Category:INSPECTION REPORT
MONTHYEARIR 05000461/20240032024-11-0505 November 2024 Integrated Inspection Report 05000461/2024003 IR 05000461/20244022024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024402 IR 05000461/20244032024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024403 IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 IR 05000461/20230062024-02-28028 February 2024 Annual Assessment Letter for Clinton Power Station (Report 05000461/2023006) IR 05000461/20230042024-02-0202 February 2024 Integrated Inspection Report 05000461/2023004 IR 05000461/20234022023-12-27027 December 2023 Security Baseline Inspection Report 05000461/2023402 IR 05000461/20235012023-12-0505 December 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2023501 IR 05000461/20230032023-11-0808 November 2023 Integrated Inspection Report 05000461/2023003 IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 IR 05000461/20234202023-08-29029 August 2023 – Security Baseline Inspection Report 05000461/2023420 IR 05000461/20230052023-08-25025 August 2023 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2023005) IR 05000461/20230022023-08-0404 August 2023 Integrated Inspection Report 05000461/2023002 IR 05000461/20234012023-07-19019 July 2023 Cyber Security Inspection Report 05000461/2023401 IR 05000461/20230102023-05-26026 May 2023 Triennial Fire Protection Inspection Report 05000461/2023010 IR 05000461/20230012023-05-0404 May 2023 Integrated Inspection Report 05000461/2023001 IR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) ML23039A1852023-02-10010 February 2023 Integrated Inspection Report 05000461/2022004 07201046/2022001 IR 05000461/20220112023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000461/2022011 IR 05000461/20224022022-12-0606 December 2022 Security Baseline Inspection Report 05000461/2022402 IR 05000461/20224032022-11-28028 November 2022 Material Control and Accounting Program Inspection Report 05000461/2022403 (Public) IR 05000461/20220032022-11-10010 November 2022 Integrated Inspection Report 05000461/2022003 IR 05000461/20220052022-08-22022 August 2022 Updated Inspection Plan for Clinton Power Station (Report 05000461/2022005) IR 05000461/20220022022-07-27027 July 2022 Integrated Inspection Report 05000461/2022002 IR 05000461/20220102022-06-0606 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000461/2022010 IR 05000461/20224012022-05-24024 May 2022 Security Baseline Inspection Report 05000461/2022401 IR 05000461/20220012022-04-28028 April 2022 Integrated Inspection Report 05000461/2022001 IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 IR 05000461/20210062022-03-0202 March 2022 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2021006) IR 05000461/20210042022-02-0404 February 2022 Integrated Inspection Report 05000461/2021004 IR 05000461/20215012022-01-0303 January 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2021501 IR 05000461/20210032021-10-29029 October 2021 Integrated Inspection Report 05000461/2021003 IR 05000461/20210052021-09-0101 September 2021 Updated Inspection Plan for Clinton Power Station; Report 05000461/2021005 IR 05000461/20214022021-08-23023 August 2021 Security Baseline Inspection Report 05000461/2021402 IR 05000461/20210112021-08-20020 August 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000461/2021011 IR 05000461/20210022021-08-0909 August 2021 Integrated Inspection Report 05000461/2021002 IR 05000461/20214402021-07-15015 July 2021 Supplemental Inspection Report 05000461/2021440 and Assessment Follow Up Letter (Cover Letter Only) IR 05000461/20210122021-06-28028 June 2021 Biennial Problem Identification and Resolution Inspection Report 05000461/2021012 IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 IR 05000461/20214012021-04-29029 April 2021 Security Baseline Inspection Report 05000461/2021401 (Cover Letter Only) IR 05000461/20210012021-04-26026 April 2021 Integrated Inspection Report 05000461/2021001 IR 05000461/20210102021-03-18018 March 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000461/2021010 IR 05000461/20210132021-03-17017 March 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000461/2021013 IR 05000461/20200102021-03-11011 March 2021 Triennial Fire Protection Inspection Report 05000461/2020010 IR 05000461/20200062021-03-0404 March 2021 Annual Assessment Letter for Clinton Power Station Unit 1 (Report 05000461/2020006) IR 05000461/20200042021-02-0909 February 2021 Integrated Inspection Report 05000461/2020004; 07201046/2020001 2024-09-09
