 45"' YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 VISUAL PHYSICAL
.... N M C! 0 .....
....c:i ......... ....t'i ....t'i 0 0 0 M 0 c:i TENDON END cD ,...: .....
cD cci cci ai COMMENTS 0 0 0 0 0 0 0 0 0 0 0 CJ) CJ) CJ) CJ) CJ) CJ) CJ) CJ) CJ) CJ) CJ) 1012 SE x x x x 2011 NE x x x x 3024 s x x x x 62H71 BT 2 x x x x 12V01 GALLERY x x x x x x 12V02 GALLERY x x x x 12V07 GALLERY x x x x 12V26 GALLERY x x x x 56V28 GALLERY x x x x 61V13 GALLERY x x x x 61V20 GALLERY x x x x NOMENCLATURE D = Dome; G = Gallery; BT = Buttress; N = North End ; S = South End ; E = East End ; W = West End LEGEND SQ 6.0 - GREASE CAP REMOVAL SQ 9.0 - MONITOR TENDON FORCE (IWL Item L2.10)
SQ 6.1 - INSPECTION FOR WATER {IWL Item L2 .50) SQ 10.2 - TENDON WIRE INSPECTION (IWL Item L2 .20)
SQ 7.0 - SHEATING FILLER ANALYSIS (IWL Item L2.40) SQ 10.3- TESTING TENDON WIRE (IWL Item L2.20)
SQ 8.0 -ANCHORAGE INSPECTION (IWL Item L2 .30) SQ 11 .0 - RETENSION TENDONS SQ 8.3 - BEARING PLATE CONCRETE (IWL Item L2.30) SQ 12.0 - GREASE CAP REPLACEMENT INSPECTION SQ 12.1 - GREASE REPLACEMENT
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 15 of 64 DOCUMENT NUMBER: -'-R=E"-P- '-1"""30'--"""51'""'0_ _ _ _ _ _ _ _ _ _ _ _ REVISION : 0 PAGE: 4 DOCUMENT TITLE: FINAL REPORT FOR THE 45th YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45rH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17
.. - .. I I -
VISUAL PHYSICAL
...... N M C? 0 ......
TENDON END 0 C? 0 M 0 N N cD <D ,..... ai ai en ci ...... ci ......
...... ...... ...... COMMENTS a a a a a a a a a a a CJ) CJ) CJ) CJ) CJ) CJ) CJ) CJ) CJ) CJ) CJ) 1030 NW &SE x x x x x x x x 1045 NW&E x x x x x x x x x x x DETENSION 3D20 N &SW x x x x x x x x COMMON 3D32 NE & S x x x x x x x x 13H12 BT 1 x x x x x x x INACCESSIBLE AT BT 3 ALTERNATE FOR 13H12 -
13H16 BT 1 & BT 3 x x x x x x x x x x x DETENSION 15H12 BT 1 & BT 5 x x x x x x x x 15H34 BT 1 x x x x x x x RVCH - INACCESSS . AT BT 5 15H35 BT 1 & BT 5 x x x x x x x x RVCH-ALT. FOR 15H34 15H37 BT 1 & BT 5 x x x x x x x x x x x RVCH - DETENSION 62H22 BT 2 x x x x x x x INACCESSIBLE AT BT 6 62H28 BT 2 & BT6 x x x x x x x x ALTERNATE FOR 62H22 62H82 BT 2 & BT6 x x x x x x x x COMMON 64H17 BT 4 & BT6 x x x x x x x x 23V08 D&G x x x x x x x x 34V05 D &G x x x x x x x x x x x DETENSION 45V10 D &G x x x x x x x x COMMON 56V29 D &G x x x x x x x x x x x RVCH - DETENSION 61V30 D &G x x x x x x x x RVCH NOMENCLATURE D = Dome; G = Gallery; BT = Buttress; N = North End ; S = South End ; E = East End ; W = West End LEGEND SQ 6.0 - GREASE CAP REMOVAL SQ 9.0 - MONITOR TENDON FORCE (IWL Item L2.10)
SQ 6.1 - INSPECTION FOR WATER (IWL Item L2 .50) SQ 10.2 -TENDON WIRE INSPECTION (IWL Item L2.20)
SQ 7.0 - SHEATING FILLER ANALYSIS (IWL Item L2.40) SQ 10.3 -TESTING TENDON WIRE (IWL Item L2.20)
SQ 8.0 - ANCHORAGE INSPECTION (IWL Item L2.30) SQ 11 .0 - RETENSION TENDONS SQ 8.3 - BEARING PLATE CONCRETE (IWL Item L2 .30) SQ 12.0 - GREASE CAP REPLACEMENT INSPECTION SQ 12.1 - GREASE REPLACEMENT
Attachment 2 EC288647 Rev . 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 16 of 64 DOCUMENT NUMBER: -'-R""E""' P_-1_1-'-30_-_
5 1'-0-'_ _ _ __ _ __ _ __ _ REVISION : 0 PAGE: 5 DOCUMENT TITLE : FINAL REPORT FOR THE 45"' YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 3036 s x x x x 13H21 BT 1 x x x x 13H53 BT 1 x x x x 62H60 BT2 x x x x 64H13 BT6 x x x x 23V06 GALLERY x x x x 23V11 GALLERY x x x x 34V02 GALLERY x x x x 56V02 GALLERY x x x x 56V17 GALLERY x x x x 56V25 GALLERY x x x x 56V28 GALLERY x x x x 61V02 GALLERY x x x x 61V03 GALLERY x x x x 61V10 GALLERY x x x x 61V14 GALLERY x x x x NOMENCLATURE D = Dome; G = Gallery; BT = Buttress; N = North End ; S = South End ; E = East End ; W = West End LEGEND SQ 6.0 - GREASE CAP REMOVAL SQ 9.0 - MONITOR TENDON FORCE (IWL Item L2.1 0)
SQ 6.1 - INSPECTION FOR WATER (IWL Item L2.50) SQ 10.2 - TENDON WIRE INSPECTION (IWL Item L2.20)
SQ 7.0 - SHEATING FILLER ANALYSIS (IWL Item L2.40) SQ 10.3 - TESTING TENDON WIRE (IWL Item L2.20)
SQ 8.0 - ANCHORAGE INSPECTION (IWL Item L2.30) SQ 11 .0 - RETENSION TENDONS SQ 8.3 - BEARING PLATE CONCRETE (IWL Item L2.30) SQ 12.0 - GREASE CAP REPLACEMENT INSPECTION SQ 12.1 - GREASE REPLACEMENT
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 17 of 64 DOCUMENT NUMBER: _R_E_P_-1_13_0_-5_1_
0 _ __ _ _ _ __ _ _ _ _ REVISION: 0 PAGE: 6 DOCUMENT TITLE: FINAL REPORT FOR THE 45lh YEAR TENDON SURVEILLANCE AT TUR KEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 2.0 SURVEILLANCE PROCEDURES Appendix E (Ref. 7) of this report contains the detailed procedures of the tendon surveillance conducted . The surveillance procedural steps are summarized below:
2.1 Removal of tendon grease cap and visual examination of sheathing filler (grease) .
2.2 Analytical testing of sheathing filler (grease) samples.
2.3 Examination for the presence of free water and analysis of water samples (if applicable).
2.4 Inspection of the anchorage assembly of each surveillance tendon end for deleterious conditions such as corrosion , cracks , and protruding , broken or missing wires or buttonheads.
2.5 Inspection of 24" of concrete surrounding each surveillance tendon bearing plate for any recordable indications.
2.6 Measurement of the lift-off force for each physical surveillance tendon .
2.7 Detensioning of tendons selected for wire removal (if applicable) .
2.8 Removal of test wire from designated physical surveillance tendon for examination and testing (if applicable) .
2.9 Visual inspection for corrosion , pitting, or any significant physical change of the removed wires (if applicable) .
2.10 Testing of samples taken from wires removed from tendons for yield strength , ultimate strength, and percentage elongation at failure (if applicable).
2.11 Retensioning of detensioned tendons and measuring the corresponding tendon elongation (if applicable).
2.12 Resealing tendon caps and replacement of lost sheathing filler (grease).
2.13 General visual inspection of the accessible exterior concrete surfaces of the containment buildings.
2.14 Evaluation oftest and inspection results to assess the general condition of the post-tensioning system.
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. O Page 18 of 64 DOCUMENT NUMBER: REP-11 30-510
~~~~~~~~~~~~~~~~
REVISION : 0 PAGE: 7 DOCUMENT TITLE : FINAL REPORT FOR THE 45'" YEAR TENDON SURVEILLANCE AT TUR KEY POINT PROJECT TITLE: 45rH YR U3 & U4 TEN DON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 3.0 SHEATHING FILLER ANALYSIS 3.1 Removal and inspection of sheathing filler was done in accordance with IWL Sections 2524.2, 2525.1 , and 2526. Table IWL-2525-1 specifies the limits of the allowable water content, water-soluble ion amounts, and the base neutralization number.
3.2 Two (2) samples of grease were removed from each end of the surveillance tendons, each one (1) quart in volume . Chemical tests were performed on all collected samples by Suburban Laboratories , Inc.
Sheathing filler testing was done per IWL-2525.2 requirements .
3.3 Reserve alkalinity (Base) number limit is in accordance with Note (4) from Table IWL-2525-1 quoted below:
Table IWL-2525-1 Note (4): "The base number shall be at least 50% of the as-installed value, unless the as-installed value is 5 or less, in which case the base number shall be no less than zero. If the tendon duct is filled with a mixture of materials having various as-installed base numbers, the lowest number shall govern acceptance."
3.3.1 The requ ired base number for the Turkey Point Unit 3 and Unit 4 are 0 mg KOH I g SAMPLE per PSC Procedure SQ7.0, Sec. 8.0.
3.4 Laboratory analysis results of the sheathing filler are as follows:
)> ION CONCENTRATION -All tendon grease samples' ion concentrations were within their respective acceptable limits.
)> MOISTURE CONTENT - All tendon grease samples' moisture contents (measured in percent of dry weight) were within the acceptable limit.
)> RESERVE ALKALINITY (BASE) NUMBER - All tendon grease samples' base numbers were above the specified acceptance limit.
3.5 No signs of degradation of the grease, by either color or consistency , were noted on any of the tendons tested.
3.6 Laboratory analysis results are contained in Appendix B, and the results , along with the acceptance limits, are summarized in Table 3-1 through Table 3-3. In Table 3-1 through Table 3-3, "N/A" indicates no inspection was performed at that tendon end.
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 19 of 64 QOCUMENT NUMBER: -"R""E"-P--1-'1-'-30"'---'-51-'0_ _ _ _ _ _ _ _ _ __ _ REVISION : 0 PAGE: 8 DOCUMENT TITLE : FINAL REPORT FOR THE 45th YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 Table 3-1: Sheathing Filler Analysis - Unit 3 All Tendons ION CONCENTRATION (PPM) o;.0 WATER BASE No.
TENDON END (mg CHLORIDE SULFIDE NITRATE CONTENT KOH/g)
NW <0.50 <0.50 <1.0 0.43 21 .1 1052 NE <0.50 <0.50 <1.0 <0.10 46.7 s 0.50 <1.0 3.6 <0.10 3.32 2D02 E 1.0 <1.0 3.5 0.10 0.563 NE 1.0 <1 .0 3.8 <0.10 5.58 2D13 SW 1.0 <1.0 4.0 0.20 7.61 NW <0.50 <0.50 <1.0 0.10 65.9 3D08 SW <0.50 <0.50 <1.0 0.10 57 .4 BT 1 <0.50 <0.50 <1.0 0.25 6.13 13H11 BT 3 1.0 <2.5 6.9 0.38 1.09 BT 1 <0.50 <0.50 <1.0 <0.10 47.9 15H18 BT 5 <0.50 <0.50 <1 .0 0.15 62.8 BT 2 1.0 <2. 5 6.1 0.29 1.07 42H10 BT 4 0.50 <0.50 <1.0 0.10 2.75 BT 2 <0.50 <0.50 <1.0 0.25 36.3 62H44 BT 6 <0.50 <0.50 <1.0 <0.1 0 29.6 BT 2 <0.50 <0.50 <1.0 0.50 47.1 62H57 BT 6 <0.50 <0. 50 <1.0 <0.10 43.7 BT 2 1.0 <0.50 <1.0 <0.10 0.584 62H83 BT6 1.0 <1 .0 1.7 0.15 4.96 BT 4 0.50 <0.50 <1.0 0.20 4.95 64H72 BT 6 0.50 <2.50 2.9 0.15 3.23 12V01
- GALLERY <0.50 <0.50 <1.0 0.10 39.5 DOME <0.50 <0.50 <1 .0 1.1 30 .9 12V11 GALLERY <0.50 <0.50 <1.0 1.1 35.8 DOME <0.50 <0.50 <1.0 3.4 34 .2 12V14 GALLERY <0.50 <0.50 <1.0 0.10 52.5 DOME <0.50 <0.50 <1. 0 0.31 70.4 12V22 GALLERY <0.50 <0.50 <1.0 0.91 29.2 DOME <0.50 <0.50 <1.0 0.61 51 .8 34V23 GALLERY <0.50 <0.50 <1. 0 0.51 15.5 DOME <0.50 <0.50 <1.0 0.50 50 .3 45V01 GALLERY <0.50 <0.50 <1.0 0.10 41 .2
- Gasket Repair Tendon ACCEPTANCE LIMITS TEST LIMITS WATER SO LUBLE CHLORIDE 10.0 (PPM ) MAXIMUM WATER SO LU BLE NITRATES 10.0 (PPM ) MAXIMUM WATER SOLUBE SULFIDES 10.0 (PPM ) MAXIMUM WATER CONTENT 10% MAXIMUM NEURALIZATION NO. GREATER THAN 0.0 mg KO H/g
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 20 of 64 DOC UMENT NUMBER: -'-R=E"-P--1'--'1-"-30"---'--51-'-'0' --- -- -- - - - - - - REVISION : 0 PAGE: 9 DOCUMENT TITLE FINAL REPORT FOR THE 45th YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45rH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 Table 3-2: Sheathing Filler Analysis - Unit 4 Dome & Hoop Scope Tendons ION CONCENTRATION (PPM) o;.0 WATER NEUTRAL.
