Similar Documents at Perry |
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000440/20243012025-01-23023 January 2025 NRC Initial License Examination Report 05000440/2024301 IR 05000440/20244022025-01-13013 January 2025 Security Baseline Inspection Report 05000440/2024402 IR 05000440/20240102024-12-0505 December 2024 NRC - Inspection Report 05000440/2024010 IR 05000440/20240032024-10-30030 October 2024 Integrated Inspection Report 05000440/2024003 and 07200069/2024001 IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 IR 05000440/20240112024-06-17017 June 2024 Fire Protection Team Inspection Report 05000440/2024011 IR 05000440/20240012024-04-24024 April 2024 Integrated Inspection Report 05000440/2024001 IR 05000440/20230062024-02-28028 February 2024 Annual Assessment Letter for Perry Nuclear Power Plant, Unit 1 (Report 05000440/2023006) IR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) IR 05000440/20220062023-03-0101 March 2023 Annual Assessment Letter for Perry Nuclear Power Plant, Unit 1 (Report 05000440/2022006) IR 05000440/20224062023-02-13013 February 2023 Material Control and Accounting Program Inspection Report 05000440/2022406 IR 05000440/20220042023-02-10010 February 2023 Integrated Inspection Report 05000440/2022004; and 07200069/2022001 and Exercise of Enforcement Discretion IR 05000440/20223012023-01-24024 January 2023 05000440/2022301 IR 05000440/20224052022-12-20020 December 2022 Security Baseline Inspection Report 05000440/2022405 (Cover Letter Only) IR 05000440/20220032022-11-0808 November 2022 Integrated Inspection Report 05000440/2022003 IR 05000440/20225012022-10-17017 October 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000440/2022501 IR 05000440/20220102022-09-29029 September 2022 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000440/2022010 IR 05000440/20220052022-08-26026 August 2022 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2022005) IR 05000440/20220022022-08-0808 August 2022 Integrated Inspection Report 05000440/2022002 IR 05000440/20224202022-08-0404 August 2022 Security Baseline Inspection Report 05000440/2022420 - Cover Letter IR 05000440/20224022022-07-21021 July 2022 Security Baseline Inspection Report 05000440/2022402 IR 05000440/20224042022-06-0909 June 2022 Security Baseline Inspection Report 05000440/2022404 IR 05000440/20220012022-05-12012 May 2022 Integrated Inspection Report 05000440/2022001 IR 05000440/20210062022-03-0202 March 2022 Annual Assessment Letter for Perry Nuclear Power Plant, Unit 1 (Report 05000440/2021006) IR 05000440/20224012022-02-17017 February 2022 Security Baseline Inspection Report 05000440/2022401 IR 05000440/20210042022-02-11011 February 2022 Integrated Inspection Report 05000440/2021004 IR 05000440/20224032022-02-0909 February 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000440/2022403 IR 05000440/20210132022-01-10010 January 2022 Biennial Problem Identification and Resolution Inspection Report 05000440/2021013 IR 05000440/20210102021-12-0101 December 2021 Triennial Fire Protection Inspection Report 05000440/2021010 IR 05000440/20210032021-11-12012 November 2021 Integrated Inspection Report 05000440/2021003 IR 05000440/20214022021-10-27027 October 2021 Security Baseline Inspection Report 05000440/2021402 IR 05000440/20210122021-09-30030 September 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000440/2021012 IR 05000440/20210052021-09-0101 September 2021 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2021005) IR 05000440/20210022021-08-12012 August 2021 Integrated Inspection Report 05000440/2021002 IR 05000440/20210012021-06-10010 June 2021 NRC Inspection of Temporary Instruction 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the OPC Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01)-Inspection Report 05 ML21132A0952021-05-12012 May 2021 Integrated Inspection Report 05000440/2021001 IR 05000440/20213012021-04-0808 April 2021 NRC Initial License Examination Report 05000440/2021301 IR 05000440/20200062021-03-0404 March 2021 Annual Assessment Letter Perry Nuclear Power Plant (Report 05000440/2020006) IR 05000440/20200042021-02-12012 February 2021 Integrated Inspection Report 05000440/2020004 2025-01-23
