Forwards Comments on Jr Benjamin & Assoc Review of Revised Millstone Unit 3 Probabilistic Safety Study Seismic Fragility. Seismic Hazard Analysis Contained in Probabilistic Safety Study Reevaluated.Info Not Current
ML20101J405
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/11/1984
From: Counsil W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20101J408 List:
References
B11390, NUDOCS 8412310011
Download: ML20101J405 (2)


Text

w

, N UTIUTIES cene, i ome.. . seioen s -e.i. seriin. Connecticut I '

c P.o. BOX 270 HARTFORD. CONNECTICUT 06141-0270 k ' J s E S E co.,,C (203) 665-5000 December 11,1984 Docket No. 50-423 B11390 Director of Nuclear Reactor Regulation Mr. B. J. Youngblood, Chief Licensing Branch No.1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Reference:

(1) B. J. Youngblood to W. G. Counsil, Transmittal of Contractors Draft Report on Millstone-3 Probabilistic Safety Study (PSS) and Request for Additional Information on PSS Seismic Analysis dated September 26,1984.

Dear Mr. Youngblood:

Response to Jack R. Benjamin & Associate's Review Comments on Revised Millstone Unit 3 Probabilistic Safety Study Seismic Fragility and Response to Request for AdditionalInformation on the PSS Seismic Analysis - Question 720.92 Reference (1) transmitted copies of the following draft reports prepared by the Staff's contractors as part of the review of the Millstone Unit 3 Probabilistic Safety Study (PSS).

(1) "A Review of the Millstone - 3 Probabilistic Safety Study," prepared by Lawrence Livermore Laboratory, May 30,1984.

l (2) " Preliminary Review and Evaluation of the Millstone - 3 Probabilistic l Safety Study," prepared by Brookhaven National Laboratory, December 19, 1983.

(3) " Containment Failure Matrix and Radiological Source Term for the Millstone - 3 DES," prepared by Brookhaven National Laboratory, April 3, 1984.

Additionally, in Reference (1), the Staff requested clarification regarding our response to Question 729.77. Please note this new request was numbered 720.92 in error. A previous question from the Reliability and Risk Assessment Branch l was also numbered 720.92. Enclosure 2 contains Northeast Nuclear Energy l Company's response to Question 720.92.

pel 8412310011 841211 ,

PDR ADOCK 05000423 A PDR

a

_2_

Northeast Nuclear Energy Company's response was requested within three weeks of the transmittal date of Reference (1). We did not receive the request until October 10,1984. Ms. E. L. Doolittle was unavailable to discuss our request for additional response time and the matter was discossed with Mr. Paul O' Conner, acting Project Manager during Ms. Doolittle's absence. A due date was not established, however, it was agreed that an extension of time was in order.

Northeast Nuclear Energy Company herein submits (Enclosu e 1) for the Staff's consideration our comments on the Review of the Revised Millstone Unit No. 3 Probabilistic Safety Study Seismie Fragility prepared for Lawrence Livermore National Laboratory by Jack R. Benjamin & Associates (Appendix A to Report (1) above). We would like to reiterate that the seismic hazard analysis contained in the PSS has been subsequently reevaluated and submitted to NRC, therefore, Section 4.1.1 of Report (1) does not reflect current information.

If you have any questions related to the information provided herein, please contact our licensing representative directly.

. Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY, et. al.

BY NORTHEAST NUCLEAR ENERGY COMPANY, Their Agent 8Z(M?,d4 W. G. Counsil Senior Vice President ec: Mr. Nilesh Chockshi, NRC, Structural and Geotechnical Engineering Branch Mr. Leon Reiter, NRC, Geosciences Branch Mr.' Ashok C. Thadani, Reliability and Risk Assessment Branch STATE OF CONNECTICUT )

) ss. Berlin COUNTY OF HARTFORD )

Then personally appeared before me W. G. Counsil, who being duly sworn, did state that he is Senior Vice President of Northeast Nuclear Energy Company, an Applicant herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Applicants herein and that the statements contained in said information are true and correct to the best of his knowledge and belief.

Of5s, J 62n#/bn ) ,

tary I)blic 4 Com=ssion Expires March 31,1939 .