TENDON END No. (mg CHLORIDE SULFIDE NITRATE CONTENT KOH/g)
NW 0.50 <0.50 <1 .0 <0.10 9.14 1030 SE 0.50 <0.50 <1 .0 <0.10 0.548 NW 0.50 <0.50 < 1.0 0.15 10.2 1045 E 0.50 <2.50 <1 .0 0.10 7.50 N <0.50 <0.50 <1.0 <0.10 54.7 3D20 SW <0.50 <0.50 <1.0 0.11 63.3 NE 0.50 <0.50 <1.0 <0.10 8.15 3D32 s <0.50 <0.50 <1 .0 <0.10 8.81 BT 1 0.50 <5.00 4.7 0.24 8.58 13H12 BT 3 N/A N/A N/A N/A N/A BT 1 0.50 <5.00 6.7 0.25 7.51 13H16 BT 3 0.50 <5.00 4.7 0.25 6.42 BT 1 0.50 <0.50 1.9 0.18 8.32 15H12 BT 5 0.50 <0.50 2.1 0.14 9.86 BT 1 <0.50 <0.50 <1.0 <0.10 47.1 15H34 BT 5 N/A N/A N/A N/A N/A BT 1 <0.50 <0.50 <1.0 <0.10 46.1 15H35 BT 5 <0.50 <0.50 <1 .0 <0.10 36.1 BT 1 <0.50 <0.50 <1.0 0.21 46.7 15H37 BT 5 <0.50 <0.50 <1 .0 <0.10 39.6 BT2 1.0 <2.50 3.2 0.10 7.46 62H22 BT6 N/A NIA N/A N/A N/A BT 2 1.0 <2.50 5.4 <0.10 7.49 62H28 BT6 1.0 <2.50 5.3 0.15 8.75 BT 2 <0.50 <0.50 <1 .0 <0.10 45.8 62H82 BT6 <0.50 <0.50 <1.0 <0.10 49.7 BT 4 0.50 <2.50 2.9 0.10 7.02 64H17 BT 6 1.5 <5.00 <1 .0 0.15 5.42 ACCEPTANCE LIMITS TEST LIMITS WATER SOLUBLE CHLORIDE 10.0 (PPM) MAXIMUM WATER SOLUBLE NITRATES 100 (PPM) MAXIMUM WATER SO LUBE SULFIDES 10.0 (PPM ) MAXIMUM WATER CONTENT 10% MAXIMUM NEURALIZATION NO. GREATER THAN 0.0 mg KOH/g
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 21 of 64 DOCUMENT NUMBER: REP-11 30-5 10
~~~~~~~~~~~~~~~~
REVISION : 0 PAGE : 10 DOCUMENT T ITLE : FINAL REPORT FOR THE 45th YEAR TENDON SURVE ILLANCE AT TURKEY POINT PROJECT TITLE : 45rH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE 06/19/17 Table 3-3: Sheathing Filler Ana lysis - Unit 4 Vertical Scope Tendons ION CONCENTRATION (PPM) NEUTRAL.
%WATER TENDON END No. (mg CHLORIDE SULFIDE NITRATE CONTENT KOH/g)
DOME 0.50 <0.50 < 1.0 6.3 1.11 23V08 GALLERY 0.50 <0.50 < 1.0 0.2 9 7.03 DOME 0.50 <0.50 < 1.0 0.24 7.01 34V05 GALLERY <0.50 <2. 50 2.9 <0.10 0.553 DOME <0.50 <0.50 < 1.0 0.49 62.7 45V10 GALLERY <0.50 <0.50 < 1.0 0.25 34.3 DOME <0.50 <0.50 < 1.0 <0.10 42.1 56V29 GALLERY 0.50 <0.50 < 1.0 <0.10 60.4 DOME 0.50 <0.50 < 1.0 0.39 40 .1 61V30 GALLERY <0.50 <0.50 < 1.0 <0.10 43.1 ACCEPTANCE LIMITS TEST LIMITS WATER SO LUBLE CH LORIDE 10.0 (PPM) MAXIMUM WATER SOLUBLE NITRATES 100 (PPM) MAXIMUM WATER SOLUBE SULFIDES 100 (PPM) MAXIMUM WATER CONTENT 10% MAXIMUM NEURALIZATION NO. GREATER THAN 0.0 mg KOH/g
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. O Page 22 of 64 DOCUMENTNUMBER: REP-11 30-510 REVISION : 0 PAGE 11 DOCUMENT TITLE : FINAL REPORT FOR THE 45th YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE: 45rH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 4.0 VISUAL INSPECTIONS A detailed visual inspection of the tendon anchorage components , beginning with the removal of grease caps, was performed in accordance with IWL-2310(b) and IWL-2524. In the following discussion , all procedures referred to are outlined in Appendix E (Ref. 7) of this report, and all completed data sheets are included in Appendix A.
4.1 SQ 6.0- GREASE CAP REMOVAL 4.1.1 Inspection of the anchorage components began by removing the grease cap from each end of the inspected tendons, per PSC Procedure SQ 6.0.
)> Acceptable grease coatings were found on all tendon ends inspected , and no unusual conditions were reported at any tendon end.
4.1.2 The observed percent of grease coating for each anchorage component is contained in SQ 6.0 data sheets of Appendix A and is tabulated in Table 4-1 through Table 4-5.
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. O Page 23 of 64 DOCUMENT NUMBER: REP-11 30-510
~~~~~~~~~~~~~~~~-
REVISION : 0 PAGE: 12 DOCUMENT TITLE : FINAL REPORT FOR THE 45"' YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 Table 4-1: SQ 6.0 - Grease Cap Removal - Unit 3 Scope Tendons GREASE COATING (%)
TENDON END GREASE BUTTON ANCHOR BEARING CAP HEADS HEAD SHIMS PLATE NW 100 100 100 100 100 1052 NE 100 100 100 100 100 s 100 100 100 100 100 2002 E 100 100 100 100 100 NE 100 100 100 100 100 2013 SW 100 100 100 100 100 NW 100 100 100 100 100 3008 SW 100 100 100 100 100 BT 1 100 100 100 100 100 13H11 BT 3 100 100 100 100 100 BT 1 100 100 100 100 100 15H18 BT 5 100 100 100 100 100 BT2 100 100 100 100 100 42H10 BT4 100 100 100 100 100 BT 2 100 100 100 100 100 62H44 BT6 100 100 100 100 100 BT 2 100 100 100 100 100 62H57 BT6 100 100 100 100 100 BT 2 100 100 100 100 100 62H83 BT6 100 100 100 100 100 BT4 100 100 100 100 100 64H72 BT6 100 100 100 100 100 DOME 100 100 100 100 100 12V11 GALLERY 100 100 100 100 100 DOME 100 100 100 100 100 12V14 GALLERY 100 100 100 100 100 DOME 100 100 100 100 100 12V22 GALLERY 100 100 100 100 100 DOME 100 100 100 100 100 34V23 GALLERY 100 100 100 100 100 DOME 100 100 100 100 100 45V01 GALLERY 100 100 100 100 100
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 24 of 64 DOCUMENT NUMBER: REP-1130-510
~~~~~~~~~~~~~~~~
REVISION : 0 PAGE: 13 DOCUMENT TITLE: FI NAL REPORT FOR THE 45th YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 Table 4-2: SQ 6.0 - Grease Cap Removal - Unit 3 Gasket Repair Tendons GREASE COATING(%)
TENDON END GREASE BUTION ANCHOR SHIMS BEARING CAP HEADS HEAD PLATE 1012 SE 100 100 100 100 100 2011 NE 100 100 100 100 100 3024 s 100 100 100 100 100 62H71 BT 2 100 100 100 100 100 12V01 GALLERY 100 100 100 100 100 12V02 GALLERY 100 100 100 100 100 12V07 GALLERY 100 100 100 100 100 12V26 GALLERY 100 100 100 100 100 56V28 GALLERY 100 100 100 100 100 61V13 GALLERY 100 100 100 100 100 61V20 GALLERY 100 100 100 100 100
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. O Page 25 of 64 DOCUMENT NUMBER: REP-1130-510
~~~~~~~~~~~~~~~~-
REVISION : 0 PAGE: 14 DOCUMENT TITLE: FINAL REPORT FOR THE 45lh YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06119117 Table 4-3: SQ 6.0 - Grease Cap Removal - Unit 4 Dome & Hoop Scope Tendons GREASE COATING (%)
TENDON END GREASE BUTTON ANCHOR SHIMS BEARING CAP HEADS HEAD PLATE NW 100 100 100 100 100 1D30 SE 100 100 100 100 100 NW 100 100 100 100 100 1D45 E 100 100 100 100 100 N 100 100 100 100 100 3D20 SW 100 100 100 100 100 NE 100 100 100 100 100 3D32 s 100 100 100 100 100 BT 1 100 100 100 100 100 13H12 BT 3 NIA NIA NIA NIA NIA BT 1 100 100 100 100 100 13H16 BT 3 100 100 100 100 100 BT 1 100 100 100 100 100 15H12 BT 5 100 100 100 100 100 BT 1 100 100 100 100 100 15H34 BT 5 NIA NIA NIA NIA NIA BT 1 100 100 100 100 100 15H35 BT 5 100 100 100 100 100 BT 1 100 100 100 100 100 15H37 BT 5 100 100 100 100 100 BT2 100 100 100 100 100 62H22 BT6 NIA NIA NIA NIA NIA BT2 100 100 100 100 100 62H28 BT6 100 100 100 100 100 BT 2 100 100 100 100 100 62H82 BT6 100 100 100 100 100 BT4 100 100 100 100 100 64H17 BT6 100 100 100 100 100
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. O Page 26 of 64 DOCUMENT NUM BER: -'-R--"E"-P--'-1_13-'-'0'--5'1-'-0-----
-' -- - - - - - REVISION: 0 PAGE: 15 DOC UMENT TITL E: FINAL REPORT FOR THE 45"' YEAR TEN DON SURVEI LLANCE AT TURKEY POINT PROJECT TITLE: 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 Table 4-4: SQ 6.0 - Grease Cap Removal - Unit 4 Vertical Scope Tendons GREASE COATING(%)
TENDON END GREASE BUTTON ANCHOR BEARING CAP HEADS HEAD SHIMS PLATE DOME 100 100 100 100 100 23V08 GALLERY 100 100 100 100 100 DOME 100 100 100 100 100 34V05 GALLERY 100 100 100 100 100 DOME 100 100 100 100 100 45V10 GALLERY 100 100 100 100 100 DOME 100 100 100 100 100 56V29 GALLERY 100 100 100 100 100 DOM E 100 100 100 100 100 61V30 GALLERY 100 100 100 100 100 Table 4-5: SQ6.0 - Grease Cap Removal - Unit 4 Gasket Repair Tendons GREASE COATING(%)
TENDON END GREASE BUTTON ANCHOR BEARING CAP HEADS HEAD SHIMS PLATE 3D36 s 100 100 100 100 100 13H21 BT 1 100 100 100 100 100 13H53 BT 1 100 100 100 100 100 62H60 BT 2 100 100 100 100 100 64H13 BT 6 100 100 100 100 100 23V06 GALLERY 100 100 100 100 100 23V11 GALLERY 100 100 100 100 100 34V02 GALLERY 100 100 100 100 100 56V02 GALLERY 100 100 100 100 100 56V17 GALLERY 100 100 100 100 100 56V25 GALLERY 100 100 100 100 100 56V28 GA LLERY 100 100 100 100 100 61V02 GALLERY 100 100 100 100 100 61V03 GALLERY 100 100 100 100 100 61V10 GALLERY . 100 100 100 100 100 61V14 GALLERY 100 100 100 100 100
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 27 of 64 DOCUMENT NUMBER: REP-11 30-510
~~~~~~~~~~~~~~~~
REVISION : 0 PAGE: 16 DOCUMENT TITLE: FINAL REPORT FOR THE 45lh YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE: 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 4.2 SQ 6.1 - FREE WATER INSPECTION 4.2.1 Beginning with the grease cap removal , and throughout the inspection process , the presence of free water on any anchorage component is monitored and recorded per PSC Procedure SQ 6.1.
4.2.2 According to ASME,Section XI , Subsection IWL-3221.3(e), "(t)he condition of tendon anchorage areas is acceptable if ... there is no evidence of free water."
);> The presence of free water was observed at Unit 3 tendons 12V11 (6 oz.) and 12V22 (4 oz .).
Water Notification Letters were submitted to Turkey Point Engineering in response to each occurrence.
);> All other inspected tendon ends were found with no evidence of free water and are acceptable per IWL-3221.3(e).
4.2.3 Samples of the observed water were collected at Unit 3 tendons 12V11 and 12V22, per PSC Procedure SQ6.1 . During the process of being released by the plant, RP personnel inadvertently discarded the samples. The details of the missing/discarded samples are recorded in PTN AR#2187886 (Appendix K) .
4.2.4 Inspection results are contained in SQ 6.1 data sheets of Appendix A and are summarized in Table 4-6 through Table 4-9. In Table 4-6 through Table 4-9, "N/A" means that the surveillance item did not apply to the tendon end.
Attachment 2 EC288647 Rev. 0 Eng ineering Evaluation: PTN-ENG-SESJ- 17-004 Rev. 0 Page 28 of 64 DOCUMENT NUMBER: RE P-11 30-510 REVISION: 0 PAGE: 17 DOCUMENT TITLE: FINAL REPORT FOR THE 45lh YEAR TE NDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLA NCE AT TU RKEY POINT DATE: 06/19/17 Table 4-6: SQ 6.1 - Inspection for Water - Unit 3 Scope Tendons WATER WATER TENDON END QUANTITY TENDON END QUANTITY NW 0 BT 2 0 1052 62H57 NE 0 BT6 0 s 0 BT 2 0 2D02 62H83 E 0 BT6 0 NE 0 BT 4 0 2D13 64H72 SW 0 BT6 0 NW 0 DOME 0 3D08 12V1 1 SW 0 GALLERY 6 oz.
BT 1 0 DOME 0 13H11 12V14 BT 3 0 GALLERY 0 BT 1 0 DOME 0 15H18 12V22 BT 5 0 GALLERY 4oz.