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990131999-08-19019 August 1999 Insp Rept 50-461/99-13 on 990611-0728.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000461/19990101999-07-16016 July 1999 Insp Rept 50-461/99-10 on 990422-0610.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990171999-07-0909 July 1999 Insp Rept 50-461/99-17 on 990607-11.No Violations Noted. Major Areas Inspected:Review of Access Authorization Program,Communications,Protected Areas Access Control of Personnel,Packages,Matl & Vehicles & Testing & Maint IR 05000461/19990121999-07-0707 July 1999 Insp Rept 50-461/99-12 on 990607-11.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Chemistry & Radiation Protection Programs Including Quality Control of Lab & Inline Instrumentation IR 05000461/19990041999-05-0505 May 1999 Insp Rept 50-461/99-04 on 990301-0407.Non-cited Violations Noted.Major Areas Inspected:Effectiveness of Operators to Safely Operate Facility IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990061999-04-21021 April 1999 Insp Rept 50-461/99-06 on 990217-0407.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000461/19990031999-04-21021 April 1999 Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Engineering Organization Effectiveness & Readiness for Restart Through in-depth Review of Calculations IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980291999-03-24024 March 1999 Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted. Major Areas Inspected:Review of Circumstances Surrounding High Number of Licensed Operator Failures That Occurred as Result of 1998 Annual Operator Requalification Exam IR 05000461/19990021999-03-18018 March 1999 Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support IR 05000461/19990051999-03-10010 March 1999 Insp Rept 50-461/99-05 on 990208-12.Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of RP Program IR 05000461/19980281999-02-0101 February 1999 Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering IR 05000461/19980201999-01-22022 January 1999 Insp Rept 50-461/98-20 on 981118-990106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980181998-12-17017 December 1998 Insp Rept 50-461/98-18 on 981002-1117.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980261998-12-13013 December 1998 Insp Rept 50-461/98-26 on 981013-30.Violations Were Identified,But No Notice Was Issued.Major Areas Inspected: Engineering & Plant Support IR 05000461/19980191998-11-25025 November 1998 Insp Rept 50-461/98-19 on 980914-1009.No Violations Noted. Major Areas Inspected:Engineering IR 05000461/19980171998-10-30030 October 1998 Insp Rept 50-461/98-17 on 980819-1001.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980251998-10-28028 October 1998 Insp Rept 50-461/98-25 on 981005-09.No Violations Noted. Major Areas Inspected:Portion of EP Program,Review of Documentation,Tours & Observations of Emergency Response Facilities & Equipment & Follow Up on Previous Findings IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980111998-08-0707 August 1998 Insp Rept 50-461/98-11 on 980527-0710.Enforcement Discretion Being Exercised for Six Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program IR 05000461/19980091998-07-0707 July 1998 Insp Rept 50-461/98-09 on 980504-08.No Violations Noted. Major Areas Inspected:Review of Documentation Re Actual EP Activation,Evaluation of Quality of EP Program Related Audits & Reviews & Effectiveness of Mgt Controls IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980101998-06-0303 June 1998 Insp Rept 50-461/98-10 on 980511-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980061998-05-11011 May 1998 Insp Rept 50-461/98-06 on 980304-0414.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000461/19980071998-04-22022 April 1998 Insp Rept 50-461/98-07 on 980323-27.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980031998-03-27027 March 1998 Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980041998-03-20020 March 1998 Insp Rept 50-461/98-04 on 980213-16.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000461/19970251998-02-13013 February 1998 Insp Rept 50-461/97-25 on 971125-980122.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980021998-02-0202 February 1998 Insp Rept 50-461/98-02 on 980105-09.No Violations Noted. Major Areas Inspected:Plant Support Performance & Specifically Evaluation of Effectiveness of RP Program IR 05000461/19970241998-01-0202 January 1998 Insp Rept 50-461/97-24 on 971201-05.No Violations Noted. Major Areas Inspected:Plant Support Activities.Selective Elements of Access Authorization Program,Security Communication Sys & Testing Were Reviewed & Evaluated IR 05000461/19970231997-12-23023 December 1997 Insp Rept 50-461/97-23 on 971103-07.No Violations Noted. Major Areas Inspected:Findings & Conclusions from Insp of Licensed RO & SRO Requalification Training Programs ML20198L2741997-12-22022 December 1997 Insp Rept for Clinton Power Station on 970923-1003 & 1020-31.Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000461/19970221997-12-22022 December 1997 Insp Rept 50-461/97-22 on 971007-1124.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19970181997-11-24024 November 1997 AIT Insp Rept 50-461/97-18 on 970805-18.Violations Noted. Major Areas Inspected:Circumstances Surrounding 970805 & 970722 RHR Pump a Circuit Breaker Failures at CPS ML20199A8771997-11-12012 November 1997 Insp Rept 50-461/97-19 on 970826-1006.Violations Noted.Major Areas Inspected:Operations,Maint,Engneering & Plant Support IR 05000461/19970151997-11-12012 November 1997 Insp Rept 50-461/97-15 on 970707-0825.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19970201997-10-11011 October 1997 Insp Rept 50-461/97-20 on 970707-0829.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering & Maint IR 05000461/19970071997-09-29029 September 1997 Insp Rept 50-461/97-07 on 970313-0522.No Violations Noted. Major Areas Inspected:Licensee Operations & Surveillance Testing IR 05000461/19970171997-08-25025 August 1997 Insp Rept 50-461/97-17 on 970714-18 & 27-28.No Violations Noted.Major Areas Inspected:Review of Gaseous & Liquid Radwaste Programs Including Effluent Releases & Monitoring IR 05000461/19970111997-07-25025 July 1997 Insp Rept 50-461/97-11 on 970407-0523.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20149J5211997-07-15015 July 1997 Insp Rept 50-461/97-12 on 961209-970703.No Violations Noted. Major Areas Inspected:Review of Specific Commitments Licensee Made in Response to Confirmatory Action Ltrs Associated w/960905 Reactor Recirculation Pump Seal Failure IR 05000461/19970131997-07-14014 July 1997 Insp Rept 50-461/97-13 on 970519-23.Violations Noted.Major Areas Inspected:Plant Support Performance & Effectiveness of RP & Chemistry Programs IR 05000461/19970051997-06-16016 June 1997 Insp Rept 50-461/97-05 on 970211-0514.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support 1999-08-19
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20217J1481999-09-30030 September 1999 Notice of Violation from Investigation Conducted from 991028-980921.In Jan 1997,CH Tewksbury Engaged in Deliberate Misconduct That Caused Util to Be in Violation of 10CFR50.7 ML20217J1361999-09-30030 September 1999 Notice of Violation from Investigation on 971028-980921. Violation Noted:During Jan 1997,QV Dept Discriminated Against Qv Inspector,For Having Engaged in Protected Activities IR 05000461/19990131999-08-19019 August 1999 Insp Rept 50-461/99-13 on 990611-0728.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000461/19990101999-07-16016 July 1999 Insp Rept 50-461/99-10 on 990422-0610.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990171999-07-0909 July 1999 Insp Rept 50-461/99-17 on 990607-11.No Violations Noted. Major Areas Inspected:Review of Access Authorization Program,Communications,Protected Areas Access Control of Personnel,Packages,Matl & Vehicles & Testing & Maint IR 05000461/19990121999-07-0707 July 1999 Insp Rept 50-461/99-12 on 990607-11.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Chemistry & Radiation Protection Programs Including Quality Control of Lab & Inline Instrumentation PNO-III-99-028, on 990506,reactor Achieved Criticality Starting Up from Sept 1995 Outage.Region III Maintained Continuous Insp Coverage Throughout Restart Period.Info in Preliminary Notification Reviewed1999-05-28028 May 1999 PNO-III-99-028:on 990506,reactor Achieved Criticality Starting Up from Sept 1995 Outage.Region III Maintained Continuous Insp Coverage Throughout Restart Period.Info in Preliminary Notification Reviewed IR 05000461/19990041999-05-0505 May 1999 Insp Rept 50-461/99-04 on 990301-0407.Non-cited Violations Noted.Major Areas Inspected:Effectiveness of Operators to Safely Operate Facility ML20206G9821999-04-30030 April 1999 Notice of Violation from Insp on 990408-21.Violation Noted:Licensee,Despite Having Considered Issue Closed in Corrective Action Program,Failed to Correct Condition Adverse to Quality IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990031999-04-21021 April 1999 Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Engineering Organization Effectiveness & Readiness for Restart Through in-depth Review of Calculations IR 05000461/19990061999-04-21021 April 1999 Insp Rept 50-461/99-06 on 990217-0407.