3F0496-30, Special Rept 96-02:on 960313,fire Detection Zones Required by Fire Protection Plan Out of Svc for Greater than Fourteen Days.Hourly Fire Watch Established

From kanterella
Jump to navigation Jump to search
Special Rept 96-02:on 960313,fire Detection Zones Required by Fire Protection Plan Out of Svc for Greater than Fourteen Days.Hourly Fire Watch Established
ML20108A053
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/26/1996
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0496-30, 3F496-30, 96-02, 96-2, NUDOCS 9605020085
Download: ML20108A053 (2)


Text

4 l

.< l Florida Power CCRPORATION i Docket Na IEVE2 April 26, 1996 3F0496-30 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Special Report 96-02 c

Dear Sir:

Please find the attached Special Report 96-02 which is submitted in accordance with the Florida Power Corporation Nuclear Operations Fire Protection Plan, Revision 12, Table 6.5c.

Sincerely,

. . Beard, Jr.

Sen or Vice President Nuclear Operations PMB/SCP:ff Attachment xc: Regional Administrator, Region II NRR Project Manager Senior Resident Inspector

/

nn -

9605020085 960426 PDR ADOOK0500g2 1 S

CRYSTAL RNER ENERGY COMPLEX: 15760 W Power une St . Crystal Ner, Florida 344286708 (352) 7956486 A Florida Progress Company l

i i \

! 'U. S. Nuclear Regulatory Commission i l . 3F0496-30 l Tage 2 of 2 i

SPECIAL REPORT 96-02 FIRE DETECTION ZONES REQUIRED BY THE FIRE PROTECTION PLAN OUT OF SERVICE FOR GREATER THAN FOURTEEN DAYS This Special Report provides information concerning the cause and corrective action for inoperability of Reactor Coolant Pump fire detection zones #23 and

  1. 24. 1
On March 13, 1996, Florida Power Corporation's (FPC) Crystal River Unit 3 (CR-3) was shutdown and defueled. At 1210, fire detection system zones #23 and #24 were removed from service. These zones consist of thermal detectors in the immediate vicinity of the four Reactor Coolant Pump Motors. This removed the capability for automatic fire detection within the 'D' rings. These zones were removed from service to facilitate removal and replacement of the 'A' RCP motor. At that time, Fire Protection Plan Actions 1A.1 and 1A.2 were entered. Action 1A.1 requires establishing an hourly roving fire watch patrol within one hour. Action 1A.2 requires equipment restoration to service within 14 days or the submission of a Special Report within the next 30 days. Following determination that the two fire detection zones were out of service, an hourly roving fire watch was .

established. l This report is being submitted because the affected fire detection zones remained out of service for greater than 14 days. The significance of this event was minimal. The affected zones were located in the immediate vicinity of the RCP motors, however the risk of fire was low at the time since the motors were shutdown. The cable tray Protect-0-Wire thermal detection system in the reactor building outside of the 'D' rings was not affected and continued to operate. The reactor building was manned almost continuously and the Class III standpipe suppression system was in service.

Fire detection zones #23 and #24 were returned to service on April 22, 1996.

l a

i