IR 05000461/1998028

From kanterella
Jump to navigation Jump to search
Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering
ML20202G507
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/01/1999
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20202G500 List:
References
50-461-98-28, NUDOCS 9902050203
Download: ML20202G507 (21)


Text

i 1

.

.

U.S. NUCLEAR REGULATORY COMMISSION REGIONlli Docket No: 50-461 License No: NPF-62 Report No: 50-461/98028(DRS)

Licensee: lilinois Power Company Facility: Clinton Power Station Location: Route 54 West Clinton,IL- 61727 Dates: December 14-18,1998 Inspectors: Andrew Dunlop, Reactor Engineer (Team Leader), Rlli Frank Talbot, Operations Engineer, NRR Carey Brown, Resident inspector, Clinton Anthony Fresco, PRA Consultant, BNL Approved by: James A. Gavula, Chief Engineering Specialists Branch 1 Division of Reactor Safety

9902050203 990201 ?

PDR ADOCK 05000461 G PDR l'

_

__ - - . . - - . . - .. . - - . - - . . - --. -.. -. --

.

.

EXECUTIVE SUMMARY Clinton Power Station NRC inspection Report 50-461/98028(DRS)

!

'

This inspection included a follow-up review of the licensee's program for implementing 10 CFR 50.65," Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." The report covers a one-week, on-site inspection by regional, resident, and Office of Nuclear Reactor Regulation inspectors, and a contractor from Brookhaven National Laboratory. The NRC's maintenance rule baseline inspection was documented in Inspection Report 50461/98005.

l l Although the licensee established an adequate maintenance rule program, due to quality i assurance concern with the ineffective implementation of the maintenance rule program, the

! inspectors concluded that the requirements of the maintenance rule were not met. The remaining aspect of the maintenance rule program that needed to be addressed to meet the requirements of the maintenance rule was to ensure acceptable program implementation throughout the plant restart and subsequent plant operations. As such, plant staff needs to continue to take ownership of their portion of the maintenance rule program to ensure effective implementation. Based on the results of the inspection, NRC Manual Chapter 0350 Case Specific Checklist item V.3, " Establish Maintenance Rule Program " was closed. No violations or open items were identified during this inspectio Maintenance

. Although the risk ranking process continued to rely on a probabilistic risk analysis based predominantly on generic data, the risk ranking of structures, systems and components was acceptable. (Section M1.2.)

.

In general, the guidance for performing periodic evaluations met the requirements of the maintenance rule and the intent of the industry implementing guidance. The Cycle 6 assessment report provided good evaluations of system performance over the period by documenting changes to maintenance activities and changes to various maintenance rule program aspects. (Section M1.3)

.

The inspectors concluded that the process for balancing the unavailability and reliability

of structures, systems and components was acceptable, however, based on the Cycle 6 periodic assessment, the licensee concluded that implementation of this process was ineffective. In response to this self-identified concem, the licensee took action to ensure a proper balance existed between the reliability and availability for structores, systems and components. (Section M1.4)

. The inspectors concluded the licensee had adequate on-line and outage risk assessment processes and had established acceptable thresholds for contingency i planning. Training of personnel on the on-line risk procedures, however, needed to be

! completed prior to restart as part of NRC Manual Chapter 0350, Case Specific Checklist item 11.4. (Section M1.5)

!

i 2

!

.

. - - -.

.. - . .- . -.. - - . - . - . - . . -- . . - - - - . . .- . .- -

.

, ,

Based on the sensitivity study performed for the availability criteria, and the use of the statistical approach as defined in the Electric Power Research institute technical ,

. bulletins, the inspectors considered the licensee's perfomiance criteria for both l availability and reliability to be consistent with the assumotions in the updated probabilistic risk assessment and therefore acceptable. (Section M1.6)

.

Appropriate goals and corrective action plans were developed for systems classified as (a)(1) per the maintenance rule. (Section M1.6)

.

. In general, structures, systems and components were being properly classifed under categories (a)(1) and (a)(2) of the MR. Performance criteria, goals, and corrective actions, both in progress and planned, for structures, systems and components in (a)(1)

status appeared adequate. The structure, system and component functions for the <

systems reviewed were property scoped under the MR. The inspectors reviewed )

condition reports, maintenance work requests, and the periodic assessment and did not identify any maintenance preventable functional failures not previously classified or unavailability time not properly tracked. (Section M2.1)

Quality Assurgri,gg

. The 1998 quality assurance audit was thorough and probing. Based on individual issues, the auditors were able to identify significant underlying causes (lack of ownership and inadequate communications) for the ineffective implementation of the maintenance rule program. Although actions have been identifed and were being implemented to correct the weaknesses, it was too soon to determine their effectivenes The use of outside personnel in the audit provided independent insights into the maintenance rule program and added to the overall quality of the program assessment (Section M7.1)

Enaineerina

-

The system engineers were experienced and knowledgeable about theit systems and understood their responsibilities with respect to the maintenance rule. (Section E4.1)

l l

,

, - . - - - . _ . - ._ - - - - - - - . - - . - . - - - - - - - - . - .

!

.

i

'

,

Report Details I Summary of Plant Status l Clinton Power Station (CPS) was in an extended shutdown during the inspectio !

Introduction  !

.

.  ;

' This inspection included a follow-up review of the licensee's program for implementing )

10 CFR 50.65, " Requirements for Monitoring the Effectiveness of Maintenance at Nuclear  :

Power Plants," (commonly referred to as the maintenance rule).