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980291999-03-24024 March 1999 Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted. Major Areas Inspected:Review of Circumstances Surrounding High Number of Licensed Operator Failures That Occurred as Result of 1998 Annual Operator Requalification Exam IR 05000461/19990021999-03-18018 March 1999 Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support ML20204E6931999-03-10010 March 1999 Notice of Violation from Insp on 990208-12.Violtion Noted: Licensee Did Not Make Adequate Surveys to Assure Compliance with 10CFR20.1902(b) Requiring Posting of Each High Radiation Area with Signs Displaying Listed Words IR 05000461/19990051999-03-10010 March 1999 Insp Rept 50-461/99-05 on 990208-12.Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of RP Program IR 05000461/19980281999-02-0101 February 1999 Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering IR 05000461/19980201999-01-22022 January 1999 Insp Rept 50-461/98-20 on 981118-990106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support PNO-III-99-002, on 990106,partial Loss of Offsite Power Occurred.Power Lost to Rhrs,Normal Shutdown Cooling Sys & in Svc at Time of Event.Plant Three EDGs Started Automatically & Provided Power to Safety Sys.Power Restored to Rhrs Pump1999-01-0808 January 1999 PNO-III-99-002:on 990106,partial Loss of Offsite Power Occurred.Power Lost to Rhrs,Normal Shutdown Cooling Sys & in Svc at Time of Event.Plant Three EDGs Started Automatically & Provided Power to Safety Sys.Power Restored to Rhrs Pump IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980181998-12-17017 December 1998 Insp Rept 50-461/98-18 on 981002-1117.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980261998-12-13013 December 1998 Insp Rept 50-461/98-26 on 981013-30.Violations Were Identified,But No Notice Was Issued.Major Areas Inspected: Engineering & Plant Support IR 05000461/19980191998-11-25025 November 1998 Insp Rept 50-461/98-19 on 980914-1009.No Violations Noted. Major Areas Inspected:Engineering ML20155E7131998-10-30030 October 1998 Notice of Violation from Insp on 980819-1001.Violation Noted:On 980909,operator Responding to Alarming Annunciator on Area Radiation Monitoring Sys Did Not Announce Annunciator to Control Room Supervisor IR 05000461/19980171998-10-30030 October 1998 Insp Rept 50-461/98-17 on 980819-1001.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980251998-10-28028 October 1998 Insp Rept 50-461/98-25 on 981005-09.No Violations Noted. Major Areas Inspected:Portion of EP Program,Review of Documentation,Tours & Observations of Emergency Response Facilities & Equipment & Follow Up on Previous Findings IR 05000461/19983011998-10-0909 October 1998 NRC Operator Licensing Retake Exam Rept 50-461/98-301(OL) Administered to One Applicant Requesting SRO License on 980831-0904.Applicant Passed Operating Retake Exam But Not Issued SRO License to Operate Plant IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20237B1531998-08-11011 August 1998 Notice of Violation from Insp on 980521.Violation Noted:On 980119,individual Exited RCA Utilizing Point Other than Designated Areas W/O Obtaining Approval from Radiological Operations Supervisor IR 05000461/19980111998-08-0707 August 1998 Insp Rept 50-461/98-11 on 980527-0710.Enforcement Discretion Being Exercised for Six Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program IR 05000461/19980091998-07-0707 July 1998 Insp Rept 50-461/98-09 on 980504-08.No Violations Noted. Major Areas Inspected:Review of Documentation Re Actual EP Activation,Evaluation of Quality of EP Program Related Audits & Reviews & Effectiveness of Mgt Controls ML20236L3071998-07-0707 July 1998 Notice of Violation from Insp on 980504-08.Violation Noted: on 980213,ERDS Not Initiated within 1 H of Declaration of Alert & Only One Electrical Maint Personnel on Shift Trained & Assigned as Member of Emergency Response Organization IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20237E6641998-06-0505 June 1998 EN-98-044:informs Commission That NRC Intends to Exercise Enforcement Discretion & Not Issue Citation or Propose Civil Penalty for Four Violations of Maint Rule.Ltr Describing Action Will Be Issued on or About 980612 ML20248J8641998-06-0303 June 1998 Notice of Violation from Insp on 980511-15.Violation Noted: Between 980429 & 980513,control Rod Drive Filter Area on 712 Elevation of Turbine Building,Radiation Area W/Radiation Dose of 8 Mrem Per Hour,Was Not Posted W/Warning Sign IR 05000461/19980101998-06-0303 June 1998 Insp Rept 50-461/98-10 on 980511-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980061998-05-11011 May 1998 Insp Rept 50-461/98-06 on 980304-0414.