MONTHYEARPY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20217F3901999-10-14014 October 1999 Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect1999-10-13013 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect ML20212K9271999-09-30030 September 1999 Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20212J1451999-09-30030 September 1999 Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed ML20217E7111999-09-30030 September 1999 Documents Telcon Conducted on 990929 Between M Underwood of Oh EPA & D Tizzan of Pnpp,Re Request to Operate Pnpp Sws,As Is,Until Resolution Can Be Obtained ML20212G4161999-09-24024 September 1999 Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant ML20212G5811999-09-23023 September 1999 Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-21021 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions1999-09-16016 September 1999 Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions ML20212D0151999-09-14014 September 1999 Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED ML20212A8371999-09-13013 September 1999 Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions ML20217A8971999-09-0909 September 1999 Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages1999-09-0909 September 1999 Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages ML20211Q6911999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218 IR 05000440/19990011999-08-31031 August 1999 Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.21999-08-26026 August 1999 Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20210Q8421999-08-13013 August 1999 First Final Response to FOIA Request for Documents.Records Listed in App a Being Released in Entirety & Records Listed in App B Being Withheld in Part (Ref FOIA Exempt 5) ML20210R7861999-08-12012 August 1999 Forwards Insp Rept 50-440/99-12 on 990712-16.No Violations Noted.New Emergency Preparedness Program Staff & Mgt Personnel Were Professional & Proactive ML20210S3961999-08-11011 August 1999 Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are Administered PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready1999-08-10010 August 1999 Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-9906301999-08-10010 August 1999 Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 ML20210Q7981999-08-10010 August 1999 Informs That Intention to Utilize Sulfuric Acid in Pnpp Circulating Water Sys to Lower Ph Is Anticipated to Be Completed in Nov ML20210Q5831999-08-10010 August 1999 Requests Permission to Chemically Treat CWS for Algae Due to Cooling Water Basin Becoming Infected with Algae of Various Types PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 9808261999-08-10010 August 1999 Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 ML20210K6331999-08-0404 August 1999 Submits Response to Requests for Addl Info to GL 92-01,Rev 1, Reactor Vessel Structural Integrity, for Perry Nuclear Plant,Unit 1 PY-CEI-NRR-2417, Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-60001999-08-0202 August 1999 Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-6000 ML20210G8411999-07-28028 July 1999 Informs That Based on Determination That Rev 14 Changes to Various Portions of Perry Nuclear Power Plant Emergency Plan Does Not Decrease Effectiveness of Licensee Emergency Plan & Meets Standard of 10CFR50.47(b),no NRC Approval Required ML20210E0661999-07-22022 July 1999 Forwards Insp Rept 50-440/99-08 on 990518-0708.No Violations Noted.Overall Conduct of Activities at Perry Facility, Conservative & Professional with Continuing Focus on Safety PY-CEI-NRR-2419, Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld1999-07-21021 July 1999 Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld PY-CEI-NRR-2415, Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-19019 July 1999 Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20210A6441999-07-15015 July 1999 Advises That Listed Operator Licenses for Company Personnel Have Expired,As of 990715,per 10CFR50.74(a) & 10CFR55.5. Individuals Listed Have Assumed Responsibilities at Pnpp That Do Not Require Operator Licenses ML20209E5951999-07-0909 July 1999 Ltr Contract:Task Order 46, Perry Engineering & Technical Support (E&Ts) Insp, Under Contract NRC-03-98-021 ML20209D5931999-07-0101 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Investigation Rept 3-98-005 Issued on 990510.Corrective Actions Will Be Examined During Future Inspections ML20211A3881999-06-30030 June 1999 Supplements Re NRC Incomprehensible