L-2020-126, ln-Service Inspection Program Owner'S Activity Report (OAR-1)

From kanterella
Jump to navigation Jump to search
ln-Service Inspection Program Owner'S Activity Report (OAR-1)
ML20206K814
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/24/2020
From: Hess R
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2020-126
Download: ML20206K814 (4)


Text

July 24, 2020 L-2020-126 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn : Document Control Desk Washington, D. C. 20555-00001 Re: Turkey Point Unit 3 Docket No. 50-250 1 - - - - - - -- - -ln se-FV-i-ee-ln soeeti-e-A-P-fe§f -H- - - - - - - - - - - - - - - - - - - - - - - - - -- -

Owner's Activity Report (OAR-1)

Attached find the Owner's Activity Report (Form OAR-1 ), for Turkey Point Unit 3 Fifth lnservice Inspection Interval, Cycle 31. The Form OAR-1, Owner's Activity Report, implements Code Case N-532-4.

Should there be any questions concerning this report, please contact Mr. Robert J. Hess, Licensing Manager, at 305-246-4112.

Licensing Manager Turkey Point Nuclear Plant Attachment cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Power & Light Com pany 9760 S.W. 344m Street Homestead, FL 33035

Attachment 1 PTN-ENG-SESJ-20-005 Rev. 0 EC-294768 Rev. 0 Page 1of3 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ISi PTN3-31 2020 Plant: Turkey Point Nuclear Power Plant Unit 3 9760 SW 344th Street Homestead, Florida 33035 Commercial Service Date: December 14, 1972 Refueling Outage No.: PTN 3-31 Current Inspection Interval: ISi-Fifth IWE-Third Current Inspection Period: ISi-Second Period and IWE-First Period Edition and Addenda of Section XI applicable to the inspection plans: ISi Fifth lnterval-2007 Edition through the 2008 Addenda and IWE Third lnterval-2007 Edition through the 2008 Addenda.

Date and Revision of Inspection Plans: ISi Fifth Interval Effective-January 7, 2020 Rev. 2 and IWE Third Interval Effective July 15, 2018, Rev.a Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: Same Code Cases Used: N-532-5, N-513-3 CERTIFICATE OF CONFORMANCE certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of PTN3-31 conform to the requirements of Section XI.

Signed ~ Site Program Manager Date 7 ~/ 7

..;t.d

'OWner or Owner's Designee, Title 7 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by the Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind a isin d with this inspection.

Attachment 1 PTN-ENG-SESJ-20-005 Rev. 0 EC-294768 Rev. 0 Page 2 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number NONE NONE NONE

Attachment 1 PTN-ENG-SESJ-20-005 Rev. 0 EC-294768 Rev. 0 Page 3of3 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class Description Of Work Completed Plan Number Indication 3T200 - Pressurizer removed by 1/A surge line nozzle weld 4/15/2020 RR40713828-01 mechanical linear indication means 3A CCW pipe- Restore 3/C corrosion through CCWpipe 4/21/2020 RR40548546-09 floor penetration seals with PM cap 3B CCW pipe- Restore 3/C corrosion through CCW pipe 4/16/2020 RR40548546-16 floor penetration seals with PM cap