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000461/19980071998-04-22022 April 1998 Insp Rept 50-461/98-07 on 980323-27.Violations Noted.Major Areas Inspected:Plant Support ML20217F4431998-04-22022 April 1998 Notice of Violation from Insp on 980323-27.Violation Noted: Description of Facility in USAR Not Accurate in All Matl Respects IR 05000461/19980031998-03-27027 March 1998 Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19973131998-03-24024 March 1998 NRC Operator Licensing Exam Rept 50-461/97-313OL Conducted on 980126-0205.Exam Results:Exam Was Administered to Two RO & Seven SRO Applicants.Five SRO & Two RO Applicants Passed All Portions of Exam & Two SRO Applicants Failed ML20217D8511998-03-20020 March 1998 EN-98-014:informs Commission That NRC Will Exercise Enforcement Discretion Per Section VII.B.2 of Enforcement Policy & Not Issue NOV to Il Power Co for Several Violations Associated W/Loss of Shutdown Cooling Event on 980213 IR 05000461/19980041998-03-20020 March 1998 Insp Rept 50-461/98-04 on 980213-16.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000461/19970251998-02-13013 February 1998 Insp Rept 50-461/97-25 on 971125-980122.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support 1999-09-30
[Table view] |
Inspection Report - Clinton - 1991009 |
---|
|
|
Text
__
_ _ _-
_
-_
_ __ _ _. _..
_ _ _ _ _ _ _
.______m_
_ _. _
-'
.-
O. S. NUCLEAR REGULATORY C0ftilSS10N R2G10N 111 Report No:
50-461/91009(DRS)
Docket No:
50-461 License No:
HPF-62 Licensee:
Illinois Power Company 500 South 27th Street Decatur,_IL 62525 Facility Name: Clinton Power Station Inspection At: Clinton, IL 61727 Inspection Conducted:- April 22-26, and liay 28, 1991 Inspector: %oM W. LD 6-S d/
Jqsppi H. Ulie Date Approved By:
d To uh Os 4-V-?/
T'.N J. Jablons ki, Chief U '
Date Maintenance & Outages Section Inspection Summary Inspection on April 22-26, and liay 28, 1991 (Report No. 50-461/91009(DRS))
Areas-Inspected:
Routine, unannounced inspection to review the implementation
-
of the licensee's fire protection program, which included a review of licensee action on previous inspection findings, general observations of fire protection
-
equipment, and a review of the fire protection organization, administrative controls, surveillance and maintenance activities, fire protection program changes, fire reports, information notices, and the quality assurance area.
I The inspector utilized inspection modules 64150, 64704 and 92701.
l Results:
Strengths included:
(1) the control of combustibles and cleanliness L
of the plant, (2) the actions of the fire brigade members including the brigade
'
leader during a fire drill, and (3) knowledgeable and well trained mechanical-maintenance personnel. A weakness identified that there was no plan to conduct periodic fire damper drop: tests to assure continued damper operability, as described further in Paragraph 2.
9106120010 910606 PDR ADOCK 05000461
- O pyg
.
..
.. -
.
-
.
..
-
.
_
,
_ - - - _... _ -
-.
- -.-
- - -
.
DETAILS 1.
Persons-Contacted Illinois Power Company (IP)
J. Perry, Vice President J. Cook, Plant Manager K. Graff, Director, Quality Assurance S. Hall, Director, Nuclear Program Assessment J. Miller, Manager, Nuclear Station Engineering Department K. Moore, Director, Plant Technical
- R. Morgenstern, Manager, Nuclear Training J.-Palchak, Manager, Nuclear Planning and Support S. Rasor, Director, Plant Maintenance F. Spangenberg, Manager, Licensing and Safety U. S. Nuclear Regulatory Commission (NRC)
F. Brush, Resident inspector
'
All of the above individuals attended the exit meeting held on April 26, 1991. Other persons were contacted as a matter of course during the inspection.
2.
Licensee Action on Previous inspection Findings (Closed) 10 CFR 50.55(e) Report Deficiency 55-84-23:
Fire dampers
~potentially failing to close under air flow conditions. To address specific plant configurations, the licensee field drop tested the four most severe damper configurations to ensure that_the dampers would close under air flow conditions as tested at the Ruskin test facilities. The inspector reviewed the fire damper test methodology, field drop test results, and corrective action. No problems were identified.