{

l 11. Maintenance M1 Conduct of Maintenance (62708) -

M1.2. Safety (Risk) DiTeination and Risk Rankina Insoection Scope Paragraph (a)(1) of the maintenance rule (MR) requires that licensees monitor the performance or condition of structures, systems, er components (SSCs), against licensee-established goals, in a manner sufficient to provide reasonable assurance that the SSCs are capable of fulfilling their intended functions. The MR also requires that

"these goals be established commensurate with safety." In order to implement this requirement, NUMARC 93-01, " Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," established two safety categories: "high safety significance" and " low safety significance." Criteria for placing SSCs in either of these two safety (also referred to as risk) categories are described in NUMARC 93-01. This safety determination (high safety significance or low safety significance) was to be used to determine if the SSCs should be monitored at the system, train, or plant leve The inspectors reviewed the methods and calculations that the licensee established for making these safety (or risk) determinations. The use of an expert panel was recommended by NUMARC 93-01 to establish safety significance of SSCs by combining ,

'

probabilistic risk assessment (PRA) insights with operations and maintenance experience, to compensate for the limitations of PRA modeling and importance measures, in audition, the inspectors reviewed issues identif'ed in the April 1998, MR ,

baseline inspection concoming the adequacy of the risk ranking process, the use of l generic data, and the importance ranking of the turbine driven feedwater pump Observations and Findinas on Risk Determinations

,

The risk ranking of systems and functions was based on importance measure calculation, "Clinton Nuclear Power Station - Calculation of System and Component importance Measures." The calculation was based on the December 1995 PRA update,

.- . _ _ .. . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ . . _ _ _ _ _

l

.

.

which was in place at the time of the baseline inspection. The baseline core damage frequency (CDF) for the PRA update was 6E-6 per reactor year with a truncation point of i 2E-10, or approximately four orders of magnitude below the baseline CDF. The PRA update was, however, based predominantly on generic industry data. The licensee stated that the PRA was being further updated to improve the modeling of SSCs in the PRA and to incorporate plant specific data. However, this PRA update was not expected to be completed until sometime after plant restar ('

Due to its recent completion, the importance measure calculation had not been presented to the expert panel for consideration. The calculation was based on the four-quadrant plot approach considering the Fussell-Vesely (2 0.005) and risk achievement worth (> 2) importance measures. In addition, the 90 preent of CDF

'

importance measure (an SSC would meet this importance measure if it was included in PRA accident sequence failure combinations that, when ranked in decreasing order,

' cumulatively accounted for 90 percent of the CDF) was considered separately. Systems that met one or more of the importance measure criteria were considered high safety significant, unless the licensee had sufficient justification for downgrading the significance classification. For example, the turbine building closed cooling water system, which only met the 90 percent of CDF importance measure, was downgraded by the licensee to low safety significance because it had been given a very conservative high probability of failure to run in the PRA of 10 percent. This was considered acceptable by the inspector l

~ With respect to the concem with the risk ranking process for the turbine-driven feedwater 4 pumps identified during the MR baseline inspection, the licensee presented an analysis l entitled " Risk Significance for the Loss of Feedwater Initiator." The analysis pointed to

! ten different categories of causes for loss of feedwater. This included the loss of either j of the two turbine-driven feedwater pumps, the tripping of any of the three operating L

'

condensate booster pumps, the loss of the turbine lube oil system, and the failure of the startup level controller loop when in startup mode. The licensee concluded based on the analysis that the contribution of the two turbine-driven feedwater pumps to the overall

,. CDF was only 1 percent compared with the 7 percent identified during the baseline L inspection. This additional analysis justified the low safety significance conclusion for the

'

turbine-driven feedwater pump I Conclusions on Risk Determinations Although the risk ranking process continued to rely on a probabilistic risk analysis based predominantly on generic data. the risk ranking of SSCs was acceptabl M1.3 (a)(3) Periodic Evaluatens l

! Inspection Scope

!

Paragraph (a)(3) of the MR requires that SSC performance and condition monitoring

activities, associated goals, and preventive maintenance (PM) activities be periodically
evaluated, taking into account where practical, industry-wide operating experience (IOE).

i 5 l

.

$

_ . _ _ _ _ _ . ._ ..

_ . . _

_..___ _ _ ..._._ ___ _ . _ _ _

l

,

i Additional guidance for conducting these periodic evaluations is provided in NUMARC 93-01, which states, "The periodic assessment is intended to evaluate the effectiveness of (a)(1) and (a)(2) activities [the maintenance rule (10 CFR 50.65) defines criteria for assigning SSCs to categories (a)(1) and (a)(2)] including goals that have been established, monitoring of those established goals, cause determinations and corrective actions [for SSC failures), and the effectiveness of preventive maintenance (including

[SSC) performance criteria)." This periodic evaluation (or assessment) was required to be performed at least one time during each refueling cycle, not to exceed 24 months between evaluations. The inspectors reviewed the licensee's procedural guidelines for these evaluations, the licensee's Cycle 6 periodic assessment report, anc the licensee's October 1998 Monthly Maintenance Rule Performance Repor b. Observations and Findinas The guidance for conducting periodic evaluations was contained in Nuclear Station Engineering Department (NSED) Procedure M.07, "NSED Maintenance Rule Activities,"

Section 4.12 and Attachment 4. The procedure addressed the areas to be reviewed as recommended by NUMARC 93-01, and included guidance for conducting overall effectiveness evaluations for the various areas of the MR program. The system i assessment guidance in procedure M.07 addressed the following areas: overall I performance, balance of reliability and availability, recommended changes to performance criteria, significant improvements, problems and concems, and planned improvement The Cycle 6 assessment report was the licensee's documentation of the subject periodic evaluation. The Cycle 6 assessment report met the requirements of the MR section ;

(a)(3); however, not all of the areas requiring an overall effectiveness evaluation per the '

M.07 procedure were addressed in the report, such as scope changes. A similar issue was also identified in the 1998 quality assurance (QA) audit. Since there was basically a complete scoping revision during Cycle 6, the lack of an assessment in this area was not significant. However, the inspectors commented that subsequent assessment reports ,

'

should address scope changes in accordance with the licensee's procedure M.07. The Cycle 6 assessment report was critical of the licensee's performance relative to several ;

areas of the MR program, which included effectiveness of removal of equipment from

'

service, the use of industry operating experience, the effectiveness of balancing reliability and availability, and the effectiveness of corrective actions. Based on the concems identified in these areas, actions were initiated to improve program implementation. The system performance assessments were comprehensive evaluations of the performance for each system, and included changes to maintenance activities and changes to various MR program aspects. The licensee also issued monthly reports which contained unavailability and functional failure data for each system to provide management with a continual overview of SSC performance with '

respect to their specific performance criteri . ._ _

,- - - - - - . - - ~ . .