Enforcement Inactions.Understands That NRC Claiming Hands Tied in Matter Re Discrimination Violation at Perry Npp.Requests That NRC Take Listed Two Actions PY-CEI-NRR-2410, Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant1999-06-29029 June 1999 Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant PY-CEI-NRR-2413, Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 9907061999-06-29029 June 1999 Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 990706 PY-CEI-NRR-2403, Submits Response to RAI Re GL 96-05 Program at Plant1999-06-29029 June 1999 Submits Response to RAI Re GL 96-05 Program at Plant ML20196H9641999-06-29029 June 1999 Confirms 990615 Telcon Request with J Lieberman for Addl Time to Respond to Enforcement Action 99-012.FirstEnergy Has 60 Days to Respond to EA PY-CEI-NRR-2412, Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-19991999-06-28028 June 1999 Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-1999 ML20211A3991999-06-28028 June 1999 Submits Concerns Re Proposed Changes to Enforcement Policy. Believes That NRC Existing Regulations & Policies Provide Adequate Controls & That NRC Not Administering Consistent Enforcement Policies in Response to Discriminatory Actions ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 PY-CEI-NRR-2405, Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt1999-06-14014 June 1999 Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt ML20195H9051999-06-10010 June 1999 Forwards Two License Renewal Applications Consisting of NRC Form 398 & NRC Form 396 for Bk Carrier,License OP-30997 & Jt Steward,License OP-30564-1 ML20212H5841999-06-10010 June 1999 Responds to NRC Notice of Level III Violation Received by K Wierman.Corrective Actions:K Wierman Has Been Dismissed from Position at Perry NPP PY-CEI-NRR-2408, Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval1999-06-10010 June 1999 Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval ML20195G6741999-06-10010 June 1999 Forwards Insp Rept 50-440/99-03 on 990407-0517.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy PY-CEI-NRR-2407, Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records1999-06-0909 June 1999 Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217F3901999-10-14014 October 1999 Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes ML20212K9271999-09-30030 September 1999 Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20212J1451999-09-30030 September 1999 Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed ML20212G4161999-09-24024 September 1999 Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant ML20212A8371999-09-13013 September 1999 Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions ML20217A8971999-09-0909 September 1999 Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211Q6911999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218 IR 05000440/19990011999-08-31031 August 1999 Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev ML20210Q8421999-08-13013 August 1999 First Final Response to FOIA Request for Documents.Records Listed in App a Being Released in Entirety & Records Listed in App B Being Withheld in Part (Ref FOIA Exempt 5) ML20210R7861999-08-12012 August 1999 Forwards Insp Rept 50-440/99-12 on 990712-16.No Violations Noted.New Emergency Preparedness Program Staff & Mgt Personnel Were Professional & Proactive ML20210K6331999-08-0404 August 1999 Submits Response to Requests for Addl Info to GL 92-01,Rev 1, Reactor Vessel Structural Integrity, for Perry Nuclear Plant,Unit 1 ML20210G8411999-07-28028 July 1999 Informs That Based on Determination That Rev 14 Changes to Various Portions of Perry Nuclear Power Plant Emergency Plan Does Not Decrease Effectiveness of Licensee Emergency Plan & Meets Standard of 10CFR50.47(b),no NRC Approval Required ML20210E0661999-07-22022 July 1999 Forwards Insp Rept 50-440/99-08 on 990518-0708.No Violations Noted.Overall Conduct of Activities at Perry Facility, Conservative & Professional with Continuing Focus on Safety ML20209E5951999-07-0909 July 1999 Ltr Contract:Task Order 46, Perry Engineering & Technical Support (E&Ts) Insp, Under Contract NRC-03-98-021 ML20209D5931999-07-0101 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Investigation Rept 3-98-005 Issued on 990510.Corrective Actions Will Be Examined During Future Inspections ML20196H9641999-06-29029 June 1999 Confirms 990615 Telcon Request with J Lieberman for Addl Time to Respond to Enforcement Action 99-012.FirstEnergy Has 60 Days to Respond to EA ML20195G6741999-06-10010 June 1999 Forwards Insp Rept 50-440/99-03 on 990407-0517.