BT 2 0 DOME 0 42H10 34V23 BT4 0 GALLERY 0 BT 2 0 DOME 0 62H44 45V01 BT 6 0 GALLERY 0 Table 4-7: SQ6.1 - Inspection for Water - Unit 3 Gasket Repair Tendons WATER WATER TENDON END QUANTITY TENDON END QUANTITY 1012 SE 0 12V07 GALLERY 0 2D11 NE 0 12V26 GALLERY 0 3024 s 0 56V28 GALLERY 0 62H71 BT 2 0 61V13 GALLERY 0 12V01 GALLERY 0 61V20 GALLERY 0 12V02 GALLERY 0
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 29 of 64 DOCUMENT NUMBER: REP-11 30-510 REVISION : 0 PAGE: 18 DOCUMENT TITLE : FINAL REPORT FOR THE 45'" YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 Table 4-8: SQ 6.1 - Inspection for Water - Unit 4 Scope Tendons WATER WATER TENDON END QUANTITY TENDON END QUANTITY NW 0 BT 2 0 1030 62H22 SE 0 BT6 NIA NW 0 BT 2 0 1045 62H28 E 0 BT6 0 N 0 BT 2 0 3D20 62H82 SW 0 BT6 0 NE 0 BT 4 0 3D32 64H17 s 0 BT6 0 BT 1 0 DOME 0 13H12 23V08 BT 3 N/A GALLERY 0 BT 1 0 DOME 0 13H16 34V05 BT3 0 GALLERY 0 BT 1 0 DOME 0 15H12 45V10 BT 5 0 GALLERY 0 BT 1 0 DOME 0 15H34 56V29 BT5 N/A GALLERY 0 BT 1 0 DOME 0 15H35 61V30 BT 5 0 GALLERY 0 BT 1 0 15H37 BT 5 0 Table 4-9: SQ 6.1 - Inspection for Water - Unit 4 Gasket Repair Tendons WATER WATER TENDON END QUANTITY TENDON END QUANTITY 3036 s 0 56V02 GALLERY 0 13H21 BT 1 0 56V17 GALLERY 0 13H53 BT 1 0 56V25 GALLERY 0 62H60 BT 2 0 56V28 GALLERY 0 64H13 BT 6 0 61V02 GALLERY 0 23V06 GALLERY 0 61V03 GALLERY 0 23V11 GALLERY 0 61V10 GALLERY 0 34V02 GALLERY 0 61V14 GALLERY 0
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 30 of 64 DOCUMENT NUMBER: REP-1130-51 0
~~~~~~~~~~~~~~~~
REVISION : 0 PAGE: 19 DOCUMENT TITLE: FINAL REPORT FOR THE 45"' YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 4.3 SQ 8.0 - ANCHORAGE INSPECTION (BUTTON HEAD COUNT) 4.3.1 The buttonhead count and status at each tendon end was compared to the original stressing record and any subsequent stressing records. Missing, broken , damaged, unseated , or improperly formed (double) buttonheads were identified on the surveillance data sheet's schematic of the anchorage.
Buttonhead inspection was done per PSC Procedure SQ 8.0.
4.3.2 According to ASME ,Section XI , Subsection IWL-3221.3(c), "[t]he condition of tendon anchorage areas is acceptable if... broken or unseated wires , broken strands , and detached buttonheads were documented and accepted during a preservice examination or during a previous inservice examination ."
J;>. The gallery end of Unit 3 vertical tendon 12V01 was found with one (1) protruding button head not previously reported . Non-conformance report (NCR) FN1130-001 was written by PSC Quality Control personnel , and Turkey Point Engineering was notified .
J;>. The buttress 5 end of Unit 4 hoop tendon 15H 12 was found to have one (1) missing wire not previously reported . Non-conformance report (NCR) FN1130-009 was written by PSC Quality Control personnel, and Turkey Point Engineering was notified .
J;>. All other buttonheads at all inspected tendon ends were found in acceptable condition, per IWL-3221 .3(c).
4.3.3 Inspection results are contained in SQ 8.0 data sheets of Appendix A and are summarized in Table 4-10 through Table 4-12. In Table 4-10 through Table 4-12, "N/A" means that the surveillance item did not apply to the tendon end .
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 31 of 64 DOCUMENT NUMBER: REP-1130-510
~~~~~~~~~~~~~~~~-
REVISION : 0 PAGE: 20 DOCUMENT TITLE: FINAL REPORT FOR THE 45"' YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17
. . II: I : .. . . **
PREVIOUS AS FOUND AS LEFT TENDON END w
0
- i Q:'.
zwz (!)
w 0
- i Q:'.
z wz
(!)
w 0
- i Q:'.
zwz (!) REMOVED FOR EFFECTIVE WIRES AS EFFECTIVE WIRES AS
~- ~- ~-
I- o~
o:-
I- o~
o:-
I- o~ TESTING FOUND LEFT 0
Q:'.
0 0 o:-
al :E Q:'. al :E Q:'. al :E
- 0. 0. 0.
NW 0 0 0 0 0 0 0 90 1052 90 NE 0 0 0 0 0 0 0 90 s 0 0 0 0 0 0 0 90 2002 90 E 0 0 0 0 0 0 0 90 NE 0 0 0 0 0 0 0 90 2013 90 SW 0 0 0 0 0 0 0 90 NW 0 2 0 2 0 2 0 88 3008 88 SW 0 2 0 2 0 2 0 88 BT 1 0 0 0 0 0 0 0 90 13H11 90 BT 3 0 0 0 0 0 0 0 90 BT 1 0 0 0 0 0 0 0 90 15H18 90 BT 5 0 0 0 0 0 0 0 90 BT 2 0 2 0 2 0 2 0 88 42H10 88 BT4 0 2 0 2 0 2 0 88 BT 2 0 0 0 0 0 0 90 62H44 89 BT 6 0 0 0 0 0 0 90 BT 2 0 0 0 0 0 0 0 90 62H57 90 BT6 0 0 0 0 0 0 0 90 BT 2 0 0 0 0 0 0 0 90 62H83 90 BT6 0 0 0 0 0 0 0 90 BT 4 0 0 0 0 0 0 0 90 64H72 90 BT6 0 0 0 0 0 0 0 90 DOME N/A N/A N/A N/A N/A N/A N/A N/A 12V01* 89 GALLERY 0 0 1** 0 0 0 89 DOME 0 0 0 0 0 0 90 12V11 89 GALLERY 0 0 0 0 0 0 90 DOME 0 0 0 0 0 0 0 90 12V14 90 GALLERY 0 0 0 0 0 0 0 90 DOME 0 0 0 0 0 0 0 90 12V22 89 GALLERY 0 0 0 0 89 DOME 0 0 0 0 0 0 0 90 34V23 90 GALLERY 0 0 0 0 0 0 0 90 DOME 0 0 0 0 0 0 0 90 45V01 90 GALLERY 0 0 0 0 0 0 0 90
- Gasket Repair Tendon ; **See Section 4.3.2 .
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. O Page 32 of 64 DOCUMENT NUMBER: REP-1130-510
~~~~~~~~~~~~~~~~-
REVISION : 0 PAGE: 21 DOCUMENT TITLE: FINAL REPORT FOR THE 45"' YEAR TENDON SU RVEILLAN CE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17
- I ..
- ti ; I : ..
- I' *** ..- - **
PREVIOUS AS FOUND AS LEFT w w w TENDON END 0
ie>
wz 0
ie>
wz 0
ie>
wz REMOVED FOR EFFECTIVE WIRES AS EFFECTIVE WIRES AS 0:: ~- 0:: ~- 0:: ~-
.... o~ .... o~ .... o~ TESTING FOUND LEFT 0 0:: - 0 0:: - 0 0:: -
0::
a.. m :E 0::
a.. m :E 0::
a.. m :E NW 0 0 0 0 0 0 0 90 1D30 90 SE 0 0 0 0 0 0 0 90 NW 0 0 0 0 0 0 90 1D45 89 E 0 0 0 0 0 0 90 N 0 0 0 0 0 0 0 90 3D20 90 SW 0 0 0 0 0 0 0 90 NE 0 0 0 0 0 0 0 90 3D32 90 s 0 0 0 0 0 0 0 90 BT 1 0 0 0 0 0 0 0 90 13H12 90 BT 3 N/A N/A N/A N/A N/A N/A N/A N/A BT 1 0 0 0 0 0 0 90 13H16 89 BT 3 0 0 0 0 0 0 90 BT 1 0 0 0 0 0 0 0 90 15H12 89 BT 5 0 0 0 1* 0 0 89 BT 1 0 0 0 0 0 0 0 90 15H34 90 BT 5 N/A N/A N/A N/A N/A N/A N/A N/A BT 1 0 0 0 0 0 0 0 90 15H35 90 BT 5 0 0 0 0 0 0 0 90 BT 1 0 0 0 0 0 0 90 15H37 89 BT 5 0 0 0 0 0 0 90 BT2 0 0 0 0 0 0 0 90 62H22 90 BT6 N/A N/A N/A N/A N/A NIA N/A N/A BT2 0 0 0 0 0 0 0 90 62H28 90 BT6 0 0 0 0 0 0 0 90 BT2 0 0 0 0 0 0 0 90 62H82 90 BT 6 0 0 0 0 0 0 0 90 BT4 0 0 0 0 0 0 0 90 64H17 90 BT6 0 0 0 0 0 0 0 90
- See Section 4.3.2
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 33 of 64 DOCUMENT NUMBER: RE P-1130-510 REVIS ION: 0 PAGE: 22 DOCUMENT TITLE: FINAL REPORT FO R TH E 45"' YEA R TENDON SURVEILLA NCE AT TURKEY POINT PROJ ECT TITLE : 45TH YR U3 & U4 TENDON SURVEI LLANCE AT TURKEY POI NT DATE : 06/1 9/17
- .... II; I : *I 0 I
- I 0 PREVIOUS AS FOUND AS LEFT w w w 0 ;zwz(!) 0 ;z (!) 0 ;zwz (!) REMOVED EFFECTIVE EFFECTIVE TENDON END ::>
Q:'.
.... )::-
o~
Q:'.
wz
)::
o~
.... o~-
Q:'. )::
FOR TESTING WIRES AS FOUND WIRES AS LEFT 0 Q:'.- 0 Q:'.- 0 Q:'.-
Q:'. Ill :ii: Q:'. al :ii: Q:'. al :ii:
- 0. 0. 0.
DOME 0 0 0 0 0 0 0 90 23V08 90 GALLERY 0 0 0 0 0 0 0 90 DOME 0 0 0 0 0 0 90 34V05 89 GALLERY 0 0 0 0 0 0 90 DOME 0 0 0 0 0 0 0 90 45V10 90 GALLERY 0 0 0 0 0 0 0 90 DOME 0 2 0 2 0 2 88 56V29 87 GALLERY 0 2 0 2 0 2 88 DOME 0 0 0 0 0 0 0 90 61V30 90 GALLERY 0 0 0 0 0 0 0 90 4.4 SQ 8.0 - ANCHORAGE INSPECTION (CORROSION LEVELS) 4.4.1 The exposed portion of the anchorhead , shi ms, and bearing plates was inspected for corrosion ,
sig ns of excessive stress, and cracking . Tendon wire buttonheads were also inspected for corrosion and cracking . Corrosion levels on all listed anchorage components were quantified accord ing to PSC Procedure SQ 8.0.
4.4.2 According to ASME,Section XI , Subsection IWL-3221 .3(a) and IWL-3221 .3(b) , "[t] he condition of tendon anchorage areas is accepta ble if ... (a) there is no evidence of cracking in anchor heads, shims, or bearin g plates .. . [and] (b) there is no evidence of active corrosion ."
- .. No evidence of cracking was observed on any of the anchorage components of any tendon end, and all inspected tendon anchorage components were found with acceptable corrosion levels.
4.4.3 Inspection results are contained in SQ 8.0 data sheets of Appendix A and are summarized in Table 4-13 through Table 4-15. In Table 4-13 through Tab le 4-15 , "N/A" means that the surveillance item did not apply to the tendon end and/or anchorage component.
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. O Page 34 of 64 DOCUMENT NUMBER: ..:.R.::E:.:.P_-1 .:..1:.::3c::
0..::.-5c.:.