However, the licensee had not planned to conduct fire damper static (drop)
tests during'the life of the plant.
As discussed with the licensee, 3ast-experience at another plant has shown that a surveillance program witiott periodic operability tests has not assured operability. Also, National Fire Protection Association (NFPA) 90A, the national consensus standard covering fire dampers, specifies the need to remove fusible links and s
operate the fire damper to assure operability.
During the exit meeting the-. inspector stated that since Standard Technical Specifications.only require a visual-inspection, there is no basis for issuing a Notice of Violatio_n at this time; however, the lack of a plan to conduct static fire damper tests is considered a weakness.and an open item pending NRC review of the licensee's-evaluation on this matter (461/91009-01(DRS)).
.
-
_
..
-
-
..
..
- - -
_.
- -
- -.
.. - -.
--
-.
-
..
3.
Fire Protection Organizatien
'
The inspector interviewed two persons performing fire watch duties.
Both individuals were adequately trained and able to describe the required emergency actions to take upon spotting smoke or a fire condition.
The inspector witnessed part of the Incident Command System (ICS) training session. The training included leaders and members of the fire brigade, plant fire protection staff and safety organizttion representatives.
The ICS has been adopted by the National Fire Acade.ny and is the model system for providing incident command for the fire service. The inspector witnessed this training to assess its adequacy in providing an emergency management structure for emergency personnel including those involved in directing and coordinating firefighting activities. No problems were identifled.
The inspector was also informed-by plant fire protection staff that new upgraded protective clothing had been received for fire brigade use.
4.
F_i_re Drills The inspector witnessed an unannounced fire brigade drill that involved a postulated fire in the high pressure core spray pump motor upper bearing seal reservoir. The inspector evaluated the fire brigade and support personnel actions-in determining and observing the following:
(1) fire brigade members' conformance with established plant firefighting procedures; (2) r.n assessment of the fire brigade leader's direction of the firefighting efforts; (3) actual donning and simulated use of the self-contained breathing apparatus; (4) actual donning of protective clothing; (5)
simulated use of the fire hose stations; (6)-use of portable radio communication equipment; (7) brigade timeliness in response and numbers of personnel responding with proper firefighting equipment; and (8) brigade leader interaction with the radiation protection and other support persennel (e.g., security on scene).
The inspector provided the following observations during the post-drill critique discussions:
Six fire brigade members responded with full protective clothing and self contained breathing apparatus.
- Response to the brigade station and to the fire area was timely.
._
'
Communications and firefighting tactics worked well.
- Radiation protection personnel were present and monitored the area for airborne contamination.
Direction by the fire brigade leader was excellent.
-High morale and professional attitudes were exhibited by brigade members.
Proper simulated notifications were completed, including a simulated request for offsite fire department assistance.
.
...
. - -.
.-
. - -
.
___-__. _ _ _
_
.
I Ly letter dated November 19, 1985, the cities of Clinton and Farmer City indicated that annual fire drills would be held with the licensee's fire brigade barring any unforeseen actual emergency occurring. Licensee records indicated that fire drills with the Clinton Fire Department occurred December 13, 1989, and June E0, 1990.
The most recent fire drill with the Farmer City Fire Department occurred on September 17, 1990.
Additionally, ti.e inspector visited the Clinton Volunteer Fire Department, which is the primary local offsite mutual aid fire department for the Clinton Power Station. The inspector interviewed the Ciinton Fire Chief, and the Clinton Assistant Fire Chief.
Both officers renarked positively about the mutual aid agreement between the city and the plant.
The Clinton Fire Chief indicated that the annual training sessions had improved in recent years, scenarios were more realistic, and the Clinton fire department members had received sufficient radiation protection training.
The city fire hose threads were checked for compatibility with the plant hose threads.
5.
Fire Protection Administrative Controls To determine the effectiveness of implementation of the fire protection program the inspector examined certain administrative control procedures and conducted inspections of plant safety re?ated areas during day shif t and swing shift hours to ensure vital plant e,u;pment was adequately protected. The procedures examined were:
Cln 'on Power Station (CPS)
procedure 1893.02, " Control of Ignition Sources, Revision 4, and CPS procedure 1893.03, " Control of Flammable and Combustible Liquids and Combustible Materials," Revision 6.