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207G3921999-06-0808 June 1999 Forwards Notice of Consideration of Approval of Transfer of License DPR-58 & Issuance of Conforming Amend & Opportunity for Hearing Re 990505 Application ML20207B7341999-05-26026 May 1999 Forwards Correction of Typo in TS Table 3.3.6.1-1 for Plant, Unit 1 DD-99-08, Informs That to Extent That Union of Concerned Scientists Requests Commission Undertake Formal Review of DD-99-08 & Hold Meeting to Directly Receive View on Decision,Request Denied.With Certificate of Svc.Served on 9905211999-05-20020 May 1999 Informs That to Extent That Union of Concerned Scientists Requests Commission Undertake Formal Review of DD-99-08 & Hold Meeting to Directly Receive View on Decision,Request Denied.With Certificate of Svc.Served on 990521 ML20207B1251999-05-20020 May 1999 Discusses Investigation Rept 3-98-007 on 981210 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $110,000 IR 05000440/19980181999-05-14014 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-440/98-18 on 981110 ML20206Q5181999-05-14014 May 1999 Responds to to SL Hiatt Re Fee Exemption Granted to Firstenergy Nuclear Operating Co,Operator of Perry Nuclear Plant.Action Consistent with Longstanding Policy & Practice,As Well as Legal Requirements ML20196F8081999-05-12012 May 1999 Partially Deleted Ltr Referring to Investigation Case 3-1998-007 Re Determination Whether Recipient Discriminated Against Radiation Protection Supervisor at Perry for Providing Testimony as Witness in DOL Hearing ML20206Q0171999-05-12012 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created ML20206S5381999-05-12012 May 1999 Forwards Insp Rept 50-440/99-07 on 990412-16.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Interviews with Personnel & Observation of Activities in Progress ML20206Q2111999-05-10010 May 1999 Discusses Investigation Rept 3-98-005,completed on 990129 & Forwards NOV & OI Rept Synopsis.Circumstances Surrounding Apparent Falsification of Training Records for Individuals Assigned Position in Er Organization Were Investigated ML20196A2961999-05-10010 May 1999 Discusses Investigation Rept 3-98-005 Conducted on 990129 Re Circumstances Surrounding Apparent Falsification of Training Records for Individuals Assigned Positions in Emergency Response Organization & Forwards NOV & Synopsis ML20206H3981999-05-0606 May 1999 Forwards Insp Rept 50-440/99-06 on 990303-04 & 0412-16.No Violations Noted.Inservice Insp Activities Effectively Implemented with Several Aspects Demonstrating Good Safety Focus ML20206N3161999-05-0606 May 1999 Responds to Ltr to NRC on Continued Events Re Transfer of Generation Assets Between Dl & Firstenergy.Info Will Be Considered as NRC Monitor Pending License Transfer Application of Bvps,Units 1 & 2 & Pnpp ML20206H6731999-05-0505 May 1999 Confirms Discussion Between Members of NRC & Recipient Re Meeting Scheduled for 990520 in Lisle,Il to Discuss Operational Issues & Related Topics of Interest to Licensed Operators at Nuclear Power Plants Located in Region III ML20206G6901999-05-0303 May 1999 Forwards Insp Rept 50-440/99-02 on 990225-0406.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206G6401999-05-0303 May 1999 Forwards Safety Evaluation Authorizing Relief Requests IR-032 to IR-035 & IR-037 to IR-040 Re Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp.Relief Requests IR-36 & IR-41 Withdrawn ML20206D4701999-04-30030 April 1999 Informs That on 990428,FirstEnergy Submitted Post Exam Results of Weld Overlay Repair for Feedwater Nozzle to safe-end Weld at Perry Nuclear Power Plant,Unit 1 (Pnpp) ML20206E2111999-04-29029 April 1999 Discusses Alternative Proposed by Licensee on 990325 & 990401 to ASME BPV Code,Section XI Repair Requirements Along with Separate Alternative to Ultrasonic Exam Acceptance Criteria.Forwards SE Approving Proposed Alternatives ML20205P4041999-04-15015 April 1999 Discusses GL 95-07 Issued by NRC on 950817 & Licensee Responses Submitted on 951016,960213 & 960624 for Perry NPP, Unit 1.Forwards Safety Evaluation Concluding That Licensee Adequately Addressed Actions Requested in GL 95-07 ML20205P0281999-04-12012 April 1999 Provides Individual Exam Results for Applicants Who Took Mar 1999 Initial License Exam.Information Considered Proprietary in Accordance with 10CFR2.790.Without Encls ML20205J5331999-04-0606 April 1999 Ack Receipt of Denying Request from NRC That Addl Info Be