1=.. 0 _ _ __ __ _ __ _ ___ REVISION : 0 PAGE : 23 DOCUMENT TITLE: FINAL REPORT FOR THE 45t* YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE: 45rH Y R U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06119117 Table 4-13: SQ 8.0 - Anchorage Corrosion Condition - Unit 3 Scope Tendons CORROSION LEVEL I CRACKS TENDON END ANCHOR BUTTON l.D. HEADS ANCHOR WIRES SHIMS BEARING HEAD PLATE NW TP233 A , NONE 1, NONE NIA 1, NONE 2, NONE 1052 NE TP1384 A , NONE 1, NONE NIA 1, NONE 2, NONE s TP 1449 A , NONE 1, NONE NIA 1, NONE 1, NONE 2D02 E TP679 A , NONE 1, NONE NIA 1, NONE 1, NONE NE TP1 389 A , NONE 1, NONE NIA 1, NONE 2, NONE 2D13 SW TP1702 A , NONE 1, NONE NIA 1, NONE 1, NONE NW TP1481 A , NONE 1, NONE NIA 1, NONE 2, NONE 3D08 SW TP701 A , NONE 1, NONE NIA 1, NONE 1, NONE BT 1 TP181 A , NONE 1, NONE NIA 1, NONE 1, NONE 13H11 BT 3 TP561 A , NONE 1, NONE NIA 1, NONE 1, NONE BT 1 TP1 911 A , NONE 1, NONE NIA 1, NONE 1, NONE 15H18 BT 5 TP917 A , NONE 2, NONE NIA 1, NONE 1, NONE BT 2 TP593 A , NONE 1, NONE NIA 1, NONE 1, NONE 42H10 BT4 TP163 A , NONE 1, NONE NIA 1, NONE 1, NONE BT 2 TP32 A , NONE 1, NONE A , NONE 1, NONE 1, NONE 62H44 BT 6 TW120 A , NONE 1, NONE A , NONE 1, NONE 2, NONE BT2 TP-9 A , NONE 1, NONE NIA 1, NONE 1, NONE 62H57 BT 6 TP44 A , NONE 1, NONE NIA 1, NONE 1, NONE BT 2 TP1453 A , NONE 1, NONE NIA 1, NONE 1, NONE 62H83 BT 6 TP778 A , NONE 1, NONE NIA 1, NONE 2 NONE BT 4 TP903 B, NONE 2, NONE NIA 2, NONE 1, NONE 64H72 BT 6 TP26 A , NONE 1, NONE NIA 1, NONE 1, NONE DOME NIA NIA NIA NIA NIA NIA 12V01*
GALLERY TP77 A , NONE 1, NONE NIA NIA 1, NONE DOM E TW208 A, NONE 1, NONE A , NONE 1, NONE 1, NONE 12V11 GALLERY TW171 A , NONE 1, NONE A , NONE 1, NONE 1, NONE DOME TW179 A , NONE 1, NONE NIA 1, NONE 2, NONE 12V14 GALLERY TP66 A , NONE 1, NONE NIA NIA 1, NONE DOME TP 1093 A , NONE 1, NONE NIA 1, NONE 2, NONE 12V22 GALLERY TP17 1 A, NONE 1, NONE NIA NIA 1, NONE DOME TP64 A , NONE 1, NONE NIA 1, NONE 2, NONE 34V23 GALLERY TP1001 A , NONE 1, NONE NIA 2, NONE 1, NONE DOME TP1103 A , NONE 1, NONE NIA 1, NONE 1, NONE 45V01 GALLERY TP74 A , NONE 1, NONE NIA NIA 1, NONE Co rros ion Level : Example: 1, NONE A - Bright, Uniform in color 1 - No visible corrosion B - Partial loss of color 2 - Visible Oxidation; no pitting INDICATES CORROSION __f L INDICATES# OF C - Major loss of color 3 - 0.000 " < pitting :S 0.003" LEVEL CRACKS
- Gasket Repair Tendon
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 35 of 64 DOCUMENT NUMBER: -'-R""'E'-'-P--1-'--1'-'3-=-0--'5-'-1-=-
0 _ _ __ __ _ __ _ _ __ REVIS ION: 0 PAGE: 24 DOCUMENT TITLE : FINAL REPORT FOR THE 45"' YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06119117 Table 4-14: SQ 8.0- Anchorage Corrosion Condition - Unit 4 Dome & Hoop Scope Tendons CORROSION LEVEL I CRACKS TENDON END ANCHOR BUTTON l.D. HEADS ANCHOR WIRES SHIMS BEARING HEAD PLATE NW TP2852 A. NONE 1, NONE NIA 1, NONE 1, NONE 1030 SE TP554 A, NONE 1, NONE NIA 1, NONE 1, NONE NW TP332 A, NONE 1, NONE A , NONE 1, NONE 1, NONE 1045 E TP2691 A, NONE 1, NONE A , NONE 1, NONE 1, NONE N TP403 A, NONE 2, NONE NIA 1, NONE 2, NONE 3D20 SW TP2267 A, NONE 1, NONE NIA 1, NONE 2, NONE NE TP424 A , NONE 1, NONE NIA 1, NONE 1, NONE 3D32 s TP3057 A, NONE 1, NONE NIA 1, NONE 1, NONE BT 1 TP3237 A, NONE 1, NONE NIA 1, NONE 1, NONE 13H12 BT 3 NIA NIA NIA NIA NIA NIA BT 1 TP2724 A, NONE 1, NONE A , NONE 1, NONE 1, NONE 13H16 BT 3 TP3064 A, NONE 2, NONE A , NONE 1, NONE 2, NONE BT 1 TP1 888 A, NONE 1, NONE NIA 1, NONE 1, NONE 15H12 BT5 TP3009 A, NONE 2, NONE NIA 1, NONE 1, NONE BT 1 TD81 A , NONE 1, NONE NIA 1, NONE 1, NONE 15H34 BT 5 NIA NIA NIA NIA NIA NIA BT 1 TD63 A , NONE 1, NONE NIA 1, NONE 1, NONE 15H35 BT 5 TD109 A, NONE 1, NONE NIA 1, NONE 2, NONE BT 1 TD99 A , NONE 1, NONE A, NONE 1, NONE 1, NONE 15H37 BT 5 TE37 A, NONE 1, NONE A , NONE 1, NONE 2, NONE BT 2 TP2472 A, NONE 1, NONE NIA 1, NONE 2, NONE 62H22 BT6 NIA NIA NIA NIA NIA NIA BT 2 TP2425 A, NONE 1, NONE NIA 1, NONE 1, NONE 62H28 BT 6 TP2928 A, NONE 2, NONE NIA 1, NONE 2, NONE BT 2 TP340 A, NONE 1, NONE NIA 1, NONE 1, NONE 62H82 BT6 TP2218 A, NONE 1, NONE NIA 1, NONE 2, NONE BT4 TP2481 A, NONE 1, NONE N/A 1, NONE 2, NONE 64H17 BT6 TP3141 A, NONE 1, NONE N/A 1, NONE 1, NONE Corrosion Level: Exa mple : 1, NONE A - Bright, Uniform in colo r 1 - No visible corrosion B - Partial loss of color 2 - Visible Oxidation; no pitting INDICATES CORROSION __t L INDICATES #OF C - Major loss of color 3 - 0.000" < pitting :s 0 .003" LEVEL CRACKS
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. O Page 36 of 64 DOCUMENT NUMBER: REP-1130-510 REVISION : 0 PAGE: 25 DOCUMENT TITLE: FINAL REPORT FOR THE 45"' YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TU RKEY POINT DATE: 06/19/17 Table 4-15: SQ 8.0 - Anchorage Corrosion Condition - Unit 4 Vertical Scope Tendons CORROSION LEVEL I CRACKS TENDON END ANCHOR BUTTON l.D. HEADS ANCHOR WIRES SHIMS BEARING HEAD PLATE DOME TP3111 A, NONE 2, NONE N/A 1, NONE 1, NONE 23V08 GALLERY TP2432 B, NONE 2, NONE N/A 1, NONE 1, NONE DOME TP3281 A , NONE 1, NONE A, NONE 1, NONE 1, NONE 34V05 GALLERY TP2308 A, NONE 1, NONE A , NONE 1, NONE 1, NONE DOME TP2058 A , NONE 2, NONE N/A 1, NONE 1, NONE 45V10 GALLERY TP2543 A, NONE 1, NONE N/A 1, NONE 1, NONE DOME TD105 A , NONE 1, NONE A , NONE 1, NONE 1, NONE 56V29 GALLERY TP2406 A, NONE 1, NONE A , NONE 1, NONE 1, NONE DOME TD111 A, NONE 1, NONE N/A 1, NONE 1, NONE 61V30 GALLERY TP2383 A, NONE 1, NONE N/A 1, NONE 1, NONE Corrosi on Level : Example : 1, NONE A - Bright, Uniform in color 1 - No vis ible corrosion B - Partia l loss of color 2 - Visible O xidation; no pitting INDICATES CORROSION _..t L INDICATES #OF C - Major loss of color 3 - 0.000" < pitting :s 0.003" LEVEL CRACKS
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 37 of 64 DOCUMENT NUMBER: REP-1130-51 0
~~~~~~~~~~~~~~~~
REVISION : 0 PAGE: 26 DOCUMENT TITLE : FINAL REPORT FOR THE 45"' YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 4.5 SQ 8.3 - BEARING PLATE CONCRETE INSPECTION 4.5.1 A more detailed visual inspection of the concrete surrounding the tendon anchorages within the 24" perimeter of the bearing plate was performed per PSC Procedure SQ 8.3. The purpose of this inspection is to detect any cracks in the concrete greater than 0.010" in width .
4.5.2 According to ASME ,Section XI , Subsection IWL-3221 .3(d), "[t]he condition of tendon anchorage areas is acceptable if.. . cracks in the concrete adjacent to the bearing plates do not exceed 0.01 in .
(0 .3 mm) in width ."
)> No cracks wider than 0.01 O" within the 24" perimeter of the concrete surrounding each inspected bearing plate were detected.
4.5.3 Inspection results are contained in SQ 8.3 data sheets of Appendix A and are summarized in Table 4-16 through Table 4-18. In Table 4-16 through Table 4-18 , "NIA" means that the excessive crack dimensions did not apply ; "C.N.L." means that the bearing plate l.D. number could not be located.
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. O Page 38 of 64 DOCUMENT NUMBER: _
R~E~
P--1~1_30~-~51~0_ _ _ _ _ _ _ _ _ _ _ _ REVISION : 0 PAGE: 27 DOCUMENT TITLE : FINAL REPORT FOR THE 45'" YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45rH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06119117 Table 4-16: SQ 8.3- Concrete Inspection - Unit 3 Scope Tendons CRACKS WITH WIDTHS > 0.01 O" BEARING TENDON END PLATE ID MAXIMUM MAXIMUM
. . QUANTITY LENGTH (IN) WIDTH (IN)
NW PC13 0 NIA NIA 1D52 NE C.N.L. 0 NIA NIA s C.N.L. 0 NIA NIA 2002 E C.N.L. 0 NIA NIA NE PC13 0 NIA NIA 2D13 SW PC13 0 NIA NIA NW PC13 0 NIA NIA 3008 SW C.N.L. 0 NIA NIA BT 1 C.N.L. 0 NIA NIA 13H11 BT 3 C.N.L. 0 NIA NIA BT 1 C.N.L. 0 NIA NIA 15H18 BT5 C.N.L. 0 NIA NIA BT 2 C.N.L. 0 NIA NIA 42H10 BT 4 C.N.L. 0 NIA NIA BT2 C.N.L. 0 NIA NIA 62H44 BT6 C.N.L. 0 NIA NIA BT2 C.N.L. 0 NIA NIA 62H57 BT6 C.N.L. 0 NIA NIA BT2 PC14 0 NIA NIA 62H83 BT6 C.N.L. 0 NIA NIA BT4 C.N.L. 0 NIA NIA 64H72 BT6 C.N.L. 0 NIA NIA DOME C.N.L. 0 NIA NIA 12V11 GALLERY C.N.L. 0 NIA NIA DOME C.N.L. 0 NIA NIA 12V14 GALLERY C.N.L. 0 NIA NIA DOME C.N.L. 0 NIA NIA 12V22 GALLERY C.N.L. 0 NIA NIA DOME PC13 0 NIA NIA 34V23 GALLERY C.N.L. 0 NIA NIA DOME C.N.L. 0 NIA NIA 45V01 GALLERY C.N.L. 0 NIA NIA
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 39 of 64 DOCUMENT NUMBER: _R_E_P_-1_13_0_-5_1_0_ _ _ __ _ _ _ _ _ _ _ REVISION : 0 PAGE: 28 DOCUMENT TITLE: FINAL REPORT FOR THE 45'" YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TU RKEY POINT DATE: 06119117 Table 4-17: SQ 8.3 - Concrete Inspection - Unit 4 Dome & Hoop Scope Tendons CRACKS WITH WIDTHS> 0.010" BEARING TENDON END PLATE l.D. QUANTITY MAXIMUM MAXIMUM LENGTH (IN) WIDTH (IN)
NW PC25 0 NIA NIA 1D30 SE PC25 0 NIA NIA NW C.N.L. 0 NIA NIA 1045 E C.N.L. 0 NIA NIA N C.N.L. 0 NIA NIA 3D20 SW PC25 0 NIA NIA NE C.N.L. 0 NIA NIA 3D32 s C.N.L. 0 NIA NIA BT 1 C.N.L. 0 NIA NIA 13H12 BT3 NIA NIA NIA NIA BT 1 C.N.L. 0 NIA NIA 13H16 BT3 C.N.L. 0 NIA NIA BT 1 C.N.L. 0 NIA NIA 15H12 BT 5 C.N.L. 0 NIA NIA BT 1 C.N.L. 0 N/A NIA 15H34 BT 5 NIA NIA NIA NIA BT 1 C.N.L. 0 NIA NIA 15H35 BT 5 C.N.L. 0 NIA NIA BT 1 PC13 0 NIA NIA 15H37 BT 5 C.N.L. 0 NIA NIA BT 2 C.N.L. 0 NIA NIA 62H22 BT6 NIA NIA NIA NIA BT 2 C.N.L. 0 NIA NIA 62H28 BT6 C.N.L. 0 NIA NIA BT2 C.N.L. 0 NIA NIA 62H82 BT6 C.N.L. 0 NIA NIA BT4 C.N.L. 0 NIA NIA 64H17 BT6 C.N.L. 0 NIA NIA
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 40 of 64 DOCUMENT NUMBER: RE P-1130-510
~~~~~~~~~~~~~~~~
REVIS ION : 0 PAG E: 29 DOCUMENT TITLE: FI NAL REPORT FOR THE 45th YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45rH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE : 06119117 Table 4-18: SQ 8.3 - Concrete Inspection - Unit 4 Vertical Scope Tendons CRACKS WITH WIDTHS> 0.010" BEARING TENDON END PLATE l.D. MAXIMUM MAXIMUM QUANTITY LENGTH (IN) WIDTH (IN)
DOME PC2-
- 0 NIA NIA 23V08 GALLERY C.N.L. 0 NIA NIA DOME C.N.L. 0 NIA NIA 34V05 GALLERY C.N.L. 0 NIA NIA DOM E C.N.L. 0 NIA NIA 45V10 GALLERY C.N.L. 0 NIA NIA DOM E C.N.L. 0 NIA NIA 56V29 GALLERY C.N.L. 0 NIA NIA DOME AF104 0 NIA NIA 61V30 GALLERY C.N.L. 0 NIA NIA
- Illegi ble fourth character; written "PC2(?)" on data sheet.
Attachment 2 EC288647 Rev. 0 Eng ineering Evaluation : PTN-ENG-SESJ-17-004 Rev. O Page 41 of 64 DOCUMENT NUMBER: -'-R-"'E"-P-'-1--'-1"'30'--5'--'1-=-0_ _ _ _ _ _ _ _ _ _ __ REVISION: 0 PAGE: 30 DOCUMENT TITLE : FINAL RE PORT FOR THE 45t* YEAR TENDON SURVEI LLAN CE AT TURKEY POINT PROJE CT TITLE: 45TH YR U3 & U4 TEN DO N SURVEILLAN CE AT TURKEY POI NT DATE: 06/19/17 5.0 HYDRAULIC JACK CALIBRATIONS Precision Surveilla nce Corporation has developed a program for calibrating hydrau lic jacks utilizing regression analysis. This is a process where a straight line is mathematically best fit to a set of data points (in th is case , force versus the gauge pressure). This results in a linear equation which relates the ram area (slope) and the constant (y-intercept) for each jack calibration , allowing the conversion of pressure to force and vice versa .
5.1 A before and after comparison of the stressing rams used during the surveillance was performed .
- .. Hydraulic jacks 9191 and 9194 are undergoing maintenance and have not completed the post-job calibration . The pre-job and post-job comparisons for these jacks are pending and will be included in the next revision of this report.