The procedures were well written and administratively minimized the exposure to safety related areas from combustibles.
The following observations were made:
The screenhouse needed improvements in general housekeeping and cleanliness to reduce the potent' 1 for fire hazards.
In the auxiliary building, on the i81' elevation, two nonflammable
'
compressed gas cylinders were improperly secured. If tipped over a cylinder could become a missile and cause damage to safety related equipment or personnel.
The licensee took action to correct the condition.
The licensee indicated that an ongoing program had been implemented to paint facility areas and improve the appearance of the plant.
Except for the examples above, the programs for control of combustibles and housekeeping were considered strengths.
6.
Fire Protection Surveillance and liaintenance Activities The inspector reviewed fire protection surveillance and maintenance activities required by Technical Specifications and other procedures to assure that fire protection equipment was adequately maintained. The inspector reviewed the completed and in-process surveillance procedures delineated below.
.__ __ ____________ _______ ____ __ -________- - _
.. -.
. -.- -
.~.
.
- - -
.
-.
. - - - - -.
-
CPS 3822.160001, " Emergency Lighting functional Test Checklist," Revision 2, for surveillances completed June 13, July 9, and August 2,_1990.
-CPS 3822.170001, " Safe Shutdown Evaluation Path Emergency Light Checklist," Revision 0, for surveillance completed May 7,1990.
CPS 9981.02D001, " Fire Protection Fuel Oil Analysis Data Sheet,"
Revision 21, for surveillance conducted April 23, 1991.
No concerns were identified.
The inspector also observed portions of work associated with maintenance work request 014991, a major overhaul of the "A" diesel fire pump. There were no problems identified. Maintenance supervisors were present throughout the activity, which was done on the day and swing shifts.
-
Mechanical maintenance personnel were knowledgeable and well trained in the work performed.
Five plant personnel had recently attended a Cummins Engine Company diesel fire pump maintenance training course. Three plant
_ persons were from the mechanical maintenance department, one was from quality control, and one from engineering. Overall, the inspector t
concluded that maintenance on fire protection equipment was adequately performed and accomplished by skilled maintenance personnel.
The inspector requested information and periodic test data to support that the designated backup pumps to the fire protection pumps could supply the required flow and pressure demands to the fire suppression systems and associated hose streams. The inspector reviewed a Sargent and Lundy (S&L)
letter to the licensee dated January 18, 1988, which indicated that the plant service water system could be r.:d as a backup if 144 psig was maintained at pressure gauge 1PlWS107. On May 8 and 10, 1991, a member of the licensee's fire protection staff reaffirmed tnat the plant service water system could be used as a backup to supply the fire suppression systems and associated hose streams if both fire pumps were inoperable.
Additionally, the licensee indicated _that abnormal operating procedure 3213.01, " Fire Detection and Protection," Revision 13, was in place to assure that appropriate actions would be taken to put the service water system in-service for fire protection uce without adversely affecting the nuclear safety of the plant.
,
I The inspector also reviewed S&L letter dated April 22, 1988, regarding the ability of the construction fire pump to be' used as a backup to the fire protection pumps.
On May 10, 1991, the inspector was informed by the licensee that the construction fire pump was to be used only when one fire pump was inoperable.
Otherwise, as.previously discussed, the service water system is used. Test procedure 2103.01, " Centrifugal Pump Performance", Revision 3, was a generic centrifugal pump test and was not specifically written for the construction fire pump. Therefore, specific applicability to the construction fire pump was unclear. This matter is considered an open item which warrants consideration by the licensee-(461/91009-02(DRS)).
5 l~
.
. - -
_ - _ _ _
.-
-
-
-
- -.
_
. - _ _ _ _ -_ - __ _ -
. _ _ _
._
_
__. - -.
.
,
V
~
7.
General Plant inspection of Fire Protection Equipment The inspector observed safety related areas of the plant for general housekeeping and control of combustibles, hot work activities in' progress, and the condition of fire protection systems and equipment.
No welding, cutting, or use of open flame ignition sources were observed during
"
inspector tours in the plant.
The inspector observed the positioning of valves of the fire water and carbon dioxide systems. The inspector also assessed the operability and/or integrity of interior hose stations, portable fire extinguishers, fire doors, penetration fire seals, structural steel fire resistive protection, cable tray fire wrap, fire barrier walls and floors. The inspector observed fire brigade equipment at the brigade stations to
-
assure readiness for use and proper maintenance. All deficiencies that were observed had already been identified and docunented by the licensee.