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000440/19990131999-09-13013 September 1999 Insp Rept 50-440/99-13 on 990712-30.Violations Noted. Major Areas Inspected:Effectiveness of PNPP Program for Identification,Resolution & Prevention of Technical Issues & Problems That Could Degrade Quality of Plant Operations IR 05000440/19990091999-09-0909 September 1999 Insp Rept 50-440/99-09 on 990709-0825.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20211M6521999-08-31031 August 1999 Revised Page Number 4, P2 Status of EP Facilities,Equipment & Resources IR 05000440/19990121999-08-12012 August 1999 Insp Rept 50-440/99-12 on 990712-16.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program IR 05000440/19990081999-07-22022 July 1999 Insp Rept 50-440/99-08 on 990518-0708.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000440/19990031999-06-10010 June 1999 Insp Rept 50-440/99-03 on 990407-0517.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000440/19990071999-05-12012 May 1999 Insp Rept 50-440/99-07 on 990412-16.No Violations Noted. Major Areas Inspected:Rp Performance & Oversight of Refueling Outage Activities IR 05000440/19990061999-05-0606 May 1999 Insp Rept 50-440/99-06 on 990303-04 & 0412-16.No Violations Noted.Major Areas Inspected:Inservice Insp Efforts & Overlay Repairs of N4C Feedwater Nozzle IR 05000440/19990021999-05-0303 May 1999 Insp Rept 50-440/99-02 on 990225-0406.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000440/19990051999-04-0202 April 1999 Insp Rept 50-440/99-05 on 990301-05.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maint at Npps IR 05000440/19990011999-03-17017 March 1999 Insp Rept 50-440/99-01 on 990113-0224.Non-cited Violation Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000440/19990041999-03-17017 March 1999 Insp Rept 50-440/99-04 on 990222-26.No Violations Noted. Major Areas Inspected:Radiation Protection Program & Radiological Planning for Upcoming Refueling Outage,Which Included Review of Rwps,Alara Reviews & Dose Goals IR 05000440/19980191998-12-23023 December 1998 Insp Rept 50-440/98-19 on 981021-1202.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000440/19980221998-11-25025 November 1998 Chemistry & RP Insp Rept 50-440/98-22 on 981102-06.No Violations Noted:Major Areas Inspected:Implementation of Chemistry Program,Meteorological Monitoring Program & Control & Monitoring of Personnel Radiation Dose IR 05000440/19980211998-11-18018 November 1998 Insp Rept 50-440/98-21 on 981019-22.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000440/19980181998-11-10010 November 1998 Insp Rept 50-440/98-18 on 980909-1020.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000440/19980171998-10-0707 October 1998 Insp Rept 50-440/98-17 on 980831-0914.Violations Noted. Major Areas Inspected:Review of Implementation of Solid Radwaste Mgt & Shipping Program.Insp Also Reviewed Conduct of Radiological Environ Monitoring Program IR 05000440/19980161998-09-25025 September 1998 Insp Rept 50-440/98-16 on 980723-0908.No Violations Noted. Major Areas Inspected:Resident Inspectors Evaluation of Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000440/19980151998-09-0808 September 1998 Insp Rept 50-440/98-15 on 980727-31.Violations Noted. Major Areas Inspected:Effectiveness of Selected Elements of Security Program IR 05000440/19980141998-08-19019 August 1998 Insp Rept 50-440/98-14 on 980620-24 & 0720-22.No Violations Noted.Major Areas Inspected:Licensee C/A for Issues Identified by NRC Inspections & Licensee Event Repts Submitted to NRC IR 05000440/19980111998-07-16016 July 1998 Insp Rept 50-440/98-11 on 980518-22.Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures, Training,Equipment & Supporting Documentation for Maint of medium-voltage & low-voltage Power Circuit Breakers IR 05000440/19980101998-07-0909 July 1998 Insp Rept 50-440/98-10 on 980421-0604.Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance,Engineering & Plant Support IR 05000440/19980071998-04-29029 April 1998 Insp Rept 50-440/98-07 on 980223-0305.Violations Noted. Major Areas Inspected:Operations,Engineering & Maintenance IR 05000440/19980051998-04-27027 April 1998 Insp Rept 50-440/98-05 on 980209-0408.No Violations Noted. Major Areas Inspected:Portions of Licensee Fire Protection Program IR 05000440/19980061998-04-0101 April 1998 Insp Rept 50-440/98-06 on 980128-0310.Violations Noted.Major Areas Inspected:Licensee Operations,Maint & Engineering IR 05000440/19980031998-03-26026 March 1998 Insp Rept 50-440/98-03 on 980223-27.No Violations Noted. Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000440/19980021998-03-12012 March 1998 Insp Rept 50-440/98-02 on 980112-16 & 26-30.No Violations Noted.Major Areas Inspected:Operations,Engineering & Review of Effectiveness of CA Program IR 05000440/19970211998-02-20020 February 1998 Insp Rept 50-440/97-21 on 971202-980127.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000440/19970171998-01-21021 January 1998 Insp Rept 50-440/97-17 on 971103-07 & 971215-18.No Violations Noted.Major Areas Inspected:Ep Program IR 05000440/19980041998-01-16016 January 1998 Insp Rept 50-440/98-04 on 980105-09.No Violations Noted. Major Areas Inspected:Radiolological,Environ & Chemistry Sections Programs IR 05000440/19970201998-01-12012 January 1998 Insp Rept 50-440/97-20 on 971202-05.No Violations Noted. Major Areas Inspected:Review of Physical Security Program IR 05000440/19970161998-01-0202 January 1998 Insp Rept 50-440/97-16 on 971004-1201.Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000440/19970221997-12-31031 December 1997 Insp Rept 50-440/97-22 on 971015-1201.Violations Noted. Major Areas Inspected:Circumstances That Led to Inadvertent Loss of Reactor Pressure Vessel Water Inventory That Occured on 971011 IR 05000440/19970151997-12-21021 December 1997 Insp Rept 50-440/97-15 on 970922-1023.No Violations Noted. Major Areas Inspected:Isi Efforts & Installation Activities of Suppression Pool Suction Strainer Mod IR 05000440/19970091997-11-26026 November 1997 Insp Rept 50-440/97-09 on 970624-0808.Violations Noted. Major Areas Inspected:Operations,Maintenance & Surveillance, Engineering & Plant Support IR 05000440/19970191997-11-25025 November 1997 Insp Rept 50-440/97-19 on 971027-31.No Violations Noted. Major Areas Inspected:Radiological Controls,Radwaste Controls,Radiation Worker Practices & High Radiation Area Controls IR 05000440/19970071997-10-24024 October 1997 Insp Rept 50-440/97-07 on 970503-0623.Violations Noted. Major Areas Inspected:Operations,Maintenance,Surveillance, Engineering & Plant Support IR 05000440/19970141997-10-17017 October 1997 Insp Rept 50-440/97-14 on 970915-19.No Viiolations Noted. Major Areas Inspected:Review of Radiation Protection Program,Including Radiation Protection Planning & Coverage for Sixth Refueling Outage ML20212A3721997-10-16016 October 1997 Predecisional Enforcement Conference Rept on 971007.Areas Discussed:Apparent Violations Identified During Insp & CA Taken or Planned by Licensee.Apparent Violations Involved SE That Failed to Identify Unreviewed Safety Question IR 05000440/19970131997-09-29029 September 1997 Insp Rept 50-440/97-13 on 970826-28.No Violations Noted. Major Areas Inspected:Followup to Maintenance Rule Baseline Insp IR 05000440/19970081997-09-23023 September 1997 Insp Rept 50-440/97-08 on 970721-0827.Violations Noted. Major Areas Inspected:Unresolved Items & Insp follow-up Items Identified by Design Insp Conducted from 970127-0327 IR 05000440/19970111997-08-26026 August 1997 Insp Rept 50-440/97-11 on 970728-31.No Violations Noted. Major Areas Inspected:Licensee Fire Protection Program IR 05000440/19970041997-06-16016 June 1997 Insp Rept 50-440/97-04 on 970322-0502.