IR 05000440/2024010
| ML24338A183 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 12/05/2024 |
| From: | Matthew Learn NRC/RGN-III/DORS/ERPB |
| To: | Penfield R Vistra Operations Company |
| References | |
| EPID I-2024-010-0051 IR 2024010 | |
| Download: ML24338A183 (1) | |
Text
SUBJECT:
PERRY NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000440/2024010
Dear Rod Penfield:
On November 7, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Perry Nuclear Power Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Matthew C. Learn, Acting Branch Chief Engineering and Reactor Projects Branch Division of Operating Reactor Safety Docket No. 05000440 License No. NPF-58
Enclosure:
As stated
Inspection Report
Docket Number:
05000440
License Number:
Report Number:
Enterprise Identifier:
I-2024-010-0051
Licensee:
Vistra Operations Company, LLC
Facility:
Perry Nuclear Power Plant
Location:
Perry, OH
Inspection Dates:
October 21, 2024 to November 07, 2024
Inspectors:
J. Corujo-Sandin, Senior Reactor Inspector
M. Domke, Senior Reactor Inspector
B. Jose, Senior Reactor Inspector
L. Rodriguez, Senior Reactor Inspector
M. Siddiqui, Reactor Inspector
Approved By:
Matthew C. Learn, Acting Branch Chief
Engineering and Reactor Projects Branch
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a NRC inspection at Perry Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2516, Policy and Guidance for the License Renewal Inspection Program. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
===71002 - License Renewal Inspection Inspectors completed a review of the applicants scoping and screening of non-safety related structures, systems, and components (SSC) as required by 10 CFR 54.4(a)(2). Inspectors evaluated aging management programs (AMP) will be capable of managing identified aging effects in an appropriate manner.
To evaluate scoping, Inspectors selected several license renewal-scoped components from plant walkdowns to assure applicant methodologies addressed non-safety related systems affecting safety functions.
Inspectors selected 37 of 44 AMPs to verify adequacy of the applicant's guidance, implementation activities, and documentation. Inspectors reviewed these programs to determine whether the applicant would appropriately manage the effects of aging and the verify the applicant would maintain the intended functions of license renewal components during the period of extended operation.
Inspectors reviewed the applicants consideration of internal and external operating experience related to aging effects and associated impacts to the applicant's program.
Inspectors performed plant walkdowns, reviewed aging management program documentation, and conducted interviews with program engineers to assess the license renewal application.
Inspectors completed walkdowns within accessible areas for a sample of license renewal systems, structures, and components to observe aging effects.
License Renewal Inspection===
- (1) ASME Section XI, Subsection IWB, IWC, and IWD Program (XI.M1)
- (2) Water Chemistry Program (XI.M2)
- (5) BWR Control Rod Drive Return Line Nozzle (XI.M6)
- (6) BWR Stress Corrosion Cracking (XI.M7)
- (7) BWR Penetrations (XI.M8)
- (8) BWR Vessel Internals (XI.M9)
- (9) Flow Accelerated Corrosion (XI.M17)
- (10) Open Cycle Cooling Water Systems Program (XI.M20)
- (11) Closed Treated Water Systems Program (XI.M21)
- (12) Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems (XI.M23)
- (13) Compressed Air Monitoring Program (XI.M24)
- (14) Fire Protection Program (XI.M26)
- (15) Fire Water System Program (XI.M27)
- (16) Aboveground Metallic Tanks Program (XI.M29)
- (17) Fuel Oil Chemistry Program (XI.M30)
- (18) One-Time Inspection Program (XI.M32)
- (19) One-Time Inspection of ASME Code Class 1 Small Bore-Piping Program (XI.M35)
- (20) External Surfaces Monitoring of Mechanical Components Program (XI.M36)
- (21) Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components Program (XI.M38)
- (22) Lubricating Oil Analysis Program (XI.M39)
- (23) Buried and Underground Piping and Tanks Program (XI.M41)
- (24) Internal Coatings/Linings for In-Scope Piping, Piping Components, Heat Exchangers, and Tanks Program (XI.M42)
