SUBJECT:
PERRY NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000440/2022401
Dear Mr. Penfield:
On February 3, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Perry Nuclear Power Plant and discussed the results of this inspection with Mr. Christopher Elliott, General Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 05000440 License No. NPF-58
Enclosure:
As stated
Inspection Report
Docket Number: 05000440
License Number: NPF-58
Report Number: 05000440/2022401
Enterprise Identifier: I-2022-401-0034
Licensee: Energy Harbor Nuclear Corp.
Facility: Perry Nuclear Power Plant
Location: Perry, OH
Inspection Dates: January 24, 2022 to February 03, 2022
Inspector: N. Egan, Senior Physical Security Inspector
Approved By: Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety
Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Perry Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
SAFEGUARDS
71130.01 - Access Authorization
The inspector evaluated the access authorization program. The following elements were evaluated:
Access Authorization
- (1) Tier I: All requirements Tier II: 02.05 a-b, 02.06 a-c, 02.07 a Tier III: 02.10 a-c, 02.11 a
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspector verified no proprietary information was retained or documented in this report.
On February 3, 2022, the inspector presented the security baseline inspection results to Mr. Christopher Elliott, General Plant Manager, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71130.01 Miscellaneous Audit 21-044 VA STP Nuclear Operating Company Audit Report of Interquest 06/24/2021
Northwest Background Investigation Program
NAQA-21-0005 NEI Audit 21-001 of All Clear Screening Services, Inc. (ACS) 02/18/2021
Background Investigation Program
Procedures NOBP-LP-1002 Administration Processing of Psychological Assessments 09
NOP-LP-1001 Unescorted Access Requirements 20
NOP-LP-1002 Fitness for Duty Program 30
NOP-LP-1003 Unescorted Access In-Processing 11
NOP-LP-1004 Behavioral Observation 12
NOP-LP-1005 Potentially Disqualifying Information Adjudication, Denial, 11
and Appeal
NOP-LP-1006 PADS Security Operations and Control 07
NOP-LP-1007 Fingerprint Processing 08
NOP-LP-1008 Protection of Confidential Information 03
NOP-LP-1009 Fatigue Assessments 09
NOP-LP-1010 Unescorted Access Background Investigation 09
NOP-LP-1017 Critical Group 02
NOP-LP-1021 Drug Alcohol Processing and Controls 18
Self-Assessments ATA-2021-15627 NRC Inspection 71130.01 Readiness 11/11/2021
MS-C-21-08-20 Quality Assurance Audit Report 09/20/2021
4