Special Rept 90-04:on 901015,portion of Mounting Platform for Triaxial Peak Accelograph on Piping on Top of Steam Generator Melted
ML20062G116
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/21/1990
From: Boldt G
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F1190-13, 90-04, 90-4, NUDOCS 9011280400
Download: ML20062G116 (2)


Text

. ._ - , .. - ..

q s e- .

I

  1. ee'. e.e Power C 0RPOR ATION

?

! Crystal River Unit 3 Docket ho, 50-302 j

November 21, 1990 i

3F1190-13 U. S. Nuclear Regulatory Commission '

Attention: Document Control Desk Washington, D. C. 20555 l

Subject:

Special Report 90-04 l

Dear Sir:

Enclosed is Special . Report 90-04 which -is submitted in accordance -

with Technical Specification 3.3.3.3.

Sincerely,.

G. L. Boldt Vice President, Nuclear Production.

WLR: mag Enclosure xc: Regional Administrator, Region II Senior Resident Inspector

.i 9011280400 901121 '

PDR S

ADOCK 05000302 f PDC i(\

POST OFFICE BOX 219

  • CRYSTAL nlVER, FLORIDA 326240219 + (904) 563-2943 A Florida Progress Company '

f

- . s ...

t.

}PECIAL REPORT 90-04 ls l This Special Report provides information'concerning the cause and  :

L corrective actions for failure of the Seismic Monitoring Instrumentation-located on the piping at the top of the Steam Generator-as required'by ,

Technical Specifications 3.3.3.3 and 6.9.2. This Report is being written because the Seismic Monitoring Instrumentation has been . inoperable for more than 30 days.

On October 15, 1990, during a routine inspection of-the Reactor Building, Florida Power Corporation (FPC) noticed a portion of the mounting platform for the Triaxial Peak Accelograph on the piping at the top of the Steam. -

Generator : had melted.. -The p1atform is composed of several . sandwiched layers. One layer composed- of. plexiglass had: partially E melted.

Apparently this 1ayer.of plexiglass materi_al was incorrectly chosen ~ for installation by utility. technicians during the .last refueling outage in June 1990. A contributing cause-is the lack of information in procedures concerning what material is required for the . seismic monitor platform.

FPC corrective actions include repairing the ' platform and updating-procedures. FPC has been unable to repair the platform due to material unavailability. The material is being orderediand should be installed during Refuel 8. To prevent recurrence, procedures will be revised to assure the correct material is clearly identified. ; Extra material will'-