,
i The inspector determined that administrative controls were in place to prevent a hazardous hydrogen concentration in the battery rooms.
Annunciatcrs were located in the control room, which would alarm in the control room upon low air flow in a battery room.
Procedure CPS 5050.05,
" Alarm Panel 5050 Annunciator Revision 5, Window SA thru 5M," Revision 27, required that an operator be sent to the battery room during a low air flow condition. When the battery is being charged the hydrogen concentration may rapidly increase.
If the concentration reached 2%, the procedure stated that it would be necessary to open the door and a portable blower set up to ventilate the room. An engineering calculation showed that at maximum equalizing charge, it would take approximately 39 days for a battery room to reach a 2% hydrogen level, which is sufficiently below the lower explosive level of approximately 4.21, 8.
Fire Protection Program Changes The licensee is allowed by a plant license condition to make changes to the fire protection program provided that a 10 CFR 50.59 evaluation has been co.npleted which shows the level of fire protection has not been reduced. The inspector reviewed selected portions of the annual change documents for 1987 through 1990 that included fire protection. The accompanying evaluations to support the changes were also reviewed.
The inspector observed one plant area where a fire protection change allowed the removal of the fire detection _ system.
The inspector assured that access to this area was key-controlled and:that no combustibles were present. The inspector confirmed that the basis was being maintr.ined.
No problems were ident.fied during this review.
9.
Fire Reports The inspector reviewed fire reports. Three fires had occurred, one in 1989 and two in 1990. The fires consisted of the following:
(1). cafeteria microwave oven due to an internal wiring short; (2) trash placed in a cigarette butt receptacle; (3) and drawings that were ignited due to
_
.
-
.
-
_
- __
_. _ _ _. - _ _ _
_
. _ _ _ _. _ _ _ _ _ _. _. _ - _ _ _.
,*
,
' verhead stick welding in the reactor water cleanup heat exchanger
"A_"
o room. Each of these fires was in the incipient phase of burning and was inmediately identified by plant personnel, One fire was extinguished with the use of a portable fire extinguisher. The other two were extinguished
!
by patting, which was not considered a good practice. One of the fires was extinguished by a fire watet who had not properly positioned the portable fire extinguisher for ready use.
Future fire watch training will continue to reinforce the need to have portable fire extinguishers readily available during hot work activities and that notification of the control room must always occur prior to or concurrent with firefighting efforts.
The inspector discussed this comment with the fire watch training instructor.
10.
Information hotices The inspector reviewed NRC Information Notices (IN) applicable to fire protection activities, including 86-17, 87-20, 88-04, 88-64, 89-04, 89-44, 90-69, and an un-numbered notice pertaining to battery packs for emergency lighting.
In all cases, the inspector considered the licensee actions to be adequate.
11.
Quality Assurance
.
The inspector evaluated the licensee's quality verification process in
'
the fire protection area by the review of records of two QA audits. The inspector reviewed these records to assess the coverage of fire protection, technical adequacy, timeliness and adequacy of justification for closeout of corrective action documents. The audits included No. Q38-89-26 and No.
Q38-90-29, which emahasized observation of fire protection-activities and verification that tie quality program requirements were implemented, lhese audit reports were viewed as performance oriented. The audit findings were technically oriented and promptly issued.
Corrective actions to audit recommendations were generally completed in a timely manner.
However, there were some deficiencies with the diesel fire pumps that had not been resolved in a timely manner.
12.
Open Items Open items are matters that have been discussed with the licensee and will be reviewed further by an inspector, and which insolve some action on the part of the NRC or licensee or both. Open items disclosed during the inspection are discussed in Paragraphs 2 and 6.
13.
Exit Maeting The. inspector met with licensee representatives (denoted in Paragraph 1)
at the conclusion of the inspection on April 26, 1991, and summarized the scope and findings of the inspection. The inspector also discussed the likely informational content of the inspection report with regard to documents reviewed by the inspector during the inspection. The licensee did not identify any of the documents as proprietary. On May 28, 1991, a telephone call was held between the inspector and a licensee representative to discuss further the test criteria for the service water pumps.
-
-
-
.
.
_ _,
_ -