- .. --.- . .- - -- -

,

,

'

.

4 i Conclusions in general, the guidance for performing periodic evaluations met the requirements of the MR and the intent of the NUMARC implementing guidance. The Cycle 6 assessment

' report provided good evaluations of system performance over the period by documenting changes to maintenance activities and changes to various MR program aspect M1.4 (aM3) Balancing Reliability and Unavailability ' Inspection Scope l

Paragraph (a)(3) of the MR requires that adjustments be made to planned maintenance and monitoring activities where necessary to ensure that the objective of preventing failures of SSCs through maintenance is appropriately balanced against the objective of minimizing unavailability of SSCs due to monitoring or preventive maintenance. As stated in NUMARC 93-01, "the intent is to optimize availability and reliability of the safety functions by property managing the occurrence of SSCs being out of service for <

~

preventive maintenance activities. This optimization could be achieved by any of the following:

e Ensuring that appropriate preventive maintenance is performed to meet *

availability objectives as stated in plant risk analysis, FSAR [ Final Safety Analysis

. Report], or other reliability approaches to maintenance; e Allocating preventive maintenance to applicable tasks commensurate with anticipated performance improvement (e.g., pump vibration analysis instead of tear down);

e Reviewing to determine that availability of SSCs has been acceptable; e Focusing maintenance resources on preventing those failure modes that affect a i safety function; or

e Scheduling, as necessary, the amount, type, or frequency of preventive maintenance to appropriately limit the time out of service."

- Observations and Findinos Procedure M.07 provided guidance for balancing unavailability and reliability for high safety significance SSCs. The procedure required evaluating the balance between unavailability and reliability and recommending changes to maintenance activities to optimize SSC performance.~ The procedure stated that performance criteria should be set such that staying viithin their limits was considered achieving a balance between <

reliability and availability. An SSC's reliability was defined in NUMARC 93-01 as "a measure of the expectation (assuming that the SSC is available) that the SSC will perform its function upon demand at any future instant in time." While an SSC's availability was defined in NUMARC 93-01 as "the time that a SSC is capable of

.

. -- e , ---a

. - . _ .____ _ _ _ - _ . - _ - . _ _ _ _ . _ _ . . _ _ _ - . _ _ - _ _ . _ _ .

.

.

performing its intended function as a fraction of the total time that the intended function may be demanded. The numerical complement of unavailability." The inspectors concluded that the method for balancing unavailability and reliability described in

, procedure M.07 was an acceptable method for complying with this aspect of the M ' The licensee also reviewed this balancing concept when an SSC was assigned to MR category (a)(1) and during the periodic assessment )

The licensee concluded in the Cycle 6 periodic assessment that the overall balancing of reliability and availability was not effectively implemented. Based on a review of recent action plans for SSCs assigned to the (a)(1) MR category and the system assessments conducted for the Cycle 6 periodic essessment, the inspectors concluded that the licensee was evaluating the concept of balancing unavailability and reliability more effectively, Conclusions i The inspectors concluded that the process for balancing the unavailability and reliability of SSCs was acceptable, however, based on the Cycle 6 periodic assessment, the licensee concluded that implementation of this process was ineffective. In response to this self-identified concem, the licensee took action to ensure a proper balance existed between an SSC's reliability and availability. Improvement has been recently note I M1.5 - (a)(3) On-line Maintenance Risk Assessments Inspection Scope

!

Paragraph (a)(3) of the MR states, "in performing monitoring and preventive '

maintenance activities, an assessment of the total plant equipment that is out of service '

should be taken into account to determine the overall effect on performance of safety functions." As stated in NUMARC 93-01,"on-line maintenance is a planned and  ;

scheduled activity to perform preventive or corrective maintenance, with the reactor at power, while properly controlling out-of-service time of systems or equipment. The benefits of well-managed maintenance conducted during power operations include ;

increased system and unit availability, reduction of equipment and system deficiencies i that could impact operations, more focused attention during periods when fewer activities are competing for specialized resources, and reduction of work scope during outage On-line maintenance should be carefully managed to achieve a balance between the benefits and potential impacts on safety, reliability, or availability. For example, the '

margin of safety could be adversely impacted if maintenance is performed on multiple equipment or systems simultaneously without proper consideration of risk, or operators are not fully cognizant of the limitations placed on the plant due to out of service equipment. On-line maintenance should be carefully evaluated, planned, and executed i to avoid undesirable conditions or transients, and to thereby ensure a conservative margin of core safety." The inspectors reviewed the procedures and discussed the process for conducting on-line maintenance with the PRA engineers, operations personnel, and the work control grou . - . _ -- ..

.. - . - . . . .- . . - - - . - - - - . - . . .

,

l

.