- (25) Environmental Qualification (EQ) of Electrical Components Program (X.E1)
- (26) Non-EQ Insulated Cables and Connections Program (XI.E1)
- (27) Non-EQ Instrumentation Circuits Program (XI.E2)
- (28) Non-EQ Electrical Cable Connections Program (XI.E2)
- (29) Non-EQ Inaccessible Power Cables Program (XI.E3)
- (30) Fuse Holders Program (XI.E5)
- (31) ASME Section XI, Subsection IWE Program (XI.S1)
- (32) ASME Section XI, Subsection IWL Program (XI.S2)
(33)10 CFR Part 50, Appendix J Program (XI.S4)
- (34) Masonry Walls Program (XI.S5)
- (35) Structures Monitoring Program (XI.S6)
- (36) RG 1.127, Inspection of Water-Control Structures Associated With Nuclear Power Plants Program (XI.S7)
- (37) Protective Coating Monitoring and Maintenance Program (XI.S8)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 7, 2024, the inspectors presented the NRC inspection results to Rod Penfield and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CR-2012-12748
Concrete Spall and Crack at Face of IB8 Wall Under FHB
Roof Girder
08/18/2012
CR-2013-06563
Degraded Drywell Interior Coatings
04/25/2013
CR-2014-00703
Frayed Strands on Polar Crane Aux Hoist Wire Rope
01/15/2014
CR-2014-07308
Concrete Spall at Face of IB-8 Wall Under FHB Roof Girder
04/22/2014
CR-2014-12476
FHB Crane Main Hoist Overspeed Switch Shaft Rotates
Without Hoist Drum Shaft Rotation
07/31/2014
CR-2014-13952
Vibration and Movement Observed on Bearing Cap and
Indicator Brackets of Fuel Handling Building Crane during
Operation
09/04/2014
CR-2015-04575
The Closed Cooling Systems Chemistry Departmental
Monthly Performance Indicator is RED for March 2015
04/03/2015
CR-2015-15519
As Found Condition Identified by Fuel Handling Building
Crane Vendor during Maintenance Inspection
11/13/2015
CR-2016-04451
0P54D1279 Manual Hose Station Cabinet rusted through in
various areas (Safety Concern)
04/02/2016
CR-2016-11251
R35 Cathodic Protection Two Test Wells Found not Meeting
PTI-R35-P0002 Acceptance Criteria
09/23/2016
CR-2017-03192
The 2" Metal Bellows Flex Hose Providing Supply Air to SRV
1B21F0041B Actuator is Leaking Air from inside the Braided
Hose Area.
03/21/2017
CR-2017-11979
Cathodic Protection Project Scope Cannot Be Completed as
Planned
2/05/2017
CR-2018-09313
Div 2 DG (1R47C0001B) Engine Oil Lubrication Oil Analysis
Results
10/23/2018
CR-2019-02328
Relevant Indication Identified during Containment Surface
Exams (ISI Location 1T23-022-I)
03/14/2019
CR-2019-09021
Cathodic Protection Test Wells Outside of Acceptance
Criteria
10/28/2019
CR-2020-00377
PY-P54C0003 FIRE SERVICE JOCKEY PUMP Cycle Time
is Degraded
01/18/2020
71002
Corrective Action
Documents
CR-2021-02192
Leak Discovered on SRV air Supply Hose
03/24/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CR-2021-02296
Air Supply Flex Hose for 1B21F051B Discovered to Be
Leaking
03/27/2021
CR-2023-02056
1R19 Inservice Inspection Containment Surface Exam
Finding in Steam Tunnel Annulus
03/17/2023
CR-2023-02185
RHR 'A' Heat Exchanger 'As Found' Inspection Results
03/22/2023
CR-2023-02255
Air Leak on Air Line to SRV 41B in Drywell
03/24/2023
CR-2023-02318
Leaking Flex Hose on Air Supply for SRV 1B21F0047B
03/26/2023
CR-2023-06647
Cooling Water Header Vent Valve 1C11-F410 Leaking a
Pencil Stream From Pipe Cap
08/25/2023
CR-2023-08469
Stagnant Water Observed on Control Complex Roof
11/13/2023
CR-2024-05238
Water Leakage in Division 3 Diesel Generator Room
06/18/2024
CR-2024-07931
Debris Accumulation & Ponding Water Observed on Fuel
Handling Building Roof
10/10/2024
CR-G202-2010-
77794
Bolts on Bearing Caps Found Loose
06/04/2010
G202-2005-
07415
CST Did Not Meet Class B Cleanliness
11/02/2005
G202-2007-
2936
CST Does Not Meet Class "B" Cleanliness
01/18/2007
G202-2010-
85629
Unsat Fuel Tank Coating Inspection
11/10/2010
G202-2010-
85703
Unsat Div II Fuel Oil Tank Internal Surface Coating
Inspection
2/11/2010
G202-2011-
95414
SRV INSTRUMENT AIR LINE LEAK
05/25/2011
CR-2024-08341
NRC ID - License Renewal Inspection: Scaffold Clearance
Violation - Div. 2 EDG Room
10/23/2024
CR-2024-08379
NRC ID -License Renewal Inspection: External Piping
Corrosion Below ESWPH Operating Deck (586' El.)