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance, Engineering & Plant Support IR 05000440/19972011997-06-10010 June 1997 Insp Rept 50-440/97-201 on 970217-0327.Issues Identified Which Challenged Capability of Sys to Perform Complete Scope DBA Mitigation Actions.Major Areas Inspected:Hpcs & Eec Sys ML20140C2631997-06-0303 June 1997 Insp Rept 50-440/97-06 on 970421-24.Violations Noted.Major Areas Inspected:Review of Plant Maint Dept Fuse Control Process,Procedure/Instruction Change Process & Selection of Qualified Maint Personnel to Do safety-related Work IR 05000440/19970051997-05-0808 May 1997 Insp Rept 50-440/97-05 on 970407-11.No Violations Noted. Major Areas Inspected:Insp Included Audits,Corrective Actions & Mgt Support Effectiveness of Mgt Controls.Insp Rept Details Withheld IR 05000440/19970031997-05-0505 May 1997 Insp Rept 50-440/97-03 on 970303-0410.No Violations Noted. Major Areas Inspected:Plant Support & Mgt Meetings IR 05000440/19970021997-04-23023 April 1997 Insp Rept 50-440/97-02 on 970204-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000440/19960181997-03-19019 March 1997 Insp Rept 50-440/96-18 on 961221-970203.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint, & Plant Support IR 05000440/19960161997-02-0404 February 1997 Insp Rept 50-440/96-16 on 961028-970124.No Violations Noted. Major Areas Inspected:Engineering & Plant Support 1999-09-09
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20212A8531999-09-13013 September 1999 Notice of Violation from Insp on 990712-30.Violation Noted: from 980324-990730,TS SR 3.5.1.4 & 3.5.2.5 Failed to Require Each ECCS Pump to Develop Pump Differential Pressure Greater than or Equal to ECCS Total Flow Resistance IR 05000440/19990131999-09-13013 September 1999 Insp Rept 50-440/99-13 on 990712-30.Violations Noted. Major Areas Inspected:Effectiveness of PNPP Program for Identification,Resolution & Prevention of Technical Issues & Problems That Could Degrade Quality of Plant Operations IR 05000440/19990091999-09-0909 September 1999 Insp Rept 50-440/99-09 on 990709-0825.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20211M6521999-08-31031 August 1999 Revised Page Number 4, P2 Status of EP Facilities,Equipment & Resources IR 05000440/19990121999-08-12012 August 1999 Insp Rept 50-440/99-12 on 990712-16.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program IR 05000440/19990081999-07-22022 July 1999 Insp Rept 50-440/99-08 on 990518-0708.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000440/19990031999-06-10010 June 1999 Insp Rept 50-440/99-03 on 990407-0517.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20207B1291999-05-20020 May 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $110,000.Violation Noted:Centerior Energy Corp Through Actions of RPM Discriminated Againt Rps,On 970716,as Result of RPS Engaging in Protected Activities ML20209B8891999-05-17017 May 1999 EN-99-019:on 990520,notice of Proposed Imposition of Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based Upon Severity Level II Violation Involving Radiation Protection Manager Discrimination Against Supervisor IR 05000440/19990071999-05-12012 May 1999 Insp Rept 50-440/99-07 on 990412-16.No Violations Noted. Major Areas Inspected:Rp Performance & Oversight of Refueling