The inspectors reviewed the licensee's actions to address NRC Manual Chapter 0350 ,

Case Specific Checklist item II.4, " Establish and implement an Effective Risk  ;

Assessment Program." The three items identified as part of the NRC intemal checklist item were:

' Development of a risk assessment process for outage and on-line maintenance activitie ' Training provided to operations and work management personnel involved in risk assessmen . Establishment of thresholds for contingency plannin l Qhagrvations and Findinos l The inspectors reviewed the licensee's procedures goveming on-line risk managemen l These procedures were: (1) CPS 1151.12, "On-Line Risk Assessment," including  !

checklists CPS 1151.12F001, " Determination of On-Line Risk Levels," and CPS 1151.12F002, " Contingency Planning;" r d (2) CPS 1151.01, "On-Line Work '

Management Process." Several mire e 3 were identified with how the procedures interrelate when used to perform risk a.. . ments and with personnel responsibilities with respect to the risk assessment process. The licensee agreed to revise the procedures to clearly define the risk assessment process and personnel responsibilitie Risk Meter was a licensee-developed software program that converted the full-scope PRA into a spreadsheet, with the exception that intemal flooding events were omitte The process of using Risk Meter involved having station personnel review the current work schedule and then manually enter the systems and components actually or

potentially out-of-service into Risk Meter. Four color conditions were established in Risk

Meter (green, yellow, orange, and red) to represent risk levels. Green meant a low risk configuration; red meant a high risk configura' ion. The transition from green to yellow occurred when the on-line risk was 1.5 times the baseline CDF. A transition from yellow l

'

to orange occurred at 5 times the baseline CDF, and the transition from orange to red occurred when the on-line risk reached 1E-4 per reactor year. As with similar on-line risk programs that are being used in the industry, SSC functions deemed to be of high safety j significance by the expert panel and important balance-of-plant components that were l not modeled explicitly in the PRA, were not included in Risk Meter. As a result, operator and engineering judgement would have to be relied upon, as allowed by the procedure, ,

to recognize potentially risky plant configurations, whether pre-scheduled or emergen Procedure CPS 1151.01 specified that an on-line risk assessment be performed for the '

work management plan 2 weeks prior to the scheduled work. Despite its limitations, the i inspectors concluded that the Risk Meter software was adequate for the licensee to perform on-line risk assessment Since the licensee's program for shutdown risk assessment had been evaluated in the

-

MR baseline inspection, the inspectors performed only a limited review of the licensee's

.- ._

.-

.. _ _ _ _-.. _.__ _ _ _ __ _ - .. _ . _ . _ __.. _ _ _ _ _ _ .._

.

shutdown risk assessment program during this follow-up MR inspection. The inspectors reviewed, procedure CPS 1151.02, " Planned, Maintenance and Forced Outage Preparation," procedure CPS 1151.04, " Outage Planning and Preparation," and procedure CPS 1151.09, " Methodology for Outage Safety Reviews and Maintenance of Acceptable Shutdown Risk." Step 8.4 of procedure CPS 1151.09 identified the steps the licensee was to follow after an outage and prior to startup to ensure the risk of expected SSC configurations was evaluated during the transition period. The procedure did not include guidance on including important balance-of-plant equipment which was not addressed in Technical Specifications, but was within the scope of the MR in these risk evaluations of SSC configurations, including this equipment in the evaluations would assure that the equipment was available before transitioning to startup. Nevertheless, the inspectors concluded that the procedure was adequate to control shutdown risk and to make the transition from shutdown to startup and vice versa. Based on the results of the baseline inspecilon and the additional review during this inspection, the inspectors concluded that the licensee had developed an adequate risk assessment process for outage activitie Guidance for establishment of thresholds for contingency planning was contained in procedure CPS 1151.12F001, and consisted of a checklist which stated that orange risk conditions were considered to be high risk, such that written and pre-planned guidance / contingency plans shall be developed before entering this risk oandition in a controlled manner. For unplanned entry into this risk condition, the procedure required that contingencies be developed and implemented until the risk condition was exite Procedure CPS 1151.12F002 was to be used by the licensee for the actual contingency planning. These controls for contingency planning were considered acceptabl Conclusions The inspectors concluded the licensee had adequate on-line and outage risk assessment processes and had established acceptable thresholds for contingency planning. Training of personnel on the on-line risk procedures, however, needed to be completed prior to restar M1.6 (a)(1) Goal Settina and Monitorina and (a)(2) Preventive Maintenance Inspection Scooe The inspectors reviewed program documents in order to evaluate the process established by the licensee to set goals and monitor under (a)(1) and to verify that PM was effective under (a)(2) of the MR. Monitoring is defined in NUMARC 93-01 as

" continuous or periodic tests, inspections, measurement or trending of the performance

,

or physical characteristics of an SSC to indicate current or future performance and the l potential for failure. Monitoring is frequently conducted on a non-intrusive basis.

! Examples of preventive maintenance actions may include operator rounds, engineering

! walk downs, and management inspections." The inspectors also discussed the MR i program with appropriate plant personnel and reviewed the following systems:

J

i

-. . --. -

-.

. . _ . . . _ _ _ .. ___ __ _ . _ __ __ _ _ _._ _

.

.

(a)(1) systems (a)(2) systems  :

Control Room Heating, Ventilation, and Actuation Trip Signal Monitoring (pseudo)

Air Conditioning (HVAC) Residual Heat Removal Instrument Air Shutdown Service Water The inspectors reviewed each of these systems to ve'rify that goals or performance

'

criteria (that is criteria established to provide a basis for determining satisfactory SSC/ system performance) were established in accordance with the safety significance of the SGC/ system, that IOE was taken into consideration where practical, that appropriate ,

monitoring and trending were being performed, and that corrective actions were taken when an SSC/ system failed to meet its goal or performance criteria or experienced a ,

maintenance preventable functional failure (MPFF). Observations and Findinas  ;

'

The inspectors reviewed the performance criteria to determine if the licensee had adequately set performance criteria consistent with the assumptions used to establish the safety significance of SSCs/ systems. Section 9.3.2 of NUMARC 93-01 '

recommended that performance criteria for SSCs whose functions were considered to

_

be of high safety significance (high safety significant SSCs) be set to ensure that the availability and reliability assumptions used in the risk determining analysis (i.e., PRA)

were maintained, Observations and Findinos for Reliability and Unavailability Performance Criteria The recently completed calculation, "Clinton Power Station Maintenance Rule Quantitative Evaluation of Performance Criteria," addressed SSCs that were both in the scope of the MR and also modeled in the PRA update, whether or not those systems were of high or low safety significance. The licensee's MR program was based on defining " parent" functions and " child" functions for SSCs, which were subsets of the parent function. The monitoring period was 18 months, which was assumed to be a fuel ,

cycle. There were four functions which were monitored over two fuel cycles based on '

the limited number of demands placed on the equipmen Availability criteria developed for the MR differed from the out-of-service assumptions in