Provided Prior to Informal Public Hearing Held on 990222 Re River Bend Station & Perry Nuclear Power Plant 10CFR2.206 Petitions ML20205K5211999-04-0505 April 1999 Forwards Notice of Withdrawal of 970409 LAR on Refueling Interlocks,In Response to Util .Amend Request Will Be Replaced in Future by Similar Request,Based on Approved STS Change Traveler,Number TSTF-225 ML20196K8461999-04-0202 April 1999 Forwards Insp Rept 50-440/99-05 on 990301-05.No Violations Noted.Informs That Licensee Use of 10-Minute Rule & 4-Hour Rule Remains Under NRC Review.Expresses Re Practice Revising Unavailability Criteria on Recurrent Basis ML20205G3891999-03-31031 March 1999 Forwards Safety Evaluation Re Second ten-year Inservice Testing Program Relief Requests.Proposed Alternatives in Relief Requests VR-6,PR-3 & PR-6 May Be Authorized.Relief Request VR-8 Denied ML20205G0441999-03-26026 March 1999 Advises of Planned Insp Effort Resulting from Perry PPR Review,Which Was Completed on 990202.Overall,performance at Perry Was Acceptable ML20205F0011999-03-25025 March 1999 Responds to Re Safety of Perry Nuclear Power Plant & That Plant Operating with Limited Leaks in Three Fuel Rods for Several Months.Informal Public Hearing Re Leaks at Perry Facility Held in Rockville,Md on 990222 ML20205C1611999-03-25025 March 1999 Discusses GL 96-05 Issued on 960918 & Firstenergy 961118, 970317 & 980930 Responses to GL 96-05 Indicating Intent to Implement Provisions of JOG Program on MOV Periodic Verification at Perry Npp.Forwards RAI Re GL 96-05 Program ML20204D8891999-03-17017 March 1999 Forwards Insp Rept 50-440/99-04 on 990222-26.No Violations Noted.Insp Focused on Radiological Planning for Spring 1999 Refueling Outage,On Assessments of Radiation Protection Program & on Radiological Training for General Employees ML20204E7791999-03-17017 March 1999 Forwards Insp Rept 50-440/99-01 on 990113-0224.Non-cited Violation Was Identified ML20207H9921999-03-11011 March 1999 Informs That Requirements to Pay Fee Under 10CFR170 for Review of Pilot Plant Application for Use of Revised Accident Source Term Methodology for Perry Nuclear Power Plant Unit 1,waived for Reasons Stated ML20207K1991999-03-0404 March 1999 Forwards List of Names of Those Individuals & Their Organizational Affiliation as Appropriate,Who Spoke at Informal Public Hearing Re Petitions Filed Pursuant to 10CFR2.206 for River Bend & Perry Plants on 990222 ML20203F8501999-02-11011 February 1999 Forwards Fr Notice to Be Published on 990219 Re Informal 10CFR2.206 Public Hearing Including Video Teleconferencing 1999-09-09
[Table view] |
Inspection Report - Perry - 1996008 |
---|
|
|
Text
_- . . . ._ _ _ _ _ . _ . _ _ . .-.__m _ .
. .e i
-
l
Novauber 15, 1996
'
Mr. Lew : Vice President - Nuclear
- Centerior Service Com7any !
P.O. Box 97, A200 !
Perry, OH 44081 j I
'
SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NO.
50-440/96008(DRS))
Dear Mr. Myers:
This will acknowledge receipt of your letter dated October 28,1996,in response to i
i
, our letter dated September 27,1996, transmitting a Notice of Violation associated with.
Licensee Event Report 93-021," Loss of Safety Function For Emergency Closed Cooling System A," which failed to provide an adequate assessment of the safety consequences
'
and implications of an event at your Perry Nuclear Power Plant. We have reviewed your I corrective actions and have no further questions at this time. These corrective actions will
>
be examined during future inspections.
.
Sincerely, Original signed by Geoffrey E. Grant Geoffrey E. Grant, Director
'
Division of Reactor Safety Docket No. 50-440 i
See Attached Distribution DOCUMENT NAME: G:\DRS\PER111_6.DRS
' To receive a copy of thle document, Indicate in the bom "C* = Copy without attachment /endosure *E' = Copy with attachment / enclosure
"N* = No copy OFFICE - Rlli E Rlll E. Rlll gp C Rlli _ l NAME EDuncan:ntypq {g; MRiryndT4. JJacobT6iigM. HClaytch3 [$Qrant DATE 11/lf/96 11/1996 11/6796 11/17/9@)() g OFFICIAL RECORD COPY 260043 9611260093 961115 n d c W-O\
PDR ADOCK 05000440 0 PM h J
.- .. -- . _ . - . - . ---
. .-
-
L. cc: J. P. Stetz, Senior Vice President - Nuclear L. W. Worley, Director, Nuclear Services Department J. D. Kloosterman, Manager, Regulatory Affairs W. R. Kanda, Director, Perry Nuclear Assurance Department N. L. Bonner, Director, Perry I Nuclear Engineering Department H. Ray Caldwell, General Superintendent Nuclear Operations R. D. Brandt, General Manager Operations cc w/Itr dtd 10/28/96: Terry L. Lodge, Esq.