Outage Activities ML20196A3131999-05-10010 May 1999 Notice of Violation from Investigation on 990129.Violation Noted:On 970114,K Wierman Employed as Training Instructor at Plant & Deliberately Submitted Info to Util That Wierman Knew to Be Incomplete or Inaccurate ML20206Q2301999-05-10010 May 1999 Notice of Violation from Investigation Completed on 990129. Violation Noted:On 970114,info Required by Commission Regulations Not Maintained Complete & Accurate in All Matl Respects IR 05000440/19990061999-05-0606 May 1999 Insp Rept 50-440/99-06 on 990303-04 & 0412-16.No Violations Noted.Major Areas Inspected:Inservice Insp Efforts & Overlay Repairs of N4C Feedwater Nozzle IR 05000440/19990021999-05-0303 May 1999 Insp Rept 50-440/99-02 on 990225-0406.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000440/19990051999-04-0202 April 1999 Insp Rept 50-440/99-05 on 990301-05.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maint at Npps IR 05000440/19990011999-03-17017 March 1999 Insp Rept 50-440/99-01 on 990113-0224.Non-cited Violation Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000440/19990041999-03-17017 March 1999 Insp Rept 50-440/99-04 on 990222-26.No Violations Noted. Major Areas Inspected:Radiation Protection Program & Radiological Planning for Upcoming Refueling Outage,Which Included Review of Rwps,Alara Reviews & Dose Goals IR 05000440/19980191998-12-23023 December 1998 Insp Rept 50-440/98-19 on 981021-1202.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20210Q9291998-12-10010 December 1998 Investigation Rept 3-1998-007.No Noncompliance Noted.Major Areas Investigated:Alleged Discrimination Against Radiation Protection Supervisor for Testifying as Witness in Dept of Labor Proceedings IR 05000440/19980221998-11-25025 November 1998 Chemistry & RP Insp Rept 50-440/98-22 on 981102-06.No Violations Noted:Major Areas Inspected:Implementation of Chemistry Program,Meteorological Monitoring Program & Control & Monitoring of Personnel Radiation Dose IR 05000440/19980211998-11-18018 November 1998 Insp Rept 50-440/98-21 on 981019-22.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000440/19980181998-11-10010 November 1998 Insp Rept 50-440/98-18 on 980909-1020.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20195C7231998-11-10010 November 1998 Notice of Violation from Insp on 980909-1020.Violation Noted:On 980902,inspectors Identified That Fire Watch Did Not Verify That Special Instructions of Burn Permit B98-DG-83,used for Welding Conducted on DG Were Met IR 05000440/19980171998-10-0707 October 1998 Insp Rept 50-440/98-17 on 980831-0914.Violations Noted. Major Areas Inspected:Review of Implementation of Solid Radwaste Mgt & Shipping Program.Insp Also Reviewed Conduct of Radiological Environ Monitoring Program ML20154H1681998-10-0707 October 1998 Notice of Violation from Insp on 980831-0914.Violation Noted:As of 980415,licensee Had Not Made Adequate Surveys to Assure Compliance with 10CFR20.2006 IR 05000440/19980161998-09-25025 September 1998 Insp Rept 50-440/98-16 on 980723-0908.No Violations Noted. Major Areas Inspected:Resident Inspectors Evaluation of Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000440/19980151998-09-0808 September 1998 Insp Rept 50-440/98-15 on 980727-31.Violations Noted. Major Areas Inspected:Effectiveness of Selected Elements of Security Program ML20151V3521998-09-0808 September 1998 Notice of Violation from Insp on 980727-31.Violation Noted: on 971219,licensee Conducted Breath Analysis as Part of for Cause Test Based on Odor of Alcohol,However Drug Portion of for Cause Test Not Conducted in Timely Manner IR 05000440/19980141998-08-19019 August 1998 Insp Rept 50-440/98-14 on 980620-24 & 0720-22.No Violations Noted.Major Areas Inspected:Licensee C/A for Issues Identified by NRC Inspections & Licensee Event Repts Submitted to NRC ML20236R8111998-07-16016 July 1998 Notice of Violation from Insp on 980518-22.Violations Noted: as of 980520,as-tested Instantaneous Trip Function of Circuit Breaker EF1B04 Used for Emergency Closed Cooling Pump Motor 1P42C001A,inadequate IR 05000440/19980111998-07-16016 July 1998 Insp Rept 50-440/98-11 on 980518-22.Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures, Training,Equipment & Supporting Documentation for Maint of medium-voltage & low-voltage Power Circuit Breakers ML20236N0231998-07-0909 July 1998 Notice of Violation from Insp on 980421-0604.Violation Noted:Inspectors Identified That on 980504,operations Personnel Failed to Verify 1 Restoration Items Specified in Surveillance Instruction Sys Restoration Checklist IR 05000440/19980101998-07-0909 July 1998 Insp Rept 50-440/98-10 on 980421-0604.Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance,Engineering & Plant Support ML20236L8941998-07-0808 July 1998 Errata to Notice of Violation from Insp Rept 50-440/97-21 on 971202-980127.Violation Noted:On 980106,combustible Matl W/No Transient Combustible Permit in Fire Area Containing Redundant Trains of safety-related Equipment,Identified ML20249C5641998-06-25025 June 1998 Notice of Violation from Insp on 980601-05.Violation Noted: on 980504-21,an Individual,Conducting Radiologically Restricted Area Entries Under Radiation Work Permits 980003, 980047 & 980051 Did Not Wear Thermoluminescent Dosimeter ML20217M1141998-04-29029 April 1998 Notice of Violation from Insp on 980223-0305.Violation Noted:On 980227,licensed Operator Incorrectly Removed Red Tag & Installed Fuse for Annulus Exhaust Gas Treatment Sys Instead of Installing Fuse for ESW Ventilation Sys IR 05000440/19980071998-04-29029 April 1998 Insp Rept 50-440/98-07 on 980223-0305.Violations Noted. Major Areas Inspected:Operations,Engineering & Maintenance IR 05000440/19980051998-04-27027 April 1998 Insp Rept 50-440/98-05 on 980209-0408.No Violations Noted. Major Areas Inspected:Portions of Licensee Fire Protection Program ML20212H3331998-04-0909 April 1998 EN-97-106A:on 971218,licensee Responded to NOV & Proposed Imposition of Civil Penalty in Amount $100,000.Licensee Denied Violation Re 10CFR50.59 & Requested Remission.Request Denied & Order Imposing Civil Monetary Penalty Issued IR 05000440/19980061998-04-0101 April 1998 Insp Rept 50-440/98-06 on 980128-0310.Violations Noted.Major Areas Inspected:Licensee Operations,Maint & Engineering IR 05000440/19980031998-03-26026 March 1998 Insp Rept 50-440/98-03 on 980223-27.No Violations Noted. Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000440/19980021998-03-12012 March 1998 Insp Rept 50-440/98-02 on 980112-16 & 26-30.No Violations Noted.Major Areas Inspected:Operations,Engineering & Review of Effectiveness of CA Program IR 05000440/19970211998-02-20020 February 1998 Insp Rept 50-440/97-21 on 971202-980127.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203D8211998-02-20020 February 1998 Notice of Violation from Insp on 971202-980127.Violation Noted:On 971208,an Inspector Observed Fire Door Between Div 2 & 3 Emergency Diesel Generator Rooms Stuck in Fully Open Position PNO-III-98-009, on 980123,licensee Declared Unusual Event Under Emergency Plan Because of Spill of Up to 275 Gallons of Refrigerant Called Trichlorethylene.No Plant Personnel Were in Bldg at Time of Spill1998-01-23023 January 1998 PNO-III-98-009:on 980123,licensee Declared Unusual Event Under Emergency Plan Because of Spill of Up to 275 Gallons of Refrigerant Called Trichlorethylene.No Plant Personnel Were in Bldg at Time of Spill IR 05000440/19970171998-01-21021 January 1998 Insp Rept 50-440/97-17 on 971103-07 & 971215-18.No Violations Noted.Major Areas Inspected:Ep Program IR 05000440/19980041998-01-16016 January 1998 Insp Rept 50-440/98-04 on 980105-09.No Violations Noted. Major Areas Inspected:Radiolological,Environ & Chemistry Sections Programs IR 05000440/19970201998-01-12012 January 1998 Insp Rept 50-440/97-20 on 971202-05.No Violations Noted. Major Areas Inspected:Review of Physical Security Program IR 05000440/19970161998-01-0202 January 1998 Insp Rept 50-440/97-16 on 971004-1201.Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 07100004/20120011998-01-0202 January 1998 Notice of Violation from Insp on 971004-1201.Violation Noted:On 971006,personnel Began Work on Reactor Recirculation Sys Flow Control Valve Actuator W/O Verifying. That tag-out Adequately Isolated Work Area from RCS 1999-09-09
[Table view] |
Inspection Report - Perry - 1996012 |
---|
|
|
Text
._
_ _
. _. _.
_ - _ _ _
_.. _
_.
- - _..
.. _.. _. -. _ _ _ _
_ - -
.
.. _.... _. _,
.
.
U. S. NUCLEAR REGULATORY COMMISSION REGION lli Docket No:
50-440 License No:
NPF-58 Report No:
50-440/96012(DRS)
I Licensee:
Cleveland Electric illuminating Company Facility:
Perry Nuclear Power Plant Location:
P. O. Box 97, A200 Perry, OH 44081 Dates:
October 7 through 11,1996 Inspectors:
E. Plettner, Reactor Engineer M. Bielby, Reactor Engineer Approved by:
M. Leach, Chief, Operator Licensing Branch Division of Reactor Safety I
I r
,
9611220138 961115 PDR ADOCK 05000440
PDR
.
.
EXECUTIVE SUMMARY Perry Nuclear Power Plant NRC Inspection Report No. 50-440/96012 This inspection report contains the findings and conclusions of the inspection of the licensed reactor operator (RO) and senior reactor operator (SRO) requalification training programs. The inspection included a review of training administrative procedures and operating examination material; observation and evaluation of operator performance and licensee evaluators during a requalification operating examination; an assessment of simulator fidelity; an evaluation of program controls to assure a systems approach to training; and a review of requalification training records.
The inspectors used the guidance in inspection procedure (IP) 71001.
Operations Licensed operator requalification programs were implemented in accordance with 10 CFR Part 55 requirements.
Licensee controls to revise the licensed operator requalification training program were satisfactory.
. -.
-.
~-
..
- -
.
_ -. - - -
.
Reoorts Details I. Ooerations
Operator Training and Qualification 05.1 Ooeratina Historv a.
insoection Scone (71001)
The inspectors reviewed the following to assess the licensed operator requalification training program's effectiveness regarding operator performance:
e SALP report No 50-440/96001.
Resident inspector observations and reports covering the time frame of e
10/95 to present.
Licensee event reports covering the time frame of 10/95 to present.
e b.
Observations and Findinas The inspectors determined that no patterns existed that were contributable to poor operator performance.
05.2 Reaualification Examinations a.
Insoection Scooe (71001)
The inspectors reviewed the following using IP 71001, Appendix A check-lists, to assess the licensee's examination materials' quality and content:
e Sample plans.
- The written and operating requalification examinations administered during the inspection week.
b.
Observations and Findinas The dynamic simulator scenarios adequately addressed the quantitative and qualitative attributes. The job performance measures (JPMs) satisfied the quality checklist and were considered good. The written exams were adequate and met
!
the NRC checklist for written examination questions. The examinations were consistent with the sample plan with minimal overlap from previous years operating exams for individual operators and minimal overlap from week to week within this year's exam cycle for the dynamic simulator examinations.