10/24/2024
CR-2024-08452
NRC ID - License Renewal Inspection: Corrosion Noted on
ESW Pipe Support 1P45H0205
10/28/2024
Corrective Action
Documents
Resulting from
Inspection
CR-2024-08530
NRC ID - License Renewal Inspection: Pipe Hangar
Corrosion on Turbine Building Chilled Water System Piping
10/30/2024
Corrective Action
Documents
Resulting from
Inspection
CR-2024-08531
NRC ID -License Renewal Inspection: Corrosion Identified on
Uninsulated ESW to ECC HX Piping
10/30/2024
24-1107-001
Install Flood Barriers to Prevent Water Intrusion Into Diesel
Generator Exhaust Corridor Subfloor Areas
Engineering
Changes
ECP 22-006-000
Install Sump Pumps in Safety and Non-Safety Related
Manholes
ATL-2021-0845-
ATA-62
Update TAI 0513, Revision 8, Attachment 1
11/06/2024
LRP-AMP-XI.M6
Aging Management Program Evaluation Results-BWR
Control Rod Drive Return Line Nozzle Program
LRPY-AMP-M29
Aboveground Metallic Tanks Program
LRPY-AMP-X.E1
Aging Management Program (AMP) Evaluation Results - EQ
of Electrical Components Program
LRPY-AMP-XI.E1
AMP Evaluation Results - Non-EQ Insulated Cables and
Connections Program
LRPY-AMP-XI.E2
AMP Evaluation Results - Non-EQ Instrumentation Circuits
Program
LRPY-AMP-XI.E3
AMP Evaluation Results - Non-EQ Inaccessible Power
Cables Program
LRPY-AMP-XI.E5
AMP Evaluation Results - Fuse Holders Program
LRPY-AMP-XI.E6
AMP Evaluation Results - Non-EQ Electrical Cable
Connections Program
LRPY-AMP-
XI.M17
Aging Management Program Evaluation Results - Flow-
Accelerated Corrosion Program
LRPY-AMP-
XI.M2
AMP Evaluation Results - Water Chemistry Program
LRPY-AMP-
XI.M20
Aging Management Program Evaluation Results - Open
Cycle Cooling Water Systems Program
LRPY-AMP-
XI.M21A
Aging Management Program Evaluation Results - Closed
Treated Water Systems Program
LRPY-AMP-
XI.M23
Inspection of Overhead Heavy Load and Light Load (Related
to Refueling) Handling Systems
71002
Engineering
Evaluations
LRPY-AMP-
XI.M24
Aging Management Program Evaluation Results -
Compressed Air Monitoring Program
LRPY-AMP-
XI.M26
AMP Evaluation Results - Fire Protection Program
LRPY-AMP-
XI.M27
AMP Evaluation Results - Fire Water System Program
LRPY-AMP-
XI.M30
Aging Management Program Evaluation Results - Fuel Oil
Chemistry Program
LRPY-AMP-
XI.M32
One-Time Inspection Program
LRPY-AMP-
XI.M35
One-Time Inspection of ASME Code Class 1 Small-Bore
Piping Program
LRPY-AMP-
XI.M36
External Surfaces Monitoring of Mechanical Components
Program
LRPY-AMP-
XI.M38
Inspection of Internal Surfaces in Miscellaneous Piping and
Ducting Components Program
LRPY-AMP-
XI.M39
Aging Management Program Evaluation Results - Lubricating
Oil Analysis Program
LRPY-AMP-
XI.M41
Buried and Underground Piping and Tanks Program
LRPY-AMP-
XI.M42
Internal Coatings/Linings for In-Scope Piping, Piping
Components, Heat Exchangers, and Tanks Program
LRPY-AMP-
XI.M5
Aging Management Program Evaluation Results - BWR
Feedwater Nozzle Program
LRPY-AMP-
XI.M7
Aging Management Program Evaluation Results -BWR
LRPY-AMP-
XI.M8
Aging Management Program Evaluation Results -BWR
Penetrations Program
LRPY-AMP-XI.S1
Aging Management Program Evaluation Results - ASME
Section XI, Subsection IWE Program
LRPY-AMP-XI.S2
ASME Section XI, Subsection IWL Program
LRPY-AMP-XI.S4
Aging Management Program Evaluation Results - 10 CFR 50, Appendix J Program
LRPY-AMP-XI.S5
AMP Evaluation Results - Masonry Walls
LRPY-AMP-XI.S6
AMP Evaluation Results - Structures Monitoring Program
LRPY-AMP-XI.S7
AMP Evaluation Results - RG 1.127, Inspection of
Water-Control Structures Associated with Nuclear Power
Plants Program
Engineering
Evaluations
LRPY-AMP-XI.S8
Protective Coating Monitoring and Maintenance Program
NORM-ER-1601
Life Cycle Plan Flow-Accelerated Corrosion
07/06/2023
NORM-ER-3507
Heat Exchangers
Miscellaneous
PYRM-ER-0001
Perry Service Water Reliability (Generic Letter 89-13)
Program Basis Document
1042-22B-006
Performed License Renewal VT-1 and VT-3 Exams of
Accessible, In-Scope Components
2/17/2022
1042-23B-018
OTI Group 18 Components. Perform VT1 and VT-3
Examination PY-1C41PIPINGL20-2
03/07/2023
1042-23B-040
Performed VT-1 and VT-3 Examination of Internal Surfaces
of Lube Oil Piping Made Accessible by Removal of Pump
PY-1E22C0007
08/02/2023
NDE Reports
1042-23B-043
Performed VT-1 and VT-3 Examination of Internal Surfaces
of Piping Made Accessible by Removal of Valve
PY-0G41F0548A.
