Special Rept 97-02:on 970714,fire Suppression Sys Required by Fire Protection Plan Out of Svc for Greater than Fourteen Days.Two Continuous Fire Watches Put in Place as Compensatory Measures as Required by CR-3
ML20217Q285
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/22/1997
From: Grazio R
FLORIDA POWER CORP.
To:
NRC
References
3F8097-33, 97-02, 97-2, NUDOCS 9709020218
Download: ML20217Q285 (2)


Text

_ _ _ _ _ _ _ - - _ _ ._

Florida 97 mru 27 P1 :23 ERWar

?:=s':,'

August 22, 1997 3F8097-33 U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street S.W.

Suite 23T85 Atlanta, Georgia 30303 Attn Regional Administrator

Subject:

Special Report 97-02, Fire Suppression System Inoperability Dear Sir Please find the attached Special Report 97-02 which is submitted in accordance with the Florida Power Corporation Nuclear Operations Fire Protection Plan.

Sincerely,

  1. 7 M

?X 0

/axw- - ,

R.E.Grbio Director, Nuclear Regulatory Affairs REG /SCP:ff

\ kI\

Attachment xc: Regional Administrator, Region II NRR Project Manager Senior Resident Inspector kh -

9709020210 970822 PDR 8

ADOCK 05000302 PDR CRTSTAL RIVER INERGT COMPLEX: 157so w rewn ur. se e civ.ta n.n. ne s'. p4:s etes e osti tes s4ss A !!onten Progreen Cenpany I- .

o *

, , U. S. Nuclear Regulatory Commission 3P0897-33 Page 2 of 2 ,

SPECIAL REPORT 97-02 FIRE SUPPRESSION SYSTEN REQUIRED BY THE FIRE PROTECTION PLAN OUT OF SERVICE FOR GREATER TNAN-FOURTEEN DAYS This Special Report provides information concerning the cauae and corrective action for inoperability of the Intermediate Building 119' elevation sprinkler system.

The Intermediate Building Sprinkler System was taken out of service on July 14, 1997. It was taken out to repair several small leaks at threaded fittings. Actual repair was accomplished

.by replacing the threaded fittings with butt welded fittings.

The work was scheduled and performed under work request #0340602.

Two continuous fire watches were put in place as compensatory measures as required by the CR-3 Fire Protection Plan. -The documentation for one of the fire watches has been located, however, the documentation for the second fire watch has not been located. . Interviews with personnel involved with the fire watch have confirmed-that the fire watch was put in place as required.

A Precursor Card, CR-3's process for identifying, documenting, evaluating, correcting and trending adverse conditions, has been written regarding the fire watch documentation.

In addition, a Precursor Card has been written to address the cause and corrective action associated with the sprinkler system

-being inoperable for greater than the 14 days allowed by the CR-3 Fire Protection Plan.

.The sprinkler system was returned to service on August 5, 1997.