- .. The comparison of the remaining jacks revealed a rang e of variations from 0.198% to 0.378%,
indicating that all jacks remained in a properly calibrated status throughout the surveillance .
Acceptab le variation is +/-1 .5%.
5.2 Complete calibration data for the hydrau lic jacks used during the tendon surveillance is contained in Appendix D and is summarized in Table 5-1.
5.3 The force exerted by a jack is calculated from the equation below:
Force = Area
- P*ressure/1 000 + Constant (kips) (psi) (kips) 5.4 The hyd raulic jack force variation percentage before and after surveillance is calcu lated from the equation below:
Variation % = [ ( Finit ial - Ftinal ) I F initial ] X 100%
BEFORE SURVEILLANCE AFTER SURVEILLANCE w 0:: ~
- > ~
I- I-u:
(/)
(/) :=-
z z Li: z 0 JACK l.D. w I-1 <-
I- ig_
u.i Ci) w I-1 <-
I- ig_ u.i Ci) w"'
0:: a. j:::
w (/)
z:. *- 0 .9-0:: ::t:. < <
w (/)
z:. *- 0 .9-0:: ::t:.
- a. -
x ii:
0 0:: 0 o- 0 0:: 0 o- < <
< 0 IJ.. < 0 IJ..
- a >
9191 12/13/16 120.712 -1.122 904 .22 Calibration Results Pendi ng 7500 9192 12/14/16 120.104 1.907 902.69 05/04/17 118.889 7.6 10 899.28 7500 0. 378 9193 12/13/16 120.273 4.174 906 .22 04/28/ 17 120.620 5.864 910.51 7500 0.474 9194 12/14/16 120.542 -1.764 902.30 Calibration Results Pending 7500 9305 01 /04/17 104.100 -0.716 884 .13 04/28/17 103.436 3.175 882.38 8500 0.198
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 42 of 64 DOCUMENT NUMBER: _R_E_P_-1_13_0_-5_1_0_ _ _ _ _ _ _ _ _ __ _ REVISIO N: 0 PAGE 31 DOCUMENT TITLE : FINAL REPORT FOR TH E 45th YEA R TENDON SURVEILLANC E AT TURKEY POINT PROJECT TITLE : 45TH Y R U3 & U4 TENDON SURVEILLANCE AT T URKEY POI NT DATE: 06/19/17 6.0 MONITOR TENDON FORCE 6.1 The process of tendon force monitoring follows the calibration of hydraulic stressing rams and consists of two (2) main processes . First, measurements are taken of the anchorage threads in order to assign an appropriate stressing adaptor to each physically inspected tendon . Second , lift-offs are performed on the physically inspected tendons , and the measurements are recorded .
6.2 SQ 9.0 - TENDON LIFT-OFF FORCES Lift-off is defined as the jacking force required for transferring the load on a tendon from the shim stack to the stressing ram, and is representative of the force held by that tendon . A lift-off is performed on each physical surveillance tendon in order to monitor the force exerted by the tendon onto the containment structure. Obtaining lift-off force measurements for inspected tendons was done in accordance with IWL-2522 and PSC Procedure SQ 9.0.
6.2.1 According to ASME ,Section XI , Subsection IWL-3221 .1(a) , "[t]endon forces ... are acceptable if...
[t]he average of all measured tendon forces , including those measured in IWL-3221 .1(b)(2), for each type of tendon is equal to or greater than the minimum requ ired prestress specified at the anchorage for that type of tendon ."
Jo>- The average lift-off value of each type of tendon (Domes , Hoops, Verticals) , including tendons from IWL-3221 .1(b)(2), exceeded the minimum required group average prestress value for that type of tendon .
6.2.2 According to ASME ,Section XI , Subsection IWL-3221 .1(b) , "[t]endon forces ... are acceptable if...
[t]he measured force in each tendon is not less than 95% of the predicted force ... "
Jo>- The lift-off force measured in all tendons exceeded the 95% of the predicted force lift-off value fo r the 45th Year Surveillance period.
6.2.3 Because all tendons had an average lift-off greater than 95% of the tendon's respective predicted lift-off value , the conditional items in section IWL-3221 .1(b) do not apply.
6.2.4 Lift-off force measurements are contained in SQ 9.0 data sheets of Appendix A and are summarized in Table 6-1 through Table 6-3. In Table 6-1 through Table 6-3, "N/A" means that the tendon was not stressed at that end .
6.2.5 Upon completion of the lift-off, a visual verification was performed to identify any changes in the condition of the tendon end.
Ji>- No protruding or broken wires or damage to any anchorage components was noted during or immediately following the lift-offs.
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. O Page 43 of 64 DOCUMENT NUMBER: _R_E~P_-1_1_30_-_51_0_ _ __ _ __ _ _ _ _ _ REVISION : 0 PAGE: 32 DOCUMENT TITLE : FINAL REPORT FOR THE 45th YEAR TENDON SURVE ILLANCE AT TURKEY POINT PROJECT TITLE : 45rH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17
.. II . I ** ... **
(/)
w z
~- a:: <ii c.
<ii <ii c.
<ii c.
?;.
z () c: § g w.9- <ii w 0
0 0
<==-
I- I- w :i u.
(!) : .
<( u.
c.
- i
- i :i ..J al 2 (/) :c > ~ u. a:: u. LL u.
z w :ii: (!) ~ ()
0 WQ u.: 0.: 0..:
<(
I-w - iij () <( >* a.
I- i-!- <(I- 0.: 0~ ~
w
~:c
"")
w u. LL in 0
0
- u. :::::i :::::i en en ()
LL ()
w <(
BT 2 2.30 90 9192 602.4 62H44 595 .7 533.3 506 .7 480 y BT6 2.125 90 9194 588 .9 BT 2 3.50 90 9192 631.3 62H57 619.7 530.7 504 .2 477. 6 y BT6 1.75 90 9194 608 .2 DOME 5.70 90 9192 727 .3 12V11 724.5 617.1 586.3 555 .4 y GALLERY 1.75 90 9305 721 .7 DOME 6.80 90 9192 729 .73 12V14 729.73 617 .2 586.4 555 .5 y GALLERY N/A NIA N/A N/A
.. - II . I ** Io .. - **
(/)
w z
~-=- a:: <ii
- c. w.9-
<ii <ii c.
<ii c.
?;.
z () c: § g <ii w 0 0
<( :.=.
w :i (!) : .
g
- c. :i :i
~ lt I- I- al 0
z 2 (/) :c ;;:::: ~
LL LL u.: u.: <(
w :ii:(.!) I-()
0 WQ u.: 0.: 0..: I-w () <( >* a.
I- - iij i-!- <(I- 0..: ~ ~ w
~:c w "")
- u. u. 0 in 0
0 ()
LL ::i ::i en en ()
w <(
NW 2.25 90 9194 593.71 1030 598.07 559.36 531 .40 503.43 YES SE 2.30 90 9192 602.42 NW 2.25 90 9194 622.64 1045 617.33 591 .63 562.04 532.46 YES E 2.30 90 9192 612 .03 N 2.75 90 9194 629 .88 3020 629 .37 571.44 542 .87 514 .29 YES SW 2.5 90 9192 628 .85 NE 2.60 90 9194 610 .58 3032 610 .10 566 .90 538 .55 510 .21 YES s 2.60 90 9192 609 .63
Attach ment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-E NG-SESJ-17-004 Rev. 0 Page 44 of 64 DOC UMENT NUMBER: REP-1130-510 REVIS ION: 0 PAGE: 33 DOCUMENT TITLE: FINAL REPORT FOR THE 45th YEAR TENDO N SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06119117
- I .. I I I I 0 I 0 I
- I I
(/)
w enc. en z
~-=- a:: w .9-enc. enc. E.
z u c:
< ::. § 9 :.;;: (!) : .
enc. ~ :.;;: w 0 c w < :.;;:
..J u.
a:: u. u:
0 I- I- al z z (/) ::c > ~ u. u. u. <
w w 2 (!) j:: u 0 wo u: a.: a.: I-I- -w
~::c u
w
"") t.!-
u.
< I-u. a.: :::S!
0 :::S!
0 a.
w
- u. :::i :::i II)
(J) 0 (J) u
- u. u w <
BT 1 NIA NIA NIA NIA 13H12 NIA NIA NIA NIA NIA BT 3 NIA NIA NIA NIA BT 1 3.15 90 9192 588 .01 13H16 593.45 559 .57 531.59 503.61 YES BT 3 2.75 90 9305 598 .90 BT 1 2.25 90 9192 609.6 15H12 588.63 548.51 521 .08 493 .66 YES BT 5 2.5 89 9305 567 .67 BT 1 NIA NIA NIA NIA 15H34 N/A NIA NIA NIA NIA BT 5 NIA NIA NIA NIA BT 1 2.90 90 9192 597 .62 15H35 61 5.96 532.08 505.47 478.87 YES BT 5 2.75 90 9305 634.29 BT 1 2.625 90 91 92 604.83 15H37 601 .865 530.54 504.01 477.48 YES BT5 2.5 90 9305 598 .9 BT2 NIA NIA NIA NIA 62H22 NIA NIA NIA NIA NIA BT 6 NIA NIA NIA NIA BT2 2.25 90 91 92 576.00 62H28 570.79 547.24 519.88 492.52 YES BT6 2.50 90 9305 565 .58 BT 2 2.50 90 9192 626.44 62H82 630.36 579.21 550.25 521 .29 YES BT6 2.25 90 9305 634.29 BT4 2.125 90 9305 561.42 64H17 568.70 547 .48 520 .11 492 .73 YES BT6 3.25 90 9305 575.99 DOME 3.25 90 9192 657 .67 23V08 657 .67 629.26 597 .80 566 .33 YES GALLERY NIA N/A N/A N/A DOME 2.70 90 9193 622.37 34V05 622.37 623.85 592.66 501 .47 YES GALLERY NIA NIA NIA NIA DOME 2.125 90 91 91 641 .06 45V10 639 .76 630.74 599 .20 567.67 YES GALLERY 1.75 90 9305 638.46 DOME 4.75 88 9191 730.39 56V29 730.39 641 .11 609.05 577.00 YES GALLERY NIA NIA NIA NIA DOME 3.50 90 9192 712 .92 61V30 712 .92 622.43 591 .31 560.19 YES GALLERY N/A NIA NIA NIA
Attachment 2 EC288647 Rev. O Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 45 of 64 DOCUMENT NUMBER: REP-1130-510
~~~~~~~~~~~~~~~~
REVISION : 0 PAGE: 34 DOCUMENT TITLE: FINAL REPORT FOR THE 45'" YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT T URKEY POINT DATE: 06/19/17 7.0 COMPARISON WITH ORIGINAL INSTALLATION DATA 7.1 In an effort to detect evidence of abnormal system degradation , a comparison of the "as-found" lift-off force levels during the 45th Year Surveillance was made to the lock-off forces found during each tendon's installation . The lift-off forces are compared in order to detect any abnormal force loss that would possibly indicate an underestimation of the creep , shrinkage , and/or elastic shortening effects in the containment building.
)> Based on the comparison results , tendon force losses are within the anticipated range , and no abnormal lift-off force loss averaged over surveillance tendons from each group is noted .
7.2 Tendon lock-off forces for each tendon were obta ined from the Unit 3 and Unit 4 installation cards, either at original installation or during RVCH project for the respective tendons .
7.3 Lift-off force values for all inspected tendons are contained in SQ 9.0 data sheets of Appendix A. Force comparison data and force losses are summarized in Table 7-1 through Table 7-3.
7.4 Force loss percentage is calculated from the equation below, where Fl..OCMIFF represents the tendon lock-off force at original installation or restressing, and fLFT-<lFF represents the tendon as-found lift-off force during the surveillance.
7.5 Comparison results provided in this section are for information only. There are no established acceptance criteria for percentage of stressing loss. The losses appear to be as expected when compared to other containments of this style and age.
Table 7-1: Comparison with Installation Data - Unit 3 RVCH Tendons AVG. LIFT-OFF FORCE LOSS GROUP TENDON @10 LOSS(%) AVERAGE R/R (kips)
YEARS LOSS(%)
(kips) (kips) 62H44 628.8 595.7 33.10 5.26 3.11 62H57 625.7 619 .7 6.00 0.96 12V11 746.6 724 .5 2.96 2.96 2.62 12V14 746.7 729.73 2.27 2.27
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 46 of 64 DOCUMENT NUMBER: REP-1130-510
~~~~~~~~~~~~~~~~
REVISION: 0 PAGE: 35 DOCUMENT TITLE : FINAL REPORT FOR T HE 451" YEAR TENDON SURVEILLANCE AT TU RKEY POINT PROJ ECT TITLE : 45TH Y R U3 & U4 TEN DON SURVEI LLANCE AT TURKEY POINT DATE: 06/19/17 Table 7-2: Comparison with Installation Data - Unit 4 Original Installation Tendons AVG. LIFT-OFF FORCE GROUP TENDON ORIGINAL @ 45 L(k'?SS) LOSS(%) AVERAGE
. ) YEARS ips LOSS(%)
(k ips (kips) 1D30 786.0 598 .07 192.93 24.55 1045 780.0 617 .33 162.67 20.86 21.78 3D20 786.0 629 .37 156.63 19.93 3D32 780. 0 610. 10 169.90 21 .78 13H16 774.0 593.45 180.55 23.33 15H12 757.2 588 .63 168.57 22.26 62H28 777.0 570.79 206.21 26.54 23.68 62H82 780.0 630.36 149.64 19.18 64H17 780.0 568.70 211 .30 27.09 23V08 774.0 657.67 116.33 15.03 34V05 780.0 622.37 157.63 20.21 17.74 45V10 780 .0 639.76 140.24 17.98 Table 7-3: Comparison with Installation Data - Unit 4 RVCH Tendons AVG. LIFT-OFF FORCE GROUP TENDON RJR @ 10 L(k'?SS) LOSS(%) AVERAGE
. ) YEARS ips LOSS (%)
(k ips (kips) 15H35 626 .8 615.96 10.84 1.73 2.72 15H37 625. 0 601 .865 23.14 3.70 56V29 757 .6 730.39 27.21 3.59 4.41 61V30 752 .3 712.92 39.38 5.23
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 47 of 64 DOCUMENT NUMBER: -'-R=E""-P--'-1-'-13'-'0---5'-'1-'-0_ _ _ __ __ _ _ _ _ _ REVISION : 0 PAGE : 36 DOCUMENT TITLE FINAL REPORT FOR THE 45'" YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE : 06/19/17 8.0 TENDON WIRE VISUAL INSPECTION AND TENSILE TESTING 8.1 One sample test wire was removed from each detensioned tendon per PSC Surveillance Procedure SQ 10.2. The tendon wires were sent to Exova testing laboratory. Each wire segment was inspected for corrosion , yield strength , ultimate tensile strength, and percent elongation in accordance with IWL-2523.2.
