SUBJECT:

PERRY NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000440/2024402

Dear Rod Penfield:

On December 17, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Perry Nuclear Power Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

January 13, 2025 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket No. 05000440 License No. NPF-58

Enclosure:

As stated

Inspection Report

Docket Number:

05000440

License Number:

NPF-58

Report Number:

05000440/2024402

Enterprise Identifier:

I-2024-402-0056

Licensee:

Vistra Operations Company, LLC

Facility:

Perry Nuclear Power Plant

Location:

Perry, OH

Inspection Dates:

September 30, 2024 to December 17, 2024

Inspectors:

N. Egan, Sr Physical Security Inspector

G. Stock, Reactor Operations Engineer

Approved By:

Michael E. Ziolkowski, Chief

Security, Emergency Preparedness, and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Perry Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: All Requirements
  • Tier II: 02.06 a, 02.06 d, 02.07 a, 02.08 b, 02.08 d-g
  • Tier III: 02.10 a

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program through completion of the following inspection elements:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All requirements
  • Tier II: 02.09 a, 02.11 a, d; 02.12 a
  • Tier III: 02.15 b, c

71130.09 - Security Plan Changes

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p(2) since the last performance of this IP.

71130.14 - Review of Power Reactor Target Sets

The inspectors evaluated the Security Target Set Program. The following elements were evaluated:

Review of Power Reactor Target Sets

(1)03.01, 03.02 a-f, 03.03, 03.04 a-b,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) September 1, 2023, through September 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On December 17, 2024, the inspectors presented the security baseline inspection results to Rod Penfield and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NOBP-LP-1003

Unescorted Access In-Processing

NOBP-LP-1013

Safeguards Information Background Investigation

NOBP-LP-1303

Safeguards Information Central Repository Control

NOP-LP-1003

Threat Reporting and Two Person Line of Sight Rule

NOP-LP-1102

Protection of Safeguards Information

NOP-LP-1104

Security-Related Access Control Devices

NOP-LP-1202

Vehicle and Material Access Control

NOP-LP-1203

Security Badge Control

NOP-LP-1204

Primary Access Facility Controls

NOP-LP-1205

Visitor Control to Protected and Vital Areas

Procedures

PYBP-SPS-0008

Material Search at the Warehouse

71130.02

Self-Assessments ATL-2023-0523-

ATA-01

Analysis of Security Access Control Program in Relation to

71130.02

08/29/2024

CR-2024-01311

2/20/2024

Corrective Action

Documents

CR-2024-03055

04/08/2024

Corrective Action

Documents

Resulting from

Inspection

CR-2024-08535

10/30/2024

NOP-LP-1107

Safety and Security Interface

NOP-LP-1301

Security Testing, Maintenance and Inspection

NOP-LP-1701

Protected Area Lighting Inspections

PYBP-SPS-0005

Site Protection Early Warning System Testing

PYBP-SPS-0009

Arms Room Practices and Weapons Maintenance Program

SSI-0003

Security System Equipment Operability Testing

SSI-0005

Security Tamper Switch Yearly Testing

SSI-0008

Perimeter Equipment - Annual and Acceptance Testing

SSI-0009

Security System Equipment Testing Following

Repairs/Calibration

SSI-0011

Hand Geometry System - Annual Operability Test Instruction

Procedures

SSSI-0001

PAF Search Equipment Testing

Self-Assessments

ATL-2023-0526

Analysis of Equipment Performance and Maintenance in

Relation to 71130.04 Perry Nuclear Power Plant

10/17/2024

200937851

PY-1R15 TSC UPS

11/26/2024

71130.04

Work Orders

200937852

PY-2R15 120 Vac Vital TSC (Inverters and Distrib)

11/26/2024

71130.09

Miscellaneous

Perry Nuclear Power Plant Physical Security Plan

Target Sets Document

01/22/2020

Perry Nuclear Power Plant Target Set Support Manual

07/26/2022

NOP-CC-2004

Design Interface Reviews and Evaluations

NOP-CC-2004-10

Design Attribute Review

NOP-LP-1007

Safety and Security Interface

NOP-LP-1106

Target Set Program

71130.14

Procedures

ONI-P56-2

Land Based Security Threat

25