09/13/2023
CHI-0004
System Chemical Treatment
CHI-0005B
Fuel Oil Sampling
EMARP-0008
Environmental Monitoring and Reporting Program
EMARP-0011
Emergency Service Water System Monitoring Program
ISI-T23-T2400-5
Containment and Drywell Vessel (Interior and Exterior)
Visual
NEI-0701
EQ Process
NOP-CC-5301
Environmental Qualification (EQ) Program Procedure
NOP-CC_5710
R6
ASME Section XI Inservice Inspection (ISI) Program
NOP-ER-2005
Flow-Accelerated Corrosion Program
PAP-1120
Leak Testing Program
PAP-1927
Perry Power Plant Lubrication Manual
PMI-0015
Reactor Polar Crane Preventive Maintenance
PMI-0031
Fuel Handling Building Crane Preventive Maintenance
PMI-0037
Refueling Platform Preventive Maintenance
71002
Procedures
PMI-0069
Emergency Service Water Crane Preventive Maintenance
PMI-0094
Fuel Handling Platform Preventive Maintenance
PTI-R44-P0001B
Division 2 Standby Diesel Generator Starting Air System
TAI-0507 R-17
Boiling Water Reactor Vessel and Internals Project
(BWRVIP) Program
TAI-0513
Structures Monitoring Program
200474724
CST Internal Inspection
2/04/2021
200530607
Remove Cracked Grout at FHB Girder
06/11/2014
200573758
Condensate Storage Tank Visual Inspection
07/26/2021
200724718
Containment and Drywell Vessel
04/15/2019
200752385
Inspect the ESW Pumphouse Crane
07/22/2021
200770454
Maintenance Rule Structural Inspection - FH Bldg.
08/05/2020
200779816
Maintenance Rule Structural Inspection - Rx Bldg.
03/29/2021
200792226
SR Instrument Air Compressor
10/17/2023
200804210
Year Fire Main Flow Test
06/05/2023
200823491
Fuel Handling Platform Maintenance PMI-0094
10/09/2022
200837842
Maintenance Rule Structural Inspection - Unit 1 Diesel
Generator Building
08/22/2023
200837843
Maintenance Rule Structural Inspection - Switchyard
08/17/2023
200843016
CST Internal Inspection to Determine Cleanliness
09/02/2021
200849188
Perform Cable Diagnostic Test of Interbus Bus Transformer
LH-1-A Cables 1R11H1X, 1R11H8X and 1R11H15X through
1R11H18 for LR
04/01/2023
200860119
Containment and Drywell Vessel (Interior and Exterior)
Visual Examination
2/28/2024
200861112
PY-1R45A0003A Diesel Generator Fuel Oil Day Tank
11/13/2023
200864852
Maintenance Rule Structural Inspection - ESWPH
07/09/2024
200935658
Megger Test: Cable 1P45F16X Associated with ESW Pump
B Discharge Blowdown for LR
05/06/2024
200935659
Emergency Feed Water (EFW) Strainer Cable Megger
Testing in Support of License Renewal (LR)
07/03/2024
Work Orders
200936752
High Pressure Core Spray (HPCS) Emergency Diesel
Generator (EDG) Jacket Water Heater Cable Megger Testing
for LR
06/10/2024