'

the PRA. Therefore, the availability criteria were confirmed by substituting bounding SSC unavailability values directly into the PRA to demonstrate that the increase in CDF was acceptable. Unavailability values were assigned to basic events in the PRA by identifying a major component in each equipment train, such as a pump, and assigning the sum of the unavailability values for that train to that component. A truncation limit of 1E-10 was established as compared to a baseline CDF of 6E-06 per reactor yea Substituting the unavailability values into the PRA resulted in a CDF of 1.6E-05 or a 66 percent increase in CDF. The inspectors considered this an acceptable increase when compared to guidance in the Electric Power Research institute (EPRI) PSA (probabilistic safety analysis) Applications Guide on the use of availability criteri _ _

.__ _ -. . - . _ _ _ _ _ _ - _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _

.

i .

s Reliability performance criteria were identified in a document titled " Systems / Structures Scoping and Performance Criteria - Clinton Power Station." This document also identified, for each high safety significant function and for all functions modeled in the PRA, the number of demands for standby systems or the number of running hours for

operating systems, the PRA failure rate, and the assigned performance criterion for each

!

'

function. From this information, the inspectors were able to compare on a sample basis the reliability performance criteria to the number of failures expected at a 95 percent

'

'

confidence level using the binomial theorem for standby functions and the Poisson distribution for normally operating functions, as described in EPRI Technical Bulletins 96-11, " Monitoring Reliability for the Maintenance Rule," and 97-03 " Monitoring Reliability for the Maintenance Rule - Failures to Run." If the probability of having the 3 number of failures specified by a particular performance criterion was greater than .

' 95 percent, then the performance criterion was considered to allow too many failures and !

the criterion was adjusted to be more conservative, in addition to the EPRI methodology, a the reliability criteria for all functions were also substituted into the PRA and resulted in a

'

1- CDF of 3.6E-05 per reactor year. The established performance criteria and the resulting CDF were considered acceptabl !

[ b.2 Observations and Findinas for Goals Established for (a)(1) SSCs

,

The inspectors determined that for the majority of SSCs monitored under category (a)(1)

of the MR, the licensee had established adequate goals and corrective action plans to

address the performance problems that formed the basis for the licensee placing the SSC in category (a)(1). This included establishing adequate goals and corrective

actions for the emergency lighting and the leak detection systems, for which adequate j goals and corrective actions had not been developed at the time of the MR baseline j i inspection. Two SSCs placed into category (a)(1) were past their due dates for i establishing goals and corrective action plans. However, an extension request, as

allowed by the licensee's corrective action program, was approved to ensure root causes were identified for the hydramotor failures on HVAC systems and for reactor water

'

i- cleanup pump shaft failures, such that adequate goals and corrective actions for these i SSCs could be put in place prior to plant start-up. The inspectors determined that the I licensee's corrective action program was being used to address these equipment performance problems in an acceptable manner.

1-l Conclusions 1  ;

. Based on the sensitivity study performed for the availability criteria, and the use of the statistical approach as defined in the EPRI technical bulletins, the inspectors considered the licensee's performance criteria for both availability and reliability to be consistent with the assumptions in the updated PRA and therefore acceptable. Appropriate goals and corrective action plans were developed for SSCs assigned to category (a)(1) of the M _

_ _ _ _ _ ._ _ _ _ .__ _ ._ _ . . _ . . _ . _ . _ _ _._ _ _ _ ._ _ ._._ _

.

.

r

M1.7 Use of Industry-wide Ooeratina Exoerience

, Inspection Scope

,

Paragraph (a)(1) of the MR states that " goals shall be established commensurate with

, safety and, where practical, taking into account industry-wide operating experience."

Paragraph (a)(3) of the MR states that " performance and condition monitoring activities and associated goals and PM activities shall be evaluated at least every refueling cycl '

The evaluations shall be conducted taking into account, where practical, industry-wide operating experience." The inspectors reviewed the program to integrate IOE into the MR monitoring program. The MR coordinator, system engineers (SEs), and an operating experience assessment department representative were interviewed to learn the extent to which they understood the application of IOE information to MR processe Observations and Findinas on Use of industry-wide Operatina Exoerlerigg

. Procedures CPS 1016.07," Industry Operating Experience Report Assessment Program," and CPS 1016.09," Conduct of Experience Assessment," delineate how the licensee gathered, evaluated, and acted on IOE; however, the procedures did not specifically link IOE use to MR activities. Procedure M.07 had been revised to require using IOE and listed numerous sources of lOE available to the SEs. The SEs also have access on their computers to IOE listings. Condition reports (CRs) were generated by the licensee for any IOE that could be applicable to the station and the CR status was actively tracke The licensee's Cycle 6 periodic assessment determined that IOE had not been consistently used with respect to the MR during the assessment period, although the inspectors concluded recent improvements in the process for using IOE were being l Implemented and that the licensee was now effectively using IOE in developing goals )

and corrective action plans. The inspectors also noted that the MR program was formally linked to the station's IOE program and that the SEs were actively using the resources provided for IO Conclusions for Use of Industry-wide Ooeratina Exoerience The inspectors determined that the use of the station IOE program in MR activities was acceptable. The (a)(1) goals and corrective action plans appropriately considered lO M2 Maintenance of Facilities and Equipment (62706)

M2.1 General System Review Insoection Scope The inspectors conducted a detailed examination of several systems from a MR perspective to assess the effectiveness of the MR program when it was applied to individual system . - - - . - - . - . . - . . -- -

h

. Observations and Findinas for the Control Room HVAC System l

As defined by the licensee, the control room HVAC system has 2 " parent" functions, ,

consisting of 12 " child" functions considered to be of low safety significance. The performance of the HVAC system in being able to fulfill it's functions was monitored using appropriate reliability and/or unavailability performance criteria. The system was ,

placed in category (a)(1) for repetitive MPFFs on hydramotors. Associated corrective actiod plans and goals were not yet established as discussed in Section M1.6.2 of this report, i Observations and Findinas for the Instrument Air System The instrument air system has 3 " parent" functions,' consisting of 5 high safety significance and 5 low safety significance " child" functions. The scoping and boundaries for the system established by the licensee were considered acceptable. The system i remained in category (a)(1) due to repetitive MPFFs associated with the automatic depressurization system pressure regulating valves. The associated corrective actions,

performance criteria, and goals were considered acceptable.