State Liaison Officer, State of Ohio Robert E. Owen, Ohio Department of Health C. A. Glazer, State of Ohio Public Utilities Commission Distribution w/ltr dtd 10/28/96:
Docket File DRS A. B. Beach, Rlli PUBLIC IE-01 Rlli PRR Enf. Coordinator, Rlll OC/LFDCB SRI, Perry CAA1 (E-mail)
DRP LPM, NRR W. L. Axelson, Rlil
3
- - . . - - . - -
. .
A:C NTEREOR y ENERGY IRW NUCLEAR POWER PLANT Mail Address:
10 CENTER ROAD P.O. BOX 97 PERRY, OHIO 44081 PERRY. OHIO 44081 (217) 259-3737 October 28, 1996
,
PY-CEI/NRR-2101L
United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 l
Perry Nuclear Power Plant Docket No. 50-440 Reply to a Notice of Violation l
!
l Ladies and Gentlemen: l Enclosed is the the reply to the Notice of Violation contained in NRC Inspection Report 50-440/96008, which was transmitted by letter dated September 27, 1996. The Notice of Violation involves submission of a Licensee Event Report 93-021, " Loss of Safety Function For Emergency closed cooling System A," which failed to provide an adequate assessment of the safety consequences and implications of the event. '
If you have questions or require additional information, please contact Mr. James D. Kloosterman, Manager - Regulatory Affairs, at (216) 280-5833.
Very truly yours, l
M g Lew Vice President - Nuclear CRE sc Enclosure cc: NRC Region III NRC Resident Inspector NRC Project Manager qh f \
l Operoneg Compor',es Clevesond Electnc mam noteg N I 1 E, toieco Eo son
. ,_ . _ _ . ~ ~ . _ _ - . . . _ _ _ _ . _ . _ - - _ _ _ . - . - - _ . _ . - . . _ _ __.m.____
!
.
1 PY-CEI/NRR-2101L
.
Enclosure i Page 1 of.3 n
>
REPLY TO A NOTICE OF VIOLATION
!
!
. Violation 96008-01 j Restatement of the Violation
10 CFR 50.73 requires, in part, that the Licencee Event Report (LER) contain an assessment of the safety consequences and implications of the event.
j
?
contrary to the above, on January 24, 1994, the licensee submitted Licensee
'
Event Report 93-021, which failed to provide.an adequate assessment of the safety, consequences and implications of the event in that i
l The. cover letter and title of LER 93-021 indicated only a loss of safety
.
function for Emergency Closed Cooling (ECC) system "A" although ECC
{ system "B" was also inoperable for about 45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> during the event, and i
-
!
The main body of the LER only explicitly discussed a loss of ECC "A".
Although the out-of-service condition of the Division 2 diesel generator .
on June 14 and 15 was discussed, neither the impact on the operability of .]
ECC "B" nor the consequences of a total loss of ECC was mentioned.
l This is a Severity Level IV violation (Supplement I) (50-440/96008-01). 1
)
Reason for the Violation i
The cover letter, title, and body of the LER did not clearly reflect the safety consequences and impact of the event because the associated event evaluation process did not determine accurate nor comprehensive conclusions regarding j event safety consequences and impact. The cause.of the inadequate evaluation l is personnel error (i.e., oversight on the part of the Compliance. engineer who i prepared the LER) . A review of activities in progress at the time of LER l preparation, indicates that the preparer had just recently transferred to the j Regulatory Affairs Section (RAS) from-the System Engineering Section, and was j
. assigned other complex projects which required action during the period of the l LER investigation. Discussions with the preparer (who is no longer at the l
Perry Nuclear Power Plant (PNPP)) indicated that the assignment and preparation. )
of the LER was performed on an abbreviated schedule; however, the preparer indicated that the Technical Specification (TS) violations and the full consequences of the loss of'ECC safety function should have been recognized, addressed, and documented in the LER.
A contributing factor for this issue is that the level of supervisory involvement was inadequate to ensure successful performance of the task. This included overseeing work in progress, and control of work assignments. The RAS Compliance Unit supervisor at the time LER 93-021 was prepared, is no longer at PNPP. Review of the associated preparation documentation.did not indicate that any substantive comments on the draft LER were received from the Compliance Unit supervisor. Although the LER preparer was a skilled and experienced individual (i.e., former shift technical advisor), supervisory oversight should (
_ _ _ _ - _ _ _ _ _ _ _ _ _ _ . _ _ -_.- - - _ . . - _ , . - - .