Wire testing was done per ASTM A421 for the yield strength and per ASTM A370-09a for the elongation .
8.2 According to ASME,Section XI, Subsection IWL-3221 .2(a) , "[t]he condition of wire or strand samples is acceptable if... samples are free of physical damage. "
~ All wire samples , selected for testing per IWL-2523.1, had acceptable corrosion level of "A" and were free of physical damage.
8.3 According to ASME ,Section XI , Subsection IWL-3221 .2(b) , "[t]he condition of wire or strand samples is acceptable if ... sample ultimate tensile strength and elongation are not less than minimum specified values ."
~ ULTl MATE TENSILE STRENGTH - The ultimate tensile strength for all wire samples exceeded the minimum specified value of 240 ksi. The lowest recorded ultimate tensile strength was 271 .5 ksi .
~ ELONGATION - The percent elongation at sample failure was at or above the required minimum of 4.0% for all samples tested . The recorded elongation values on the samples varied from 4.3% to 6.8%.
8.4 Wire diameter and yield strength test results were as follows :
~ WIRE DIAMETER - All tendon wire sample diameter measurements were within the acceptable range of 0.250" +/- 0.002".
~ YIELD STRENGTH - The yield strength for all wire samples exceeded the min imum of 204 ksi. The lowest recorded yield strength was 216.1 ksi .
8.5 Wire test results data are contained in Appendix C and summarized in Table 8-1 and Table 8-2.
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. O Page 48 of 64 DOCUMENT NUMBER: REP-11 30-510
~~~~~~~~~~~~~~~~-
REVISION : 0 PAGE: 37 DOCUMENT TITLE : FINAL REPORT FOR THE 45th YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE 06/19/17
... II II .. **
0::
w m
- a; z
0 j::
<(
..J w
w g
- x::
I-(!)
z w "iii
.¥
-~
~
z z
- > u
..J z 0:: W- I- -
<( ::x:: 0 ~
z o~
0 w 0:: ...: :a: I- j:: I-TENDON ..J .i:: I- I- c..
w
..J w- iii 0
w (/) :.
I/)
- (!)
1-Z w
<(
(!) w u
c.. ..J :a!: 0 ..J z
- iE c.. 0:: <( ..J ::> 0:: 0 u
<(
- a; 0:: i5 w I- ..J <(
(/) <( 0 >= (/) w IJ) u 10-20 A 0.2500 242.4 269.0 6.8 YES 62H44 2 60-70 A 0.2500 242.4 269.5 6.0 YES 3 120-130 A 0.2500 244.7 269.5 6.4 YES 20-30 A 0.2500 230.3 253.8 4.8 YES 12V11 2 80-90 A 0.2500 229.5 253.1 4 .2 YES 3 140-150 A 0.2500 228.7 253.6 5.0 YES
.. II II **
0::
w m
z 0
j::
<(
..J w
w -~ ::x::
I-(!)
zw_ w-¥
'iii
-~
z z
- iE
- > u
..J z 0::
1--
<( ::x:: 0 ~
z o~
0 w 0:: ...: :a: I- j:: I-TENDON w ..J .i:: I- I- I/)
- (!) <( c..
..J w- iii w IJ) : . I- zw (!) w c.. ..J 0 :iE 0 ..J z u
- iE c.. 0:: <( ..J ::> 0:: 0 u
<( :a: 0:: i5 w I- ..J <(
IJ) <( 0 >= IJ) w IJ) u 20-30 A 0.2500 222.8 251 .2 5.0 YES 1045 2 60-70 A 0.2500 220.3 250.8 5.0 YES 3 90-100 A 0.2500 217.9 248.3 5.5 YES 10-20 A 0.2500 218.2 248.4 6.0 YES 13H16 2 60-70 A 0.2500 2 17.0 248.0 5.0 YES 3 120-130 A 0.2500 216.1 246.6 6.0 YES 20-30 A 0.2500 238.9 270.8 6.5 YES 15H37 2 70-80 A 0.2500 238.4 271 .5 6.5 YES 3 110-120 A 0.2500 240.5 270.4 6.5 YES 20-30 A 0.2500 221.4 221 .6 6.0 YES 34V05 2 80-90 A 0.2500 222.5 251.4 6.0 YES 3 140-150 A 0.2500 223.0 251 .1 5.5 YES 20-30 A 0.2500 223.5 247.8 4.0 YES 56V29 2 80-90 A 0.2500 219.8 246.3 4.5 YES 3 140-150 A 0.2500 218.0 247.5 4 .0 YES
Attachment 2 EC288647 Rev. O Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 49 of 64 DOCUMENT NUMBER: -'-R=E'- P--'-1-'-
13""0-'-5'-'1"'"
0 _ _ _ _ _ _ _ _ __ _ _ REVISION : 0 PAGE : 38 DOCUMENT TITLE : FINAL REPORT FOR THE 45th YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45rH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE : 06/ 19/ 17 9.0 TENDON RETENSIONING 9.1 The tendons that were detensioned for test wire removal and tendons whose lift-off force values were below the specified limit were subsequently retensioned per PSC Surveillance Procedure SQ 11 .0 and in accordance with IWL-3220, in order to restore them to an acceptable working force . In the process of retensioning , observations were recorded on tendon lock-off forces , tendon wire elongations , and the post-retensioning condition of tendon wires and button heads.
9.2 SQ 11 .0 - TENDON LOCK-OFF FORCES 9.2.1 According to PSC Procedure SQ 11 .0 (Ref. 7, Sec. 9.9.3) , for tendons whose lift-off force value during the surveillance is greater than or equal to the predicted lift-off value for that surveillance, the lock-off force shall be within -0/+6% of the as-found lift-off force.
- .. Unit 4 vertical tendon 56V29 had an average as-found lift-off value greater than 70% of the minimum ultimate tensile strength. Per PSC Procedure SQ 11 .0, Section 9.9.3 and Data Sheet SQ11.0, the target restressing lock-off force was within 67% to 70% of the minimum ultimate tensile strength, instead of -0/+6% of the as-found lift-off force .
- .. The as-found lift-off forces for all other tendons exceeded their respective specified limits for all tendons designated for de/retensioning due to wire removal and were restored to acceptable force levels.
9.2.2 For any tendon whose lift-off force value during the surveillance is less than the predicted lift-off value for that surveillance , retensioning is required per PSC Procedure SQ 9.0 (Ref. 7, Sec. 10.5) ,
and the lock-off force shall be within -0/+6% of the predicted lift-off force of that tendon.
- .. Unit 4 vertical tendon 34V05 had a lift-off value less than its predicted lift-off value . After removal of the test wire and during retensioning , the tendon was restored to an acceptable force level.
9.2.3 According to ASME ,Section XI, Subsection IWL-2523.3(a) , " [~endons that have been detensioned shall be re tensioned to at least the force predicted for the tendon at the time of the test. However, the tendon force after retensioning shall not exceed 70% of the specified minimum ultimate tensile strength of the tendon based on the number of effective wires or strands in the tendon at the time of retensioning."
- .. The lock-off force values of all retensioned tendons were within acceptable levels, and the lock-off force values were less than their respective maximum specified value of 70% of the minimum ultimate tensile strength.
9.2.4 As-found lift-off and as-left lock-off force values are contained in SQ 9.0 and SQ 11.0 data sheets of Appendix A, respectively. Predicted lift-off force values for each tendon of the surveillance scope are summarized in Table 2-1 and Table 2-2 of the PSC Surveillance Procedure SQ 9.1 .
9.2 .5 Comparison of tendon lock-off force to the applicable (as-found I predicted) lift-off force variation percent interval is summarized in Table 9-1 and Table 9-2. In Table 9-1 and Table 9-2, "N/A" means that the tendon was not stressed on that end .
9.2.6 Measured variation percentage for the retensioning force is calculated from the equation below, where F~ represents the tendon lock-off force after retensioning , and FLFT.oFF represents (a) the tendon as-found lift-off force in case of tendons whose as-found lift-off force values exceeded their predicted lift-off force values , and (b) the tendon predicted lift-off force otherwise.
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 50 of 64 DOCUMENT NUMBER: REP-1 130-510 REVISION: 0 PAGE : 39 DOCUMENT TITLE: FINAL REPORT FOR THE 45th YEAR TENDON SURVE ILLANCE AT TURKEY POINT PROJECT TITLE : 45TH Y R U3 & U4 TENDON SURVEI LLANCE AT TURKEY POINT DATE: 06/19/17
. .. . II **
OBSERVED AS-FOUND LIFT-OFF RETENSIONING ELONGATION (OS 9.0) (OS 11.0) z -10 z ~
~
0~ z 0 c <( i= z u.. w u.. w z E c ~<(~ 0 u.. 0 I-z z (!) (!) *- :::c ...J i= ~ 0u.. -I/) (!)
<( -I/) ~ o- (!) -I/) i= 0..
w -z- <( <( w a::: .e- a::: .e-
<( <(
w r:i::o (.)
I-C2
(.)
' c. (.) '
~.e-I/)
u I- 0-1 <(
0 <(
I-*- w.:.:: <(
-, w.:o:: C2 u w w I- <( u..:::. >-
(.).:0::
o- >- <( <(
> :J <( ...J <( >
BT 2 4.15 9192 602.4 9 192 628.84 62H44 7.55 7.85 +3.97 595.7 628 .85 +5.56 YES BT 6 3.7 9194 588 .9 9 194 627 .47 DOME 6.05 9192 727. 3 9 192 732.13 12V11 9.80 9.80 0 724.5 729 .53 +0.69 YES GALLE RY 3.75 9305 72 1.7 9305 726.94
..... II . **
OBSERVED AS-FOUND LIFT-OFF RETENSIONING ELONGATION (OS 9.0) (OS 11.0) z -10 z ~
0 ~
~ z 0 c <( i= z u.. w u.. w z E c ~<(~ 0 u.. 0 I-z z (!) (!) *- :::c ...J i= ~ 0u.. -I/) (!) - ~ o- (!) - i= 0..
w -z- <( <( I/) <( I/) w a::: .e- a::: .e-
<( <(
w a:: 0 (.)
<(
I-C2
(.)
<( ' c.
I-*-
(.)
<(
~.e-I/)
C2 u I- 0-1 w 0 -, u.. :::. w.:.:: -, (.).:0:: w.:o:: u w I- <(
> :J >-
<(
o-
...J
<( >
<(
<(
NW 2.90 9194 622 .64 919 1 653 .14 1045 7.00* 6.60 -5.71 617.33 65 1.80 +5.58 YES E 3.70 9192 6 12.03 9192 650.46 BT 1 4.10 9192 588 .01 9 192 626.44 13H16 8.20* 7.80 -4.87 593.45 627.24 +5 .69 YES BT 3 3.70 9305 598.90 9305 628 .05 BT 1 3.9 9192 604.83 9192 624.05 15H37 7.60 7.75 +1 .97 601.865 629.17 +4 .54 Y ES BT 5 3.85 9305 598.9 9305 634 .29 DOME 9.00 9 193 622 .37 9 193 651 .24 34V05 8.45* 9.00 +6.5 622 .37 651.24 +4.64 YES GALLERY N/A N/A N/A N/A N/A DOME 9.90 9 191 730.39 919 1 708 .66 56V29 10.125 9.90 -2.20 730.39 708 .66 -2.98** YES**
GALLERY N/A N/A N/A N/A N/A
- Reduced from insta llation va lue, based on anchorhead limitations. See Section 9.3.1.
- Retension target based on a maxi mum of 70% GUTS. See Section 9.2.1 .
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 51 of 64 DOCUMENT NUMBER: _R_E_P_-1_13_0_- 5_10__ _ _ _ _ __ _ __ _ _ REVISION : 0 PAGE: 40 DOCUMENT TITLE: FINAL REPORT FOR THE 45th YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEI LLANCE AT TURKEY POINT DATE: 06/19/17 9.3 SQ 11 .0 - TENDON WIRE ELONGATIONS 9.3.1 According to ASME ,Section XI , Subsection IWL-3221 .1(d) , " [~endon forces and elongation are acceptable if. .. [t]he measured tendon elongation varies from the last measurement, adjusted for effective wires or strands, by less than 10%."
l'> After thread strength verifications of Unit 4 tendons 1D45, 13H 16, and 34V05, it was determined the threads strength would be insufficient to achieve Overstress at 80% of the tendon capacity . The overstress force of tendons 1D45, 13H 16, and 34V05 was calculated at 70% of the Guaranteed Ultimate Tensile Strength (GUTS). The recalculation of the overstress data is addressed in Field Change Requests FCR-N1130-002, FCR-N1130-003 , and FCR-N1130-004.
l'> Based on the thread measurements on Unit 4 vertical tendon 34V05, it was determined the threads maximum capacity of 689 kips , which is less than 70% of GUTS (742 kips) . This was evaluated by FPL Engineering, and maximum overstress value for 34V05 was reduced to 689 kips (approximately 65% GUTS) . The corresponding elongation at that overstress force was calculated and included in FCR-N1130-005.
l'> The elongation values observed at 1D45, 13H16, and 34V05 were acceptable when compared to the factored original elongation value .
l'> All other elongation values recorded during the retensioning of tendons were compared to elongation values recorded at the time of last measurement (which was in this case the time of original installation). The variation percentage between respective elongation values was found to be acceptable for all retensioned tendons.
9.3.2 Elongation values for de/retensioned tendons during the 45th Year Surveillance are contained in SQ 11 .0 data sheets of Appendix A. Elongation values during the previous measurement (tendon installation) are obtained from installation stressing data, either at original installation or during the RVCH Project for the respective tendons .
9.3.3 Comparison of tendon elongation values during retensioning to elongation values during installation are summarized in Table 9-1 and Table 9-2. In Table 9-1 and Table 9-2, "N/A" means that the tendon was not stressed at that end.