.;

' Observations and Findinos for Actuation Trio Sianal Monitorina System (96)

i

Pseudo-system 96 was developed to monitor the performance of actuation trip signals in  !

'

. numerous systems. The system has 3 " parent" functions, consisting of 29 high safety

! significance and i low safety significance " child" function. The licensee established j acceptable performance criteria for this system. The system had recently been returned

to category (a)(2) status based on a thorough review of MPFFs from which the licensee i determined that there were no repetitive MPFFs which were not being addressed by the licensee in classifying the individual systems, i.e., category (a)(1) or (a)(2). The

reciassification of the pseudo-system 96 was considered appropriate by the inspector )

. Observations and Findinas for the Residual Heat Removal System

The residual heat removal system has 1 " parent" function, consisting of 13 high safety i significance and 20 low safety significance " child" functions. The inspectors concluded that the licensee had established appropriate reliability and availability performance

. criteria for functions which could be linked to the assumptions in the licensee's PRA.

The residual heat removal system's performance satisfied the licensee's criteria for

'

monitoring the system under category (a)(2) of the MR program, i- Observations and Findinos for the Shutdown Service Water System

The shutdown service water system has 3 " parent" functions, consisting of 4 high safety  !

i significance and 10 low safety significance " child" functions. The performance of the system in being able to fulfill its functions was monitored using appropriate reliability and/or unavailability performance criteria. The shutdown service water system's

! performance satisfied the licensee's criteria for monitoring the system under category

(a)(2) of the MR progra !

i 14

!

!

__

_ _ _ _ _ _ - _ _ _ - . . .

- .. _ _ - . . _ . _ , _ _ __ _ ~ _ = _ . _ _ _ _ _ _ _ _ . . . _ . _ _ _ _

.

I Conclusions for General System' Review -

- .

!

'

- In general, SSCs were being property classified under categories (a)(1) and (a)(2) of the ;

MR. Performancs criteria, goals, and corrective actions, both in progress and planned, for SSCs in (a)(1) status appeared adequate.- The SSC functions for the systems .

reviewed were proper!y scoped under the MR. The inspectors reviewed CRs, l maintenance work requests, and the periodic assessment and did not identify any -  !

MPFFs not previously classified or unavailability time not properly tracked.' ' '

.M7 Quality Assurance (QA) In Maintenance Activities (40500)

M7.1 Licensee Self-Assessments of the Maintenance Rule Proaram 4 Inspection Scooe _

i The inspectors reviewed three licensee evaluations of the MR program, including the or October 1998 QA audit, the June 1998, independent assessment, and the September 1998, engineering self-assessmen i Observations and Findinas -

l The recent QA sudit of the MR program was broad-based and involved the use of I technical experts, which provided additional insights and improved the effectiveness of the audit. The audit resulted in the identification of a number ofitems and some l underlying significant issues. Specifically, when the identified issues were evaluated in total, the audit team's conclusion was that an adequate MR program was in place, but it was not being effectively implemented by the licensee. The licensee subsequently conducted root cause evaluations to identify underlying problems with implementation of the MR program. This resulted in the initiation of a number of corrective actions to

~

address the identified concems. Some of the underlying causes for the identified concems were ineffective communications between organizations and between the staff and senior management and the failure of organizations to take ownership for their roles and responsibilities with respect to the MR progra For example, new or revised procedures were implemented which did not specify roles and responsibilities for the individuals tasked with implementing portions of the MR program and these individuals were not adequately trained to ensure the associated processes would work as intended. The inspectors, based on their observations during this inspection, concluded that this was still an issue, albeit to a lesser extent, and further i concluded that the licensee's implementation of the MR program had improved. Based ,

on the QA organization's audit finding, the licensee plans on conducting a follow-up audit before plant restar An independent assessment was conducted by a MR coordinator from another utility to determine what improvements could be made to the MR program to ensure that the licensee was in compliance with 10 CFR 50.65. A number of observations and recommendations were identified and responded to by the licensee. The

, - - .

.

.

self-assessment conducted by engineering personnel was an effort to ensure the MR program was sufficiently ready for restart. Engineering personnel involved in the assessment concluded that the program was ready; however, some additional implementation concems were identified through the QA audit as previously stated, that required resolution, Conclusions The 1998 QA audit was thorough and probing. Based on individual issues, the auditors were able to identify significant underlying causes (lack of ownership and inadequate communications) for the ineffective implementation of the MR program. Although actions have been identified and were being implemented to correct the weaknesses, it was too soon to determine their effectiveness. The use of outside personnelin the audit provided independent insights into the MR program and added to the overall quality of the program assessment M8 Miscellaneous Maintenance issues (92902)