. . -
____..___...._._____--.._._._.-_.__.m. _ _ . _ . m.m
. ..
PY-CEI/NRR-2101L Enclosure Page 2 of 3 have resulted in the content of the LER being challenged. Review comments from the RAS manager at the time questioned whether the issue resulted in a TS-violation. The LER preparer answered that the issue did not involve a TS violation; the issue was not appropriately resolved at that time in the review process.
As mentioned in the cause discussion above, the preparer was tasked with
'
additional complex assignments, and was working to an abbreviated schedule.
Additionally, the associated corrective action program investigation was assigned to the LER preparer, which resulted in the LER preparer becoming the driving force for technical resolution of the issue (versus the engineering / operational experts) and also resulted in the LER preparer having to evaluate the issues not directly related to the LER. The aspects of additional work assignments, abbreviated LER development schedule, and investigation responsibilities were within the responsibility and control of the Compliance Unit supervisor, and these aspects contributed to the LER preparer not thoroughly evaluating and reporting the safety consequences and implications of the event.
Another contributing factor was undefined accountability. The responsibilities of personnel reviewing the LER were not well defined and personnel were not held accountable for the accuracy / completeness of the information within the LER. The LER was sent out for' site multi-disciplinary review; however, the LER review copies were not marked, as is the current practice, to delineate responsibility for verifying and concurring in the LER contents. This reduced
.
C the effectiveness of the multi-disciplinary reviews by blurring responsibility and accountability of reviewers and contributed to the inadequate LER.
-
Corrective Steos Taken and Results Achieved Since the time of LER 93-021 development (January 1994), improvements have been made to the corrective action program and to the program for controlling written communications with the NRC.
1) PAP-1608, " Corrective Action Program," has' superseded PAP-0606,
" Condition Reports," (which was in effect at the time of the LER 93-021 investigation) and the investigation associated with a reportable event is assigned to a person trained in root cause evaluation techniques, and no longer automatically assigned to the RAS Compliance Unit. The improved program requires the most appropriate section to investigate the reportable event and interface with the compliance engineer responsible for preparation of the associated LER. This process allows the assigned investigating section to focus on resolution of the technical issues and the Compliance engineer to focus on LER preparation in accordance with 10 CFR 50.73 requirements.
2) PAP-0611, "NRC Conatunications," effective July 25, 1995, now clearly delineates responsibilities and accountability in the review process for outgoing correspondence to the NRC, and draft copies of LERs are currently marked with the appropriate sections identified so that reviewers know what their specific verification / concurrence 4 k responsibilities are regarding LER content.
c
.
-u~ . -- _ . - . . , - - . _ - . . , , .
. ..
. .
PY-CEI/NRR-2101L Enclo2ure Page 3 of 3 I j Corrective Steos That Will Be Taken To Avoid Further Violati SD.E The compliance engineer, compliance' supervisor, and the RAS manager responsible for the preparation and submission of LER 93-021 are not presently assigned to any of those positions; however, the current. RAS manager, Compliance supervisor, and compliance engineers have discussed the significance of the
- issue, its cause and contributing factors, and the importance of clear and accurate reporting.
Since the time LER 93-021 was written, the RAS Compliance Unit _and the RAS manager positions have been restaffed. Methods of developing LER responses-(e.g. , review' process enhancements in PAP-0611) and ownership of issues (e.g.,
investigation assignments in PAP-1608) have been addressed and have resulted in .
improved LER content. )
The issues addressed by LCR.93-021 were substantially j more complex than the technical and regulatory issues typically addressed in LERs. Based on the level of scrutiny that LERs now receive from both internal l and external sources on a continuing basis, and improvements in the method of developing LERs, the actions already taken are considered to be sufficient to preclude recurrence of this violation.
Date When Full'Comoliance Will be Achieved Full compliance will be achieved by December 20, 1996, upon submittal of a supplement to LER 93-021
)
The following table identifies those actions which are considered to be regulatory commitments. Any other actions discussed in this document represent intended or planned actions, are, described for the NRC's information, and are not regulatory commitments.
...............................................................................
Commitments
,
...............................................................................
1. Full compliance will be achieved by December 20, 1996, upon submittal of a supplement to LER 93-021.
............................................................ ................... j (