9.3.4 Variation percentage for both the elongation and the retensioning force are calculated from the equation below, dL o/o, :::; [ ( L LQCK-QFF "" ltNtTlAL ) l LNHitAL 1x 1OQ,%
where l..uJac.a::Frepresents the total tendon elongation at the time of lock-off; lNMa. represents the total tendon elongation at the time of installation.
9.3.5 An ELONGATION vs. FORCE graph of each retensioned tendon is plotted to show the comparison of retensioned tendon elongation/force to its original stressing elongation/force.
9.4 SQ 11 .0 - TENDON WIRE AND BUTTON HEAD VISUAL INSPECTIONS 9.4.1 According to ASME ,Section XI , Subsection IWL-2524.1(c) , "broken wires of strands, protruding wires and deta ched buttonheads following retensioning of tendons which have been detensioned ...
shall be documented. "
l'> No broken , protruding , or detached buttonheads were recorded for any tendon due to restressing activities.
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 52 of 64 DOCUMENT NUMBER: REP-1 130-51 0 REVISION : 0 PAGE: 41 DOCUMENT TITLE : FINAL REPORT FOR THE 45"' YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE 06/19/17 ELONGATION vs. FORCE GRAPH VERTICAL TENDON U3 - 62H44
--o-- 45th year 200 400 600 800 1000 FORCE (kips)
ELONGATION vs. FORCE GRAPH VERTICAL TENDON U3 -12V11 12.0 !
I I
--o--45th year Original r *---+-l *--* *-*** -- -- ~-
10.0 -
~
rn 8.0 !
I I I I
--r-- ---
./
/ '"'
~
-¥rrt ~lJ_J_
I I
I I I I I -
z
~
0 6.0 I I 1 I I ! ! I l I I
(!)
z ! I I I
' I I i **~-l ;_ j i I
- --~-;--.+--+-
I i I I I
!i I I I
i I I I l! I 0...J w 4.0
I I I i !
I i j j
i I 1 lj II I I
I I
I I! li I
.L i I I I I
- t i I **h .....,- __L.L.___ J_J-++
I y ! I i j I I i : !
i l I !
I i i i ! i ' I I I i 2.0 I: I !i !i I / I l I ! I ! I i l ! I I
--4--~-.....1--1.- --L- ' v .,__ __!_ _ I I ***-L-.L.-+-...J..--
--*r-r-* --J~i __ J.__i-0.0 I I I i / il i l I~
I I i i lj ii I Ii 0 200 400 600 800 1000 FORCE (kips)
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. O Page 53 of 64 DOCUMENT NUMBER: REP-1130-510 REVISION : 0 PAGE: 42 DOCUMENT TITLE: FINAL REPORT FOR THE 45** YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45rH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 ELONGATION vs. FORCE GRAPH VERTICAL TENDON U4 - 1045 I
I
-<>-40th year -a- Original '
. .......-'.- - t --t---t--t--t-'fl-t --;
i
- 6. 0 +--+~+---+---+~-+--+-~+---+---+~-+--+~+--+-
i 1
--1~-r--+,,.....,+--+-~1--~
II
- - ---- -*-- -*--***r -**-
- 4. 0 +--+~+---+---!~-+--+~+---+---!~-+--+-...~-+-!--1'---i--+~+--+-~!--~
' I
. i
-..-r1-- 1 I I I
-,~~~'--!
20 +--+~t---1---+~+--+~~;.<f---fi~+--+ l ~~.~~i--ir---t--+~+--+~t--~
1---+--+--+---+--~r--+--+---ij-*--*1 i
I1 L'
i,
+. -t-iJ -il-+,i i-1 I
I l
1 I' I 1 ,
i 0 . 0 +---'-~+---a:--'~+---'-~'---'---'~+--'-~;.___;___J'--+----'-~-'--'-~'---~
0 200 400 600 800 FORCE (kips)
ELONGATION vs. FORCE GRAPH VERTICAL TENDON U4 -13H16 10.0
~
I
-<>- 45th year -a- Original j
.D 8.0 I µ>
Ui' (1) I / t?
~v
.J::.
u c
I /
z 0
6.0
/ ~
v
~
<(
(9
~
v z 4.0
-+
0_J ~
w ~ ~
- 2.0 v
v ~
/
/
0 .0 v
0 200 400 600 800 FORCE (kips)
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 54 of 64 DOCUMENT NUMBER: REP-11 30-510 REVISION : 0 PAGE: 43 DOCUMENT TITLE: FINAL REPORT FOR THE 45lh YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45rH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 ELONGATION vs. FORCE GRAPH VERTICAL TENDON U4 - 15H37 10 .0 .,--..,...-..,...!--,---,--....-..,...-..,...-.....-....-....-,-.-..l. .-....--,...1,-.,...-..,...1-...-- , . .,. .-.....-.....-.....--....--....-.....--.
- I I I
~45th year - 0riginal I i I III 8.0 +--l'--..- 1 ....-....,--..........--....-..-....-....,-"'-+--+---'1--+-+--+--+--l-!--+-+--+-+---1--i
,_..._,_I 1
~._,_-+-+-t-_,__,_t--+-_,__;1 I IT. i II I I J~ :J l ~v 60 I --+----ll-,__r--_,_. _ I I I I J?f'I I z
0 .
~---+-- .. --11-T:? ~ rt-r--l--t----i-l-+--ii--i
~ -
(.!)
z 0
! I i 1
! j l 4.0 +--+--+-1-+1--!i!--i--+1---l1!--+-+!---1-+,i-+i--!,....,,..~i--t-,!--+,--+!-~
I ! 1....1?' ! i i ! ! I
' -+--!,-+-+1---l--i I
...J w I i i ! i j I : . ' ! i I ! ! I '
I!:
1
,'** !! 1'. l I i I,.; iii i,,' !! !! ',i I II II II 2.o +-+I......,,r---+-
! ! j AV J l i ! I
,. --+,-~ 1 .#.'""+-r- 1 +, -+..,-+--
--r-1-t-r- i
., -+1-t-+
I I i l ; I l !
. +---+,-+--
i ! I ! i
'-t--t--r--- - i-+-t--l- +1--
, -+,-11--t--+.1.- lr---+- .µ_--+1--1 I*
I ! i' i ! i! ! I !t I I I I
- 00. --~~~~-~
I
- ,i i! ii II/ . .~
I/ ,l I j!
.... j
~-~~--~~-~~-+-~~~-~--~~~~
- I : : J l t 0 200 400 600 800 1000 FORCE (kips)
ELONGATION vs. FORCE GRAPH VERTICAL TENDON U4 - 34V05 10 .0 I
i I i
- I Ii 8.0
~45th year -o- Original v: ~ I II ~/'
Ci) 1!
I /
k?v I I g I I I
= 6.0 I I z
1£ t- ~~
I 0
~
I! I I
(.!)
l I' I i i: II ! /, b'/ " I i ! !
I
! I rI ;
z 4.0 I
! i I ; : i 0
...J w
j I; I I
I I j
! i i
I I
ii !
i I I
! I l
- y i *i 1-
!I I ii
..._. -+-i-->-
II i! I !
i vr.
-lI-+ :
1 I
I 1 I ! Io :t l ! 1 I 2.0 :
I I ; ; ;
II l'
! I I
tr 1r11-I I jI i: :I l I i I l l II i
I
--l Ii I I i i iI i I Ij I l I l i I !
0.0 ....
0 200 400 600 800 FORCE (kips)
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 55 of 64 DOCUMENT NUMBER: REP-1 130-510 REVISION : 0 PAGE: 44 DOCUMENT TITLE: FINAL REPORT FOR THE 45"' YEAR TEN DON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 ELONGATION vs. FORCE GRAPH VERTICAL TENDON U4 - 56V29 12.0
~
--<>-45th year --<l-- Origina l r----- ***-e--*** ---- - -- ,__,__.
10.0 - I V ,...
n f--+--l---+--l---1-1---l--l---l----+--l-*1-* -*-i.--- ~t--.- --
A'v H- 0 0 ,_ --
(/)
~ 1 8.0
.~
z I I 0
~ 6.0 I I
~-- *---t-J_j ___~-- --!-~_l_J_
I I I .,I__,,___+-t-' -l--L,. __J__!
~
z l i 0
UJ 4.0
! I i I I I
I ' I
- ,, ~--t l b' ! j
,. i 1' !
I :
i I i
I I I I I
h i A',
.r i.
l ! I I i
I *-- ~--1*--ir--+,,
i
,1 !
I I !;
r--+--t--+--+-t-!--+--t--* -r--r**-
I
---t-;---;--t---t---1 i I i :,
j ./'!v '*. I
! 'I :' ;! I,* I :! II 2.0 Ij Ij ! I i I 1,. ! ! 1 ! ! l f---"---1---~-l---if-+-l-.l"rJt-i--+--_.__-+i ___[___ _j __ **---L--l---+--~--i'--l-'
I i ! 1 0.0 ! i I / ,,!!Ill Ill! I 0 200 400 600 800 1000 FORCE (kips)
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. O Page 56 of 64 DOCUMENT NUMBER: REP-1 130-51 0 REVISION : 0 PAGE: 45 DOCUMENT TITLE : FINAL REPORT FOR THE 45 1" YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT T URKEY POINT DATE: 06/19/17 10.0 TENDON RESEALING After completion of all visual inspections, lift-offs, detensioning, wire removal , and retensioning, the tendons are restored to the condition that protects the anchorage components from environmental effects. Tendon resealing consists of the grease cap replacement and the sheathing filler (grease) replacement.
10.1 SQ 12.0 GREASE CAP REPLACEMENT 10.1.1 After the tendons were locked-off, all anchorage components were hand-coated with cold grease to ensure complete coverage . The caps were then anchored back to their respective tendon ends per PSC Procedure SQ 12.0.
- l> All tendon grease caps were properly installed to their respective tendon ends using new gaskets.
10.1 .2 Grease cap replacement checklist items for all tendons are contained in SQ 12.0 data sheets of Appendix A.
10.2 SQ 12.1 GREASE REPLACEMENT Upon acceptable grease cap replacement, the necessary amount of sheathing filler was poured , hand-pumped, or pressure-pumped (as required) back into the caps through cap inlets per PSC Procedure SQ 12.1. The tendon cap inlet plug was then installed , and any excess grease was cleaned from the outer cap surfaces and any surrounding concrete areas.
10.2.1 According to ASME ,Section XI , Subsection IWL-3221.4, " [~he absolute difference between the amount of[corrosion protection medium (grease)] removed and the amount replaced shall not exceed 10% of the tendon net duct volume. "
- l> Three (3) Unit 3 scope tendons-12V11 (NCR-FN1130-007), 12V22 (NCR-FN1130-002), and 34V23 (NCR-FN1130-003) , three (3) Unit 3 gasket repair tendons-56V28 (NCR-FN1130-005) ,
61V13 (NCR-FN1130-004), and 61 V20 (NCR-FN 1130-006), and two (2) Unit 4 gasket repair tendons-23V06 (NCR-FN1130-011) and 56V02 (NCR-FN1130-010)-had a difference of the grease replaced , versus the grease lost, greater than 10% of the net duct volume for each respective tendon . The indicated Nonconformance Reports were written in response to each occurrence, and the conditions were evaluated by FPL Engineering .
- l> All other tendon caps were refilled within the acceptable limits.
10.2.2 Grease replacement data is contained in SQ 12.1 data sheets of Appendix A and is summarized in Table 10-1 through Table 10-5. In Table 10-1 through Table 10-5, "NIA" means that no grease was removed or replaced at that tendon end.
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 57 of 64 DOCUMENT NUMBER: -'-R=E"-P--1-'"1"'"""30'--"'"""51'-'0_ _ _ _ _ _ _ _ _ _ _ _ REVISION : 0 PAGE: 46 DOCUMENT TITLE: FINAL REPORT FOR THE 45'" YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45rH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 NW 1.25 1.77 1052 2.75 3.54 0.79 59.20 1.33 YES NE 1.5 1.77 s 2.25 2.65 2002 4.5 5.3 0.8 57.42 1.39 YES E 2.25 2.65 NE 8.5 18.01 2013 17.25 18.01 0.76 64.17 1.18 YES SW 8.75 N/A NW 2 2.21 3008 4.25 4.896 0.646 60.80 1.06 YES SW 2.25 2.65 BT 1 1.75 1.77 13H11 3.25 4.42 1.17 73.42 1.59 YES BT 3 1.5 2.65 BT 1 2 2.65 15H18 3.25 4.42 1.17 73.66 1.59 YES BT 5 1.25 1.77 BT 2 1.5 1.77 42H10 2.75 3.54 0.79 72.49 1.09 YES BT 4 1.25 1.77 BT2 1.5 1.77 62H44 3.0 3.54 0.54 73.49 0.73 YES BT6 1.5 1.77 BT 2 1.25 1.77 62H57 2.5 3.54 1.04 73.25 1.41 YES BT6 1.25 1.77 BT 2 1.75 1.77 62H83 3.75 3.98 0.23 72.49 0.3 YES BT6 2 2.21 BT 4 1.25 1.77 64H72 2.5 3.54 1.04 73.25 1.4 YES BT6 1.25 1.77 DOME 1.75 37 .61 12V11 7.5 37.61 30.11 88.39 34.06 NO ALLERY 5.75 N/A DOME 1.75 4.86 12V14 3.75 4.86 1.11 88 .53 1.25 YES GALLERY 2 N/A DOME 2 30.09 12V22 11 .25 30.09 18.84 89. 15 21 .1 NO GALLERY 9.25 N/A DOME 1.75 27.32 34V23 12 27.32 15.32 88 .53 17.3 NO GALLERY 10.25 N/A DOME 1.75 N/A 45V01 34.75 35.4 0.65 89.15 0.73 YES GALLERY 33 35.4
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 58 of 64 DOCUMENT NUMBER: _R--"E'--
P--1'-1-'--30'---'-
51'-'0_ _ _ _ _ _ _ __ _ _ _ REVIS ION : 0 PAGE: 47 DOCUMENT TITLE : FINAL REPO RT FOR THE 45'" YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17
- - I . * .. . -. . - .. **
GREASE GREASE REMOVED REPLACED (GALLONS) (GALLONS) DIFF. DUCT %
TENDON END (GAL) VOL. DIFF. ACCEPT (GAL)
END TOTAL END TOTAL 10 12 SE 0.25 0.25 1.77 1.77 1.52 62 .99 2.41 YES 2D11 NE 0.5 0.5 0.88 0.88 0.38 63.32 0.60 YES 3D24 s 2 2 2.21 2.21 0.21 69.47 0.30 YES 62H71 BT 2 1.75 1.75 2.21 2.21 0.46 74.28 0.62 YES DOME 0 4.86 12V01 4 .86 3.86 88.94 4.34 YES GALLERY N/A DOME 0 7.08 12V02 0 7.08 7.08 88.67 7.98 YES GALLERY 0 N/A DOME 0 0.44 12V07 0 0.44 0.44 88 .94 0.49 YES GALLERY 0 N/A DOME 3.5 3.54 12V26 3.5 3.54 0.04 88 .77 0.04 YES GALLERY N/A N/A DOME 0 23 .89 56V28 0 23 .89 23 .89 88.81 26.90 NO GALLERY 0 N/A DOME 0 31 .86 61V13 8 31 .86 23 .86 89.01 26 .8 NO GALLERY 8 N/A DOME 0 9.73 61V20 0 9.73 9.73 88.94 10.93 NO GALLERY 0 N/A
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev . O Page 59 of 64 DOCUMENT NUMBER: -'"R.:.::E:.;_
P_-1'--'1-'-
30=---'-51
' -'0' - - - - -- -- -- - -- REVISION : 0 PAGE: 48 DOCUMENT TITLE : FINAL REPORT FOR THE 45'" YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17
... I II .. * .. I * .
