IR 05000440/2024005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005)
ML24234A282
Person / Time
Site: Perry, 07200069  FirstEnergy icon.png
Issue date: 08/22/2024
From: James Beavers
NRC/RGN-III/DORS/RPB2
To: Penfield R
Vistra Operations Company
References
IR 2024005
Download: ML24234A282 (1)


Text

SUBJECT:

UPDATED INSPECTION PLAN FOR PERRY NUCLEAR POWER PLANT (REPORT 05000440/2024005)

Dear Rod Penfield:

The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Perry Nuclear Power Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

The NRC plans to perform Inspection Procedure (IP) 71002, License Renewal Inspection, and IP 71003, Post-Approval Site Inspection for License Renewal, during this period.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).August 22, 2024 Please contact me at 630-829-9593 with any questions you have regarding this letter.

Sincerely, James Beavers, Acting Chief Reactor Projects Branch 2 Division of Operating Reactor Safety Docket Nos. 05000440 and 07200069 License No. NPF-58 Enclosure:

Inspection Plan cc: Distribution via LISTSERV Signed by Beavers, James on 08/22/24