M8.1 (Closed) Violation 50-461/98005-01(DRS): This was a violation for which enforcement discretion was exercised and involved not properly including SSCs in the scope of the MR. In the October 1997 QA audit, the independent assessment, and the subsequent re-scoping effort, the licensee identified SSCs and functions that required inclusion in the MR scope. In the recent QA audit, the audit team identified questionable scoping -

decisions for several SSC functions. From the investigation for the resulting CR 1-98-10-170, the licensee determined that an existing scoping document had been recently converted into a large database resulting in a number of errors. The licensee was in the process of re-evaluating and strengthening the information contained in the database to clarify the existing scoping. The inspectors evaluated the licensee's resolution of the scoping issues against the requirements of the MR and concluded that scoping concems had been properly addressed. This issue is close M8.2 (Closed) Insoection Follow-uo item 50-461/98005-02(DRS): This issue concerned the adequacy of the risk determination process, which was under revision at the time of the baseline inspection. Based on the discussion in Section M1.2 of this report, this issue is close M8.3 (Closed) Insoection Follow-uo item 50-461/98005-03(DRS): This issue concerned completion of the Cycle 6 periodic assessment review. Based on the discussion in Sections M1.3 and M1.4 of this report, this issue is close M8.4 (Closed) Insoection Follow-uo item 50-461/98005-04(DRS): This issue concerned adequacy of the on-line risk assessment process. Based on the discussion in Section M1.5 of this report, this issue is close M8.5 (Closed) Violation 50-461/98005-05(DRS): This was a violation for which enforcement discretion was exercised and involved establishing inadequate performance criteri Based on the discussion in Section M1.6 of this report, this issue is close .- .. - - - __ _ __ _ . __ _ _ _ _ . - _ _ . .. __ _

.

.

M8.6 (Closed) Violation 50-461/98005-06(DRS); This was a violation for which enforcement discretion was exercised and involved establishing inadequate goals. Based on the  !

discussion in Section M1.6 of this report, this issue is close ,

M8.7 (Ooen) Violation 50-461/98005-07(DRS): This was a violation for which enforcement discretion was exercised and involved the failure to monitor goals for (a)(1) SSC Specifically, the licensee was not identifying MPFFs, not identifying and tracking unavailability, and not monitoring unavailability for SSCs which required monitoring and -

which were required to be available during shutdown. During this inspection, the

'

inspectors verified that the licensee was tracking MPFFs and unavailability for SSCs needed for shutdown operations. The inspectors also evaluated the licensee's activities for tracking MPFFs and monitoring unavailability while shutdown for key safety functions as well as for other SSCs required during the shutdown mode of operations. Based on these evaluations, the inspectors determined that the licensee's monitoring activities were acceptable. This portion of the violation is closed. Due to recent issues identified .

in the QA audit concerning the inadequate implementation of the MR program, the other two issues will remain open pending further review by QA personnel and the NRC as to i the effectiveness of the MR implementation and monitoring of availability and reliabilit l M8.8 (Open) Case Specific Checklist item 11.4: Establish and implement an eifective risk assessment program. As discussed in Section M1.5 of this report, the licensee has ,

established a risk assessment process for outage and on-line maintenance activities, )

and established thresholds for contingency planning. However, this issue will remain

'

open pending completion of the required training on the recently issued on-line risk assessment procedure M8.9 (Closed) Case Specific Checklist item V.3: Establish MR program. Based on the results of this inspection as documented in this report, the license has developed an acceptable MR program, although the effectiveness of its implementation will be further reviewed as follow-up to Non-Cited Violation 50-461/98005-07. This issue is close . Enaineerina E4 Engineering Staff Knowledge and Performance (62706)

E System Enaineers' Knowledae of the Maintenance Rule l 4 Insoection Scooe (62706)

The inspectors interviewed SEs to assess their understanding of PRA, the MR, and  ;

associated responsibilitie Observations and Findinos The SEs were experienced and knowledgeable about their systems and MR requirements. Responsibilities included tracking the performance of their assigned

.- - - .

-

1 1

.

!

l l

i systems, MPFF determinations, and the preparation of goals and corrective action.' The l SEs were familiar with the MR databases set up to track SSC failures and unavailabilit l Industry-wide operating experience data was easily retrieved from their work station computers and used to make adjustments to goals, performance criteria, and  !

maintenance activities on their systems. The timeliness concems with MR activities l identified in the QA audit appeared to be resolved and performance indicators were -

identified and implemented by the licensee to ensure that MR activities were conducted in a timely manne The guidance provided to SEs in Procedure M.07, step 4.6.3.5.4, for tracking system unavailability of support and supported systems, was potentially confusing. The guidance could lead SEs to not properly track system unavailability when certain system l

support components fail. However, based on discussions with two SEs, the inspectors ,

determined that the SEs were familiar with proper methods of tracking unavailability for support and supported systems and no specific cases were identified where l unavailabihty was not being properly tracked. Nevertheless, the licensee stated that !

procedure M.07 would be revised to clarify the guidance, Conclusions The SEs were experienced and knowledgeable about their systems and understood their responsibilities with respect to the M l

,

V. Management Meetings l

X1 Exit Meeting Summary The inspectors discussed the progress of the inspection with licensee representatives on a daily l basis and presented the inspection results to members of licensee management at the conclusion of the inspection on December 18,1998. The licensee acknowledged the findings '

l presented. The inspectors asked the licensee whether any materials examined during the

'

inspection should be considered proprietary; none was identified.

l i

i l

I

'

18 i l

1 _ J

. .- .- _ .. - - I

l PARTIAL LIST OF PERSONS CONTACTED )

Licensee J. Barron, Director, Plant Engineering M. Bridges, System Engineer l V. Cwietniewicz, Manager, Maintenance T Devore, System Engineer .

i M. Dodds, Experience Assessment l A. Hable, PRA Engineer  !

G. Hunger, Manager, CPS T. Husted, System Engineer J. Jansen, PRA Engineer K. Johnson, Manager, Nuclear Training and Support G. Krampholz, Plant Engineering J. Logan, System Engineer W. Maguire, Director Operations .

D. Majeras, System Engineer I G. Mosely, Work Management Unit Coordinator l R. Nilsson, Quality Assurance l M. Norris, Supervisor, Engineering Assurance l T. Parrent, Quality Assurance  !