- I o *** ... **
GREASE GREASE REMOVED REPLACED (GALLONS) (GALLONS) DIFF. DUCT %
TENDON END (GAL) VOL. DIFF. ACCEPT (GAL)
END TOTAL END TOTAL NW 8 N/A 1D30 18 18.89 0.89 70.81 1.25 YES SE 10 18.89 NW 20 N/A 1045 36 37.79 1.79 63.39 2.82 YES E 16 37.79 N 1.5 1.77 3D20 2.75 3.54 0.79 67 .63 1.17 YES SW 1.25 1.77 NE 6 N/A 3D32 23 23.63 0.63 68.30 0.92 YES s 17 23.63 BT 1 2 2.65 13H12 2 2.65 0.65 73.59 0.88 YES BT 3 N/A N/A BT 1 2 2.65 13H16 3.5 4.42 0.92 73.45 1.25 YES BT 3 1.5 1.77 BT 1 2 2.655 15H12 3.5 4.425 0.925 73.11 1.26 YES BT 5 1.5 1.77 BT 1 2 2.65 15H34 2 2.65 0.65 73.25 0.88 YES BT 5 N/A BT 1 2 2.65 15H35 3.25 4.42 1.17 73 .14 1.60 YES BT 5 1.25 1.77 BT 1 2 2.21 15H37 3.25 3.98 0.73 73.28 0.99 YES BT 5 1.25 1.77 BT 2 1.77 62H22 1.77 0.77 73 .25 1.05 YES BT6 N/A NIA BT 2 2 2.21 62H28 3.25 3.98 0.73 73.38 0.99 YES BT 6 1.25 1.77 BT 2 1.77 62H82 2.25 3.54 1.29 73.45 1.75 YES BT 6 1.25 1.77 BT 4 1.25 1.77 64H17 3 3.98 0.98 72.49 1.35 YES BT 6 1.75 2.21
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 60 of 64 DOCUMENT NUMBER: REP-1130-510
~~~~~~~~~~~~~~~~-
REVIS ION: 0 PAGE: 49 DOC UMENT TITLE : FINAL REPORT FOR THE 45th YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17
- I - I * . .. . . .. I I
- I I GREASE GREASE REMOVED REPLACED (GALLONS) (GALLONS) DUCT DIFF. %
TENDON END (GAL)
VOL.
DIFF.
ACCEPT (GAL)
END TOTAL END TOTAL DOME 1.5 15.05 23V08 14 15.05 1.05 89 .01 1.18 YES GALLERY 12.5 DOME 1.25 5.75 34V05 57.25 65.93 8.68 89.67 9.68 YES GALLERY 56 60.18 DOME 1.75 4.43 45V10 20.75 22.13 1.38 89.32 1.6 YES GALLERY 19 17.7 DOME 2 N/A 56V29 42 48.68 6.68 88.56 7.54 YES GALLERY 40 48.68 DOME 1.5 5.31 61V30 4.5 5.31 0.81 88.94 0.91 YES GALLERY 3 N/A
Attachment 2 EC288647 Rev. 0 Engi neering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 61 of 64 DOC UMENT NUMBER: -'-R"'E"-
P-'-1'""'1.:...30:....-.:...51'
- "-'0_ __ __ _ _ __ _ __ REVISIO N: 0 PAGE: 50 DOC UMENT TITL E: FINAL REPORT FOR THE 451* YEAR TE NDON SU RVEILLANC E AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SU RVEILLANCE AT TURKEY POINT DATE: 06/19/17
... I . * ...... - - -. .. **
GREASE GREASE REMOVED REPLACED (GALLONS) (GALLONS) DIFF. DUCT %
TENDON END VOL. DIFF. ACCEPT (GAL) (GAL)
END TOTAL END TOTAL 3D36 s 1.25 1.25 1.77 1.77 0.52 67 .21 0.77 YES 13H21 BT 1 1.25 1.25 1.77 1.77 0.52 73 .21 0.71 YES 13H53 BT 1 1.25 1.25 1.77 1.77 0.52 73.28 0.71 YES 62H60 BT2 1.75 1.75 2.65 2.65 0.90 73 .18 1.23 YES 64H13 BT6 1.25 1.25 1.77 1.77 0.52 73.52 0.707 YES DOME N/A 28.32 23V06 24.25 52.21 27.96 88.94 31 .44 NO GALLERY 24.25 23.89 DOME N/A 2.65 23V11 1.5 2.65 1.15 89.36 1.29 YES GALLERY 1.5 N/A DOME N/A 9.73 34V02 1.5 9.73 8.23 88.81 9.26 YES GALLERY 1.5 N/A DOME N/A 15.05 56V02 16 46.03 30.03 89.36 33.6 NO GALLERY 16 30.98 DOME N/A 26.55 56V17 54 56.64 2.64 89.29 2.96 YES GALLERY 54 30.09 DOME N/A 3.54 56V25 2.5 3.54 1.04 88 .94 1.17 YES GALLERY 2.5 N/A DOME N/A N/A 56V28 3.25 6.63 3.38 89 .01 3.79 YES GALLERY 3.25 6.63 DOME N/A 5.31 61V02 2.5 5.31 2.8 1 89.91 3.13 YES GALLERY 2.5 N/A DOME N/A 5.31 61V03 1.5 5.31 3.81 89 .63 4 .25 YES GALLERY 1.5 N/A DOME N/A 5.31 61V10 1.5 5.31 3.81 89.25 4 .27 YES GALLERY 1.5 N/A DOM E N/A 6.2 61V14 1.5 6.2 4.7 89.36 5.26 YES GALLERY 1.5 N/A
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 62 of 64 DOC UMENT NUMBER: REP-1130-510
~~~~~~~~~~~~~~~~
REVIS ION: 0 PAGE : 51 DOCUMENT TITLE : FI NAL REPORT FOR THE 45th YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SU RVE ILLAN CE AT TURKEY POI NT DATE : 06/19/17 11.0 EXTERIOR CONCRETE SURFACE EXAMINATION 11.1 A general visual exterior concrete examination (VT-3) was performed on the exposed concrete surfaces of the Turkey Point Nuclear Plant containment bu ilding . The VT-3 examinations were performed in accordance with PSC Procedure SQ 8.4 .
11.2 According to ASME ,Section XI , Subsection IWL-3211 , "[t]he conditi on of the concrete surface and tendon end anchorage areas is acceptable if the Responsible Engineer determines that there is no evidence of damage or degradation , corrosion protection medium leakage, or end-cap deformation requiring further evaluation or performance of repair/replacement activities ."
11.3 Visual inspection results, as well as the Responsible Engineer's assessment, for the containment buildings' exterior concrete surface are contained in Appendix J.
Attachment 2 EC288647 Rev. 0 Engineering Evaluation : PTN-ENG-SESJ-17-004 Rev. 0 Page 63 of 64 DOCUMENT NUMBER: REP-1130-510
~~~~~~~~~~~~~~~~
REVISION : 0 PAGE: 52 DOCUMENT TITLE : FINAL REPORT FOR THE 45th YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE : 45TH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17
12.0 CONCLUSION
12.1 A review of this surveillance was conducted per IWL-3221 Unbonded Post-Tensioning Systems and is outlined below:
IWL-3221 Acceptance by Examination IWL-3221.1 Tendon Force and Elongation. Tendon forces and elongation are acceptable if the following conditions are met:
(a) The average of all measured tendon forces, including those measured in IWL-3221 .1(b)(2), for each type of tendon is equal to or greater than the minimum required prestress specified at the anchorage for that type of tendon .
Results: The average of all measured tendon forces was above the minimum required prestress force . The average of each "Original Installation" group's lift-off values were as follows: Unit 4 domes - 590.38 kips, Unit 4 hoops - 639.93 kips, Unit 4 verticals - 672.62 kips. These values exceeded the minimum prestress forces for domes (531 .00 kips) , hoops (491.60 kips) , and verticals (522.00 kips) .
The average of each RVCH group's lift-off values were as follows : Unit 3 RVCH hoops -607.70 kips and Unit 3 RVCH verticals - 727.12 kips ; Unit 4 RVCH hoops
- 608 .91 kips and Unit 3 RVCH verticals - 721 .66 kips. These values exceeded the minimum design prestress force for hoops (491.60 kips) and verticals (522.00 kips) .
(b) The measured force in each individual tendon is not less than 95% of the predicted force unless the following conditions are satisfied.
(1) The measured force in not more than one tendon is between 90% and 95% of the predicted force .
(2) The measured forces in two tendons located adjacent to the tendon in IWL-3221 .1(b)(1) are not less than 95% of the predicted forces.
(3) For tendons requiring augmented examination in accordance with Table IWL-2521-2, Item L2-10, the measured forces in two like tendons located nearest to but on opposite sides of the tendon described in IWL 3221-1(b)(1) are not less than 95% of the predicted forces.
(4) The measured forces in all the remaining sample tendons are not less than 95% of the predicted force .
Results: All of the tendon lift-off forces were found within the acceptable limits. All tendons were found with an average lift-off value greater than 95% of the tendon predicted force.
IWL-3221.2 Tendon Wire or Strand Samples. The condition of wire or strand samples is acceptable if-(a) samples are free of physical damage; Results: All test wire samples collected for this inspection were found to have acceptable corrosion levels and free of physical damage.
(b) sample ultimate tensile strength and elongation are not Jess than minimum specified values.
Results : All test wire samples had acceptable results for ultimate tensile stress
(<:240ksi) and elongation (<:4.0%).
IWL-3221.3 Tendon Anchorage Areas. The condition of tendon anchorage areas is acceptable if-(a) there is no evidence of cracking in anchor heads, shims, or bearing plates; Results: Detailed inspections did not reveal any cracks in the anchorage components for any inspected tendon end.
Attachment 2 EC288647 Rev. 0 Engineering Evaluation: PTN-ENG-SESJ-17-004 Rev. 0 Page 64 of 64 DOCUMENT NUMBER: REP-1130-51 0 REVISION : 0 PAGE: 53 DOCUMENT TITLE : FINAL REPORT FOR THE 45"' YEAR TENDON SURVEILLANCE AT TURKEY POINT PROJECT TITLE: 45rH YR U3 & U4 TENDON SURVEILLANCE AT TURKEY POINT DATE: 06/19/17 (b) there is no evidence of active corrosion; Results: No tendon end inspected revealed active corrosion on the anchorage components.
(c) broken or unseated wires, broken strands, and detached buttonheads were documented and accepted during a pre-service examination or during a previous in-service examination; Results: The gallery end of Unit 3 vertical tendon 12V01 was found with one (1) protruding button head not previously reported . Non-conformance report (NCR) FN 1130-001 was written by PSC Quality Control personnel , and Turkey Point Engineering was notified .
The buttress 5 end of Unit 4 hoop tendon 1SH12 was found to have one (1) missing wire not previously reported . Non-conformance report (NCR) FN 1130-009 was written by PSC Quality Control personnel , and Turkey Point Engineering was notified.
All other buttonheads at all inspected tendon ends were found in acceptable condition, per IWL-3221 .3(c) .
(d) cracks in the concrete adjacent to the bearing plates do not exceed 0.01 in .(3mm) in width; Results: No cracks exceeding 0.010" were detected in the 24" of concrete adjacent to the bearing plates of the tendon ends inspected .
(e) there is no evidence of free water.
Results: The presence of free water was observed at Unit 3 tendons 12V11 (6 oz.) 12V22 (4 oz.). Water Notification Letters were submitted to Turkey Point Engineering in response to each occurrence. No other free water was observed at any other tendon end inspected .
IWL-3221 .4 Corrosion Protection Medium. Corrosion protection medium is acceptable when the reserve alkalinity, water content and soluble ion concentrations of all samples are within the limits specified in Table IWL-2525-1 . The absolute difference between the amount removed and the amount replaced shall not exceed 10% of the tendon net duct volume.
Results: Reserve alkalinity (base number), water-soluble ion concentrations, moisture contents of the tested sheathing filler samples were within acceptable limits for all inspected tendons, per IWL-3221.4.
Three (3) Unit 3 scope tendons-12V11 (NCR-FN1130-007) , 12V22 (NCR-FN1130-002), and 34V23 (NCR-FN1130-003) , three (3) Unit 3 gasket repair tendons-56V28 (NCR-FN1130-005), 61V13 (NCR-FN1130-004) , and 61V20 (NCR-FN 1130-006), and two (2) Unit 4 gasket repair tendons-23V06 (NCR-FN 1130-011) and 56V02 (NCR-FN 1130-010)-had a difference of the grease replaced , versus the grease lost, greater than 10% of the net duct volume for each respective tendon . The indicated Nonconformance Reports were written in response to each occurrence, and the conditions were evaluated by FPL Engineering. No other tendon accepted more than 10% of its net duct volume more than was removed , and all refills were acceptable.
Based upon the evaluation of the In-Service Inspection results for the Turkey Point Unit 3 and Unit 4 45th Year Containment Building Tendon Surveillance reported herein, PSC concludes that the containment structure has experienced no abnormal degradation of the post-tensioning system and all nonconformance items have been identified, documented, and reported as required . *