Millstone Power Station, Units 2 and 3 - U.S. Nuclear Regulatory Commission Material Control and Accounting Program Inspection Report No. 05000336/2014404 and 05000423/2014404 Public Document
ML14295A200
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 10/22/2014
From: Powell R J
Division Reactor Projects I
To: Heacock D A
Dominion Resources Services
References
IR 2014404
Download: ML14295A200 (4)


Text

October 22, 2014

Mr. David President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT: MILLSTONE POWER STATION, UNITS 2 AND 3 - U.S. NUCLEAR REGULATORY COMMISSION MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT NO. 05000336/2014404 AND 05000423/2014404

Dear Mr. Heacock:

On September 17, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Millstone Power Station. The NRC inspectors discussed the results of this inspection with Mr. Stephen Scace and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.

The inspectors did not identify any findings or violations with more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. Mr. David A Heacock 2 If you choose to provide a response, and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-

Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,/RA by Len Cline Acting for /

Raymond J. Powell, Chief Technical Support and Assessment Branch Division of Reactor Projects Docket Nos. 50-336, 50-423 License Nos. DPR-65, NPF-49

Nonpublic

Enclosure:

NRC Inspection Report 05000336/2014404 and 05000423/2014404]

w/Attachment:

Supplemental Information (CONTAINS (OUO-SRI))

cc w/encl; w/OUO-SRI P. Baumann, Security Department Manager J. Semancik, Director, CT Dept of Energy and Environmental Protection cc w/o encl; w/o OUO-SRI Distribution via ListServ Mr. David A Heacock 2 If you chose to provide a response, and security-related information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,/RA by Len Cline Acting for /

Raymond J. Powell, Chief Technical Support and Assessment Branch Division of Reactor Projects

Docket Nos. 50-336, 50-423 License Nos. DPR-65, NPF-49 Nonpublic

Enclosure:

NRC Inspection Report 50555336/2014404 and 05000423/2014404

w/Attachment:

Supplemental Information (CONTAINS (OUO-SRI)) cc w/o encl; w/o OUO-SRI: (see attached Distribution) cc w/encl; w/OUO SRI (see attached Distribution) DOCUMENT NAME: \\nrc.gov\nrc\R1\Office\DRP\BRANCH TSAB\MC&A\Inspection Reports\2014\MILLSTONE\MIL_MCA_2014404_Public.docx ADAMS ACCESSION NO: SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available (M.D. 3.4 Non-Public A.3) OFFICE RI/DRP RI/DRP RI/DRS RI/DRP NAME N. Warnek R. McKinley/ss for A. Dimitriadis/dc for R. Powell/lc for DATE 10/14/14 10/21/14 10/14/14 10/22/14 OFFICIAL RECORD COPY Letter to Mr. David from Raymond J. Powell dated October 22, 2014

SUBJECT: MILLSTONE POWER STATION, UNITS 2 AND 3 - U.S. NUCLEAR REGULATORY COMMISSION MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT NO. 05000336/2014404 AND 05000423/2014404

Distribution w/o encl; w/o OUO-SRI: (via E-mail) D. Lew, DRA H. Nieh, DRP M. Scott, DRP R. Lorson, DRS J. Trapp, DRS B. Haagensen, DRP, RI L. McKown, DRP, RI J. Jandovitz, RI OEDO RidsNrrPMMillstone Resource RidsNrrDorlLpl1-1 Resource ROPreportsResource@nrc.gov Distribution w/encl; w/OUO_SRI: N. Warnek, DRP R. Powell, DRP R. McKinley, DRP M. Gray, DRS J. Ambrosini, DRP, SRI S. Chaudhary, DRS R. Albert, NSIR S. Coker, NSIR C. Johnson, NSIR B. Desai, DRS, RII R. Skokowski, DRS, RIII M. Haire, DRS, RIV