R. Phares, Manager, Nuclear Safety and Performance improvement W. Romberg, Manager, Nuclear Station Engineering Department B. Stalter, Work Management M. Stookey, Licensing D. Szymklewicz, Maintenance Rule Coordinator M. Tacelosky, Operetions Services Manager E. Tiedemann, Shift Technical Advisor l G. Vandre, Nuclee- 4tation Engineering Department J. Waddell, Indel:bndent Analysis Group P. Walberg, PRA Supervisor LIST OF INSPECTION PROCEDURES USED IP 62706: Maintenance Rule IP 40500: Effectiveness of Licensee Controls in Identifying, Resolving, and Preventing )

Problems l lP 92902 Follow-up - Maintenance J l

l l

!

)

... -. - - - . . - - ~ . . ---- -.. .

.

.

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED 9.19fdtd 50-461/98005-01(DRS) . NCV Scoping Errors 50-461/98005-02(DRS) IFl Risk determination Process 50-461/98005-03(DRS) IFl Cycle 6 Periodic Assessment Review I 50-461/98005-04(DRS) . IFl On-line Risk Assessment 1 50-461/98005-05(DRS) NCV Inadequate Performance Criteria 50-461/98005-06(DRS) NCV Inadequate Goals Case Specific Checklist item Establish Maintenance Rule Program Discussed I

50-461/98005-07(DRS) _ NCV Failure to Monitor Goals Case Specific Checklist item I Establish and implement an Effective Risk l Assessment Program I LIST OF ACRONYMS USED BNL Brookhaven National Laboratory i CDF Core Damage Frequency l CFR Code of Federal Regulations CPS Clinton Power Station CR ' Condition Report DRS- Division of Reactor Safety EPRI Electric Power Research Institute HVAC Heating, Ventilation, and Air Conditioning IFl inspection Follow-up ltem l

'

IOE Industry-wide Operating Experience IP inspection Procedure MPFF Maintenance Preventable Functional Failure '

MR ' Maintenance Rule NCV Non-Cited Violation

'

NRC Nuclear Regulatory Commission NRR Nuclear Reactor Regulation  ;

'

NSED . Nuclear Station Engineering Department NUMARC Nuclear Management Resource Council PM Preventive Maintenance PRA Probabilistic Risk Assessment PSA ' Probabilistic Safety Assessment

'QA Quality Assurance SE System Engineer SSC Structure, System, or Component l

.

.-. .-- - -=.- - -.-.-,- - - - - . . - . - -

,

.  !

.  !

. :.-

-

l

p LIST OF DOCUMENTS REVIEWED

  • NSED Procedure M.07,"NSED Maintenance Rule Activities," Revision 6,12/3/98
  • CPS No.1029.05, " Implementation of the Maintenance Rule at CPS," Revision 2,3/1/98
  • CPS No.1016.07, " Industry Operating Experience Report Assessment Program," Revision 2, 1 1- ' 7/16/98

-

e * CPS No.1016.09," Conduct of Experience Assessment," Revision 0,7/1/98

, * CPS No.1014.10 " Availability Tracking of Systems, Structures, and Components," Revision 3,

! 12/10/98-

'

  • CPS No.1141.01, " Work Control Program," Revision 1,6/25/97 ,

3 * CPS No.1151.01, "On-Line Work Management Process," Revision 4, 9/11/98 with Change N .l i PAC 0493-98,12/3/98 I

,

  • CPS No.1151.02, " Planned, Maintenance and Forced Outage Preparation," Revision 4,8/7/98 I E with Change No. PAC 0494-98,12/3/98

.

  • CPS No.1151.04, " Outage Planning and Preparation," Revision 4,6/26/98 with Change No. 2, L 12/3/98 . _ <

j * CPS No.1151.09, " Methodology for Outage Safety Reviews and Maintenance of Acceptable I

[ Shutdown Risk," Revision 3,12/10/98 I

- -*CPS No.1151.12,"On-Line Risk Assessment," Revision 1,12/11/98 i
.* CPS No.1151.12F001," Determination of On-Line Risk Levels," Revision 0,12/11/98 i i~ * CPS No.1151.12F002, " Contingency Planning," Revision 0,12/11/98
* CPS No.1016.01, " CPS Condition Reports," Revision 29,4/11/97 l

[ * "Clinton Power Station - Calculation of System and Component importance Measures," ;

'

12/11/98 '

'

' CPS analysis, " Risk Significance for the Loss of Feedwater initiator"

  • CPS Calculation, "Clinton Power Station Maintenance Rule Quantitative Evaluation of i-

,

Performance Criteria"

' * CPS, " Systems / Structures Scoping and Performance Criteria - Clinton Power Station,"

[ 12/14/98 ~

. Assessment of Maintenance Effectiveness at Clinton Power Station for Cycle 6,7/10/98 j * October 1998 Monthly Maintenance Rule Performance Report

. 'NE-98-45, NSED Self Assessment of Maintenance Rule,9/30/98

! * Program Readiness Restart Review Report, Maintenance Rule,8/12/98 ( *Q38-98-18, Quality Assurance Audit Report on Maintenance Rule,10/26/98 9 *Q38-97-14, Quality Assurance Audit Report on Maintenance Rule,10/97

'

  • Self-Assessment No.98-150," Assessment of Experience Assessment Department"
  • Y-108496 Letter, " Expectations: Communications up the Chain of Command," 12/4/98
  • Y-108266, " Support of Maintenance Rule Expert Panel," 8/21/98

' 'Y-107193, " Reclassification of Pseudosystem 96-00 to Maintenance Rule Status of a(2),

11/4/98

  • Nuclear Policy Statement #21 " Implementation of the Maintenance Rule at CPS," Revision 0, 12/3/98
  • Clinton Power Station Individual Plant Examination, 9/92
  • Probability Risk Assessment Update Report,12/95
  • Condition Reports: Q-98-10-094,1-98-09-350,1-98-07-125, Q-98-10-167, Q-98-10-168, 1-98-10-169,1-98-10-170,1-98-09-246,1-97-10-506,1-97-10-427,1-97-09-233,1-98-06-125, 1-98-03-083-00,1-98-04-194-0,1-98-04-445-0