1
.
.
05.3 Recualification Examination Administration Practices a.
Insoection Scope (71001)
The inspectors performed the following to assess the licensee's policies and practices regarding requalification examination administration, and simulator fidelity:
Observed the performance of and evaluated one operating crew during dynamic simulator scenarios and the JPM examinations.
- Reviewed the simulator fidelity log.
Reviewed Training Administrative Procedures.
Observations and Findinas The facility evaluators adequately identified operator performance errors during the operating examinations. The facility evaluated the crew and all individuals as satisfactory as all critical tasks were accomplished. One individual was going to be given some remediation training to improve upon the formal command and control function. The inspectors agreed with the licensee's evaluation results.
No simulator fidelity deficiencies were observed. A simulation facility fidelity report is attached.
05.4 Reaualification Trainina Proaram Feedback System a.
Insoection Scooe (71001)
The inspectors performed the following to assess the licensee's training program feedback system effectiveness:
Reviewed the Safety Assessment and Quality Verification (SAQV) audit PA 95-15 " Personnel Training and Qualification Audit Report" for requalification training.
- Reviewed recorded changes to the requalification program.
- Reviewed operator feedback.
b.
Observations and Findinas The licensee had a satisfactory tracking program to incorporate changes to the examination bank material when procedure changes or modifications were implemented by the plant. The program was current and up to date. If a question was incorrectly answered on an examination a specified number of times, the licensee had an evaluation program in place to review the question for clarity and correctness.
.
.
05.5 Conformance with Ooerator License Conditions
a.
Insoection Scooe (71001)
The inspectors reviewed the following documents to assess the facility and operator licensees' compliance with 10 CFR 55.53 license condition requirements:
I e
Systems approach to training program records.
O Requalification training records, b.
Qhsprvations and Findinos l
The inspectors determined that alllicensed individuals met the requirements.
05,7 Conclusions on Ooerator Trainina and Qualification The inspectors concluded the following:
e The licensee's overall implementation of the licensed RO and SRO requalification training programs were in accordance with 10 CFR Part 55 requirements.
e A continuous review and upgrade program was in place to address immediate and long range simulator repair and improvement initiatives.
e The licensee's controls to revise the program based on audits, industry and plant events, system and procedure modifications, and operator feedback were satisfactory.
V. Manaaement Meetinas X1 Exit Meeting Summary The inspectors presented the preliminary inspection results to members of licensee management on October 11,1996. The licensee acknowledged the findings presented.
The inspectors asked the licensee whether any materials examined during the inspection could be considered proprietary. No proprietary information was identified.
-.. -. _-. - _. -. -
..~.. - _
.= _..
.
-
-
-. -... -.
f
.
.
.
PARTIAL LIST OF PERSONS CONTACTED Licensee R. D. Brandt, General Manager Operations t
H. Coon, Supervisor Regulatory Affairs R. Matthys, Supervisor Quality Assurance J. Messina, Operations Manager
'
T. Rausch, Training Manager
-
L. W. Worley, Nuclear Assurance Director
,
1LR.C
!
D. Kosloff Perry Senior Resident inspector
,
-... _ _.. _. _. _ _. _. - _. _. __.
_ _ _. - _..... ~.. _ _ _ _. _ _ _ _. - -. _ _. _ _ _ _ _ _.. _ -.
-
_
l
.s
,
-
.
f Attachment
i
!
SIMULATION FACILITY FIDELITY REPORT
!,
Facility Licensee: Perry Nuclear Power Station
.
Facility Licensee Docket No.: 50-440 Operating Tests Administered: October 7-11,1996 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and are not, without further verification and review, indicative of noncompliance with 10 CFR 55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information that may be used in future evaluations. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating tests, the following items were observed (if none, so state):
ITEM DESCRIPTION NONE OBSERVED i